Attachment 4 J14 Rail Track Maintenance.xlsx
XLSX spreadsheet 71 KB Posted
- Attached to
- Rail Track Maintenance
- Solicitation number
- W912D0-24-R-0013
About this file
This document appears to be an attachment, titled "J14 Rail Track Maintenance.xlsx", related to a federal contract opportunity for rail track maintenance services at Fort Wainwright, Alaska.
The key details are as follows: The government intends to award a firm-fixed price requirements contract for the inspection, maintenance, service, and repair of the U.S. Army-owned railroad track system at Fort Wainwright. The contract will have a 12-month base period plus four 12-month option periods. This is a small business set-aside procurement. The contractor will be responsible for providing all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the required rail track maintenance activities, which include inspecting the track and switches, snow and vegetation removal, and various maintenance, repair, and replacement tasks. The document provides a detailed pricing schedule for the various line items.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| CLIN | Para. Number | Rail Track Maintenance | UM | |||||||
| INSPECT RAILROAD TRACK AND ADJUST AND LUBE ALL SWITCHES | Est Units | Unit Price | Total | |||||||
| 0001 | 5.1.1/5.1.2 | Inspect Railroad Trackage and adjust and lube all the switches | Monthly | 12 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL INSPECT AND ADJUST AND LUBE ALL SWITCHES- COSTS | 12 | $0.00 |
| SNOW AND VEGETATION REMOVAL | Est Units | Unit Price | Total | |||||||
| 0002 | 5.1.3 | Snow Rmoval, Switches | Task | 36 | $ - 0 | $ - 0 | BASE | 51202a | 51202b | 51202c |
| 0002 | 5.1.3 | Vegetation Removal, Switches | Task | 12 | $ - 0 | $ - 0 | BASE | 51203a | 51203b | 51203c |
| 0002 | 5.1.3.2 | Snow Removal, All Railway at A Track (CH&PP) | Task | 6 | $ - 0 | $ - 0 | BASE | 51204a | 51204b | 51204c |
| 0002 | 5.1.3.2 | Snow Removal, All Railway at E Track | Task | 3 | $ - 0 | $ - 0 | BASE | 51205a | 51205b | 51205c |
| 0002 | 5.1.3 | Vegetation Removal, All Railway | Task | 2 | $ - 0 | $ - 0 | BASE | 51206a | 51206b | 51206c |
| TOTAL SNOW AND VEGETATION REMOVAL - COSTS | 59 | $0.00 |
| MAINTENANCE REPAIR REPLACE | Est Units | Unit Price | Total | |||||||
| 0003 | 5.1.4 | Ballast (Replacement) | Task | 120 CY | $ - 0 | ERROR:#VALUE! | BASE | 51101a | 51101b | 51101c |
| 0003 | 5.1.4 | Ballast (Regulator) | Task | 1000 LF | $ - 0 | ERROR:#VALUE! | ||||
| 0003 | 5.1.4 | Rail Crossings | Task | 4 | $ - 0 | $ - 0 | BASE | 51102a | 51102b | 51102c |
| 0003 | 5.1.4 | Road Crossing Surface Materials(wood) | Task | 4 | $ - 0 | $ - 0 | BASE | 51104a | 51104b | 51104c |
| 0003 | 5.1.4 | Road Crossing Surface Materials(Concrete) | Task | 1 | $ - 0 | $ - 0 | BASE | 51105a | 51105b | 51105c |
| 0003 | 5.1.4 | Road Crossing Surface Materials(rubber) | Task | 1 | $ - 0 | $ - 0 | BASE | 51106a | 51106b | 51106c |
| 0003 | 5.1.4 | Culverts | Task | 1 | $ - 0 | $ - 0 | BASE | 51107a | 51107b | 51107c |
| 0003 | 5.1.4 | Ties | Task | 50 | $ - 0 | $ - 0 | BASE | 51108a | 51108b | 51108c |
| 0003 | 5.1.4 | Joint Bars | Task | 8 | $ - 0 | $ - 0 | BASE | 51109a | 51109b | 51109c |
| 0003 | 5.1.4 | Rails (includes bonded and grounded rails) | Task | 4 | $ - 0 | $ - 0 | BASE | 51110a | 51110b | 51110c |
| 0003 | 5.1.4 | Mud Rails | Task | 1 | $ - 0 | $ - 0 | BASE | 51111a | 51111b | 51111c |
| 0003 | 5.1.4 | Grade crossing warning signs and signals | Task | 1 | $ - 0 | $ - 0 | BASE | 51112a | 51112b | 51112c |
| 0003 | 5.1.4 | Portable Derails | Task | 2 | $ - 0 | $ - 0 | BASE | 51113a | 51113b | 51113c |
| 0003 | 5.1.4 | Bumper stops | Task | 2 | $ - 0 | $ - 0 | BASE | 51114a | 51114b | 51114c |
