Attachment 4 J14 Rail Track Maintenance.xlsx

XLSX spreadsheet 71 KB Posted

Attached to
Rail Track Maintenance
Solicitation number
W912D0-24-R-0013
Issued by

About this file

This document appears to be an attachment, titled "J14 Rail Track Maintenance.xlsx", related to a federal contract opportunity for rail track maintenance services at Fort Wainwright, Alaska.

The key details are as follows: The government intends to award a firm-fixed price requirements contract for the inspection, maintenance, service, and repair of the U.S. Army-owned railroad track system at Fort Wainwright. The contract will have a 12-month base period plus four 12-month option periods. This is a small business set-aside procurement. The contractor will be responsible for providing all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the required rail track maintenance activities, which include inspecting the track and switches, snow and vegetation removal, and various maintenance, repair, and replacement tasks. The document provides a detailed pricing schedule for the various line items.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

CLINPara. NumberRail Track MaintenanceUM
INSPECT RAILROAD TRACK AND ADJUST AND LUBE ALL SWITCHESEst UnitsUnit PriceTotal
00015.1.1/5.1.2Inspect Railroad Trackage and adjust and lube all the switchesMonthly12$ - 0$ - 0BASE51201a51201b51201c
TOTAL INSPECT AND ADJUST AND LUBE ALL SWITCHES- COSTS12$0.00
SNOW AND VEGETATION REMOVALEst UnitsUnit PriceTotal
00025.1.3Snow Rmoval, SwitchesTask36$ - 0$ - 0BASE51202a51202b51202c
00025.1.3Vegetation Removal, SwitchesTask12$ - 0$ - 0BASE51203a51203b51203c
00025.1.3.2Snow Removal, All Railway at A Track (CH&PP)Task6$ - 0$ - 0BASE51204a51204b51204c
00025.1.3.2Snow Removal, All Railway at E TrackTask3$ - 0$ - 0BASE51205a51205b51205c
00025.1.3Vegetation Removal, All RailwayTask2$ - 0$ - 0BASE51206a51206b51206c
TOTAL SNOW AND VEGETATION REMOVAL - COSTS59$0.00
MAINTENANCE REPAIR REPLACEEst UnitsUnit PriceTotal
00035.1.4Ballast (Replacement)Task120 CY$ - 0ERROR:#VALUE!BASE51101a51101b51101c
00035.1.4Ballast (Regulator)Task1000 LF$ - 0ERROR:#VALUE!
00035.1.4Rail CrossingsTask4$ - 0$ - 0BASE51102a51102b51102c
00035.1.4Road Crossing Surface Materials(wood)Task4$ - 0$ - 0BASE51104a51104b51104c
