This document provides details for a federal contract opportunity to expand and renovate the hemodialysis suite at the Bruce W. Carter VA Healthcare Center in Miami, Florida. The Department of Veterans Affairs Network Contracting Office 8 is seeking construction services including demolition of existing areas, installation of new hemodialysis equipment and air conditioning systems, plumbing, and light fixtures. Interested parties must be registered in the System for Award Management. The solicitation will be issued on or around July 21, 2021 with a closing response date of June 21, 2021. The magnitude of construction is estimated between $1,000,000 to $5,000,000. This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24821R0141 0002.pdf | ||
| Site Visit Page 2.docx | DOCX document | |
| Site Visit Page 1.docx | DOCX document | |
| 36C24821R0141 0001.pdf | ||
| RFIs Log Hemodialysis.pdf | ||
| Solicitation for 36C24821R0141.pdf | ||
| Attachment 8 - Past Performance Questionnaire.pdf | ||
| Attachment 5 - Wage Determination.pdf | ||
| Attachment 3 - Specifications Volume 2B.pdf | ||
| Attachment 9 - EMR.docx | DOCX document | |
| Attachment 1 - Specifications Volume 1.pdf | ||
| Attachment 6 - LOS Certification.doc | DOC document | |
| Attachment 7 - Price Matrix.xlsx | XLSX spreadsheet | |
| Attachment - 10 - Experience Information Sheet.docx | DOCX document | |
| Attachment 2 - Specifications Volume 2A.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Location
DEPARTMENT OF VETERANS AFFAIRS
DESIGN, EXPAND AND
RENOVATE HEMODIALYSIS
BRUCE W. CARTER MEDICAL CENTER
1201 NW 16TH STREET - MIAMI, FL 33125
PROJECT NUMBER - 546-17-113
CONSTRUCTION DOCUMENTS FINAL SUBMISSION
DECEMBER 22, 2020
strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
U.S. Department of Veterans Affairs
PROJECT LOCATION
BUILDING #1
strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
U.S. Department of Veterans Affairs
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
FLOOR PLAN - RENOVATION - LIFE SAFETY
1/8" = 1'-0"
LS-100
System No.W-L-7091 May 19, 2005
F Ratings - 1 & 2 Hr (See Item 1) T Rating - 0 Hr
1. Wall Assembly - The 1 or 2 hr fire rated gypsum board/steel stud wall assembly shall be constructed of the materials and in the manner described in the individual U400 or V400 Series Wall or Partition Design in the UL Fire Resistance Directory and shall include the following construction features:
A. Studs - Wall framing shall consist of steel channel studs to be min 3-1/2 in.
(89 mm) wide and spaced max 24 in. (610 mm) OC. Additional 3-1/2 in. (89
mm) wide steel studs shall be used to completely frame opening.
B. Gypsum Board* - Thickness, type, number of layers and fasteners as required in the individual Wall and Partition Design. Max size of opening to be 640 sq in. (4129 cm2) with a max dimension of 32 in. (813 mm)
The hourly F Rating of the firestop system is equal to the hourly fire rating of the wall assembly in which it is installed.
2. Steel Duct - Nom 30 in. by 18 in. (762 mm by 457 mm) (or smaller) No. 24 gauge (or heavier) galv steel duct installed concentrically or eccentrically within opening.
Annular space between duct and periphery of opening to be min 0 in. (point contact) to max 2 in. (0 mm to max 51 mm). Duct to be rigidly supported on both sides of wall assembly.
3. Firestop System - The firestop system shall consist of the following:
A. Fill,Void or Cavity Material* - Caulk or Sealant - Min 5/8 in. (16 mm) thickness of caulk applied within annulus, flush with both surfaces of wall.
3M COMPANY - CP 25WB+, IC 15WB+ caulk or FB-3000 WT sealant
B. Retaining Angles - Min 16 gauge galv steel angles sized to lap duct a min of 2 in. (51 mm) and lap wall surfaces a min of 1 in. (25 mm). Angles attached to duct on both sides of wall with min 1/2 in. (13 mm) long, No. 10 (or larger) sheet metal screws spaced a max 1 in. (25 mm) from each end and spaced a max 6 in. (152 mm) OC.
*Bearing the UL Classification Marking
SECTION A-A
SECTION A-A
System No.W-L-2299 May 19, 2005
F Ratings - 1 & 2 Hr (See Item 1) T Rating - 0 Hr
1. Wall Assembly - The 1 or 2 hr fire rated gypsum board/stud wall assembly shall be constructed of the materials and in the manner described in the individual U300, U400 or V400 Series Wall or Partition Design in the UL Fire Resistance Directory and shall include the following construction features:
A. Studs - Wall framing may consist of either wood studs or steel channel studs.
Wood studs to consist of nom 2 in. by 4 in. (51 mm by 102 mm) lumber spaced 16 in. (406 mm) OC. Steel studs to be min 3-1/2 in. wide (89 mm) spaced max 24 in. (610 mm) OC.
B. Gypsum Board* - The gypsum board type, thickness, number of layers, fastener type and sheet orientation shall be as specified in the individual U300 or U400 Series Design in the UL Fire Resistance Directory. Max diam of opening is 3-1/2 in. (89 mm).
The hourly F Rating of the firestop system is equal to the hourly fire rating of the wall assembly in which it is installed.
2. Through Penetrants - One nonmetallic pipe or conduit installed eccentrically or concentrically within opening. Annular space between penetrant and periphery of opening to be min 0 in. (point contact) to max 1-1/8 in. (0 mm to max 29 mm).
Penetrant to be rigidly supported on both sides of wall. The following types and sizes of penetrants may be used:
A. Polyvinyl Chloride (PVC) Pipe - Nom 2 in. (51 mm) diam (or smaller) Schedule 40 solid core or cellular core PVC pipe for use in closed (process or supply) or vented (drain, waste or vent) piping system.
B. Chlorinated Polyvinyl Chloride (CPVC) Pipe - Nom 2 in. (51 mm) diam (or smaller) SDR13.5 CPVC pipe for use in closed (process or supply) piping systems.
C. Rigid Nonmetallic Conduit+ - Nom 2 in. (51 mm) diam (or smaller) Schedule 40 PVC conduit installed in accordance with Article 347 of the National Electrical Code (NFPA No. 70).
D. Acrylonitrile Butadiene Styrene (ABS) Pipe - Nom 1-1/2 in. (38 mm) diam (or smaller) Schedule 40 solid core or cellular core ABS pipe for use in closed (process or supply) or vented (drain, waste or vent) piping systems.
E. Electrical Nonmetallic Tubing (ENT)+ - Nom 1-1/4 in (32 mm) diam (or smaller) ENT installed in accordance with Article 331 of the National Electrical Code (NFPA No. 70).
See Electrical Nonmetallic Tubing (FKHU) category in the Electrical Construction Materials Directory for names of manufacturers.
3. Fill,Void or Cavity Material* - Caulk or Sealant - Min 5/8 in. (16 mm) thickness of caulk applied within annulus, flush with both surfaces of wall. Min 1/4 in. (6 mm) diam bead of caulk applied to gypsum board/penetrant interface at point contact location on both sides of wall.
3M COMPANY - IC 15WB+, CP 25WB+ caulk or FB-3000 WT sealant (Note: CP 25WB+ not suitable for use with CPVC pipes.)
*Bearing the UL Classification Marking +Bearing the UL Listing Mark
1. Wall Assembly — The 1 or 2 h fire-rated gypsum wallboard/stud assembly shall be constructed of the materials and in the manner specified in the individual U300 or U400 Series Wall and Partition Designs in the UL Fire Resistance Directory and shall include the following construction features:
A. Studs — Wall framing may consist of either wood studs or steel channel studs.
Wood studs to consist of nom 2 by 4 in. lumber spaced 16 in. OC. Steel studs to be min 2-1/2 in. wide and spaced max 24 in. OC. Additional framing members to be installed in stud cavity containing the through penetrating item to form a rectangular box around the penetrant.
B. Gypsum Board* — One or two layers of nom 5/8 in. thick gypsum wallboard, as specified in the individual Wall and Partition Design. Max area of opening is 160 sq in. with max dimension of 20 in. Max width of opening in wood stud walls is limited to 14-1/2 in. The hourly F Rating the firestop system is equal to the hourly fire-rating of the wall assembly in which it is installed. In 1 h fire-rated wall assemblies, the T Rating is 0 h. In 2 h fire-rated wall assemblies, the T Rating is 1/2 h.
2. Cable Tray — Max 18 in. wide by 6 in. deep open ladder cable formed from No.
16 MSG (0.060 in.) thick galv steel with 1 in. wide by 3/4 in. deep galv steel rungs spaced 9 in. OC, or max 18 in. wide by 4 in. deep open ladder aluminum tray formed from 0.060 in. thick aluminum with 1 in. wide by 1-7/16 in. deep aluminum rungs spaced 9 in. OC. One cable tray shall be installed in the opening. The annular space between the cable tray the and top and bottom of the opening shall range from 0 in. (point contact) to a max 2 in. The annular space between the cable tray and each side shall be a nom 1 in.