| 0003 | 5.1.4 | Wheel stops | Task | 2 | $ - 0 | $ - 0 | BASE | 51115a | 51115b | 51115c |
| 0003 | 5.1.4 | Turnouts-Switch | Task | 1 | $ - 0 | $ - 0 | BASE | 51117a | 51117b | 51117c |
| 0003 | 5.1.4 | Turnouts-Frogs | Task | 1 | $ - 0 | $ - 0 | BASE | 51118a | 51118b | 51118c |
| 0003 | 5.1.4 | Turnouts-Guardrail | Task | 1 | $ - 0 | $ - 0 | BASE | 51119a | 51119b | 51119c |
| 0003 | 5.1.4 | Turnouts-Switch Stands including targets | Task | 1 | $ - 0 | $ - 0 | BASE | 51120a | 51120b | 51120c |
| 0003 | 5.1.4 | Turnouts-Connecting Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51121a | 51121b | 51121c |
| 0003 | 5.1.4 | Turnout-Switch Point Rail | Task | 1 | $ - 0 | $ - 0 | BASE | 51122a | 51122b | 51122c |
| 0003 | 5.1.4 | Turnout-Switch Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51123a | 51123b | 51123c |
| 0003 | 5.1.4 | Turnout-Switch Clips | Task | 1 | $ - 0 | $ - 0 | BASE | 51124a | 51124b | 51124c |
| 0003 | 5.1.4 | Turnout-Switch Heels | Task | 1 | $ - 0 | $ - 0 | BASE | 51125a | 51125b | 51125c |
| 0003 | 5.1.4 | Turnout-Rail Braces | Task | 1 | $ - 0 | $ - 0 | BASE | 51126a | 51126b | 51126c |
| 0003 | 5.1.4 | Turnout-Point Rail Stops | Task | 1 | $ - 0 | $ - 0 | BASE | 51127a | 51127b | 51127c |
| 0003 | 5.1.4 | (OTM) Tie Plates | Task | 1 | $ - 0 | $ - 0 | BASE | 51128a | 51128b | 51128c |
| 0003 | 5.1.4 | (OTM) Spikes | Task | 1 | $ - 0 | $ - 0 | BASE | 51129a | 51129b | 51129c |
| 0003 | 5.1.4 | (OTM) Hold down devices | Task | 1 | $ - 0 | $ - 0 | BASE | 51130a | 51130b | 51130c |
| 0003 | 5.1.4 | (OTM) Bolts, nuts, washers | Task | 1 | $ - 0 | $ - 0 | BASE | 51131a | 51131b | 51131c |
| 0003 | 5.1.4 | (OTM) Rail Anchors | Task | 1 | $ - 0 | $ - 0 | BASE | 51142a | 51142b | 51142c |
| 0003 | 5.1.4 | (OTM) Gage Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51132a | 51132b | 51132c |
| TOTAL MAINTENANCE REPAIR AND REPLACE COSTS | 98 | ERROR:#VALUE! |
| EMERGENCY CALL OUT FOR TRACK MAINTENANCE | Est Units | Unit Price | Total | ||||||
| 0004 | After hours emergency calls for track maintenance, repairs and replacement | Task | 1 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL EMERGENCY CALL OUT FOR TRACK MAINTENANCE - COSTS | 1 | $0.00 |
TOTAL COST OF THE CONTRACT ERROR:#VALUE!
&G BASE YEAR Volume IV: Cost/Price Proposal Sol. No. W912D0-18-R-0002 | 1 June 2018
BASE YEAR
Sol. No. W912D0-18-R-0025 | &KFF000028 February 2019&K000000
Use or disclosure of data contained on this sheet is subject to the restriction on the cover page of this proposal. &P
OPT1
| CLIN | Para. Number | Rail Track Maintenance | UM | |||||||
| INSPECT RAILROAD TRACK AND ADJUST AND LUBE ALL SWITCHES | Est Units | Unit Price | Total | |||||||
| 1001 | 5.1.1/5.1.2 | Inspect Railroad Trackage and adjust and lube all the switches | Monthly | 12 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL INSPECT AND ADJUST AND LUBE ALL SWITCHES- COSTS | 12 | $0.00 |
| SNOW AND VEGETATION REMOVAL | Est Units | Unit Price | Total | |||||||
| 1002 | 5.1.3 | Snow Rmoval, Switches | Task | 36 | $ - 0 | $ - 0 | BASE | 51202a | 51202b | 51202c |
| 1002 | 5.1.3 | Vegetation Removal, Switches | Task | 12 | $ - 0 | $ - 0 | BASE | 51203a | 51203b | 51203c |
| 1002 | 5.1.3.2 | Snow Removal, All Railway at A Track (CH&PP) | Task | 6 | $ - 0 | $ - 0 | BASE | 51204a | 51204b | 51204c |
| 1002 | 5.1.3.2 | Snow Removal, All Railway at E Track | Task | 3 | $ - 0 | $ - 0 | BASE | 51205a | 51205b | 51205c |
| 1002 | 5.1.3 | Vegetation Removal, All Railway | Task | 2 | $ - 0 | $ - 0 | BASE | 51206a | 51206b | 51206c |
| TOTAL SNOW AND VEGETATION REMOVAL - COSTS | 59 | $0.00 |
| MAINTENANCE REPAIR REPLACE | Est Units | Unit Price | Total | |||||||
