Attachment 4 - JUBJ 03-6469 Repair East Perimeter Fence - 3052.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
FY24 JUBJ 03-6469 Repair East Perimeter Fence (Solicitation)
Solicitation number
FA330024R0042
Issued by

About this file

This document is an Attachment 4 - JUBJ 03-6469 Repair East Perimeter Fence - 3052.xlsx, which is a construction cost estimate breakdown for a federal contract opportunity to repair the east perimeter fence at Gunter Annex, Maxwell Air Force Base, Alabama.

The related federal contract opportunity is Solicitation Number FA330024R0042, titled "FY24 JUBJ 03-6469 Repair East Perimeter Fence (Solicitation)". The work consists of removing 3,100 feet of existing perimeter fence and replacing it according to the plans and specifications. The estimated magnitude of this project is between $1,000,000 and $2,000,000. The contract will be awarded by the Department of the Air Force, Air Education and Training Command.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTORDATEADDRESS
400 Cannon Street Maxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Repair East Perimeter Fence Gunter Annex$0.00
LOCATION (Work to be performed)PROJECT NUMBER/WORK ORDERWORK LOCATION
Gunter AnnexJUBJ 03-6469Repair East Perimeter Fence, Gunter Annex, Maxwell AFB
ITEMUNIT OF MEASUREQUANTITYMATERIAL/EQUIP. COSTSLABOR RATESOTHER
UNITAVERAGEDIRECTLINE
TOTALRATETOTALCOSTSTOTAL
DIVISION 1 (General Requirements)
Topographical survey, conventional, maximumAcre$0.00$0.00$0.00
DIVISION 2 (Site Work)$0.00$0.00$0.00
Demo Old FenceLF$0.00$0.00$0.00
Install New Cable Reinforced FenceLF$0.00$0.00$0.00
Intall New Non Cable Reinforced FenceLF$0.00$0.00$0.00
DIVISION 3 (CONCRETE$0.00$0.00$0.00
DIVISION 4 (MASONRY)$0.00$0.00$0.00
DIVISION 5 (METAL)$0.00$0.00$0.00
DIVISION 6 (WOOD AND PLASTICS)$0.00$0.00$0.00
DIVISION 7 (THERMAL AND MOISTURE PROTECTION)$0.00$0.00$0.00
DIVISION 8 (DOORS AND WINDOWS)$0.00$0.00$0.00
DIVISION 9 (FINISHES)$0.00
DIVISION 10 (SPECIALTIES)$0.00
DIVISION 11 (EQUIPMENT)$0.00
DIVISION 12 (FURNISHINGS)$0.00
DIVISION 13 (SPECIAL CONSTRUCTION)$0.00
DIVISION 14 (CONVEYING SYSTEMS)$0.00
DIVISION 15 (MECHANICAL)$0.00
DIVISION 16 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS)$0.00
$0.00$0.00$0.00
TOTAL$0.00$0.00$0.00$0.00
$0.00$0.00$0.00
Material Costs$0.00$0.00
Tax on Materials10%$0.00$0.00
TOTAL MATERIAL COST$0.00$0.00
$0.00$0.00$0.00
Labor Cost$0.00$0.00
Insurance & Tax on Labor20%$0.00$0.00
TOTAL LABOR COST$0.00$0.00
$0.00$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00
Total Material, Labor, Tax & Insurance$0.00$0.00
TOTAL DIRECT COSTS$0.00$0.00$0.00
$0.00$0.00$0.00
Overhead10%$0.00$0.00$0.00
Subtotal$0.00$0.00$0.00$0.00
Profit10%$0.00$0.00$0.00
Sub Total$0.00$0.00
TOTAL$0.00$0.00$0.00
Bonds2.5%$0.00$0.00
TOTAL$0.00$0.00$0.00
$0.00$0.00
I acknowledge the above cost estimate has been estimated to the best of my ability and means.

Signature: ______________________________________ Gov't Coord___________________________________

File details come from the government source that posted it. Updated .