3. Cables — Aggregate cross-sectional area of cables in cable tray to be max 30 percent of the cross-sectional area of the cable tray based on a max 3 in. cable loading depth within the cable tray. The max cable loading within the cable tray is dependent upon the depth of the cable tray (Item 2). For cable trays having a depth of 4 in. or less, the max cable loading depth is 30 percent. For cable trays having a depth greater than 4 in., the max cable loading is 18 percent. Any combination of the following types and sizes of copper conductor cables may be used:
A. Max 1/C No. 300 kcmil cable with cross-linked polyethylene (XLPE) jacket.
B. Max 7/C No. 12 AWG cable with polyvinyl chloride (PVC) or XLPE insulation and PVC jacket.
C. Max 100 pair No. 24 AWG cable with PVC insulation and jacket.
4. Firestop System — The firestop system shall consist of the following:
A. Steel Channel — "C" shaped channel field fabricated from min No. 30 MSG
(0.016 in.) thick galv sheet steel. Channel shall consist of two min 3 in. wide by 6 in. long flange and a min 5 in. deep by 6 in. wide web. The channels shall be fitted against each side of the opening. Each flange shall be secured to the steel studs on both surfaces of the wall by means of 2-1/4 in. long Type S self-drilling, self-tapping bugle-head steel screws and 1/4 in. by 1-1/2 in. diam steel fender washers, spaced 4 in. OC.
B. Fill, Void or Cavity Material* — Pillows — Max 9-1/2 in. long by 8 in. wide by 2-1/4 in. thick plastic covered intumescent pillows. Pillows to be installed with 9-1/2 in. dimension projecting through wall and centered within the opening of the wall assembly. Pillows tightly packed into opening to fill the annular space between cables and periphery of opening and between cable tray and periphery of opening. EGS NELSON FIRESTOP — Type PLW Pillows
C. Fill, Void or Cavity Material* — Putty — (Not Shown) — After installation of the pillows (Item 4B), putty shall be applied to seal any voids between the cables and the pillows and between the cable tray and the pillows on both sides of wall assembly. EGS NELSON FIRESTOP — Type FSP Putty
D. Wire Lath — Nom 2 in. hexagonal shaped wire lath fabricated from min No. 19 SWG (0.041 in.) galv steel wire. Wire lath cut to fit the contour of the opening with a min 3 in. lap beyond the periphery of the opening to keep the pillows in place. Wire lath secured to both surfaces of wall assembly by means of 2-1/4
in. long Type S self-drilling, self-tapping bugle-head steel screws and 1/4 in. by 1-1/2 in diam steel fender washers, spaced 6 in. OC.
System No. W-L-4003 November 05, 2010
F Ratings — 1 and 2 Hr (See Item 1B) T Ratings — 0 and 1/2 Hr (See Item 1B) strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
FLOOR PLAN - DEMOLITION
AD-100
strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
FLOOR PLAN - RENOVATION - ARCHITECTURAL
A-100 south wall materialmaterial finish room number space name floor material material material- finishfinish finish
ROOM FINISH SCHEDULE
base north wall east wall material materialfinish finishfinish west wall ceiling ceiling height remarks notes &
APC = ACOUSTICAL PANEL CEILING
BG = BUMPER GUARD (SEE DETAIL ON SHEET A-301)
B.O.S. = BOTTOM OF STRUCTURE
CONC = CONCRETE
CR = CHAIR RAIL (SEE DETAIL ON SHEET A-301)
CT = CERAMIC TILE
CG = CORNER GUARD (SEE DETAIL ON SHEET A-301)
FACT = FACTORY FINISH
GYP = GYPSUM WALLBOARD
HR = HAND RAIL (SEE DETAIL ON SHEET A-301)
N/A = NOT APPLICABLE
P = PAINT
SEALER = SEALER
TERR = TERRAZZO 3 8" MIN. THICKNESS
WD = WOOD
WSCT = WAINSCOT
1. CT TO BE WAINSCOT HEIGHT. SEE INTERIOR ELEVATIONS.
2. CHAIR RAIL. SEE PLAN FOR LOCATION. SEE DETAIL ON SHEET A-301.
3. HANDRAILS/CORNER GUARDS. SEE FLOOR PLAN FOR LOCATIONS.
4. MARBLE THRESHOLD.
5. WALL GUARDS. SEE DETAIL ON SHEET A-301. SEE FLOOR PLAN FOR
LOCATIONS.
6. WOOD WAINSCOT. REFER TO DETAILS ON SHEET A-301.
7. INSTALL CURTAIN TRACK.
8. CORNER GUARDS. SEE FLOOR PLAN FOR LOCATIONS.
100 PATIENT ENTRANCE EXIST CONC TERR VINYL COVE GYP P GYP P NA NA GYP P GYP P SEE RCP NOTE 8 101 CORRIDOR EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P APC FACT SEE RCP NOTE 3, 6, 8 102 MOBILITY DEVICE STORAGE EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P APC FACT SEE RCP NOTE 5, 8 103 WAITING EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P APC FACT SEE RCP NOTE 2, 6, 8 104 PATIENT TOILET EXIST CONC CT CT COVE GYP P/CT GYP P/CT GYP P/CT GYP P/CT APC FACT SEE RCP NOTE 1, 4 105 SEC./OPEN OFF./RECEP./STOR. EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P APC FACT SEE RCP NOTE 8 106 KITCHEN \ NOURISHMENT EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P APC FACT SEE RCP NOTE 6, 8 107 CORRIDOR EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P APC FACT SEE RCP NOTE 8 108 STAFF TOILET EXIST CONC CT CT COVE GYP P/CT GYP P/CT GYP P/CT GYP P/CT APC FACT SEE RCP NOTE 1, 4
110 STAFF LOUNGE/LOCKERS EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P APC FACT SEE RCP NOTE 8 111 CORRIDOR EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P APC FACT SEE RCP NOTE 8 112 CONFERENCE / CLASS ROOM EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P APC FACT SEE RCP 113 DOCTOR'S OFFICE EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P APC FACT SEE RCP
115 NURSE MANAGER EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P APC FACT SEE RCP 116 EXAM ROOM EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P APC FACT SEE RCP NOTE 5, 7, 8
117 NOT USED - - - - - - - - - - - - - - - -
119 NURSE AREA EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P APC FACT SEE RCP NOTE 5, 6, 8 120 MED. PREP. EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P APC FACT SEE RCP
122 #1 BARIATRIC BED STATION EXIST CONC TERR VINYL COVE NA NA NA NA GYP P NA NA APC FACT SEE RCP NOTE 5, 6, 7, 8
130 DIALYSIS EQUIP. STORAGE EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P APC FACT SEE RCP 131 #8 CHAIR STATION EXIST CONC TERR VINYL COVE NA NA NA NA GYP P GYP P APC FACT SEE RCP NOTE 5, 6, 7, 8 132 #9 CHAIR STATION EXIST CONC TERR VINYL COVE GYP P NA NA NA NA GYP P APC FACT SEE RCP NOTE 5, 6, 7, 8 133 SUPPLY STORAGE EXIST CONC TERR VINYL P GYP P GYP P GYP P GYP P APC FACT SEE RCP
135 #10 CHAIR STATION EXIST CONC TERR VINYL COVE GYP P NA NA NA NA GYP P APC FACT SEE RCP NOTE 5, 6, 7, 8 136 #11 CHAIR STATION EXIST CONC TERR VINYL COVE GYP P NA NA NA NA NA NA APC FACT SEE RCP NOTE 5, 6, 7, 8 137 #12 CHAIR STATION EXIST CONC TERR VINYL COVE GYP P GYP P NA NA NA NA APC FACT SEE RCP NOTE 5, 6, 7, 8 138 SOILED UTILITY EXIST CONC TERR CT COVE GYP P/CT GYP P/CT GYP P/CT GYP P/CT APC FACT SEE RCP NOTE 1, 4
139 H.A.C. EXIST CONC TERR CT COVE GYP P GYP P GYP P GYP P GYP P SEE RCP
141 NOT USED - - - - - - - - - - - - - - -
142 WATER TREAT./DIALYSIS PREP.EXIST CONC TERR TERR COVE GYP P GYP P GYP P GYP P B.O.S. P SEE RCP 143 #13 CHAIR STATION EXIST CONC TERR VINYL COVE GYP P NA NA NA NA GYP P APC FACT SEE RCP NOTE 5, 6, 7, 8
146 STAFF ENTRANCE EXIST CONC TERR VINYL COVE NA NA GYP P GYP P GYP P GYP P SEE RCP NOTE 8
148 #16 NEG. ISO. BED STATION EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P APC FACT SEE RCP NOTE 5, 6, 7, 8
153 DATA CLOSET EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P GYP P SEE RCP
154 ELEC. CLOSET EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P GYP P SEE RCP
128 #7 BARIATRIC CHAIR STATION EXIST CONC TERR VINYL COVE NA NA NA NA GYP P GYP P APC FACT SEE RCP NOTE 5, 6, 7, 8 129 BIOMED ENGINEERING EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P APC FACT SEE RCP
140 NOT USED - - - - - - - - - - - - - - -
109 STAFF ENTRANCE EXIST CONC TERR VINYL COVE GYP P GYP P NA NA GYP P GYP P SEE RCP NOTE 8
114 CORRIDOR EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P APC FACT SEE RCP NOTE 8
118 PATIENT TOILET EXIST CONC CT CT COVE GYP P/CT GYP P/CT GYP P/CT GYP P/CT APC FACT SEE RCP NOTE 1, 4
121 NURSE AREA EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P APC FACT SEE RCP NOTE 5, 6, 8
123 #2 BARIATRIC BED STATION EXIST CONC TERR VINYL COVE NA NA NA NA GYP P NA NA APC FACT SEE RCP NOTE 5, 6, 7, 8 124 #3 BARIATRIC BED STATION EXIST CONC TERR VINYL COVE NA NA NA NA GYP P NA NA APC FACT SEE RCP NOTE 5, 6, 7, 8 125 #4 BARIATRIC CHAIR STATION EXIST CONC TERR VINYL COVE NA NA NA NA GYP P NA NA APC FACT SEE RCP NOTE 5, 6, 7, 8 126 #5 BARIATRIC CHAIR STATION EXIST CONC TERR VINYL COVE NA NA NA NA GYP P NA NA APC FACT SEE RCP NOTE 5, 6, 7, 8 127 #6 BARIATRIC CHAIR STATION EXIST CONC TERR VINYL COVE NA NA NA NA GYP P NA NA APC FACT SEE RCP NOTE 5, 6, 7, 8
134 PATIENT TOILET EXIST CONC CT CT COVE GYP P/CT GYP P/CT GYP P/CT GYP P/CT APC FACT SEE RCP NOTE 1
143 #14 CHAIR STATION EXIST CONC TERR VINYL COVE GYP P NA NA NA NA NA NA APC FACT SEE RCP NOTE 5, 6, 7, 8 144 #15 CHAIR STATION EXIST CONC TERR VINYL COVE GYP P GYP P NA NA NA NA APC FACT SEE RCP NOTE 5, 6, 7, 8
149 PATIENT TOILET EXIST CONC CT CT COVE GYP P/CT GYP P/CT GYP P/CT GYP P/CT GYP P SEE RCP NOTE 1, 4 150 #17 NEG. ISO. BED STATION EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P APC FACT SEE RCP NOTE 5, 6, 7, 8 151 #18 NEG. ISO. BED STATION EXIST CONC TERR VINYL COVE GYP P GYP P GYP P GYP P APC FACT SEE RCP NOTE 5, 6, 7, 8 152 PATIENT TOILET EXIST CONC CT CT COVE GYP P/CT GYP P/CT GYP P/CT GYP P/CT GYP P SEE RCP NOTE 1, 4
147 PATIENT TOILET EXIST CONC CT CT COVE GYP P/CT GYP P/CT GYP P/CT GYP P/CT GYP P SEE RCP NOTE 1, 4 strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
FLOOR PLAN - RENOVATION - DIMENSIONED
A-101 strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
FLOOR PLAN - RENOVATION - RCP
A-200
CORRIDOR SIDE
SUITE SIDE
strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
BUILDING SECTION
1/4" = 1'-0"
A A-300
A-301
A-701
BUILDING SECTION
1/4" = 1'-0"
B A-300
A-701 strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
BIOMED ENGINEERING
TYPICAL CHAIR STATION LAYOUT
1/4" = 1'-0"
A-400
#134
PATIENT TOILET
1/4" = 1'-0"
A-400
TYPICAL BED STATION LAYOUT
1/4" = 1'-0"
A-400
ISO. BED STATION LAYOUT
1/4" = 1'-0"
A-400
#103
WAITING
1/4" = 1'-0"
A-400
ENLARGED PLANS
1/4" = 1'-0"
A-400
ENLARGED PLANS
1/4" = 1'-0"
A-400
TYPICAL CHAIR STATION LAYOUT
N.T.S.
