Attachment 4 - MSS.xls
XLS spreadsheet 58 KB Posted
- Attached to
- Replace Carpet at Bay Breeze Event Center Federal contract opportunity
- Solicitation number
- FA301023R0018
About this file
This document is a Material Submittals Schedule for a federal contract with the Department of the Air Force Air Education and Training Command to replace carpet at the Bay Breeze Event Center. The schedule outlines 21 items or descriptions of work requiring submittals from the contractor, including product data, shop drawings, samples, and warranties. It specifies the number of copies required for submittals and establishes due dates for initial submissions as well as dates for responses and resubmittals. Key deadlines include submittals being due 10 days following notice to proceed for items like tile carpeting, resilient flooring, and paint work. The schedule provides a framework for the contractor to receive design approvals from the contracting agency for materials and finishes before proceeding with installation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 11 - Questions and Answers.pdf | ||
| Solicitation Amendment - FA301023R00180002.pdf | ||
| Solicitation Amendment FA301023R00180002 SF 30.pdf | ||
| Solicitation Amendment FA301023R00180001 SF 30.pdf | ||
| Carpet Adhesive Pricing Sheet.pdf | ||
| Pre-Bid Site Visit - Replace Carpet BBEC - 20230803.pdf | ||
| Attachment 3 - Drawings.pdf | ||
| Solicitation - FA301023R0018.pdf | ||
| Attachment 1 - SOW.pdf | ||
| Attachment 2 - Specs.pdf | ||
| Attachment 6 - Manufacturer Carpet and Adhesive Pricing.pdf | ||
| Attachment 9 - Past Performance Reference List.pdf | ||
| Attachment 5 - USAF Carpet Ordering Guide Jan2022.pdf | ||
| Attachment 7 - Wage Det MS230050.pdf | ||
| Attachment 8 - Past Performance Questionnaire.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| 231011 | Project Title: | ||
| MAHG231011 Replace Carpet BBEC | Solicitation / Contract Number: |
FA301023R0018; Attachment #4
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||
| Number of Copies Required (if not electronically submitted) | Remarks | |||||||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Warranty-Manufacturer and/or Workmanship | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | ||||
| Notified | Contractor Resubmittal | Final Approval | ||||||||||||||||||||
| Approved | Disapproved | |||||||||||||||||||||
| 1 | HazMat Questionnaire | 3 | 3 | 5 Days Prior to Start Date | ||||||||||||||||||
| 2 | HazMat MSDS | 3 | 3 | 5 Days Prior to Start Date | Must be filled out if Contractor answers YES to to the HazMat questinnaire | |||||||||||||||||
| 3 | HazMat Reporting Entry Form | 3 | 3 | 5 Days Prior to Start Date | Submot Final Quantities | |||||||||||||||||
| 4 | HazMat Reporting entry Form | 3 | 3 | End of Contract | ||||||||||||||||||
| 5 | Recycling and Landfill Report | 3 | 3 | End of Contract | ||||||||||||||||||
| 6 | Warranty (Manufacture's) | 3 | 3 | End of Contract | ||||||||||||||||||
| 7 | 1-Year Warranty (Contractor's) | 3 | 3 | End of Contract | ||||||||||||||||||
| 8 | Digital Lock Set | 3 | 3 | 10 Days Following NTP | ||||||||||||||||||
| 8 | Section 096813-Tile Carpeting | 1 | 1 | 1 | 1 | 3 | 3 | 10 Days Following NTP | ||||||||||||||
| 8 | Section 096500-Resilient and Luxury Vinyl Tile | 1 | 1 | 1 | 1 | 3 | 3 | 10 Days Following Issuance of Award | ||||||||||||||
| 9 | Section 096813-Tile Carpeting | 1 | 1 | 1 | 1 | 3 | 3 | 10 Days Following Issuance of Award | ||||||||||||||
| 10 | Section 090170-Repair of Exterior Insulation Finish System | 1 | 1 | 3 | 3 | 10 Days Following NTP | ||||||||||||||||
| 9 | Section 062000-Finish Carpentry General | 1 | 1 | 1 | 1 | 1 | 1 | 10 Days Following NTP | ||||||||||||||
| 10 | Section 079200-Joint Sealants | 1 | 1 | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||
| 11 | Section 081113-Steel Frames | 1 | 1 | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||
| 12 | Section 082000-Wood Doors | 1 | 1 | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||
| 13 | Section 084010-Aluminum Doors and Frames | 1 | 1 | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||
| 14 | Section 092550-Gypsum Board Assemblies | 1 | 1 | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||
| 15 | Section 093013-Tile and Grout | 1 | 1 | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||
| 16 | Section 093050-Tile Setting Materials and Accessories | 1 | 1 | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||
| 17 | Section 095110-Acoustical Panel Ceilings | 1 | 1 | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||
| 18 | Section 096500-Resilient and LVT Flooring | 1 | 1 | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||
| 19 | Section 099100-Paint | 1 | 1 | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||
| 20 | Section 099323-Stains and Transparent Finishes | 1 | 1 | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||
| 21 | Section 123600-Countertops | 1 | 1 | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||
| 14 | ||||||||||||||||||||||
| 15 | ||||||||||||||||||||||
| 16 | ||||||||||||||||||||||
| 17 | ||||||||||||||||||||||
| 18 | ||||||||||||||||||||||
| 19 | ||||||||||||||||||||||
| 20 | ||||||||||||||||||||||
| 21 | ||||||||||||||||||||||
| 22 | ||||||||||||||||||||||
| 23 | ||||||||||||||||||||||
| 24 | ||||||||||||||||||||||
| 11 | Section 099000-Painting and Coating | 1 | 1 | 3 | 3 | 10 Days Following NTP |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)