Attachment 4 QASP Ambulance Final.docx
DOCX document 69 KB Posted
- Solicitation number
- 36C24524R0030
About this file
This document is a Quality Assurance Surveillance Plan (QASP) that outlines the performance standards and monitoring methods the government will use to evaluate the contractor's performance for a federal contract opportunity.
The key details are:
- The QASP defines what will be monitored, how monitoring will occur, who will conduct the monitoring, and how results will be documented. It allows the government to be objective, fair, and consistent in evaluating the contractor's performance.
- The government roles and responsibilities include the Contracting Officer (CO) and Contracting Officer's Representative (COR) who will oversee surveillance activities.
- The contractor is responsible for meeting all contract terms and conditions. The QASP lists performance standards, acceptable quality levels, and surveillance methods the government will use to evaluate performance.
- The document provides sample performance reports, rating criteria, and procedures for documenting and addressing any performance issues.
The related federal contract opportunity is for "V225--A Maryland Health Care System (VAMHCS) Ground Ambulance Transportation Service" with a solicitation number of 36C24524R0030. Proposals are due by 3:00PM EST on 4/25/2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02 36C24524R0030 0001.pdf | ||
| Solicitation Attachment - Past Performance Questionnaire.pdf | ||
| 36C24524R0030.docx | DOCX document | |
| P07 WAGE DETERMINATIONS 2015-4265 REV25 Baltimore.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
The contractor will be evaluated in accordance with the following:
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored?
· How monitoring will take place.
· Who will conduct the monitoring?
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO:
Organization or Agency: Department of Veterans Affairs
b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR:
Organization or Agency: Department of Veterans Affairs
3. CONTRACTOR REPRESENTATIVES
The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.
Primary:
Alternate:
Quality Assurance Surveillance Plan (QASP)
4. PERFORMANCE STANDARDS
The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.
The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
5. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. PERIODIC SAMPLING. Inspections scheduled and reported quarterly per COR delegation or as needed.
b. RANDOM SAMPLING. Inspections scheduled and reported quarterly per COR delegation or as needed.
c. Verification and/or documentation provided by Contractor. Tasks and Deliverables shall be met by the vendor per the PWS.
6. SAMPLE QASP PERFORMANCE REPORT DATE:
| Task |
| PWS |
Reference
| Standard |
| Acceptable Quality Level |
| Method of Surveillance |
Provide on- time ambulance services
| Section 4.5.1.9 |
| Scheduled patient pick-ups shall not deviate more than 15 minutes past scheduled pick-up time for scheduled |
orders
| 97% |
| Customer Feedback |
| Incident Reporting |
| Section 4.8 |
| The contractor shall notify the Program Manager, Beneficiary Travel Department, of any accidents and/or safety problems that occur while the patient is being transported. This notification shall occur within one (1) hour by telephone. A written report of the incident shall be delivered to the Program Manager, Benefits Management, by the close of business of the next working day. |
| 97% |
| Customer Feedback |
| Invoice Reports |
| Section 4.9 |
| Provide a monthly invoice including secondary documentation in accordance with Section 4.10 of the PWS |
| 95% |
| 100% inspection |
of monthly invoices/reports
The table below is a sample that can be tailored – note that the table must identify where in the PWS the standards are found for monitoring performance. Check the MSO Customer Resource Center for approved mandatory QASPs.
7. CPAR RATINGS ASSIGNED TO QASP ITEMS:
Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used (Reference: CPARS User Manual https://www.cpars.gov/pdfs/CPARS-Guidance.pdf p. A2-1):
| EXCEPTIONAL: |
| Performance meets contractual requirements and exceeds many to the |
Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also there should have been NO significant weaknesses identified.
| VERY GOOD: | |
| Performance meets contractual requirements and exceeds some to the | Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective. |
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also there should have been NO significant weaknesses identified.
| SATISFACTORY: |
| Performance meets contractual requirements. The contractual performance of the element or sub- element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also there should have been NO significant weaknesses identified.
| MARGINAL: | |
| Performance does not meet some contractual requirements. The contractual | performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. |
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g. Management, Quality, Safety or Environmental Deficiency Report or letter).
| UNSATISFACTO RY: | ||
| Performance does not meet most contractual requirements and recovery | is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective. | |
| Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or | Environmental Deficiency Reports, or letters). |
8. DOCUMENTING PERFORMANCE
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR).
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Report (CR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CR in writing. The CR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.
Any CRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO. See Sample CR on the following page.
9. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP
SIGNED:
COR NAME/TITLE DATE
SIGNED:
CONTRACTOR NAME/TITLE DATE
CONTRACT REPORT
| 1. CONTRACT NUMBER |
| 2. REPORT NUMBER FOR THIS ISSUE |
| 3. TO: (Contracting Officer) |
| 4. FROM: (Name of COR) |
5. DATES
| a. CR PREPARED |
| b. RETURNED BY CONTRACTOR: |
| c. ACTION COMPLETE |
6. Issue Identified (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)
| 7. SIGNATURE OF COR |
| Date: |
| 8. SIGNATURE OF CONTRACTING OFFICER |
| Date: |
| 9a. TO (Contracting Officer) |
| 9a. FROM (Contractor) |
10. CONTRACTOR RESPONSE AS TO CAUSE AND ACTIONS TO PREVENT
RECURRENCE. (Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)
| 11. SIGNATURE OF CONTRACTOR REPRESENTATIVE |
| Date: |
12. GOVERNMENT EVALUATION.
13. GOVERNMENT ACTIONS
14. CLOSE OUT
| NAME |
| TITLE |
| SIGNATURE |
| DATE |
CONTRACTOR NOTIFIED
COR
CONTRACTING OFFICER