Attachment_4_Pile_Drive_Report_Form2.pdf
PDF 117 KB Posted
- Solicitation number
- 2024-QQ-275
- Issued by
- Sarasota County, Siesta Key CDP, Florida
About this file
The document is a Pile Drive Report form from Sarasota County, designed to track detailed information about pile driving activities for navigational aid repairs in Sarasota Bay and Lemon Bay. The form provides a structured template for contractors to record critical installation data, including marker ID, latitude/longitude coordinates, piling type and length, driving method, pile embedment depth, substrate composition, water depth, equipment used, and the length of any excess pile removed. The form is intended to be completed for each pile installation during the project, with a certification statement at the bottom affirming the accuracy of the recorded information.
The form itself does not contain specific pricing, funding details, or contract terms, but it is part of the documentation for a county-level navigational aid repair project. The form's last updated date is March 24, 2023, suggesting recent development or revision. Its standardized format indicates a systematic approach to documenting marine infrastructure installation, which is crucial for maintaining accurate records of navigational marker repairs in the Sarasota County area. The form allows for tracking up to three separate pile driving instances, providing comprehensive documentation for each installation location.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pile Drive Report Project Name
Contractor
Installation Date
Marker ID Lat/Long Piling Type/Length Driving Method Pile Embedment
Depth
Substrate Water Depth Equipment Used Length of Excess Pile Removed
Marker ID Lat/Long Piling Type/Length Driving Method Pile Embedment
Depth
Substrate Water Depth Equipment Used Length of Excess Pile Removed
Marker ID Lat/Long Piling Type/Length Driving Method Pile Embedment
Depth
Substrate Water Depth Equipment Used Length of Excess Pile Removed
I certify that all the information above is to the best of my knowledge and belief true, correct, and complete.
Signature Date
Last Updated: March 24, 2023
| Project Name: |
| Contractor: |
| Installation Date: |
| Marker IDRow1: |
| LatLongRow1: |
| Piling TypeLengthRow1: |
| Driving MethodRow1: |
| Pile Embedment DepthRow1: |
| SubstrateRow1: |
| Water DepthRow1: |
| Equipment UsedRow1: |
| Length of Excess Pile RemovedRow1: |
| Marker IDRow1_2: |
| LatLongRow1_2: |
| Piling TypeLengthRow1_2: |
| Driving MethodRow1_2: |
| Pile Embedment DepthRow1_2: |
| SubstrateRow1_2: |
| Water DepthRow1_2: |
| Equipment UsedRow1_2: |
| Length of Excess Pile RemovedRow1_2: |
| Marker IDRow1_3: |
| LatLongRow1_3: |
| Piling TypeLengthRow1_3: |
| Driving MethodRow1_3: |
| Pile Embedment DepthRow1_3: |
| SubstrateRow1_3: |
| Water DepthRow1_3: |
| Equipment UsedRow1_3: |
| Length of Excess Pile RemovedRow1_3: |
| Date: |
File details come from the government source that posted it. Updated .