AA
A-400
TYPICAL BED STATION LAYOUT
N.T.S.
BB
A-400
TYPICAL ISO. BED STATION LAYOUT
N.T.S.
CC
A-400 strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
NURSE'S AREA
1/4" = 1'-0"
A-401
NURSE STATION
N.T.S.
AA
A-401 strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
VAO VAO
VAO VAO
VAOVAO VAOVAO VAO
VAOVAOVAOVAOVAO VAO
strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
VAO
718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994 door, frame and glazingopening hardware re ma rks / n ote s ke y s ide ke y m ar k ke y t yp e loc k a cc es s gla zin g t yp e fra me fin ish fra me m ate ria l fra me ty pe do or fin ish do or m ate ria l do or ty pe fire ra tin g no mi na l s ize s do or nu mb er
DOOR SCHEDULE
ja mb de tai l he ad de tai l sil l d eta il gla zin g s top si de ha rd wa re gr ou p
WD = WOOD
ALUM= ALUMINUM
DOOR MATERIAL:
DOOR FINISH
S = STAIN
M = MANUFACTURE'S FINISH
FRAME TYPE
SEE ELEVATIONS FOR TYPES.
AL = ALUMINUM
S = STANDARD
FRAME MATERIAL:
HM = STD HOLLOW METAL (O8110)
ALUM = ALUMINUM
FRAME FINISH:
P = PAINT
M = MANUFACTURE'S FINISH
HARDWARE GROUPS:
REFER TO SPEC SECTION 08 71 00
DOOR TYPE:
SEE ELEVATIONS FOR TYPES.
AL = ALUMINUM
F = FLUSH
FG = FULL GLASS
NL = NARROW LIGHT
SL = SLIDING DOOR
SLG = GLASS SLIDING DOOR
NOTES:
1. SINGLE SLIDING DOOR. HARDWARE AND FRAME BY
MANUFACTURER.
2. DOUBLE EGRESS DOOR.
3. GLAZING .25 T = 14" CLEAR TEMPERED GLASS
4. THE ABBREVIATION "NA" MEANS " NOT APPLICABLE "
WHERE NOTED ON THE SCHEDULE.
5. SEE WINDOW TYPES FOR DOOR FRAME.
6. ICU DOOR HARDWARE AND FRAME BY
MANUFACTURER.
100 PR. 3'-0"x7'-0" 45 MIN NL WD S S2 HM P .25 T NA 4 3 NA HW-1 NA NA NA NA NOTE 3
102 4'-0"x7'-0" NA F WD S S1 HM P NA NA 2 1 NA HW-2 NA NA NA NA
112 3'-0"x7'-0" NA FG ALUM M B ALUM M .25 T NA 13 5 NA HW-8 NA NA NA NA NOTE 3, 5
120 3'-0"x7'-0" NA SLG1 ALUM M F ALUM M .5 T NA 17 16 NA HW-16 NA NA NA NA NOTE 1
146 PR. 2'-0"/3'-0"x7'-0" 45 MIN F WD S S1 HM P NA NA 2 1 NA HW-1 NA NA NA NA
101 PR. 3'-0"x7'-0" NA NL WD S S2 HM P .25 T NA 4 3 NA HW-3 NA NA NA NA NOTE 2, 3
104 3'-0"x7'-0" NA F WD S S1 HM P NA NA 2 1 A HW-4 NA NA NA NA 106 3'-0"x7'-0" NA NL WD S S1 HM P .25 T NA 2 1 NA HW-9 NA NA NA NA NOTE 3 108 3'-0"x7'-0" NA F WD S S1 HM P NA NA 2 1 A HW-5 NA NA NA NA 109 3'-0"x7'-0" 45 MIN F WD S S1 HM P NA NA 2 1 NA HW-6 NA NA NA NA 110 3'-0"x7'-0" NA NL WD S S1 HM P .25 T NA 2 1 NA HW-7 NA NA NA NA NOTE 3 111 3'-0"x7'-0" NA NL WD S S1 HM P .25 T NA 2 1 NA HW-7 NA NA NA NA NOTE 3
113 3'-0"x7'-0" NA FG ALUM M B ALUM M .25 T NA 13 5 NA HW-8 NA NA NA NA NOTE 3, 5 115 3'-0"x7'-0" NA FG ALUM M B ALUM M .25 T NA 13 5 NA HW-8 NA NA NA NA NOTE 3, 5 116 4'-0"x7'-0" NA F WD S S1 HM P NA NA 2 1 NA HW-8 NA NA NA NA 118 3'-0"x7'-0" NA F WD S S1 HM P NA NA 2 1 A HW-4 NA NA NA NA
129 3'-0"x7'-0" NA F WD S S1 HM P NA NA 2 1 NA HW-7 NA NA NA NA 130 3'-0"x7'-0" NA F WD S S1 HM P NA NA 2 1 NA HW-2 NA NA NA NA 133 3'-0"x7'-0" NA F WD S S1 HM P NA NA 2 1 NA HW-2 NA NA NA NA 134 3'-0"x7'-0" NA F WD S S1 HM P NA NA 2 1 A HW-4 NA NA NA NA 138 3'-0"x7'-0" NA F WD S S1 HM P NA NA 2 1 NA HW-2 NA NA NA NA 139 3'-0"x7'-0" NA F WD S S1 HM P NA NA 2 1 NA HW-2 NA NA NA NA
148 9'-0"x7'-4" NA ICU2 ALUM M FACT ALUM M .25 T NA 19 20 NA HW-12 NA NA NA NA NOTE 6, 3
153 PR. 3'-0"x7'-0" 45 MIN F WD S S2 HM P NA NA 4 3 NA HW-15 NA NA NA NA
142 3'-0"x7'-0" NA F WD S S1 HM P NA NA 2 1 NA HW-2 NA NA NA NA
147 3'-0"x7'-0" NA NL WD S S1 HM P .25 T NA 2 1 NA HW-10 NA NA NA NA NOTE 3 147A 3'-0"x7'-0" NA NL WD S S1 HM P .25 T NA 2 1 NA HW-11 NA NA NA NA NOTE 3 147B 3'-0"x7'-0" NA NL WD S S1 HM P .25 T NA 2 1 NA HW-11 NA NA NA NA NOTE 3
149A 3'-0"x7'-0" NA F WD S S1 HM P NA NA 2 1 A HW-14 NA NA NA NA 149B 3'-0"x7'-0" NA F WD S S1 HM P NA NA 2 1 A HW-14 NA NA NA NA 150 8'-8"x7'-4" NA ICU1 ALUM M FACT ALUM M .25 T NA 10 11 12 HW-13 NA NA NA NA NOTE 6, 3 151 8'-8"x7'-4" NA ICU1 ALUM M FACT ALUM M .25 T NA 10 11 12 HW-13 NA NA NA NA NOTE 6, 3 152 3'-0"x7'-0" NA F WD S S1 HM P NA NA 2 1 A HW-14 NA NA NA NA
154A 3'-0"x7'-0" 45 MIN F WD S S1 HM P NA NA 2 1 NA HW-2 NA NA NA NA
E1-2 3'-0"x7'-0" NA F WD S S1 HM P NA NA 2 1 NA HW-2 NA NA NA NA 154B 3'-0"x7'-0" 45 MIN F WD S S1 HM P NA NA 2 1 NA HW-2 NA NA NA NA
A
-6
A-600
B A-600
A
-6
A-600B
A-600
A
-6
A
-6
A
-6
A-600
A-600
A
-6
A-600
A-600
A
-6
A-600
A
-6
A-600
A
-6 00 5
A -6
00 5 A
-6
A
-6
A -6
A -6
A-600
A-600
A
-6
A-600
A
-6
A-600
A
-6
A
-6
A-600
A-60013
A-600
A-600
A-600
A
-6
A
-6
A
-6
A-600
A
-6 00 7
A -6
A
-6
A-600
A-600
A-600
A-600
A-600
A-600
DOOR
HEAD DTL.
