Attachment 4_OSPREY_BLANK SOS.xls

XLS spreadsheet 81 KB Posted

Attached to
DRYDOCK: USCGC SWORDFISH & OSPREY DD FY26
Solicitation number
70Z08026QPBPL0007
Issued by

About this file

This document is a comprehensive pricing schedule and foreseeable cost worksheet for the United States Coast Guard Cutter (USCGC) OSPREY drydock availability in Fiscal Year 2026. The detailed pricing schedule includes 34 specific line items for maritime maintenance and repair services, such as hull plating preservation, shaft bearing renewal, propeller replacement, ventilation system maintenance, and various system upgrades, with each line item currently priced at $0.00. The foreseeable cost worksheet calculates additional expenses related to the drydock availability, including transportation, per diem, crew separation allowances, and other logistical factors, with a total evaluated quote price of $2,548.98.

The associated federal contract opportunity (Solicitation Number 70Z08026QPBPL0007) is a combined drydock repair solicitation for two Coast Guard cutters: USCGC SWORDFISH and USCGC OSPREY. The performance periods are 26 March 2026-19 May 2026 for SWORDFISH and 15 September 2026-17 November 2026 for OSPREY. The solicitation is issued by the Department of Homeland Security's US Coast Guard, with the drydock repair location specified as 102 Benedict St, Port Townsend, WA 98363. The pricing schedule suggests preparation for comprehensive maritime vessel maintenance and potential growth work, with provisions for additional labor and material markup.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC OSPREY (WPB-87) DRYDOCK AVAILABILITY FY2026
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Hull Plating (Side Scan), Ultrasonic TestingJOB1$0.00
O-002Ultrasonic Thickness Measurements, PerformJOB1$0.00
D-003U/W Body, Preserve, 100 percentJOB1$0.00
D-004Hull Plating Freeboard, Preserve, 100 PercentJOB1$0.00
D-005Decks, Exterior (Main Deck), PreserveJOB1$0.00
D-006Superstructure, Preserve, 100%JOB1$0.00
O-007Capastic Fairing, Depth Sounder, RenewJOB1$0.00
D-008Mast, Preserve (“100%”) – Contractor Interference RemovalJOB1$0.00
O-009Main Engine/Reduction Gear, RealignJOB1$0.00
D-010Intermediate Water-Lubricated Propulsion Shaft Bearings, RenewJOB1$0.00
D-011Aft Water-Lubricated Propulsion Shaft Bearings, RenewJOB1$0.00
O-012Intermediate Bearing Carriers, RenewJOB1$0.00
O-013Aft Bearing Carriers, RenewJOB1$0.00
D-014Propulsion Shafts, RenewJOB1$0.00
D-015Stern Tube Interior Surfaces, Preserve, 100 PercentJOB1$0.00
D-016Propellers, RenewJOB1$0.00
D-017Fathometer Transducer, RenewJOB1$0.00
D-018Speed Log, Skin Valve, RenewJOB1$0.00
D-019Ventilation System, Engine Room Supply and Exhaust Fan Assemblies, Clean and InspectJOB1$0.00
D-020Sea Water System, Perform MaintenanceJOB1$0.00
D-021Rudder Assemblies, RenewJOB1$0.00
D-022Stern Launch Door, Remove, Inspect and ReinstallJOB1$0.00
D-023Cathodic Protection/Zinc Anodes, RenewJOB1$0.00
D-024DrydockJOB1$0.00
D-025Temporary Services, Provide - CutterJOB1$0.00
D-026Sea Trial Performance, Support, ProvideJOB1$0.00
D-02724VDC Distribution System, UpgradeJOB1$0.00
D-028Unmanned Space Ventilation ModifyJOB1$0.00
D-029Fire Main Bleed Line, ModifyJOB1$0.00
D-030Fire Alarm Control Panel, ReplaceJOB1$0.00
D-031Grey Water Holding Tanks, Clean and InspectJOB1$0.00
D-032Sewage Holding Tanks, Clean and InspectJOB1$0.00
D-033Grey Water Piping, Clean and FlushJOB1$0.00
D-034Sewage Piping, Clean and FlushJOB1$0.00
O-00AComposite Labor Rate$0.00Hour0$0.00
D-00BGFP ReportNSPEANSP
O-00ZLaydays$0.00Day5$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00
Over and Above/Growth Work
The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered.
**Provide breakdown, as follows:Hour544$0.00
Over and Above/Growth Labor Rate
Unit Price: $________; Quantity: 544; Unit of Issue: Hour; Extended Price: $____________
Over and Above/Growth Material Markup/Handling Fee$20,955.00$0.00
Unit Price: $20,955.00; Quantity: 1; Unit of Issue: Percent ________%;
Extended Price: [$20,955.00 X percentage quoted]: $______________
Total Price for Over and Above/Growth$0.00

&C(4/7/2025) Rev-0 - Page &P of &N

Foreseeable Costs

FORESEEABLE COST WORKSHEET
USCGC OSPREYFY26
Contractor's Name:
The contractor shall fill-in all yellow labeled boxes below to determine their foreseeable costs. Please read all notes and headers of sections for instructions in completing this worksheet.
DISTANCE FACTORS FOR: 102 Benedict St, Port Townsend WA 98363
NAUTICAL MILES BASED ON ROUND-TRIP (TO AND FROM)
NUMBER OF DAYS OF AVAILABILITY64
(1) Port Engineer/COR Transportation: AIR TRAVEL
(Applicable if > 50 miles from PE address

