Schedule of Material Submittals Print on Legal size paper ( 8 x 14 ).
Approved Disapproved
1 HazMat Questionnaire 1 5 Days Prior to Start Date
Provide the documents as required per the Environmental packet provided by Keesler AFB.
2 HazMat MSDS 1 1 5 Days Prior to
Start Date Provide the documents as required per the Environmental packet provided by Keesler AFB.
3 Hazmat Reporting Entry Form 1 1 1 5 Days Prior to
Start Date Provide the documents as required per the Environmental packet provided by Keesler AFB.
4 Recycling and Landfill Report 1 1 End of
Contract Provide the documents as required per the Environmental packet provided by Keesler AFB.
5 Warranty (Manufacturer's) 1 End of Contract
6 1-Year Warranty (Contractor) 1 End of Contract
7 Demolition Plan 1
2 Weeks Prior to Planned
Construction Start
8 Dust Control Plan 1
2 Weeks Prior to Planned
Construction Start
9 Record of Existing Conditions 1
2 Weeks Prior to Planned
Construction Start
10 Demolition Notificaton 1
2 Weeks Prior to Planned
Construction Start
11 Ozone Depleting Substance Receipts 1 As Required
12 Fill Gradation and Proctor Testing 1 As Required
13 Compaction Testing Results 1 As Required
14 Testing Lab Certifications 1 5 Days Prior to Start Date
Re tu rn S us pe ns e
D at e
Te ch ni ca l D at a
Te st
R ep or ts
D at e to
C iv il En gi ne er in g
Sa m pl es
Co lo r S el ec tio n
M an uf ac tu re r's R ec om m en da tio n
W ar ra nt y- M an uf ac tu re r a nd /o r W or km an sh ip
Ca ta lo g
D at a
Project Number:
MAHG21-1132
Project Title:
Demolish Building 4904
Solicitation / Contract Number:
[ enter here ]
Remarks
(To be completed by Project Engineer)
Li ne
N um be r
Re qu ire d
Su bm is si on D at e
Item or Description of Item, Contract Reference, Type of Submittal
Ce rt ifi ca te o f C om pl ia nc e
Sh op
D ra w in gs
Date Contractor Notified
(To be completed by Contract Administrator)
Su bm itt al
N um be rs
Co nt ra ct or R es ub m itt al
Fi na l A pp ro va l
Number of Copies Required (if not electronically submitted)
D at e Re ce iv ed in
C on tr ac tin g
Fi el d Re po rt s
O pe ra tin g In st ru ct io ns
Sc he du le s, L is tin gs , R ep or ts , P la ns