1 1/2" = 1'-0"
A-600
DOOR
JAMB DTL.
1 1/2" = 1'-0"
A-600
DOOR
HEAD DTL.
1 1/2" = 1'-0"
A-600
DOOR
JAMB DTL.
1 1/2" = 1'-0"
A-600
ICU SLIDING
SILL DTL.
1 1/2" = 1'-0"
A-600
ICU SLIDING
JAMB DTL.
1 1/2" = 1'-0"
A-600
ICU SLIDING
HEAD DTL.
1 1/2" = 1'-0"
A-600
UNEVEN PAIR
JAMB DTL.
1 1/2" = 1'-0"
A-600
UNEVEN PAIR
HEAD DTL.
1 1/2" = 1'-0"
A-600 strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
COUNTER SUPPORT DETAIL
3" = 1'-0"
C A-700 strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
A-701 strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
TYPICAL DIVIDER STRIP
1'-0" = 1'-0"
A A-800
SILL/THRESHOLD @ DOOR 200
6" = 1'-0"
B A-800
NEW 5/8" TERRAZZO FLOOR TRANSITION
6" = 1'-0"
C A-800 strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
FLOOR PLAN - EQUIPMENT LAYOUT
AI-100
strollo & strollo 718 Virginia Drive
Orlando, FL. 32803 T: (407) 423-5355 F: (407) 422-5994
SCALE:
SCALE:
SCALE:
SCALE:
NTS
NTS
NTS
NTS
X X X
X X X
BOTTOM OF STRUCTURE
UPRIGHT SPRINKLER HEAD
REDUCER
1" NIPPLE
BRANCH LINE
RECESSED PENDENT
SPRINKLER HEAD DETAIL
UPRIGHT SPRINKLER HEAD DETAIL
SPRINKLERS IN GRID CEILING SYSTEMS SHALL BE LOCATED AT THE
MIDPOINT OR QUARTERPOINT OF THE FOUR FOOT (4') DIMENSION AND THE
MIDPOINT OF THE TWO (2') DIMENSION. WHERE A CONFLICT OCCURS,
SYMMETRY ABOUT THE AXIS SHALL BE MAINTAINED.
E Q
E
Q
EQ.EQ.EQ.EQ.
E Q
E
Q
E Q
E
Q
EQ.EQ.
E Q
E
Q
EQ. EQ.
E Q
E
Q
EQ. EQ.
SPRINKLER
SPEAKER OR
OTHER DEVICE
AIR DEVICE OR
LIGHT FIXTURE
CEILING LEGEND
SPRINKLER MOUNTING DETAIL
UNION WITH CORROSION
RESISTANT ORIFICE GIVING FLOW
EQUIVALENT TO THE SMALLEST
SPRINKLER ORIFICE IN THE SYSTEM
TO DRAIN
SYSTEM RISER
AUXILIARY DRAIN
VALVE
SITE GLASS
INSPECTORS TEST VALVE
1" DRAIN LINE
PRESSURE GAUGE
WATER FLOW SWITCH
TO SPRINKLERS
INDICATING TYPE FLOOR
CONTROL VALVE WITH
SUPERVISORY SWITCH
FIRE SPRINKLER ZONE
VALVE PIPING DETAIL
CEILING
SPRINKLER HEAD
BRANCH LINE
REDUCER
1" NIPPLE
CEILING
GENERAL NOTES
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND
INDICATIVE OF WORK TO BE PROVIDED (FURNISHED AND
INSTALLED) UNDER THIS CONTRACT. DRAWINGS SHOULD NOT
BE SCALED.
2. THE CONTRACTOR IS RESPONSIBLE TO EXAMINE THE EXISTING
CONDITIONS UNDER WHICH THEY SHALL OPERATE AND VERIFY
THE EXTENT OF WORK REQUIRED TO COMPLETE THE WORK
UNDER THIS CONTRACT.
3. PRIOR TO ORDERING AND FABRICATING ANY EQUIPMENT, IT IS
THE RESPONSIBILITY OF THE CONTRACTOR TO EXAMINE THE
PHYSICAL CONDITIONS AT THE PROJECT SITE AND VERIFY
SPACE AND SUFFICIENT CLEARANCES ARE AVAILABLE FOR
INSTALLING EQUIPMENT, DUCTWORK, PIPING, AND
APPURTENANCES, AND TO DETERMINE ANY NECESSARY
MODIFICATIONS.
4. PERFORM ALL WORK IN COMPLIANCE WITH ALL APPLICABLE
FEDERAL, STATE, AND LOCAL CODES, REGULATIONS, AND
STANDARDS ADOPTED BY THE AUTHORITY HAVING
JURISDICTION. IF CONFLICTS EXIST BETWEEN THESE
ENGINEERING DOCUMENTS AND CODES, THE MOST STRINGENT
REQUIREMENTS SHALL GOVERN.
5. ALL CONSTRUCTION WORK SHALL ALSO MEET THE FOLLOWING
CODE REQUIREMENTS:
• VA ARCHITECTURAL DESIGN MANUAL 2014
• VA INTERIOR DESIGN MANUAL 2020
• VA ASBESTOS ABATEMENT DESIGN MANUAL 2011
• VA CRITICAL PATH METHOD DESIGN MANUAL 2012
• VA PHYSICAL SECURITY DESIGN MANUAL 2020
• MANUAL FOR PREPERATION OF COST ESTIMATES AND
RELATED DOCUEMENTS FOR VA FACILITIES 2019
• VA ELEVATOR DESIGN MANUAL 2020
• VA HVAC DESIGN MANUAL 2020
• VA PLUMBING DESIGN MANUAL 2018
• VA FIRE PROTECTION DESIGN MANUAL 2015
• VA ELECTRICAL DESIGN MANUAL 2019
• VA LIGHTING DESIGN MANUAL 2015
• INTERNATIONAL BUILDING CODE (IBC) 2018
• INTERNATIONAL EXISTING BUILDING CODE 2018
• IBC MECHANICAL 2018
• IBC PLUMBING 2018
• IBC ENERGY CONSERVATION 2018
• INTERNATIONAL FIRE CODE 2018
• NFPA 1-2021, THE UNIFORM FIRE CODE
• NFPA 101-2021, THE LIFE SAFETY CODE
• NFPA 51B-2019, STANDARD FOR FIRE PREVENTION DURING
WELDING, CUTTING AND OTHER HOT WORK
• NFPA 13-2019, STANDARD FOR THE INSTALLATION OF
SPRINKLER SYSTEMS
• NFPA 70-2020, NATIONAL ELECTRICAL CODE
• NFPA 90A-2021, STANDARD FOR THE INSTALLATION OF AIR
CONDITIONING AND VENTING SYSTEMS.
• NFPA 99-2021, STANDARD FOR HEALTH CARE FACILITIES
• NFPA 241-2019, STANDARD FOR SAFEGUARDING
CONSTRUCTION, ALTERATION AND DEMOLITION
OPERATIONS.
6. CONTRACTOR SHALL COORDINATE AND SEQUENCE
DEMOLITION, CLEANING, AND CONSTRUCTION WORK.
7. CONTRACTOR SHALL NOTE ANY SPECIAL REQUIREMENTS FOR
INSTALLATION OF WORK UNDER THIS CONTRACT. DISMANTLE
AND REASSEMBLE EQUIPMENT AS NECESSARY FOR ENTRY INTO
THE BUILDING AND THE LOCATION OF INSTALLATION.
8. THE CONTRACTOR SHALL MAINTAIN A COMPLETE PROJECT
SCHEDULE AND SHALL UPDATE THIS SCHEDULE WEEKLY. ANY
CHANGES SHALL BE NOTED AND AN UPDATED SCHEDULE SHALL
BE PROVIDED TO THE OWNER.
9. ALL PERMITS, FEES, TAXES, ETC SHALL BE PAID BY
CONTRACTOR AS PART OF THE TOTAL PROJECT COST.
10. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED
WALLS, PARTITIONS, CEILINGS, AND FLOORS. SEAL ALL
PENETRATIONS THROUGH RATED ASSEMBLIES WITH FIRESTOP
MATERIAL IN ACCORDANCE WITH U.L. REQUIREMENTS TO
MAINTAIN THE ASSEMBLY RATING.
11. CONTRACTOR SHALL FURNISH U.L. APPROVED DRAWINGS FOR
EACH TYPE OF FIRE AND SMOKE RATED ASSEMBLY
PENETRATION BY DUCTS, PIPES, OR CONDUITS, AND SHALL
DISPLAY THESE DRAWINGS ON THE JOB SITE AT ALL TIMES
DURING CONSTRUCTION.