00035.1.4Road Crossing Surface Materials(Concrete)Task1$ - 0$ - 0BASE51105a51105b51105c
00035.1.4Road Crossing Surface Materials(rubber)Task1$ - 0$ - 0BASE51106a51106b51106c
00035.1.4CulvertsTask1$ - 0$ - 0BASE51107a51107b51107c
00035.1.4TiesTask50$ - 0$ - 0BASE51108a51108b51108c
00035.1.4Joint BarsTask8$ - 0$ - 0BASE51109a51109b51109c
00035.1.4Rails (includes bonded and grounded rails)Task4$ - 0$ - 0BASE51110a51110b51110c
00035.1.4Mud RailsTask1$ - 0$ - 0BASE51111a51111b51111c
00035.1.4Grade crossing warning signs and signalsTask1$ - 0$ - 0BASE51112a51112b51112c
00035.1.4Portable DerailsTask2$ - 0$ - 0BASE51113a51113b51113c
00035.1.4Bumper stopsTask2$ - 0$ - 0BASE51114a51114b51114c
00035.1.4Wheel stopsTask2$ - 0$ - 0BASE51115a51115b51115c
00035.1.4Turnouts-SwitchTask1$ - 0$ - 0BASE51117a51117b51117c
00035.1.4Turnouts-FrogsTask1$ - 0$ - 0BASE51118a51118b51118c
00035.1.4Turnouts-GuardrailTask1$ - 0$ - 0BASE51119a51119b51119c
00035.1.4Turnouts-Switch Stands including targetsTask1$ - 0$ - 0BASE51120a51120b51120c
00035.1.4Turnouts-Connecting RodsTask1$ - 0$ - 0BASE51121a51121b51121c
00035.1.4Turnout-Switch Point RailTask1$ - 0$ - 0BASE51122a51122b51122c
00035.1.4Turnout-Switch RodsTask1$ - 0$ - 0BASE51123a51123b51123c
00035.1.4Turnout-Switch ClipsTask1$ - 0$ - 0BASE51124a51124b51124c
00035.1.4Turnout-Switch HeelsTask1$ - 0$ - 0BASE51125a51125b51125c
00035.1.4Turnout-Rail BracesTask1$ - 0$ - 0BASE51126a51126b51126c
00035.1.4Turnout-Point Rail StopsTask1$ - 0$ - 0BASE51127a51127b51127c
00035.1.4(OTM) Tie PlatesTask1$ - 0$ - 0BASE51128a51128b51128c
00035.1.4(OTM) SpikesTask1$ - 0$ - 0BASE51129a51129b51129c
00035.1.4(OTM) Hold down devicesTask1$ - 0$ - 0BASE51130a51130b51130c
00035.1.4(OTM) Bolts, nuts, washersTask1$ - 0$ - 0BASE51131a51131b51131c
00035.1.4(OTM) Rail AnchorsTask1$ - 0$ - 0BASE51142a51142b51142c
00035.1.4(OTM) Gage RodsTask1$ - 0$ - 0BASE51132a51132b51132c
TOTAL MAINTENANCE REPAIR AND REPLACE COSTS98ERROR:#VALUE!
EMERGENCY CALL OUT FOR TRACK MAINTENANCEEst UnitsUnit PriceTotal
0004After hours emergency calls for track maintenance, repairs and replacementTask1$ - 0$ - 0BASE51201a51201b51201c
TOTAL EMERGENCY CALL OUT FOR TRACK MAINTENANCE - COSTS1$0.00

