MIL‐STD‐2191 Facility Certification – Procedure List, Rev(‐)
MIL‐STD‐2191 Facility Certification Quality Assurance Facility Review Checklist (Surface Ships)
Procedures 1 Governing Specifications Requirements Approval/Acceptance Welding 2
Welding Procedures for Steel Base Metal Repair MIL‐STD‐2191(SH), ACN1 5.1 and 14.1.1(a)
Approval of PQR data/Acceptance of WPS
Welding Procedures for Inconel Alloy 625 Cladding MIL‐STD‐2191 (SH), ACN1 5.1 and
14.1.1(a) Approval of PQR data/Acceptance of WPS
Welding Procedures for CuNi Sleeve Installation
NAVSEA Technical Repair Standard S9243‐ AW‐TRS‐011/SHAFT; and NAVSEA Technical Publication S9074‐AR‐GIB‐ 010/278
3‐4.11.4; and 4.2
Approval of PQR data/Acceptance of WPS
Welder Qualification MIL‐STD‐2191(SH), ACN1; and NAVSEA Technical Publication S9074‐AQ‐GIB‐ 010/248
5.2, 14.1.1(b);
and 5.2, 5.5
Review of welder records management procedure for compliance
Welder Workmanship Training Program NAVSEA Technical Publications S9074‐AQ‐ GIB‐010/248; and S9074‐AR‐GIB‐010/278
5.2.3.1, 5.6.8;
and 7
Approval of activity’s written welder workmanship training program
Receipt Inspection Procedure of Welding Filler Metal
MIL‐STD‐2191(SH), ACN1, and NAVSEA Technical Publication S9074‐AR‐GIB‐ 010/278
8; and 4.1.2,
5.3 Reviewed for compliance
Post Weld Heat Treatment Stress Relief Procedures (local and/or global) MIL‐STD‐2191(SH), ACN1 10.4.7 Reviewed for compliance
Welding Filler Metal Handling and Storage Procedures
NAVSEA Technical Publication S9074‐AR‐ GIB‐010/278 4.1.2 and 6.6 Reviewed for compliance
Maintenance of Welding Record System MIL‐STD‐2191(SH), ACN1 6 Reviewed for compliance Straightening
Hot Spotting Procedure for Straightening Shafts (if applicable)
MIL‐STD‐2191(SH), ACN1; and NAVSEA Technical Repair Standard S9243‐AW‐
TRS‐011/SHAFT
11; and 3‐4.8 Reviewed for compliance
Cold Peening Procedure for Straightening Shafts (if applicable)
MIL‐STD‐2191(SH), ACN1; and NAVSEA Technical Repair Standard S9243‐AW‐
TRS‐011/SHAFT
11; and 3‐4.8 Reviewed for compliance
MIL‐STD‐2191 Facility Certification – Procedure List, Rev(‐)
Surface Treatment
Shot Peening Procedures MIL‐STD‐2191(SH), ACN1; and NAVSEA Technical Repair Standard S9243‐AW‐
TRS‐011/SHAFT
13; and 3‐4, 3‐
4.7 Reviewed for compliance
Cold Rolling Procedure MIL‐STD‐2191(SH), ACN1; and NAVSEA Technical Repair Standard S9243‐AW‐
TRS‐011/SHAFT
12; and 3‐4.2, 3‐4.4, 3‐4.5, and 3‐4.6
Reviewed for compliance
Inspection
Nondestructive Testing Procedures
(VT/MT/PT/UT)
MIL‐STD‐2191(SH), ACN1; and NAVSEA Technical Repair Standard S9243‐AW‐
TRS‐011/SHAFT
7; and 3‐4.10, 3‐4.11.5 Reviewed for compliance
Notes:
1. During on‐site facility certification visit, NAVSEA representatives will verify the repair facility is physically able to handle shafting without damage, and is capable to perform and document a uniform controlled stress relief of shafting (MIL‐STD‐2191, ACN1 14.1.1(c)‐(d).
2. Welding, cladding, and post weld heat treatment stress relief procedures are to either reference a global distortion control procedure, or specify details within as required by MIL‐STD‐2191, ACN1.