12. CONTRACTOR SHALL REFER TO ALL DETAILS FOR PROPER
GUIDANCE.
13. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND
EQUIPMENT SUBMITTALS FOR ALL PRODUCTS USED ON
PROJECT.
14. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT
RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR
DEVIATIONS FROM THE REQUIREMENTS OF CONTRACT
DOCUMENTS UNLESS THE CONTRACTOR HAS RECEIVED
WRITTEN APPROVAL FROM THE ENGINEER TO THE SPECIFIC
DEVIATION. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA
SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR
ERRORS OR OMISSIONS IN HIS OR HER SUBMITTAL DATA.
15. THE CONTRACTOR IS REQUIRED TO SUBMIT THREE COMPLETE
O&M MANUALS IN THREE RING BINDERS AT SUBSTANTIAL
COMPLETION. MANUALS SHALL INCLUDE INSTALLATION AND
MAINTENANCE DATA ON ALL NEW EQUIPMENT AND MATERIALS,
CERTIFIED TECHNICAL PRODUCT DATA, EQUIPMENT SHOP
DRAWINGS, SPARE PARTS DATA, ETC. PROVIDE AN INDEX AND
ASSOCIATED DIVIDERS.
16. CLOSE OUT DOCUMENTS: THE CONTRACTOR IS TO MAINTAIN
ONE SET OF CONSTRUCTION DRAWINGS ON SITE AND KEEP
CURRENT WITH MARK UP AS-BUILT CONDITIONS DURING
CONSTRUCTION OF THE PROJECT. THIS SET IS TO INCLUDE ALL
CONTRACT CHANGES, MODIFICATIONS AND CLARIFICATIONS.
THIS SET ALONG WITH ALL SHOP DRAWINGS SHALL BE TURNED
OVER TO THE ARCHITECT/ENGINEER AFTER CONSTRUCTION
COMPLETION.
17. IT IS THE RESPONSIBILITY OF ALL BIDDERS TO THOROUGHLY
REVIEW AND UNDERSTAND ALL CONSTRUCTION DOCUMENTS.
THIS INCLUDES BUT IS NOT LIMITED TO ALL DRAWINGS,
SPECIFICATION SECTIONS, ETC. THE DRAWINGS ARE
SCHEMATIC IN NATURE. THEREFORE BEFORE STARTING ANY
WORK, THE CONTRACTOR SHALL REVIEW ALL OTHER
CONSTRUCTION DOCUMENTS, VERIFY FIELD CONDITIONS AND
SHALL MAKE ANY REQUIRED MINOR ADJUSTMENTS WITHOUT
EXTRA COST TO THE OWNER. ANY MAJOR DISCREPANCIES
FOUND SHALL BE BROUGHT TO THE ATTENTION OF THE
ARCHITECT/ENGINEER. THE BASE BID SHALL REFLECT THE
TOTAL COST OF NEW EQUIPMENT INSTALLATION. THIS
INCLUDES LABOR, EQUIPMENT AND MATERIALS. NO CHANGE
ORDERS SHALL BE ISSUED WITHOUT WRITTEN CONSENT AND
APPROVAL FROM ENGINEER AND ARCHITECT.
1. THESE DOCUMENTS REPRESENT THE DESIGN INTENT AND
COVERAGE AREA FOR THE FIRE SPRINKLER SYSTEM WITHIN THE
PROJECT SCOPE. THE CONTRACTOR IS RESPONSIBLE FOR
PROVIDING A COMPLETE FIRE SPRINKLER SYSTEM APPROVED PER
NFPA AND BY THE AUTHORITY HAVING JURISDICTION. PROVIDE
HYDRAULIC CALCULATIONS, SHOP DRAWINGS, AND ANY
ADDITIONAL EQUIPMENT NECESSARY TO COMPLETE THE
INSTALLATION AND COMPLY WITH THE SPECIFICATIONS AND ALL
APPLICABLE CODES AND CRITERIA.
2. ALL FIRE PROTECTION WORK SHALL MEET ALL THE
REQUIREMENTS OF THE US DEPARTMENT OF VETERAN AFFAIRS
FIRE PROTECTION DESIGN MANUAL, LATEST APPROVED EDITION
NFPA FIRE CODES, AND APPLICABLE OSHA AND EPA REGULATIONS
AND GUIDELINES. WHERE CONFLICTS BETWEEN CODE AND
CONSTRUCTION DOCUMENTS OCCUR, THE MOST RESTRICTIVE
REQUIREMENTS SHALL GOVERN.
3. THE CONTRACTOR SHALL SUBMIT A SEPARATE PERMIT
APPLICATION AND PLANS FOR REVIEW ACCORDING TO NFPA 1
(2018 EDITION), SECTION 1.14.
4. A CONTRACTOR'S MATERIAL AND TEST CERTIFICATE SHALL BE
COMPLETED IN ACCORDANCE WITH NFPA 13 AND FORWARDED TO
THE OWNER'S REPRESENTATIVE.
5. ALL MATERIAL SHALL BE OF APPROVED QUALITY AND THE WORK
SHALL BE DONE IN A THOROUGH AND WORKMANLIKE MANNER.
THE WORK, MATERIALS AND TEST SHALL BE IN ACCORDANCE WITH
THE CURRENT REQUIREMENTS OF NFPA 13, LATEST EDITION.
6. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT
NECESSARILY SHOW ALL PIPING, ELBOWS, OFFSETS, UNION,
VALVES AND FITTINGS REQUIRED TO COMPLETE THE
INSTALLATION OF THE WORK. THE SUBMISSION OF A PROPOSAL
SHALL BE CONSTRUED AS EVIDENCE THAT THE CONTRACTOR HAS
FAMILIARIZED HIMSELF WITH THE PLANS AND BUILDING SITE.
CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR MATERIALS
AND LABOR BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT
BE RECOGNIZED IF THEY COULD HAVE BEEN FORESEEN HAD
PROPER EXAMINATION BEEN MADE.
7. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS,
PARTITIONS, CEILINGS, AND FLOOR ASSEMBLIES. SEAL ALL
PENETRATIONS THROUGH RATED ASSEMBLIES WITH FIRESTOP
MATERIAL IN ACCORDANCE WITH UL REQUIREMENTS TO MAINTAIN
THE ASSEMBLY RATING. REFER TO ARCHITECTURAL DOCUMENTS
FOR LOCATIONS OF SMOKE AND/OR FIRE RATED WALLS; REFER TO
PENETRATION DETAILS FOR FIRE PROTECTION PIPING
PENETRATIONS THROUGH RATED ASSEMBLIES.
8. THE SPACING AND SIZES OF SPRINKLERS AND PIPES SHALL
CONFORM TO THE REQUIREMENTS OF NFPA 13. SPRINKLERS
SHALL BE INSTALLED BY PERSONNEL WHO HAVE ENGINEERING
FACILITIES AND EXPERIENCE IN SUCH WORK AND WHO ARE
REGULARLY EMPLOYED TO DO SUCH WORK.
9. FIRE SPRINKLER CONTRACTOR SHALL COORDINATE THE
LOCATION OF RISERS, CROSS MAINS, BRANCH LINES, AND
SPRINKLER HEADS WITH ALL OTHER TRADE SYSTEMS TO AVOID
CONFLICTS AND MAINTAIN ARCHITECTURAL ELEMENTS OF THE
BUILDING.
10. PIPE HANGERS SHALL BE SPACED AND LOCATED ACCORDING TO
NFPA 13.
11. ALL BRANCH LINES SERVING ONE SPRINKLER SHALL BE 1"
MINIMUM, UNLESS OTHERWISE NOTED.
12. INSTALL ALL SPRINKLERS ACCORDING TO THEIR LISTINGS,
SPACING, AND OBSTRUCTION REQUIREMENTS.
13. COORDINATE SPRINKLER HEAD TYPES AND LOCATIONS WITH
ARCHITECTURAL FINISHES, CEILING, LIGHTING, DUCTS, PIPING,
OTHER CEILING MOUNTED DEVICES, AND STRUCTURAL
COMPONENTS.
14. LIGHT FIXTURES AND HVAC DIFFUSERS TAKE PRECEDENCE. ADD
ADDITIONAL SPRINKLERS AT NO ADDITIONAL COST AND AS
NECESSARY TO MEET COVERAGE REQUIREMENTS IN
ACCORDANCE WITH NFPA 13.
15. INSTALL SPRINKLERS IN THE CENTER OF CEILING TILES WHEN
POSSIBLE. PROVIDE RETURN BENDS AT ALL SPRINKLER
LOCATIONS TO ALLOW FIELD ADJUSTMENT.
16. FOR MECHANICAL ROOMS, DETERMINE THE FINAL LOCATION OF
SPRINKLERS AFTER EQUIPMENT AND DUCTWORK ARE INSTALLED.
PROVIDE ADDITIONAL SPRINKLERS, IF NECESSARY, TO PROVIDE
ADEQUATE COVERAGE IN ACCORDANCE WITH NFPA.
17. PROVIDE A UL LISTED SPRINKLER GUARD IN LOCATIONS WHERE
SPRINKLERS ARE SUBJECT TO MECHANICAL DAMAGE; INCLUDING
IN MECHANICAL ROOMS, ELECTRICAL ROOMS, STAIRWELL
LANDINGS, ELEVATOR SHAFTS, AND ON ALL SPRINKLERS
INSTALLED BELOW 7'-0" AFF.