TOTAL COST OF THE CONTRACT ERROR:#VALUE!

&G BASE YEAR Volume IV: Cost/Price Proposal Sol. No. W912D0-18-R-0002 | 1 June 2018

BASE YEAR

Sol. No. W912D0-18-R-0025 | &KFF000028 February 2019&K000000

Use or disclosure of data contained on this sheet is subject to the restriction on the cover page of this proposal. &P

OPT1

CLINPara. NumberRail Track MaintenanceUM
INSPECT RAILROAD TRACK AND ADJUST AND LUBE ALL SWITCHESEst UnitsUnit PriceTotal
10015.1.1/5.1.2Inspect Railroad Trackage and adjust and lube all the switchesMonthly12$ - 0$ - 0BASE51201a51201b51201c
TOTAL INSPECT AND ADJUST AND LUBE ALL SWITCHES- COSTS12$0.00
SNOW AND VEGETATION REMOVALEst UnitsUnit PriceTotal
10025.1.3Snow Rmoval, SwitchesTask36$ - 0$ - 0BASE51202a51202b51202c
10025.1.3Vegetation Removal, SwitchesTask12$ - 0$ - 0BASE51203a51203b51203c
10025.1.3.2Snow Removal, All Railway at A Track (CH&PP)Task6$ - 0$ - 0BASE51204a51204b51204c
10025.1.3.2Snow Removal, All Railway at E TrackTask3$ - 0$ - 0BASE51205a51205b51205c
10025.1.3Vegetation Removal, All RailwayTask2$ - 0$ - 0BASE51206a51206b51206c
TOTAL SNOW AND VEGETATION REMOVAL - COSTS59$0.00
MAINTENANCE REPAIR REPLACEEst UnitsUnit PriceTotal
10035.1.4Ballast (Replacement)Task120 CY$ - 0ERROR:#VALUE!BASE51101a51101b51101c
10035.1.4Ballast (Regulator)Task1000 LF$ - 0ERROR:#VALUE!BASE51102a51102b51102c
10035.1.4Rail CrossingsTask4$ - 0$ - 0BASE51104a51104b51104c
10035.1.4Road Crossing Surface Materials(wood)Task4$ - 0$ - 0BASE51105a51105b51105c
10035.1.4Road Crossing Surface Materials(Concrete)Task1$ - 0$ - 0BASE51106a51106b51106c
10035.1.4Road Crossing Surface Materials(rubber)Task1$ - 0$ - 0BASE51107a51107b51107c
10035.1.4CulvertsTask1$ - 0$ - 0BASE51108a51108b51108c
10035.1.4TiesTask50$ - 0$ - 0BASE51109a51109b51109c
10035.1.4Joint BarsTask8$ - 0$ - 0BASE51110a51110b51110c