| 1003 | 5.1.4 | Ballast (Replacement) | Task | 120 CY | $ - 0 | ERROR:#VALUE! | BASE | 51101a | 51101b | 51101c |
| 1003 | 5.1.4 | Ballast (Regulator) | Task | 1000 LF | $ - 0 | ERROR:#VALUE! | BASE | 51102a | 51102b | 51102c |
| 1003 | 5.1.4 | Rail Crossings | Task | 4 | $ - 0 | $ - 0 | BASE | 51104a | 51104b | 51104c |
| 1003 | 5.1.4 | Road Crossing Surface Materials(wood) | Task | 4 | $ - 0 | $ - 0 | BASE | 51105a | 51105b | 51105c |
| 1003 | 5.1.4 | Road Crossing Surface Materials(Concrete) | Task | 1 | $ - 0 | $ - 0 | BASE | 51106a | 51106b | 51106c |
| 1003 | 5.1.4 | Road Crossing Surface Materials(rubber) | Task | 1 | $ - 0 | $ - 0 | BASE | 51107a | 51107b | 51107c |
| 1003 | 5.1.4 | Culverts | Task | 1 | $ - 0 | $ - 0 | BASE | 51108a | 51108b | 51108c |
| 1003 | 5.1.4 | Ties | Task | 50 | $ - 0 | $ - 0 | BASE | 51109a | 51109b | 51109c |
| 1003 | 5.1.4 | Joint Bars | Task | 8 | $ - 0 | $ - 0 | BASE | 51110a | 51110b | 51110c |
| 1003 | 5.1.4 | Rails (includes bonded and grounded rails) | Task | 4 | $ - 0 | $ - 0 | BASE | 51111a | 51111b | 51111c |
| 1003 | 5.1.4 | Mud Rails | Task | 1 | $ - 0 | $ - 0 | BASE | 51112a | 51112b | 51112c |
| 1003 | 5.1.4 | Grade crossing warning signs and signals | Task | 1 | $ - 0 | $ - 0 | BASE | 51113a | 51113b | 51113c |
| 1003 | 5.1.4 | Portable Derails | Task | 2 | $ - 0 | $ - 0 | BASE | 51114a | 51114b | 51114c |
| 1003 | 5.1.4 | Bumper stops | Task | 2 | $ - 0 | $ - 0 | BASE | 51115a | 51115b | 51115c |
| 1003 | 5.1.4 | Wheel stops | Task | 2 | $ - 0 | $ - 0 | BASE | 51117a | 51117b | 51117c |
| 1003 | 5.1.4 | Turnouts-Switch | Task | 1 | $ - 0 | $ - 0 | BASE | 51118a | 51118b | 51118c |
| 1003 | 5.1.4 | Turnouts-Frogs | Task | 1 | $ - 0 | $ - 0 | BASE | 51119a | 51119b | 51119c |
| 1003 | 5.1.4 | Turnouts-Guardrail | Task | 1 | $ - 0 | $ - 0 | BASE | 51120a | 51120b | 51120c |
| 1003 | 5.1.4 | Turnouts-Switch Stands including targets | Task | 1 | $ - 0 | $ - 0 | BASE | 51121a | 51121b | 51121c |
| 1003 | 5.1.4 | Turnouts-Connecting Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51122a | 51122b | 51122c |
| 1003 | 5.1.4 | Turnout-Switch Point Rail | Task | 1 | $ - 0 | $ - 0 | BASE | 51123a | 51123b | 51123c |
| 1003 | 5.1.4 | Turnout-Switch Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51124a | 51124b | 51124c |
| 1003 | 5.1.4 | Turnout-Switch Clips | Task | 1 | $ - 0 | $ - 0 | BASE | 51125a | 51125b | 51125c |
| 1003 | 5.1.4 | Turnout-Switch Heels | Task | 1 | $ - 0 | $ - 0 | BASE | 51126a | 51126b | 51126c |
| 1003 | 5.1.4 | Turnout-Rail Braces | Task | 1 | $ - 0 | $ - 0 | BASE | 51127a | 51127b | 51127c |
| 1003 | 5.1.4 | Turnout-Point Rail Stops | Task | 1 | $ - 0 | $ - 0 | BASE | 51128a | 51128b | 51128c |
| 1003 | 5.1.4 | (OTM) Tie Plates | Task | 1 | $ - 0 | $ - 0 | BASE | 51129a | 51129b | 51129c |
| 1003 | 5.1.4 | (OTM) Spikes | Task | 1 | $ - 0 | $ - 0 | BASE | 51130a | 51130b | 51130c |
| 1003 | 5.1.4 | (OTM) Hold down devices | Task | 1 | $ - 0 | $ - 0 | BASE | 51131a | 51131b | 51131c |
| 1003 | 5.1.4 | (OTM) Bolts, nuts, washers | Task | 1 | $ - 0 | $ - 0 | BASE | 51142a | 51142b | 51142c |
| 1003 | 5.1.4 | (OTM) Rail Anchors | Task | 1 | $ - 0 | $ - 0 | BASE | 51132a | 51132b | 51132c |
| 1003 | 5.1.4 | (OTM) Gage Rods | Task | 1 | $ - 0 | $ - 0 | ||||
| TOTAL MAINTENANCE REPAIR AND REPLACE COSTS | 98 | ERROR:#VALUE! |
| EMERGENCY CALL OUT FOR TRACK MAINTENANCE | Est Units | Unit Price | Total | ||||||
| 1004 | After hours emergency calls for track maintenance, repairs and replacement | Task | 1 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL EMERGENCY CALL OUT FOR TRACK MAINTENANCE - COSTS | 1 | $0.00 |
TOTAL COST OF THE CONTRACT ERROR:#VALUE!