18. PIPE SUPPORTS: PROVIDE HANGERS, CLAMPS, RODS AND OTHER
ACCESSORIES OF AN APPROVED TYPE AND IN SUFFICIENT
NUMBER TO PROPERLY SUPPORT ALL PIPING. PIPING SHALL BE
SUPPORTED BY ROUND WROUGHT U-TYPE APPROVED
ADJUSTABLE HANGERS.
19. SPRINKLERS SHALL BE 1/2" ORIFICE TYPE OF ORDINARY DEGREE
RATING EXCEPT WHERE EXCESSIVE TEMPERATURES ARE
ANTICIPATED. IN THESE LOCATIONS PROVIDE HIGH TEMPERATURE
SPRINKLERS INSTALLED IN ACCORDANCE WITH NFPA 13. PROVIDE
QUICK RESPONSE SPRINKLERS IN LIGHT HAZARD AREAS.
20. PROVIDE AND MAINTAIN A MINIMUM OF 18 INCHES CLEARANCE
BETWEEN THE BOTTOM OF THE SPRINKLER DEFLECTOR AND THE
TOP OF STORAGE, FILES, ETC.
21. IF FIRE RATED CONSTRUCTION BARRIERS ARE NOT USED TO
SEPARATE AREA OF WORK FROM SURROUNDING AREAS, PROVIDE
TEMPORARY UPRIGHT SPRINKLER COVERAGE UNTIL NEW CEILING
SYSTEM IS INSTALLED PER NFPA 241. ALTERNATIVELY, A FIRE
WATCH IS ACCEPTABLE IN LIEU OF TEMPORARY UPRIGHT
SPRINKLER COVERAGE
TITLEFIRE PROTECTION NOTES
A. THESE FIRE PROTECTION SYSTEM ENGINEERING DOCUMENTS
REPRESENT THE OVERALL SCOPE, DESIGN INTENT, AND COVERAGE
AREA FOR THE FIRE PROTECTION SYSTEM WITHIN THE PROJECT SCOPE.
DELEGATED ENGINEER IS RESPONSIBLE FOR DESIGNING A FIRE
PROTECTION SYSTEM FOR THE ENTIRE BUILDING, PERMITTED AND
APPROVED PER NFPA AND BY THE AUTHORITY HAVING JURISDICTION.
B. DELEGATED ENGINEER SHALL PROVIDE FIRE PROTECTION SYSTEM
LAYOUT DOCUMENTS TO THE ENGINEER OF RECORD AND AUTHORITY
HAVING JURISDICTION, INCLUDING THE FOLLOWING AS APPLICABLE, BUT
NOT LIMITED TO:
a. SPRINKLER SYSTEM DRAWINGS, INCLUDING SPRINKLER SYSTEM
LAYOUT, NODE IDENTIFICATION AND NODE SPOT ELEVATIONS.
b. HYDRAULIC CALCULATIONS AND PIPE SIZES. SIZE PIPING TO PROVIDE
AN EXCESS RESIDUAL PRESSURE OF 10 PSI AT THE HYDRAULICALLY
MOST DEMANDING POINT AT SYSTEM DESIGN FLOW.
c. SPRINKLER SYSTEM DESIGN, CALCULATIONS, DETAILED
WORKSHEETS, WATER SUPPLY CURVE, AND SPRINKLER SYSTEM
DEMAND CURVE.
d. SPRINKLER HEAD PRODUCT DATA SHEETS WITH SPECIFIC SYSTEM
COMPONENTS IDENTIFIED.
e. ADDITIONAL SPRINKLER SYSTEM SPECIFICATIONS AS REQUIRED FOR
COMPLIANCE WITH NFPA 13, CHAPTER 8 PLANS AND CALCULATIONS,
PRIOR TO AUTOMATIC SPRINKLER SYSTEMS INSTALLATION.
f. ALL NECESSARY COMPONENTS, SYSTEMS MATERIALS, ASSEMBLIES, EQUIPMENT, AND SUPPORT SYSTEMS REQUIRED.
C. FIRE SPRINKLER CONTRACTOR SHALL COORDINATE THE LOCATION OF
RISERS, CROSS MAINS, BRANCH LINES, AND SPRINKLER HEADS WITH ALL
OTHER TRADE SYSTEMS TO AVOID CONFLICTS AND MAINTAIN
ARCHITECTURAL ELEMENTS OF THE BUILDING.
D. COORDINATE SPRINKLER HEAD TYPES AND LOCATIONS WITH
ARCHITECTURAL FINISHES AND OTHER CEILING MOUNTED DEVICES.
TITLEDELEGATED DESIGN REQUIREMENTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
CONSULTANTS: ARCHITECT/ENGINEERS:
STROLLO & STROLLO
718 Virginia Drive
Orlando, FL, 32803 T: (407) 423-5355 F: (407) 422-5994
Mechanical, Electrical, Fire Protection & Plumbing:
FULLY SPRINKLERED
C R e v it L o c a l\
\1
V A
M ia m i R e n o v a te
H e m o d ia ly s is
M E
P -R
T a y lo r.
R in a ld i.
rv t
/2
/2
:5
:1
P M
NOTES & DETAILS - FIRE
PROTECTION
DESIGN, EXPAND AND
RENOVATE HEMODIALYSIS
CONSTRUCTION
DOCUMENTS -
FINAL SUBMISSION
1201 NW 16th ST, MIAMI, FL.
DECEMBER 22, 2020 NPS TMR
FX-001
546-17-113
MES Group, Inc.
550 North Reo Street, Suite 203
Tampa, FL, 33609
813.289.4700
Nicholas Stephenson
DRAWING INDEX - FIRE PROTECTION
FX-001 NOTES & DETAILS - FIRE PROTECTION
FD-101 FIRST FLOOR PLAN - DEMOLITION - FIRE PROTECTION
FX-101 FIRST FLOOR PLAN - RENOVATION - FIRE PROTECTION
Revisions: Date:
12/21/2020
H J K M N PM.3K.8J.9
12.8
11.6
10.8
10.2
10.5
(E)FWP
(E )F
W P
(E )F
W P
AREA NOT IN SCOPE
LEGEND
EXISTING SPRINKLERS TO REMAIN
EXISTING SPRINKLERS TO BE DEMOLISHED
E
E
H
YD
S
D
E
CB
REFERENCED
KEY PLAN
N.T.S.
PATIENT RECREATION
AREA
N.W. 16TH
STREET
N .W
TH
S
TR
E
ET
W
AG
N E
R C R
EEK
N .W T H
A V E N U E
N .W T H
A V E N U E
TRAILERS
POLICE
BOOTH
POLICE
BOOTH
POLICE
BOOTH
ENTRANCE
ENTRANCE
ENTRANCE
F U E L
T
AN
K
F U E L
T
AN
K
FUEL
TANK
FUEL
TANK
FUEL
TANK
FUEL
TANK
ENGINEERING
STORAGE 40
8 RESEARCH AND
EDUCATION 7
CENTRAL
PLANT 44
BULK
OXYGEN
No. 4
RAD.
THERAPY
MAIN
HOSPITAL
BLDG.
No.1
M.I.C.U.
C.C.U.
AMBULATORY
CARE
BLDG.
COMMUNITY LIVING
CENTER BLDG. 10
MRI
TRAILER
PET/CT
TRAILER
COOLING TOWER
No.38
SPINAL
CORD
TOWER
RADIATION
WASTE
ENTRANCE
WATER
TOWER
FISHER
HOUSE
BLDG. No.68
T R A
IL
E R
W
W
S
W
W
GAS STORAGE
B122
FLAMMABLE
GASES
B121
BIOMEDICAL SHOP
B116C
OFFICE
B116A
OFFICE
B116B
PARTS ROOM
B116B1
RETAIL STORE
B112
MECH ROOM
B115
FOYER
B116
STORAGE
B120
CLEANING ROOM
B116D
SEC'Y
B116E
CONFERENCE
B116F
ISOLATION
1B 105B
ISOLATION
1B 105C
TEL. CLOSET
T1 2
ELECTRIC CLOSET
E1 2
Room B116
STAFF LOUNGE
1B102
RECEPTION
1B101
WAITING RM.
1B104
HEAD NURSE
1B103
VESTIBULE
1B100
TECH.
1B115
CLEANING
1B116
SPD/ORTHO
STORAGE
1B117
STORAGE
1B114
STORAGE
1B105P
STO/FILE RM
B116G
STORAGE
1B105K
ISOLATION
1B 105N
C.A.P.D.
1B 105M
MEDICATION
ROOM
1B105L
CLEAN UTILITY
1B105J
SOILED UTILITY
1B105H
TEL.
T1B 3
WATER
TREATMENT
1B105G
STORAGE
1B 105F
TOILET
1B105E
TOILET
1B105D
TREATMENT AREA
1B105
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
CONSULTANTS: ARCHITECT/ENGINEERS:
STROLLO & STROLLO
718 Virginia Drive
Orlando, FL, 32803 T: (407) 423-5355 F: (407) 422-5994
Mechanical, Electrical, Fire Protection & Plumbing:
FULLY SPRINKLERED
C R e v it L o c a l\
\1
V A
M ia m i R e n o v a te
H e m o d ia ly s is
M E
P -R
T a y lo r.
R in a ld i.
rv t
/2
/2
:5
:5
P M
FIRST FLOOR PLAN - DEMOLITION
- FIRE PROTECTION
DESIGN, EXPAND AND
RENOVATE HEMODIALYSIS
CONSTRUCTION
DOCUMENTS -
FINAL SUBMISSION
1201 NW 16th ST, MIAMI, FL.
DECEMBER 22, 2020 NPS TMR
FD-101
546-17-113
MES Group, Inc.
