This document includes a past performance evaluation template for a federal solicitation. The solicitation seeks firms to add HVAC and insulation systems to Building 1133 at Minot Air Force Base, including replacing bay lighting and installing a direct digital control system. Work will be done according to applicable standards using approved methods and includes 10% site work, 40% architectural, 30% mechanical, and 20% electrical. The Air Force is requesting past performance evaluations from references using the template to rate offerors' performance on prior contracts in areas such as management, quality control, scheduling, and responsiveness. Evaluations should be sent to two Air Force contacts at the provided phone numbers and email addresses.

View the file

Other files for this federal contract opportunity

Other files attached to HVAC & Insulation B1133, newest first.
File Type Posted
Attachment 6 - Section L - Instructions to Offerors_HVAC 1133.pdf PDF
Attachment 2 - Drawings.pdf PDF
Attachment 5 - Financial Reference.pdf PDF
Attachment 3 - DBA Wage Determination_ND20200031.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 7 - Section M - Evaluations_HVAC 1133.pdf PDF
Solicitation - FA452820R0004.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCE SELECTION SENSITIVE IAW FAR 3.104 WHEN FILLED IN

Attachment 4

FA4528-20-R-0004

PAST PERFORMANCE INFORMATION (PPIF)

A. GENERAL INFORMATION:

Contractor’s Name: __________________ Telephone: ___________________________ Address: __________________________ Fax Number: _________________________ __________________________ Point of Contact: ______________________

Submitting Survey as Prime or Sub-Contractor (please circle one) If submitting as Sub-Contractor, Prime Contractors Name:___________________________ Address: __________________________ Fax Number: _________________________ __________________________ Point of Contact: ______________________

Project Title and Detailed Description of Work: ______________________________________________

Contract Number Provided by Offeror: ___________________ Dollar Amount: ________

Contract Period or Dates of Performance Provided by Offeror: ______________________

Contractor performed as the Prime Contractor Sub-Contractor Key Personnel.

B. RESPONDENT INFORMATION:

Name and Title of Evaluator: ____________________________

Company Name: ______________________________________

Address: _____________________ Telephone Number: ___________________ _____________________________ Fax Number: ______________________ _____________________________ Email Address: ______________________

C. SEND COMPLETED SURVEY FORM TO:

5 CONS/PKA, 165 Missile Avenue, Minot AFB, ND 58705 ATTN: Vanessa Natividad and James Moore FAX: (701) 723-3055 EMAIL: vanessa.natividad@us.af.mil and james.moore.45@us.af.mil DUTY PHONE: (701) 723-2139 and (701) 723-4674

D. PERFORMANCE INFORMATION: Choose the appropriate letter on the scale (E, G, S, M, U, and N) that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF M or U.

E G S M U N

Exceptional Very Good Satisfactory Marginal Unsatisfactory Neutral

Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

Performance meets contractual requirements with some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor was effective.

Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor were satisfactory.

Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions.

The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Performance was not observed or not applicable to the current effort being reported against.

CONTRACTOR’S NAME: _______________ CONTRACT NUMBER: _______________

Note: Include this information on each page of the questionnaire form to ensure there is no mix up in information among contracts surveyed for respective primes/subs, etc.

Place an “X” in the appropriate column using the definitions matrix above.

The contractor: E G S M U N

1. Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.

2. Demonstrated ability to hire, maintain, and replace, if necessary, qualified personnel during the contract period.

mailto:vanessa.natividad@us.af.mil mailto:james.moore.45@us.af.mil

The contractor: E G S M U N

3. Delegated authority to project managers and supervisors commensurate with contract requirements.

4. Home office participated in solving significant local problems.

5. Followed approved quality control plan.

6. Provided effective quality control and/or inspection procedures to meet contract requirements.

7. Corrected deficiencies in timely manner and pursuant to their quality control procedures.

8. Provided timely resolution of contract discrepancies.

9. Identified problems as they occurred.

10. Suggested alternative approaches to problems.

11. Displayed initiative to solve problems.

12. Developed realistic progress schedules.

13. Met established project schedules.

14. Provided timely resolution of warranty defects.

15. Was responsive to contract changes.

16. Provided adequate project supervision.

17. Obtained consent of surety for increases in bonding as work-in-progress increased.

18. Paid subcontractors/suppliers in a timely manner.

19. Provided accurate and complete line item cost proposals including all aspects of work required for each task.

20. Cooperated with Government personnel after award.

21. How would you rate the contractor's overall performance?

22. Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.”

YES/NO

23. Would you award another contract to this contractor? If not, explain in “remarks.”

YES/NO

24. Is the contractor rated in CCASS? YES/NO

CONTRACTOR’S NAME: ___________________ CONTRACT NUMBER ______________

Remarks:______________________________________________________________________

File details come from the government source that posted it. Updated .