(PE's desk location)

A. Number of CG Representatives from NESU:A=1
B. The number of round trips between the contractor's facility and NESUB=1
C. A multiplied by B:AxB=C=1
D. Travel cost per trip:D=
E. C multiplied by D =E, if >50 miles from NESU otherwise N/A.E=$0.00
(2) Port Engineer Transportation: CAR TRAVEL
A. Number of CG Representatives from NESU:A=1
B. Number of Driving miles Round-trip between the COR office and contractors facility:B=
C. Travel cost per driving mile (rate at $0.58 per mile)$0.580$0.00
(3) PER DIEM: (Applicable >50 miles CREW + PE)
A. Number of Ship's Crew & Port EngineerA=12
B. Total number of day(s) in drydock.B=66
C. Per diem cost at place of performance, per day: (if < 50 miles, enter "0" for all below)C=$0.00
C.1.1. Enter Lodging Daily Per Diem Rate
C.2.1. Enter Meals & Incidentals Total Daily Rate
C.2.1.1. Enter Meals & Incidentals First & Last Day of Travel Daily Rate
D. AxBxC= D: (if >50 miles from NESU)D=$0.00
(4) PER DIEM: (Applicable >50 miles Contracting Officer Travel & Per Diem. KO location is Norfolk, VA 23510)
A. Number of KO authorized travel:A=1
B. Total number of KO travel days:B=3
C. Transportation cost for KO travelC=
D. Per diem cost at place of performance, per dayD=$0.00
D.1.1. Enter Lodging Per Diem Rate
D.2.1. Enter Meals & Incidentals Total Daily Rate
D.2.1.1. Enter Meals & Incidentals First & Last Day of Travel Daily Rate
E. A [(B*D) + C] =E=$0.00
(5) CUTTER COST Operation Factors:
A. Round Trip Nautical Miles from the vessels pier to the contractors facility:A=0
B. Cutter Cost Factor Per Nautical Mile:B=$34.48
C. A multiplied by B= CC=$0.00
(6) FAMILY SEPARATION ALLOWANCES (FSA) Applicable if > 50 miles from Homeport - for crew with dependents only (Daily Rate $8.33). If less than 50 miles enter 0 for A below.
A. Number of Personnel entitled to Family Separation Allowance:A=9
B. Number of Days for Availability minus 30 days if availability is greather than 30 days:B=34
C. A multiplied by B = C (Daily FSA rate of $8.33)C=$2,548.98
(7) CREW TRANSPORTATION FOR HOME VISIT (Applicable after 31 consecutive days if > 50 miles from Homeport - for crew with dependents only
A. Number of Personnel (with dependents) entitled to HOME visit:A=9
B. Number of Homeport Visits:B=1
C Mileage to homeport = (Roundtrip Ticket Cost)C=
D. A multiplied by B, multiplied by C = D:C=$0.00
GRAND TOTAL
1. PE/COR Transportation (AIRFARE)$0.00
2. PE/COR Transportation (CAR)$0.00
3. Per Diem for Crew and PE/COR$0.00
4. Cutter Cost Operations Factors$0.00
5. Family Separation Allowance$2,548.98
6. Crew Transportation Home Visit$0.00
Total Cost of Distance Factors:$2,548.98
Total Contractor Quoted/Proposal Price:$0.00
TOTAL EVALUATED QUOTE/PRICE$2,548.98

Contractor enters name here Contractor shall utilize: https://nauticalcharts.noaa.gov/publications/docs/distances.pdf http://ports.com/sea-route/ Contractor shall utilize: https://www.gsa.gov/travel/plan-a-trip/transportation-airfare-rates-pov-rates-etc/airfare-rates-city-pair-program

Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 driving miles from the PE's homeport OR (2) Enter "0" if their dry dock is less than 150 driving miles from the PE's homeport.

Contractor will enter either (1) "0" if their dry dock is located less than 50 miles or more than 150 miles from the PE's homeport or (2) the total number of round trip driving miles if the contractor is located between 51 to 149 miles from PE's homeport.

Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates based on the location of their facility.

Contractor shall utilize: https://www.gsa.gov/travel/plan-a-trip/transportation-airfare-rates-pov-rates-etc/airfare-rates-city-pair-program

Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 miles from the KO's location in Norfolk, VA 23510 or (2) Enter "0" if their dry dock is less than 150 miles from the PE's homeport.

Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates Do Not Change this cell unless Drydock is less than 50 driving miles from Homeport. Then enter 0.

If contractor's facility is:

- located < 50 miles from the ship's homeport, enter $0.

- located > 51 miles but less than 149 miles from the ship's homeport, multiply round trip vehicle mileage by $0.58

- located > 150 miles from ship's homeport, utilize https://www.gsa.gov/travel/plan-a-trip/transportation-airfare-rates-pov-rates-etc/airfare-rates-city-pair-program

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009) Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it. Updated .