550 North Reo Street, Suite 203
Tampa, FL, 33609
813.289.4700
Nicholas Stephenson
3/16" = 1'-0"FD-101
1 FIRST FLOOR PLAN - DEMOLITION - FIRE PROTECTION
E
H
YD
S
D
E
CB
REFERENCED
KEY PLAN
N.T.S.
PATIENT RECREATION
AREA
N.W. 16TH
STREET
N .W
TH
S
TR
E
ET
W
AG
N E
R C R
EEK
N .W T H
A V E N U E
N .W T H
A V E N U E
TRAILERS
POLICE
BOOTH
POLICE
BOOTH
POLICE
BOOTH
ENTRANCE
ENTRANCE
ENTRANCE
F U E L
T
AN
K
F U E L
T
AN
K
FUEL
TANK
FUEL
TANK
FUEL
TANK
FUEL
TANK
ENGINEERING
STORAGE 40
8 RESEARCH AND
EDUCATION 7
CENTRAL
PLANT 44
BULK
OXYGEN
No. 4
RAD.
THERAPY
MAIN
HOSPITAL
BLDG.
No.1
M.I.C.U.
C.C.U.
AMBULATORY
CARE
BLDG.
COMMUNITY LIVING
CENTER BLDG. 10
MRI
TRAILER
PET/CT
TRAILER
COOLING TOWER
No.38
SPINAL
CORD
TOWER
RADIATION
WASTE
ENTRANCE
WATER
TOWER
FISHER
HOUSE
BLDG. No.68
T R A
IL
E R
W
W
S
W
W
H J K M N PM.3K.8J.9
12.8
11.6
10.8
10.2
10.5
(E )F
W P
(E )F
W P
(E)FWP
NURSE AREA
MED PREP
NURSE AREA
H.A.C
SOILED UTILITY
#12 CHAIR
STATION
#11 CHAIR
STATION
#10 CHAIR
STATION
PATIENT TOILET
SUPPLY STORAGE
#9 CHAIR STATION
#8 CHAIR STATION
GAS STORAGE
B122
FLAMABLE GASES
B121
WATER
TREATMENT /
DIALYSIS PREP
STAFF ENTRANCE
#15 CHAIR
STATION
#14 CHAIR
STATION
#13 CHAIR
STATION
#16 NEG ISO.\ BED
STATION
PATIENT TOILET
PATIENT TOILET
#17 NEG. ISO. BED
STATION
NURSE AREA
#18 NEG. ISO. BED
STATION
PATIENT TOILET
PATIENT TOILET
MOBILITY DEVICE
STORAGE
EXAM ROOM
DOCTOR'S OFFICE
CORR.
CONFERENCE /
CLASS ROOM
NURSE
MANAGEMENT
CORR.
SEC. / OPEN
OFFICE / RECEP. /
STROAGE
CORR.
WAITING
KITCHEN /
NOURISHMENT
CORR.
STAFF TOILET
STAFF LOUNGE /
LOCKERS
ELEC. CLO.
STAFF ENTRANCE
DATA CLO.
PATIENT TOILET
PATIENT
ENTRANCE
DIALYSIS
EQUIPMENT
STORAGE
AREA NOT IN SCOPE
FIRE PROTECTION SPRINKLER SYSTEM DESIGN CRITERIA
SPACE TYPE
HAZARD
CLASSIFICATION
SYSTEM
TYPE
DISCHARGE
DENSITY
REMOTE
AREA
MAXIMUM
COVERAGE
AREA PER
SPRINKLER
MAXIMUM
SPACING
WATER
SUPPLY
DURATION
OUTSIDE
HOSE
ALLOWANCE TEMPERATURE
CLASSIFICATION
SPRINKLER TYPE NOTES
GPM/FT² FT² FT² FT. MINUTES GPM
GENERAL,
EXCEPT AS
LISTED BELOW
LIGHT HAZARD WET PIPE 0.10 1,500 225 15 30 100 ORDINARY
SEMI-RECESSED
PENDENT, QUICK
RESPONSE, UL LISTED,
FM APPROVED
STORAGE,
SOILED UTILITY
ORDINARY
HAZARD
GROUP 2
WET PIPE 0.20 1,500 130 15 60-90 250 ORDINARY
SEMI-RECESSED
PENDENT OR UPRIGHT,
QUICK RESPONSE,
UL LISTED, FM APPROVED
EQUIPMENT
ROOM
ORDINARY
HAZARD
GROUP 1
WET PIPE 0.15 1,500 130 15 60-90 250 INTERMEDIATE
QUICK RESPONSE
UPRIGHT, FM APPROVED
HOUSEKEEPING
CLOSET
ORDINARY
HAZARD
GROUP 1
WET PIPE 0.15 1,500 130 15 60-90 250 ORDINARY
PENDENT OR UPRIGHT,
QUICK RESPONSE,
UL LISTED, FM APPROVED
NOTES:
1. WATER DEMAND REQUIREMENTS ARE FOR HYDRAULIC CALCULATION METHOD. IF OTHER METHOD IS USED ADJUST VALUES ACCORDING TO NFPA 13 REQUIREMENTS.
HAZARD
SYMBOL
KITCHEN
ORDINARY
HAZARD
GROUP 2
WET PIPE 0.20 1,500 130 15 60-90 250 INTERMEDIATE
PENDENT,
QUICK RESPONSE,
UL LISTED, FM APPROVED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
CONSULTANTS: ARCHITECT/ENGINEERS:
STROLLO & STROLLO
718 Virginia Drive
Orlando, FL, 32803 T: (407) 423-5355 F: (407) 422-5994
Mechanical, Electrical, Fire Protection & Plumbing:
FULLY SPRINKLERED
C R e v it L o c a l\
\1
V A
M ia m i R e n o v a te
H e m o d ia ly s is
M E
P -R
T a y lo r.
R in a ld i.
rv t
/2
/2
:5
:1
P M
FIRST FLOOR PLAN - RENOVATION
- FIRE PROTECTION
DESIGN, EXPAND AND
RENOVATE HEMODIALYSIS
CONSTRUCTION
DOCUMENTS -
FINAL SUBMISSION
1201 NW 16th ST, MIAMI, FL.
DECEMBER 22, 2020 NPS TMR
FX-101
546-17-113
MES Group, Inc.
550 North Reo Street, Suite 203
Tampa, FL, 33609
813.289.4700
Nicholas Stephenson
3/16" = 1'-0"FX-101
1 FIRST FLOOR PLAN - RENOVATION - FIRE PROTECTION
GENERAL NOTES
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATIVE OF WORK TO BE PROVIDED (FURNISHED AND
INSTALLED) UNDER THIS CONTRACT. DRAWINGS SHOULD NOT BE SCALED.
2. THE CONTRACTOR IS RESPONSIBLE TO EXAMINE THE EXISTING CONDITIONS UNDER WHICH THEY SHALL OPERATE
AND VERIFY THE EXTENT OF WORK REQUIRED TO COMPLETE THE WORK UNDER THIS CONTRACT.
3. PRIOR TO ORDERING AND FABRICATING ANY EQUIPMENT, IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO EXAMINE THE PHYSICAL CONDITIONS AT THE PROJECT SITE AND VERIFY SPACE AND SUFFICIENT CLEARANCES ARE AVAILABLE FOR INSTALLING EQUIPMENT, DUCTWORK, PIPING, AND APPURTENANCES, AND TO DETERMINE ANY
NECESSARY MODIFICATIONS.
4. PERFORM ALL WORK IN COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, REGULATIONS, AND STANDARDS ADOPTED BY THE AUTHORITY HAVING JURISDICTION. IF CONFLICTS EXIST BETWEEN THESE
ENGINEERING DOCUMENTS AND CODES, THE MOST STRINGENT REQUIREMENTS SHALL GOVERN.
5. ALL CONSTRUCTION WORK SHALL ALSO MEET THE FOLLOWING CODE REQUIREMENTS:
• VA ARCHITECTURAL DESIGN MANUAL 2014
• VA INTERIOR DESIGN MANUAL 2020
• VA ASBESTOS ABATEMENT DESIGN MANUAL 2011
• VA CRITICAL PATH METHOD DESIGN MANUAL 2012
• VA PHYSICAL SECURITY DESIGN MANUAL 2020
• MANUAL FOR PREPERATION OF COST ESTIMATES AND RELATED DOCUEMENTS FOR VA FACILITIES 2019
• VA ELEVATOR DESIGN MANUAL 2020
• VA HVAC DESIGN MANUAL 2020
• VA PLUMBING DESIGN MANUAL 2018
• VA FIRE PROTECTION DESIGN MANUAL 2015
• VA ELECTRICAL DESIGN MANUAL 2019
• VA LIGHTING DESIGN MANUAL 2015
• INTERNATIONAL BUILDING CODE (IBC) 2018
• INTERNATIONAL EXISTING BUILDING CODE 2018
• IBC MECHANICAL 2018
• IBC PLUMBING 2018
• IBC ENERGY CONSERVATION 2018
• INTERNATIONAL FIRE CODE 2018
• NFPA 1-2021, THE UNIFORM FIRE CODE
• NFPA 101-2021, THE LIFE SAFETY CODE
• NFPA 51B-2019, STANDARD FOR FIRE PREVENTION DURING WELDING, CUTTING AND OTHER HOT WORK
• NFPA 13-2019, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
• NFPA 70-2020, NATIONAL ELECTRICAL CODE
• NFPA 90A-2021, STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTING SYSTEMS.
• NFPA 99-2021, STANDARD FOR HEALTH CARE FACILITIES
• NFPA 241-2019, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION AND DEMOLITION OPERATIONS.