10035.1.4Rails (includes bonded and grounded rails)Task4$ - 0$ - 0BASE51111a51111b51111c
10035.1.4Mud RailsTask1$ - 0$ - 0BASE51112a51112b51112c
10035.1.4Grade crossing warning signs and signalsTask1$ - 0$ - 0BASE51113a51113b51113c
10035.1.4Portable DerailsTask2$ - 0$ - 0BASE51114a51114b51114c
10035.1.4Bumper stopsTask2$ - 0$ - 0BASE51115a51115b51115c
10035.1.4Wheel stopsTask2$ - 0$ - 0BASE51117a51117b51117c
10035.1.4Turnouts-SwitchTask1$ - 0$ - 0BASE51118a51118b51118c
10035.1.4Turnouts-FrogsTask1$ - 0$ - 0BASE51119a51119b51119c
10035.1.4Turnouts-GuardrailTask1$ - 0$ - 0BASE51120a51120b51120c
10035.1.4Turnouts-Switch Stands including targetsTask1$ - 0$ - 0BASE51121a51121b51121c
10035.1.4Turnouts-Connecting RodsTask1$ - 0$ - 0BASE51122a51122b51122c
10035.1.4Turnout-Switch Point RailTask1$ - 0$ - 0BASE51123a51123b51123c
10035.1.4Turnout-Switch RodsTask1$ - 0$ - 0BASE51124a51124b51124c
10035.1.4Turnout-Switch ClipsTask1$ - 0$ - 0BASE51125a51125b51125c
10035.1.4Turnout-Switch HeelsTask1$ - 0$ - 0BASE51126a51126b51126c
10035.1.4Turnout-Rail BracesTask1$ - 0$ - 0BASE51127a51127b51127c
10035.1.4Turnout-Point Rail StopsTask1$ - 0$ - 0BASE51128a51128b51128c
10035.1.4(OTM) Tie PlatesTask1$ - 0$ - 0BASE51129a51129b51129c
10035.1.4(OTM) SpikesTask1$ - 0$ - 0BASE51130a51130b51130c
10035.1.4(OTM) Hold down devicesTask1$ - 0$ - 0BASE51131a51131b51131c
10035.1.4(OTM) Bolts, nuts, washersTask1$ - 0$ - 0BASE51142a51142b51142c
10035.1.4(OTM) Rail AnchorsTask1$ - 0$ - 0BASE51132a51132b51132c
10035.1.4(OTM) Gage RodsTask1$ - 0$ - 0
TOTAL MAINTENANCE REPAIR AND REPLACE COSTS98ERROR:#VALUE!
EMERGENCY CALL OUT FOR TRACK MAINTENANCEEst UnitsUnit PriceTotal
1004After hours emergency calls for track maintenance, repairs and replacementTask1$ - 0$ - 0BASE51201a51201b51201c
TOTAL EMERGENCY CALL OUT FOR TRACK MAINTENANCE - COSTS1$0.00

TOTAL COST OF THE CONTRACT ERROR:#VALUE!

