Attachment 4 Evaluation Criteria.pdf
PDF 275 KB Posted
- Solicitation number
- 12444323Q0053
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Proposal Evaluation Criteria
Contents Section 1: Evaluation Methodology Section 2: Evaluation Factors
1.1 Factor 1 Technical Capability
1.1.1 Subfactor 1 WV Water Well Driller License
1.1.2 Subfactor 2 Technical Experience
1.2 Factor 2: Past Performance
1.3 Factor 3: Cost/Price
Section 3: Definitions
4.1 Adjectival Ratings
Section 1: Evaluation Methodology
Adjectival Evaluation will be based on Technical Capability, Past Performance, and Cost/Price as outlined below.
Section 2: Evaluation Factors
1.1 Factor 1 Technical Capability
1.1.1 Subfactor 1 WV Water Well Driller License
Submission Requirements:
Contractor must submit a copy of their West Virginia Water Well Driller’s License for a Key Person who will be assigned to this project.
Evaluation Criteria/Methodology:
Valid West Virginia Water Well Driller’s License is required to be considered Technically capable of performing this scope of work. Not including a License will result in a Unsatisfactory Rating
1.1.2 Subfactor 2 Technical Experience
Submission Requirements:
Contractor must submit a list of completed projects that are similar in nature to the proposed project, and details about the projects including scope, total cost.
Evaluation Criteria/Methodology:
Type, size, and relevance of projects shall be considered as part of this evaluation.
1.2 Factor 2: Past Performance
Submission Requirements:
Contractor shall submit a list of completed water well related projects, along with a list of references with contact information to be evaluated for past performance. List of completed projects to include change orders, schedule adherence, and cost overrun.
Evaluation Criteria/Methodology:
One or more references will be contacted to determine quality of past performance.
1.3 Factor 3: Cost/Price
Submission Requirements:
Contractor shall submit a quote to complete the work in the project scope. Evaluation Criteria/Methodology:
Quotes shall be evaluated on a best value basis. Lowest quote may not be accepted, pending the above listed evaluation factors.
Section 3: Definitions
4.1 Adjectival Ratings
Adjectival Rating Definition Exceptional Quote/Offer contains no deficiencies and fully addresses all aspects of the criteria and demonstrates an excellent approach/solution and understanding of the requirements. Many strengths exist, far outweighing any weaknesses. The highest quality of contract performance is anticipated with very low risk.
Very Good Quote/Offer contains no deficiencies; fully addresses all aspects of the criteria and demonstrates a very effective approach/solution and understanding of the requirements. Some weaknesses may exist; however, the weaknesses, if any, are outweighed by strengths. A high quality of contract performance is anticipated with low risk.
Satisfactory Quote/Offer contains no deficiencies; addresses all aspects of the criteria and demonstrates an adequate approach/solution and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. A quality contract performance is anticipated with an acceptable amount of risk.
Marginal Quote/Offer may contain deficiencies; fails to address all of the criteria and does not demonstrate an adequate approach/solution or understanding of the requirements. One or more weaknesses exist which are not offset by strengths.
Contract performance is anticipated with high risk.
Unsatisfactory Quote/Offer contains many deficiencies and does not address all aspects of the criteria and/or does not present evidence demonstrating an adequate approach/solution and understanding of the requirements. Many weaknesses and/or omissions exist creating an unacceptable risk.
| Section 1: Evaluation Methodology |
| Section 2: Evaluation Factors |
| 1 |
| 1.1 Factor 1 Technical Capability |
| 1.1.1 Subfactor 1 WV Water Well Driller License |
| 1.1.2 Subfactor 2 Technical Experience |
| 1.2 Factor 2: Past Performance |
| 1.3 Factor 3: Cost/Price |
| Section 3: Definitions |
| 2 |
| 3 |
| 4 |
| 4.1 Adjectival Ratings |
File details come from the government source that posted it. Updated .