&G OPTION YEAR 1 Volume IV: Cost/Price Proposal
OPTION YEAR 1
Use or disclosure of data contained on this sheet is subject to the restriction on the cover page of this proposal. &P
&P
OPT2
| CLIN | Para. Number | Rail Track Maintenance | UM | |||||||
| INSPECT RAILROAD TRACK AND ADJUST AND LUBE ALL SWITCHES | Est Units | Unit Price | Total | |||||||
| 2001 | 5.1.1/5.1.2 | Inspect Railroad Trackage and adjust and lube all the switches | Monthly | 12 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL INSPECT AND ADJUST AND LUBE ALL SWITCHES- COSTS | 12 | $0.00 |
| SNOW AND VEGETATION REMOVAL | Est Units | Unit Price | Total | |||||||
| 2002 | 5.1.3 | Snow Rmoval, Switches | Task | 36 | $ - 0 | $ - 0 | BASE | 51202a | 51202b | 51202c |
| 2002 | 5.1.3 | Vegetation Removal, Switches | Task | 12 | $ - 0 | $ - 0 | BASE | 51203a | 51203b | 51203c |
| 2002 | 5.1.3.2 | Snow Removal, All Railway at A Track (CH&PP) | Task | 6 | $ - 0 | $ - 0 | BASE | 51204a | 51204b | 51204c |
| 2002 | 5.1.3.2 | Snow Removal, All Railway at E Track | Task | 3 | $ - 0 | $ - 0 | BASE | 51205a | 51205b | 51205c |
| 2002 | 5.1.3 | Vegetation Removal, All Railway | Task | 2 | $ - 0 | $ - 0 | BASE | 51206a | 51206b | 51206c |
| TOTAL SNOW AND VEGETATION REMOVAL - COSTS | 59 | $0.00 |
| MAINTENANCE REPAIR REPLACE | Est Units | Unit Price | Total | |||||||
| 2003 | 5.1.4 | Ballast (Replacement) | Task | 120 CY | $ - 0 | ERROR:#VALUE! | BASE | 51101a | 51101b | 51101c |
| 2003 | 5.1.4 | Ballast (Regulator) | Task | 1000 LF | $ - 0 | ERROR:#VALUE! | BASE | 51102a | 51102b | 51102c |
| 2003 | 5.1.4 | Rail Crossings | Task | 4 | $ - 0 | $ - 0 | BASE | 51104a | 51104b | 51104c |
| 2003 | 5.1.4 | Road Crossing Surface Materials(wood) | Task | 4 | $ - 0 | $ - 0 | BASE | 51105a | 51105b | 51105c |
| 2003 | 5.1.4 | Road Crossing Surface Materials(Concrete) | Task | 1 | $ - 0 | $ - 0 | BASE | 51106a | 51106b | 51106c |
| 2003 | 5.1.4 | Road Crossing Surface Materials(rubber) | Task | 1 | $ - 0 | $ - 0 | BASE | 51107a | 51107b | 51107c |
| 2003 | 5.1.4 | Culverts | Task | 1 | $ - 0 | $ - 0 | BASE | 51108a | 51108b | 51108c |
| 2003 | 5.1.4 | Ties | Task | 50 | $ - 0 | $ - 0 | BASE | 51109a | 51109b | 51109c |
| 2003 | 5.1.4 | Joint Bars | Task | 8 | $ - 0 | $ - 0 | BASE | 51110a | 51110b | 51110c |
| 2003 | 5.1.4 | Rails (includes bonded and grounded rails) | Task | 4 | $ - 0 | $ - 0 | BASE | 51111a | 51111b | 51111c |
| 2003 | 5.1.4 | Mud Rails | Task | 1 | $ - 0 | $ - 0 | BASE | 51112a | 51112b | 51112c |
