Attachment 4 - Evaluation Factors .pdf

PDF 393 KB Posted

Attached to
AIR TRAFFIC CONTROL TOWER WINDOW REPAIR/REPLACEMENT
Solicitation number
FA441924Q0047
Issued by

About this file

This document is an Evaluation Factors attachment for the federal contract solicitation FA441924Q0047 for AIR TRAFFIC CONTROL TOWER WINDOW REPAIR/REPLACEMENT at Altus Air Force Base, Oklahoma.

The key details are:

  • The contract will be awarded to the responsible offeror whose quote conforming to the solicitation will be most advantageous to the Government, considering price and technical acceptability.
  • The evaluation factors are: 1) Price, determined by the total of CLIN 0001, and 2) Technical Acceptability, assessed on whether the quoted item meets the salient characteristics specified in Attachment 1 - Statement of Need.
  • Quotes determined "Acceptable" for the Technical Acceptability factor will be further evaluated on price. Quotes determined "Unacceptable" will not receive further evaluation.
  • The solicitation will only be available via the Internet at SAM.gov, with no paper copies furnished. Questions must be submitted by 28 Jun 2024. The contract is subject to availability of funds, and the Government reserves the right to cancel the solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4 - Evaluation Factors

FA441924Q0047

52.212-2 EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

(May 2024)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

1. Price

2.Technical Acceptability

(End of provision)

ADDENDUM TO FAR 52.212-2:

Most advantageous to the Government is expected to result from selection of the technically acceptable quote with the lowest evaluated price. By submission of its quote, the vendor accepts all solicitation requirements, including all technical requirements and terms and conditions. Failure to conform to solicitation requirements may result in a quote being determined not awardable without further evaluation. The evaluation criteria are detailed below: Factor 1: Price The total evaluated price will be determined by the total of CLIN 0001. Before a contract may be awarded, the contracting officer must determine the price fair and reasonable per FAR 13.106-3. No telephonic responses will be processed. Factor 2: Technical Acceptability The purpose of the technical factor is to assess whether the vendor’s quoted item meets all of the provided salient characteristics for the required item. Each vendor’s quote will be evaluated against technical requirements and will be assigned a rating of “acceptable” or “unacceptable.” Rating Description: “Acceptable” - Quote clearly meets the items specifications of the solicitation. “Unacceptable” - Quote does not clearly meet the minimum requirements of the solicitation. The quote will be determined technically acceptable if it reflects the salient physical, functional, or performance characteristic specified in Attachment 1 –

Statement of Need, of this solicitation.

File details come from the government source that posted it. Updated .