&G OPTION YEAR 1 Volume IV: Cost/Price Proposal

OPTION YEAR 1

Use or disclosure of data contained on this sheet is subject to the restriction on the cover page of this proposal. &P

&P

OPT2

CLINPara. NumberRail Track MaintenanceUM
INSPECT RAILROAD TRACK AND ADJUST AND LUBE ALL SWITCHESEst UnitsUnit PriceTotal
20015.1.1/5.1.2Inspect Railroad Trackage and adjust and lube all the switchesMonthly12$ - 0$ - 0BASE51201a51201b51201c
TOTAL INSPECT AND ADJUST AND LUBE ALL SWITCHES- COSTS12$0.00
SNOW AND VEGETATION REMOVALEst UnitsUnit PriceTotal
20025.1.3Snow Rmoval, SwitchesTask36$ - 0$ - 0BASE51202a51202b51202c
20025.1.3Vegetation Removal, SwitchesTask12$ - 0$ - 0BASE51203a51203b51203c
20025.1.3.2Snow Removal, All Railway at A Track (CH&PP)Task6$ - 0$ - 0BASE51204a51204b51204c
20025.1.3.2Snow Removal, All Railway at E TrackTask3$ - 0$ - 0BASE51205a51205b51205c
20025.1.3Vegetation Removal, All RailwayTask2$ - 0$ - 0BASE51206a51206b51206c
TOTAL SNOW AND VEGETATION REMOVAL - COSTS59$0.00
MAINTENANCE REPAIR REPLACEEst UnitsUnit PriceTotal
20035.1.4Ballast (Replacement)Task120 CY$ - 0ERROR:#VALUE!BASE51101a51101b51101c
20035.1.4Ballast (Regulator)Task1000 LF$ - 0ERROR:#VALUE!BASE51102a51102b51102c
20035.1.4Rail CrossingsTask4$ - 0$ - 0BASE51104a51104b51104c
20035.1.4Road Crossing Surface Materials(wood)Task4$ - 0$ - 0BASE51105a51105b51105c
20035.1.4Road Crossing Surface Materials(Concrete)Task1$ - 0$ - 0BASE51106a51106b51106c
20035.1.4Road Crossing Surface Materials(rubber)Task1$ - 0$ - 0BASE51107a51107b51107c
20035.1.4CulvertsTask1$ - 0$ - 0BASE51108a51108b51108c
20035.1.4TiesTask50$ - 0$ - 0BASE51109a51109b51109c
20035.1.4Joint BarsTask8$ - 0$ - 0BASE51110a51110b51110c
20035.1.4Rails (includes bonded and grounded rails)Task4$ - 0$ - 0BASE51111a51111b51111c
20035.1.4Mud RailsTask1$ - 0$ - 0BASE51112a51112b51112c
20035.1.4Grade crossing warning signs and signalsTask1$ - 0$ - 0BASE51113a51113b51113c
20035.1.4Portable DerailsTask2$ - 0$ - 0BASE51114a51114b51114c
20035.1.4Bumper stopsTask2$ - 0$ - 0BASE51115a51115b51115c
20035.1.4Wheel stopsTask2$ - 0$ - 0BASE51117a51117b51117c
20035.1.4Turnouts-SwitchTask1$ - 0$ - 0BASE51118a51118b51118c
20035.1.4Turnouts-FrogsTask1$ - 0$ - 0BASE51119a51119b51119c
20035.1.4Turnouts-GuardrailTask1$ - 0$ - 0BASE51120a51120b51120c
20035.1.4Turnouts-Switch Stands including targetsTask1$ - 0$ - 0BASE51121a51121b51121c
20035.1.4Turnouts-Connecting RodsTask1$ - 0$ - 0BASE51122a51122b51122c
20035.1.4Turnout-Switch Point RailTask1$ - 0$ - 0BASE51123a51123b51123c
20035.1.4Turnout-Switch RodsTask1$ - 0$ - 0BASE51124a51124b51124c
20035.1.4Turnout-Switch ClipsTask1$ - 0$ - 0BASE51125a51125b51125c
20035.1.4Turnout-Switch HeelsTask1$ - 0$ - 0BASE51126a51126b51126c
20035.1.4Turnout-Rail BracesTask1$ - 0$ - 0BASE51127a51127b51127c
20035.1.4Turnout-Point Rail StopsTask1$ - 0$ - 0BASE51128a51128b51128c
20035.1.4(OTM) Tie PlatesTask1$ - 0$ - 0BASE51129a51129b51129c
20035.1.4(OTM) SpikesTask1$ - 0$ - 0BASE51130a51130b51130c
20035.1.4(OTM) Hold down devicesTask1$ - 0$ - 0BASE51131a51131b51131c
20035.1.4(OTM) Bolts, nuts, washersTask1$ - 0$ - 0BASE51142a51142b51142c
20035.1.4(OTM) Rail AnchorsTask1$ - 0$ - 0BASE51132a51132b51132c
20035.1.4(OTM) Gage RodsTask1$ - 0$ - 0
TOTAL MAINTENANCE REPAIR AND REPLACE COSTS98ERROR:#VALUE!
EMERGENCY CALL OUT FOR TRACK MAINTENANCEEst UnitsUnit PriceTotal
2004After hours emergency calls for track maintenance, repairs and replacementTask1$ - 0$ - 0BASE51201a51201b51201c
TOTAL EMERGENCY CALL OUT FOR TRACK MAINTENANCE - COSTS1$0.00