6. CONTRACTOR SHALL COORDINATE AND SEQUENCE DEMOLITION, CLEANING, AND CONSTRUCTION WORK.
7. CONTRACTOR SHALL NOTE ANY SPECIAL REQUIREMENTS FOR INSTALLATION OF WORK UNDER THIS CONTRACT.
DISMANTLE AND REASSEMBLE EQUIPMENT AS NECESSARY FOR ENTRY INTO THE BUILDING AND THE LOCATION OF
INSTALLATION.
8. THE CONTRACTOR SHALL MAINTAIN A COMPLETE PROJECT SCHEDULE AND SHALL UPDATE THIS SCHEDULE WEEKLY. ANY CHANGES SHALL BE NOTED AND AN UPDATED SCHEDULE SHALL BE PROVIDED TO THE OWNER.
9. ALL PERMITS, FEES, TAXES, ETC SHALL BE PAID BY CONTRACTOR AS PART OF THE TOTAL PROJECT COST.
10. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS, PARTITIONS, CEILINGS, AND FLOORS. SEAL ALL PENETRATIONS THROUGH RATED ASSEMBLIES WITH FIRESTOP MATERIAL IN ACCORDANCE WITH U.L.
REQUIREMENTS TO MAINTAIN THE ASSEMBLY RATING.
11. CONTRACTOR SHALL FURNISH U.L. APPROVED DRAWINGS FOR EACH TYPE OF FIRE AND SMOKE RATED ASSEMBLY PENETRATION BY DUCTS, PIPES, OR CONDUITS, AND SHALL DISPLAY THESE DRAWINGS ON THE JOB SITE AT ALL
TIMES DURING CONSTRUCTION.
12. CONTRACTOR SHALL REFER TO ALL DETAILS FOR PROPER GUIDANCE.
13. CONTRACTOR SHALL COORDINATE ALL ELECTRICAL REQUIREMENTS WITH ELECTRICAL CONTRACTOR.
14. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND EQUIPMENT SUBMITTALS FOR ALL PRODUCTS USED ON
PROJECT.
15. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR DEVIATIONS FROM THE REQUIREMENTS OF CONTRACT DOCUMENTS UNLESS THE CONTRACTOR HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER TO THE SPECIFIC DEVIATION. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR ERRORS OR OMISSIONS IN HIS
OR HER SUBMITTAL DATA.
16. THE CONTRACTOR IS REQUIRED TO SUBMIT THREE COMPLETE O&M MANUALS IN THREE RING BINDERS AT SUBSTANTIAL COMPLETION. MANUALS SHALL INCLUDE INSTALLATION AND MAINTENANCE DATA ON ALL NEW EQUIPMENT AND MATERIALS, CERTIFIED TECHNICAL PRODUCT DATA, EQUIPMENT SHOP DRAWINGS, SPARE PARTS
DATA, ETC. PROVIDE AN INDEX AND ASSOCIATED DIVIDERS.
17. CLOSE OUT DOCUMENTS: THE CONTRACTOR IS TO MAINTAIN ONE SET OF CONSTRUCTION DRAWINGS ON SITE AND KEEP CURRENT WITH MARK UP AS-BUILT CONDITIONS DURING CONSTRUCTION OF THE PROJECT. THIS SET IS TO INCLUDE ALL CONTRACT CHANGES, MODIFICATIONS AND CLARIFICATIONS. THIS SET ALONG WITH ALL SHOP DRAWINGS SHALL BE TURNED OVER TO THE ARCHITECT/ENGINEER AFTER CONSTRUCTION COMPLETION.
18. IT IS THE RESPONSIBILITY OF ALL BIDDERS TO THOROUGHLY REVIEW AND UNDERSTAND ALL CONSTRUCTION DOCUMENTS. THIS INCLUDES BUT IS NOT LIMITED TO ALL DRAWINGS, SPECIFICATION SECTIONS, ETC. THE DRAWINGS ARE SCHEMATIC IN NATURE. THEREFORE BEFORE STARTING ANY WORK, THE CONTRACTOR SHALL REVIEW ALL OTHER CONSTRUCTION DOCUMENTS, VERIFY FIELD CONDITIONS AND SHALL MAKE ANY REQUIRED MINOR ADJUSTMENTS WITHOUT EXTRA COST TO THE OWNER. ANY MAJOR DISCREPANCIES FOUND SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER. THE BASE BID SHALL REFLECT THE TOTAL COST OF NEW EQUIPMENT INSTALLATION. THIS INCLUDES LABOR, EQUIPMENT AND MATERIALS. NO CHANGE ORDERS SHALL
BE ISSUED WITHOUT WRITTEN CONSENT AND APPROVAL FROM ENGINEER AND ARCHITECT.
DRAWING KEYNOTE#
POINT OF NEW CONNECTION
LIMIT OF DEMOLITION
CW COLD WATER PIPING
HW HOT WATER PIPING
HWR HOT WATER RETURN PIPING
SAN SANITARY PIPING
(E)CW EXISTING COLD WATER
(E)HWR EXISTING HOT WATER RETURN
(E)HW EXISTING HOT WATER PIPING
EXISTING PIPING TO BE REMOVED
(E)SAN EXISTING SANITARY PIPING
V SANITARY VENT PIPING
PIPE UP
PIPE DOWN
GCO GRADE CLEAN OUT (1-WAY OR 2-WAY)OR
HOSE BIB WITH VACUUM BREAKER
OR VTR VENT THRU ROOF
WCO WALL CLEAN OUT
FCO FLOOR CLEAN OUT (1-WAY OR 2-WAY)OR
INVERT ELEVATIONIE
PIPE CAP
WCO
FLOOR DRAIN
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
GATE VALVE
PLUG VALVE
STRAINER
UNION
PRESSURE RELIEF VALVEPRV
BACKFLOW PREVENTER
FLOOR SINK
PLUMBING LEGEND
FD
FS
CHMW CHEMICAL WASTE PIPING
CHMV CHEMICAL WASTE VENT PIPING
CHMW
CHMV
MA MEDICAL AIR PIPINGMA
O OXYGEN PIPINGO
MV MEDICAL VACUUM PIPINGMV
RO REVERSE OSMOSIS WATER PIPINGRO
BC BICARB WATER PIPINGBC
AC ACID PIPINGAC
EQUIPMENT MARKXX-X
(E)CHMW CHEMICAL WASTE PIPING
(E)CHMV CHEMICAL WASTE VENT PIPING
(E)CHMW
(E)CHMV
(E)MA EXISTING MEDICAL AIR PIPING(E)MA
(E)O EXISTING OXYGEN PIPING(E)O
(E)MV EXISTING MEDICAL VACUUM PIPING(E)MV
BFP
(E) EXISTING
AC ACID
AFF ABOVE FINISHED FLOOR
BC BICARB WATER
BFF BELOW FINISHED FLOOR
CHMW CHEMICAL WASTE PIPE
CHMV CHEMICAL VENT PIPE
CO PIPE CLEAN OUT
COR CONTRACTING OFFICERS REPRESENTATIVE
CP CIRCULATOR PUMP
CTE CONNECT TO EXISTING
CW COLD WATER
DB DIALYSIS WALL BOX
DEMO DEMOLISH OR DEMOLITION
DFU DRAINAGE FIXTURE UNITS
DW DOMESTIC WATER
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EXIST EXISTING
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FS FLOOR SINK
G GAS
GCO GRADE CLEAN OUT
GPM GALLONS PER MINUTE
GR GREASE
HB HOSE BIBB
HD HUB DRAIN
HW HOT WATER
HWR HOT WATER RETURN
IB ICE MAKER OUTLET BOX
IBC INTERNATIONAL BUILDING CODE
IE INVERT ELEVATION
LAV LAVATORY
MA MEDICAL AIR
MV MEDICAL VACUUM
MS MOP SINK
NC NORMALLY CLOSED
NO NORMALLY OPEN
O OXYGEN
RO REVERSE OSMOSIS WATER
S SINK
SAN SANITARY
SH SHOWER
W WASTE
WC WATER CLOSET
WCO WALL CLEAN OUT
WSFU WATER SUPPLY FIXTURE UNITS
ZVA AREA ALARM PANEL
ZVB ZONE VALVE BOX
ABBREVIATIONS
PLUMBING NOTES
1. REVIEW PLANS OF ALL TRADES PRIOR TO BIDDING AND BEGINNING WORK. INSTALLATIONS ARE TO INCLUDE ALL
PLUMBING FOR COMPLETE SYSTEMS SHOWN ON THE PLANS AND AS REQUIRED.
2. COORDINATE WITH OTHER TRADES TO PREVENT INTERFERENCE WITH HVAC DUCTS, STRUCTURE, ELECTRICAL, LIGHTING, AND OTHER PIPING IN THE CEILING SPACE. VENT PIPING AND WATER PIPING SHALL BE HELD EITHER
ABOVE OR BELOW HVAC DUCTWORK, AS COORDINATED WITH THE HVAC CONTRACTOR.
3. ALL CHANGES SHALL BE REVIEWED BY THE ARCHITECT.
4. COORDINATE WITH ARCHITECTURAL DRAWINGS BEFORE ROUGHING-IN PLUMBING FIXTURES AND EQUIPMENT
SUPPLIES.
5. THE PLUMBING SUBCONTRACTOR SHALL FURNISH AND INSTALL ALL PLUMBING FIXTURES, UNLESS NOTED
OTHERWISE.
6. VERIFY MOUNTING HEIGHT AND WATER CONNECTION SIZES OF ALL PLUMBING FIXTURES PRIOR TO ROUGH-IN.
FURNISH…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .