Schedule of Material Submittals Print on Legal size paper ( 8 x 14 ).

Approved Disapproved

1 HazMat Questionnaire 1 5 Days Prior to Start Date

Provide the documents as required per the Environmental packet provided by Keesler AFB.

2 HazMat MSDS 1 1 5 Days Prior to

Start Date Provide the documents as required per the Environmental packet provided by Keesler AFB.

3 Hazmat Reporting Entry Form 1 1 1 5 Days Prior to

Start Date Provide the documents as required per the Environmental packet provided by Keesler AFB.

4 Recycling and Landfill Report 1 1 End of

Contract Provide the documents as required per the Environmental packet provided by Keesler AFB.

5 Warranty (Manufacturer's) 1 End of Contract

6 1-Year Warranty (Contractor) 1 End of Contract

7 Demolition Plan 1

2 Weeks Prior to Planned

Construction Start

8 Dust Control Plan 1

2 Weeks Prior to Planned

Construction Start

9 Record of Existing Conditions 1

2 Weeks Prior to Planned

Construction Start

10 Demolition Notificaton 1

2 Weeks Prior to Planned

Construction Start

11 Ozone Depleting Substance Receipts 1 As Required

12 Fill Gradation and Proctor Testing 1 As Required

13 Compaction Testing Results 1 As Required

14 Testing Lab Certifications 1 5 Days Prior to Start Date

Re tu rn S us pe ns e

D at e

Te ch ni ca l D at a

Te st

R ep or ts

D at e to

C iv il En gi ne er in g

Sa m pl es

Co lo r S el ec tio n

M an uf ac tu re r's R ec om m en da tio n

W ar ra nt y- M an uf ac tu re r a nd /o r W or km an sh ip

Ca ta lo g

D at a

Project Number:

MAHG21-1132

Project Title:

Demolish Building 4904

Solicitation / Contract Number:

[ enter here ]

Remarks

(To be completed by Project Engineer)

Li ne

N um be r

Re qu ire d

Su bm is si on D at e

Item or Description of Item, Contract Reference, Type of Submittal

Ce rt ifi ca te o f C om pl ia nc e

Sh op

D ra w in gs

Date Contractor Notified

(To be completed by Contract Administrator)

Su bm itt al

N um be rs

Co nt ra ct or R es ub m itt al

Fi na l A pp ro va l

Number of Copies Required (if not electronically submitted)

D at e Re ce iv ed in

C on tr ac tin g

Fi el d Re po rt s

O pe ra tin g In st ru ct io ns

Sc he du le s, L is tin gs , R ep or ts , P la ns