TOTAL COST OF THE CONTRACT ERROR:#VALUE!

&G OPTION YEAR 2 Volume IV: Cost/Price Proposal

OPTION YEAR 2

Use or disclosure of data contained on this sheet is subject to the restriction on the cover page of this proposal. &P

OPT3

CLINPara. NumberRail Track MaintenanceUM
INSPECT RAILROAD TRACK AND ADJUST AND LUBE ALL SWITCHESEst UnitsUnit PriceTotal
30015.1.1/5.1.2Inspect Railroad Trackage and adjust and lube all the switchesMonthly12$ - 0$ - 0BASE51201a51201b51201c
TOTAL INSPECT AND ADJUST AND LUBE ALL SWITCHES- COSTS12$0.00
SNOW AND VEGETATION REMOVALEst UnitsUnit PriceTotal
30025.1.3Snow Rmoval, SwitchesTask36$ - 0$ - 0BASE51202a51202b51202c
30025.1.3Vegetation Removal, SwitchesTask12$ - 0$ - 0BASE51203a51203b51203c
30025.1.3.2Snow Removal, All Railway at A Track (CH&PP)Task6$ - 0$ - 0BASE51204a51204b51204c
30025.1.3.2Snow Removal, All Railway at E TrackTask3$ - 0$ - 0BASE51205a51205b51205c
30025.1.3Vegetation Removal, All RailwayTask2$ - 0$ - 0BASE51206a51206b51206c
TOTAL SNOW AND VEGETATION REMOVAL - COSTS59$0.00
MAINTENANCE REPAIR REPLACEEst UnitsUnit PriceTotal
30035.1.4Ballast (Replacement)Task120 CY$ - 0ERROR:#VALUE!BASE51101a51101b51101c
30035.1.4Ballast (Regulator)Task1000 LF$ - 0ERROR:#VALUE!BASE51102a51102b51102c
30035.1.4Rail CrossingsTask4$ - 0$ - 0BASE51104a51104b51104c
30035.1.4Road Crossing Surface Materials(wood)Task4$ - 0$ - 0BASE51105a51105b51105c
30035.1.4Road Crossing Surface Materials(Concrete)Task1$ - 0$ - 0BASE51106a51106b51106c
30035.1.4Road Crossing Surface Materials(rubber)Task1$ - 0$ - 0BASE51107a51107b51107c
30035.1.4CulvertsTask1$ - 0$ - 0BASE51108a51108b51108c
30035.1.4TiesTask50$ - 0$ - 0BASE51109a51109b51109c
30035.1.4Joint BarsTask8$ - 0$ - 0BASE51110a51110b51110c
30035.1.4Rails (includes bonded and grounded rails)Task4$ - 0$ - 0BASE51111a51111b51111c
30035.1.4Mud RailsTask1$ - 0$ - 0BASE51112a51112b51112c
30035.1.4Grade crossing warning signs and signalsTask1$ - 0$ - 0BASE51113a51113b51113c
30035.1.4Portable DerailsTask2$ - 0$ - 0BASE51114a51114b51114c
30035.1.4Bumper stopsTask2$ - 0$ - 0BASE51115a51115b51115c
30035.1.4Wheel stopsTask2$ - 0$ - 0BASE51117a51117b51117c
30035.1.4Turnouts-SwitchTask1$ - 0$ - 0BASE51118a51118b51118c
30035.1.4Turnouts-FrogsTask1$ - 0$ - 0BASE51119a51119b51119c
30035.1.4Turnouts-GuardrailTask1$ - 0$ - 0BASE51120a51120b51120c
30035.1.4Turnouts-Switch Stands including targetsTask1$ - 0$ - 0BASE51121a51121b51121c
30035.1.4Turnouts-Connecting RodsTask1$ - 0$ - 0BASE51122a51122b51122c
30035.1.4Turnout-Switch Point RailTask1$ - 0$ - 0BASE51123a51123b51123c
30035.1.4Turnout-Switch RodsTask1$ - 0$ - 0BASE51124a51124b51124c
30035.1.4Turnout-Switch ClipsTask1$ - 0$ - 0BASE51125a51125b51125c
30035.1.4Turnout-Switch HeelsTask1$ - 0$ - 0BASE51126a51126b51126c
30035.1.4Turnout-Rail BracesTask1$ - 0$ - 0BASE51127a51127b51127c
30035.1.4Turnout-Point Rail StopsTask1$ - 0$ - 0BASE51128a51128b51128c
30035.1.4(OTM) Tie PlatesTask1$ - 0$ - 0BASE51129a51129b51129c
30035.1.4(OTM) SpikesTask1$ - 0$ - 0BASE51130a51130b51130c
30035.1.4(OTM) Hold down devicesTask1$ - 0$ - 0BASE51131a51131b51131c
30035.1.4(OTM) Bolts, nuts, washersTask1$ - 0$ - 0BASE51142a51142b51142c
30035.1.4(OTM) Rail AnchorsTask1$ - 0$ - 0BASE51132a51132b51132c
30035.1.4(OTM) Gage RodsTask1$ - 0$ - 0
TOTAL MAINTENANCE REPAIR AND REPLACE COSTS98ERROR:#VALUE!
EMERGENCY CALL OUT FOR TRACK MAINTENANCEEst UnitsUnit PriceTotal
3004After hours emergency calls for track maintenance, repairs and replacementTask1$ - 0$ - 0BASE51201a51201b51201c
TOTAL EMERGENCY CALL OUT FOR TRACK MAINTENANCE - COSTS1$0.00