| 2003 | 5.1.4 | Grade crossing warning signs and signals | Task | 1 | $ - 0 | $ - 0 | BASE | 51113a | 51113b | 51113c |
| 2003 | 5.1.4 | Portable Derails | Task | 2 | $ - 0 | $ - 0 | BASE | 51114a | 51114b | 51114c |
| 2003 | 5.1.4 | Bumper stops | Task | 2 | $ - 0 | $ - 0 | BASE | 51115a | 51115b | 51115c |
| 2003 | 5.1.4 | Wheel stops | Task | 2 | $ - 0 | $ - 0 | BASE | 51117a | 51117b | 51117c |
| 2003 | 5.1.4 | Turnouts-Switch | Task | 1 | $ - 0 | $ - 0 | BASE | 51118a | 51118b | 51118c |
| 2003 | 5.1.4 | Turnouts-Frogs | Task | 1 | $ - 0 | $ - 0 | BASE | 51119a | 51119b | 51119c |
| 2003 | 5.1.4 | Turnouts-Guardrail | Task | 1 | $ - 0 | $ - 0 | BASE | 51120a | 51120b | 51120c |
| 2003 | 5.1.4 | Turnouts-Switch Stands including targets | Task | 1 | $ - 0 | $ - 0 | BASE | 51121a | 51121b | 51121c |
| 2003 | 5.1.4 | Turnouts-Connecting Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51122a | 51122b | 51122c |
| 2003 | 5.1.4 | Turnout-Switch Point Rail | Task | 1 | $ - 0 | $ - 0 | BASE | 51123a | 51123b | 51123c |
| 2003 | 5.1.4 | Turnout-Switch Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51124a | 51124b | 51124c |
| 2003 | 5.1.4 | Turnout-Switch Clips | Task | 1 | $ - 0 | $ - 0 | BASE | 51125a | 51125b | 51125c |
| 2003 | 5.1.4 | Turnout-Switch Heels | Task | 1 | $ - 0 | $ - 0 | BASE | 51126a | 51126b | 51126c |
| 2003 | 5.1.4 | Turnout-Rail Braces | Task | 1 | $ - 0 | $ - 0 | BASE | 51127a | 51127b | 51127c |
| 2003 | 5.1.4 | Turnout-Point Rail Stops | Task | 1 | $ - 0 | $ - 0 | BASE | 51128a | 51128b | 51128c |
| 2003 | 5.1.4 | (OTM) Tie Plates | Task | 1 | $ - 0 | $ - 0 | BASE | 51129a | 51129b | 51129c |
| 2003 | 5.1.4 | (OTM) Spikes | Task | 1 | $ - 0 | $ - 0 | BASE | 51130a | 51130b | 51130c |
| 2003 | 5.1.4 | (OTM) Hold down devices | Task | 1 | $ - 0 | $ - 0 | BASE | 51131a | 51131b | 51131c |
| 2003 | 5.1.4 | (OTM) Bolts, nuts, washers | Task | 1 | $ - 0 | $ - 0 | BASE | 51142a | 51142b | 51142c |
| 2003 | 5.1.4 | (OTM) Rail Anchors | Task | 1 | $ - 0 | $ - 0 | BASE | 51132a | 51132b | 51132c |
| 2003 | 5.1.4 | (OTM) Gage Rods | Task | 1 | $ - 0 | $ - 0 | ||||
| TOTAL MAINTENANCE REPAIR AND REPLACE COSTS | 98 | ERROR:#VALUE! |
| EMERGENCY CALL OUT FOR TRACK MAINTENANCE | Est Units | Unit Price | Total | ||||||
| 2004 | After hours emergency calls for track maintenance, repairs and replacement | Task | 1 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL EMERGENCY CALL OUT FOR TRACK MAINTENANCE - COSTS | 1 | $0.00 |
TOTAL COST OF THE CONTRACT ERROR:#VALUE!