TOTAL COST OF THE CONTRACT ERROR:#VALUE!

&G OPTION YEAR 3 Volume IV: Cost/Price Proposal

OPTION YEAR 3

Use or disclosure of data contained on this sheet is subject to the restriction on the cover page of this proposal. &P

OPT4

CLINPara. NumberRail Track MaintenanceUM
INSPECT RAILROAD TRACK AND ADJUST AND LUBE ALL SWITCHESEst UnitsUnit PriceTotal
40015.1.1/5.1.2Inspect Railroad Trackage and adjust and lube all the switchesMonthly12$ - 0$ - 0BASE51201a51201b51201c
TOTAL INSPECT AND ADJUST AND LUBE ALL SWITCHES- COSTS12$0.00
SNOW AND VEGETATION REMOVALEst UnitsUnit PriceTotal
40025.1.3Snow Rmoval, SwitchesTask36$ - 0$ - 0BASE51202a51202b51202c
40025.1.3Vegetation Removal, SwitchesTask12$ - 0$ - 0BASE51203a51203b51203c
40025.1.3.2Snow Removal, All Railway at A Track (CH&PP)Task6$ - 0$ - 0BASE51204a51204b51204c
40025.1.3.2Snow Removal, All Railway at E TrackTask3$ - 0$ - 0BASE51205a51205b51205c
40025.1.3Vegetation Removal, All RailwayTask2$ - 0$ - 0BASE51206a51206b51206c
TOTAL SNOW AND VEGETATION REMOVAL - COSTS59$0.00
MAINTENANCE REPAIR REPLACEEst UnitsUnit PriceTotal
40035.1.4Ballast (Replacement)Task120 CY$ - 0ERROR:#VALUE!BASE51101a51101b51101c
40035.1.4Ballast (Regulator)Task1000 LF$ - 0ERROR:#VALUE!BASE51102a51102b51102c
40035.1.4Rail CrossingsTask4$ - 0$ - 0BASE51104a51104b51104c
40035.1.4Road Crossing Surface Materials(wood)Task4$ - 0$ - 0BASE51105a51105b51105c
40035.1.4Road Crossing Surface Materials(Concrete)Task1$ - 0$ - 0BASE51106a51106b51106c
40035.1.4Road Crossing Surface Materials(rubber)Task1$ - 0$ - 0BASE51107a51107b51107c
40035.1.4CulvertsTask1$ - 0$ - 0BASE51108a51108b51108c
40035.1.4TiesTask50$ - 0$ - 0BASE51109a51109b51109c
40035.1.4Joint BarsTask8$ - 0$ - 0BASE51110a51110b51110c
40035.1.4Rails (includes bonded and grounded rails)Task4$ - 0$ - 0BASE51111a51111b51111c
40035.1.4Mud RailsTask1$ - 0$ - 0BASE51112a51112b51112c
40035.1.4Grade crossing warning signs and signalsTask1$ - 0$ - 0BASE51113a51113b51113c
40035.1.4Portable DerailsTask2$ - 0$ - 0BASE51114a51114b51114c
40035.1.4Bumper stopsTask2$ - 0$ - 0BASE51115a51115b51115c
40035.1.4Wheel stopsTask2$ - 0$ - 0BASE51117a51117b51117c
40035.1.4Turnouts-SwitchTask1$ - 0$ - 0BASE51118a51118b51118c
40035.1.4Turnouts-FrogsTask1$ - 0$ - 0BASE51119a51119b51119c
40035.1.4Turnouts-GuardrailTask1$ - 0$ - 0BASE51120a51120b51120c
40035.1.4Turnouts-Switch Stands including targetsTask1$ - 0$ - 0BASE51121a51121b51121c
40035.1.4Turnouts-Connecting RodsTask1$ - 0$ - 0BASE51122a51122b51122c
40035.1.4Turnout-Switch Point RailTask1$ - 0$ - 0BASE51123a51123b51123c
40035.1.4Turnout-Switch RodsTask1$ - 0$ - 0BASE51124a51124b51124c
40035.1.4Turnout-Switch ClipsTask1$ - 0$ - 0BASE51125a51125b51125c
40035.1.4Turnout-Switch HeelsTask1$ - 0$ - 0BASE51126a51126b51126c
40035.1.4Turnout-Rail BracesTask1$ - 0$ - 0BASE51127a51127b51127c
40035.1.4Turnout-Point Rail StopsTask1$ - 0$ - 0BASE51128a51128b51128c
40035.1.4(OTM) Tie PlatesTask1$ - 0$ - 0BASE51129a51129b51129c
40035.1.4(OTM) SpikesTask1$ - 0$ - 0BASE51130a51130b51130c
40035.1.4(OTM) Hold down devicesTask1$ - 0$ - 0BASE51131a51131b51131c
40035.1.4(OTM) Bolts, nuts, washersTask1$ - 0$ - 0BASE51142a51142b51142c
40035.1.4(OTM) Rail AnchorsTask1$ - 0$ - 0BASE51132a51132b51132c
40035.1.4(OTM) Gage RodsTask1$ - 0$ - 0
TOTAL MAINTENANCE REPAIR AND REPLACE COSTS98ERROR:#VALUE!
EMERGENCY CALL OUT FOR TRACK MAINTENANCEEst UnitsUnit PriceTotal
4004After hours emergency calls for track maintenance, repairs and replacementTask1$ - 0$ - 0BASE51201a51201b51201c
TOTAL EMERGENCY CALL OUT FOR TRACK MAINTENANCE - COSTS1$0.00

TOTAL COST OF THE CONTRACT ERROR:#VALUE!

OPTION YER 4

Sol. No. W912d0-18-R-0025 28 February 2019

File details come from the government source that posted it. Updated .