&G OPTION YEAR 2 Volume IV: Cost/Price Proposal
OPTION YEAR 2
Use or disclosure of data contained on this sheet is subject to the restriction on the cover page of this proposal. &P
OPT3
| CLIN | Para. Number | Rail Track Maintenance | UM | |||||||
| INSPECT RAILROAD TRACK AND ADJUST AND LUBE ALL SWITCHES | Est Units | Unit Price | Total | |||||||
| 3001 | 5.1.1/5.1.2 | Inspect Railroad Trackage and adjust and lube all the switches | Monthly | 12 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL INSPECT AND ADJUST AND LUBE ALL SWITCHES- COSTS | 12 | $0.00 |
| SNOW AND VEGETATION REMOVAL | Est Units | Unit Price | Total | |||||||
| 3002 | 5.1.3 | Snow Rmoval, Switches | Task | 36 | $ - 0 | $ - 0 | BASE | 51202a | 51202b | 51202c |
| 3002 | 5.1.3 | Vegetation Removal, Switches | Task | 12 | $ - 0 | $ - 0 | BASE | 51203a | 51203b | 51203c |
| 3002 | 5.1.3.2 | Snow Removal, All Railway at A Track (CH&PP) | Task | 6 | $ - 0 | $ - 0 | BASE | 51204a | 51204b | 51204c |
| 3002 | 5.1.3.2 | Snow Removal, All Railway at E Track | Task | 3 | $ - 0 | $ - 0 | BASE | 51205a | 51205b | 51205c |
| 3002 | 5.1.3 | Vegetation Removal, All Railway | Task | 2 | $ - 0 | $ - 0 | BASE | 51206a | 51206b | 51206c |
| TOTAL SNOW AND VEGETATION REMOVAL - COSTS | 59 | $0.00 |
| MAINTENANCE REPAIR REPLACE | Est Units | Unit Price | Total | |||||||
| 3003 | 5.1.4 | Ballast (Replacement) | Task | 120 CY | $ - 0 | ERROR:#VALUE! | BASE | 51101a | 51101b | 51101c |
| 3003 | 5.1.4 | Ballast (Regulator) | Task | 1000 LF | $ - 0 | ERROR:#VALUE! | BASE | 51102a | 51102b | 51102c |
| 3003 | 5.1.4 | Rail Crossings | Task | 4 | $ - 0 | $ - 0 | BASE | 51104a | 51104b | 51104c |
| 3003 | 5.1.4 | Road Crossing Surface Materials(wood) | Task | 4 | $ - 0 | $ - 0 | BASE | 51105a | 51105b | 51105c |
| 3003 | 5.1.4 | Road Crossing Surface Materials(Concrete) | Task | 1 | $ - 0 | $ - 0 | BASE | 51106a | 51106b | 51106c |
| 3003 | 5.1.4 | Road Crossing Surface Materials(rubber) | Task | 1 | $ - 0 | $ - 0 | BASE | 51107a | 51107b | 51107c |
| 3003 | 5.1.4 | Culverts | Task | 1 | $ - 0 | $ - 0 | BASE | 51108a | 51108b | 51108c |
| 3003 | 5.1.4 | Ties | Task | 50 | $ - 0 | $ - 0 | BASE | 51109a | 51109b | 51109c |
| 3003 | 5.1.4 | Joint Bars | Task | 8 | $ - 0 | $ - 0 | BASE | 51110a | 51110b | 51110c |
| 3003 | 5.1.4 | Rails (includes bonded and grounded rails) | Task | 4 | $ - 0 | $ - 0 | BASE | 51111a | 51111b | 51111c |
| 3003 | 5.1.4 | Mud Rails | Task | 1 | $ - 0 | $ - 0 | BASE | 51112a | 51112b | 51112c |
| 3003 | 5.1.4 | Grade crossing warning signs and signals | Task | 1 | $ - 0 | $ - 0 | BASE | 51113a | 51113b | 51113c |
| 3003 | 5.1.4 | Portable Derails | Task | 2 | $ - 0 | $ - 0 | BASE | 51114a | 51114b | 51114c |
| 3003 | 5.1.4 | Bumper stops | Task | 2 | $ - 0 | $ - 0 | BASE | 51115a | 51115b | 51115c |
| 3003 | 5.1.4 | Wheel stops | Task | 2 | $ - 0 | $ - 0 | BASE | 51117a | 51117b | 51117c |
| 3003 | 5.1.4 | Turnouts-Switch | Task | 1 | $ - 0 | $ - 0 | BASE | 51118a | 51118b | 51118c |
| 3003 | 5.1.4 | Turnouts-Frogs | Task | 1 | $ - 0 | $ - 0 | BASE | 51119a | 51119b | 51119c |
| 3003 | 5.1.4 | Turnouts-Guardrail | Task | 1 | $ - 0 | $ - 0 | BASE | 51120a | 51120b | 51120c |
| 3003 | 5.1.4 | Turnouts-Switch Stands including targets | Task | 1 | $ - 0 | $ - 0 | BASE | 51121a | 51121b | 51121c |
| 3003 | 5.1.4 | Turnouts-Connecting Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51122a | 51122b | 51122c |
| 3003 | 5.1.4 | Turnout-Switch Point Rail | Task | 1 | $ - 0 | $ - 0 | BASE | 51123a | 51123b | 51123c |
| 3003 | 5.1.4 | Turnout-Switch Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51124a | 51124b | 51124c |
| 3003 | 5.1.4 | Turnout-Switch Clips | Task | 1 | $ - 0 | $ - 0 | BASE | 51125a | 51125b | 51125c |
| 3003 | 5.1.4 | Turnout-Switch Heels | Task | 1 | $ - 0 | $ - 0 | BASE | 51126a | 51126b | 51126c |
| 3003 | 5.1.4 | Turnout-Rail Braces | Task | 1 | $ - 0 | $ - 0 | BASE | 51127a | 51127b | 51127c |
| 3003 | 5.1.4 | Turnout-Point Rail Stops | Task | 1 | $ - 0 | $ - 0 | BASE | 51128a | 51128b | 51128c |
| 3003 | 5.1.4 | (OTM) Tie Plates | Task | 1 | $ - 0 | $ - 0 | BASE | 51129a | 51129b | 51129c |
| 3003 | 5.1.4 | (OTM) Spikes | Task | 1 | $ - 0 | $ - 0 | BASE | 51130a | 51130b | 51130c |
| 3003 | 5.1.4 | (OTM) Hold down devices | Task | 1 | $ - 0 | $ - 0 | BASE | 51131a | 51131b | 51131c |
| 3003 | 5.1.4 | (OTM) Bolts, nuts, washers | Task | 1 | $ - 0 | $ - 0 | BASE | 51142a | 51142b | 51142c |
| 3003 | 5.1.4 | (OTM) Rail Anchors | Task | 1 | $ - 0 | $ - 0 | BASE | 51132a | 51132b | 51132c |
| 3003 | 5.1.4 | (OTM) Gage Rods | Task | 1 | $ - 0 | $ - 0 | ||||
| TOTAL MAINTENANCE REPAIR AND REPLACE COSTS | 98 | ERROR:#VALUE! |
| EMERGENCY CALL OUT FOR TRACK MAINTENANCE | Est Units | Unit Price | Total | ||||||
| 3004 | After hours emergency calls for track maintenance, repairs and replacement | Task | 1 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL EMERGENCY CALL OUT FOR TRACK MAINTENANCE - COSTS | 1 | $0.00 |
TOTAL COST OF THE CONTRACT ERROR:#VALUE!
&G OPTION YEAR 3 Volume IV: Cost/Price Proposal
OPTION YEAR 3
Use or disclosure of data contained on this sheet is subject to the restriction on the cover page of this proposal. &P
OPT4
| CLIN | Para. Number | Rail Track Maintenance | UM | |||||||
| INSPECT RAILROAD TRACK AND ADJUST AND LUBE ALL SWITCHES | Est Units | Unit Price | Total | |||||||
| 4001 | 5.1.1/5.1.2 | Inspect Railroad Trackage and adjust and lube all the switches | Monthly | 12 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL INSPECT AND ADJUST AND LUBE ALL SWITCHES- COSTS | 12 | $0.00 |
| SNOW AND VEGETATION REMOVAL | Est Units | Unit Price | Total | |||||||
| 4002 | 5.1.3 | Snow Rmoval, Switches | Task | 36 | $ - 0 | $ - 0 | BASE | 51202a | 51202b | 51202c |
| 4002 | 5.1.3 | Vegetation Removal, Switches | Task | 12 | $ - 0 | $ - 0 | BASE | 51203a | 51203b | 51203c |
| 4002 | 5.1.3.2 | Snow Removal, All Railway at A Track (CH&PP) | Task | 6 | $ - 0 | $ - 0 | BASE | 51204a | 51204b | 51204c |
| 4002 | 5.1.3.2 | Snow Removal, All Railway at E Track | Task | 3 | $ - 0 | $ - 0 | BASE | 51205a | 51205b | 51205c |
| 4002 | 5.1.3 | Vegetation Removal, All Railway | Task | 2 | $ - 0 | $ - 0 | BASE | 51206a | 51206b | 51206c |
| TOTAL SNOW AND VEGETATION REMOVAL - COSTS | 59 | $0.00 |
| MAINTENANCE REPAIR REPLACE | Est Units | Unit Price | Total | |||||||
| 4003 | 5.1.4 | Ballast (Replacement) | Task | 120 CY | $ - 0 | ERROR:#VALUE! | BASE | 51101a | 51101b | 51101c |
| 4003 | 5.1.4 | Ballast (Regulator) | Task | 1000 LF | $ - 0 | ERROR:#VALUE! | BASE | 51102a | 51102b | 51102c |
| 4003 | 5.1.4 | Rail Crossings | Task | 4 | $ - 0 | $ - 0 | BASE | 51104a | 51104b | 51104c |
| 4003 | 5.1.4 | Road Crossing Surface Materials(wood) | Task | 4 | $ - 0 | $ - 0 | BASE | 51105a | 51105b | 51105c |
| 4003 | 5.1.4 | Road Crossing Surface Materials(Concrete) | Task | 1 | $ - 0 | $ - 0 | BASE | 51106a | 51106b | 51106c |
| 4003 | 5.1.4 | Road Crossing Surface Materials(rubber) | Task | 1 | $ - 0 | $ - 0 | BASE | 51107a | 51107b | 51107c |
| 4003 | 5.1.4 | Culverts | Task | 1 | $ - 0 | $ - 0 | BASE | 51108a | 51108b | 51108c |
| 4003 | 5.1.4 | Ties | Task | 50 | $ - 0 | $ - 0 | BASE | 51109a | 51109b | 51109c |
| 4003 | 5.1.4 | Joint Bars | Task | 8 | $ - 0 | $ - 0 | BASE | 51110a | 51110b | 51110c |
| 4003 | 5.1.4 | Rails (includes bonded and grounded rails) | Task | 4 | $ - 0 | $ - 0 | BASE | 51111a | 51111b | 51111c |
| 4003 | 5.1.4 | Mud Rails | Task | 1 | $ - 0 | $ - 0 | BASE | 51112a | 51112b | 51112c |
| 4003 | 5.1.4 | Grade crossing warning signs and signals | Task | 1 | $ - 0 | $ - 0 | BASE | 51113a | 51113b | 51113c |
| 4003 | 5.1.4 | Portable Derails | Task | 2 | $ - 0 | $ - 0 | BASE | 51114a | 51114b | 51114c |
| 4003 | 5.1.4 | Bumper stops | Task | 2 | $ - 0 | $ - 0 | BASE | 51115a | 51115b | 51115c |
| 4003 | 5.1.4 | Wheel stops | Task | 2 | $ - 0 | $ - 0 | BASE | 51117a | 51117b | 51117c |
| 4003 | 5.1.4 | Turnouts-Switch | Task | 1 | $ - 0 | $ - 0 | BASE | 51118a | 51118b | 51118c |
| 4003 | 5.1.4 | Turnouts-Frogs | Task | 1 | $ - 0 | $ - 0 | BASE | 51119a | 51119b | 51119c |
| 4003 | 5.1.4 | Turnouts-Guardrail | Task | 1 | $ - 0 | $ - 0 | BASE | 51120a | 51120b | 51120c |
| 4003 | 5.1.4 | Turnouts-Switch Stands including targets | Task | 1 | $ - 0 | $ - 0 | BASE | 51121a | 51121b | 51121c |
| 4003 | 5.1.4 | Turnouts-Connecting Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51122a | 51122b | 51122c |
| 4003 | 5.1.4 | Turnout-Switch Point Rail | Task | 1 | $ - 0 | $ - 0 | BASE | 51123a | 51123b | 51123c |
| 4003 | 5.1.4 | Turnout-Switch Rods | Task | 1 | $ - 0 | $ - 0 | BASE | 51124a | 51124b | 51124c |
| 4003 | 5.1.4 | Turnout-Switch Clips | Task | 1 | $ - 0 | $ - 0 | BASE | 51125a | 51125b | 51125c |
| 4003 | 5.1.4 | Turnout-Switch Heels | Task | 1 | $ - 0 | $ - 0 | BASE | 51126a | 51126b | 51126c |
| 4003 | 5.1.4 | Turnout-Rail Braces | Task | 1 | $ - 0 | $ - 0 | BASE | 51127a | 51127b | 51127c |
| 4003 | 5.1.4 | Turnout-Point Rail Stops | Task | 1 | $ - 0 | $ - 0 | BASE | 51128a | 51128b | 51128c |
| 4003 | 5.1.4 | (OTM) Tie Plates | Task | 1 | $ - 0 | $ - 0 | BASE | 51129a | 51129b | 51129c |
| 4003 | 5.1.4 | (OTM) Spikes | Task | 1 | $ - 0 | $ - 0 | BASE | 51130a | 51130b | 51130c |
| 4003 | 5.1.4 | (OTM) Hold down devices | Task | 1 | $ - 0 | $ - 0 | BASE | 51131a | 51131b | 51131c |
| 4003 | 5.1.4 | (OTM) Bolts, nuts, washers | Task | 1 | $ - 0 | $ - 0 | BASE | 51142a | 51142b | 51142c |
| 4003 | 5.1.4 | (OTM) Rail Anchors | Task | 1 | $ - 0 | $ - 0 | BASE | 51132a | 51132b | 51132c |
| 4003 | 5.1.4 | (OTM) Gage Rods | Task | 1 | $ - 0 | $ - 0 | ||||
| TOTAL MAINTENANCE REPAIR AND REPLACE COSTS | 98 | ERROR:#VALUE! |
| EMERGENCY CALL OUT FOR TRACK MAINTENANCE | Est Units | Unit Price | Total | ||||||
| 4004 | After hours emergency calls for track maintenance, repairs and replacement | Task | 1 | $ - 0 | $ - 0 | BASE | 51201a | 51201b | 51201c |
| TOTAL EMERGENCY CALL OUT FOR TRACK MAINTENANCE - COSTS | 1 | $0.00 |
TOTAL COST OF THE CONTRACT ERROR:#VALUE!
OPTION YER 4
Sol. No. W912d0-18-R-0025 28 February 2019
File details come from the government source that posted it. Updated .