Aggregate 1 Attachment 5 - Price Proposal Template - Aggregate 1
| Department: | OCA on behalf of RED |
| Sourcing Event ID: | 0000009416 |
| Proposer's Name: | |
| Instructions: | Proposers shall complete all YELLOW cells for ALL LINES in their entirety within EACH AGGREGATE. Failure to do so will result in a rejected Proposal. All prices shall be exclusive of sales tax. The lowest “Evaluated Hourly Rate” for each Aggregate will be deemed the Lowest Proposed Price for that Aggregate. |
The City may reject a bid as materially unbalanced if one or more line-item prices are nominal, materially overstated, or materially understated in relation to the work, or if the pricing creates a reasonable doubt that award will result in the lowest ultimate cost to the City.
Each required line must contain a numeric rate or markup; blank, conditional, “included,” or “N/A” entries are not permitted. An offered rate or markup of zero will be binding and means the applicable line will be provided at no additional charge
| Will City Award Primary and Secondary Contracts for each Aggregate? | No |
| Must Proposers Bid on All Aggregates? | No |
| May Proposers offer equal/substitute to products named below? | No |
| Aggregate 1 | | | |
| Hourly rates are all-inclusive of labor, supervision, ordinary tools and equipment, routine cleanup, incidental consumable materials, and minor quantities of Standard Materials, except for separately priced items identified below. Travel within the City and within twenty (20) miles outside the City’s boundaries is included in the applicable hourly rate. | | | |
| Line | General Description of Service | | |
| See Scope of Work in Attach 1A Appendix A for details of each bid header | | Unit of Measure | Standard Hourly Rate | |
| Pruning and Deadheading | | | |
| 1 | Pruning and deadheading of non-tree vegetation (i.e., shrubs, bushes, plants, and hedges), including routine cleanup. | | |
| | Per Hour | | |
| 2 | Pruning of trees fifteen (15) feet or less in height, including routine cleanup. | | |
| | Per Hour | | |
| 3 | Pruning of Large Trees exceeding fifteen (15) feet in height, including routine ISA Certified Arborist direction and routine cleanup | | Per Hour |
| 4 | Separately authorized, as-needed, stand-alone ISA Certified Arborist consultation, visual assessment, diagnostic evaluation, or written recommendations that are not incidental to pruning performed under Bid Lines 2 or 3. | | Per Hour |
| Weed Abatement | | |
| 5 | Routine weed abatement by manual or mechanical methods, including cutting, hand-pulling, trimming, raking, collection, hauling, lawful disposal, and cleanup. Excludes pesticide and herbicide application and separately authorized brush clearing. | Per Hour |
| Planting and Plant Management | | |
| 6 | Planting of non-tree vegetation, including ordinary planting-area preparation, installation, backfilling, initial watering, routine soil-amendment incorporation, minor basin formation, routine staking, and cleanup. | Per Hour |
| 7 | Planting of trees, including ordinary planting-area preparation, installation, backfilling, initial watering, routine soil-amendment incorporation, basin formation, routine staking, and cleanup. | Per Hour |
| 8 | General plant-management labor not separately priced under another Planting and Plant Management line. | Per Hour |
| 9 | Soil-amendment, fertilizer, planting-media, and soil-conditioning work in existing planting areas, excluding work included in an applicable planting rate. | Per Hour |
| 10 | Installation, adjustment, maintenance, decontamination, or removal of plant-protection tubes, cages, stakes, minor fencing, and browse-protection measures. | Per Hour |
| 11 | Installation, monitoring, and removal of solarization materials for areas not exceeding twenty feet by twenty feet. | Per Hour |
| 12 | Hydroseeding and native-plant establishment, including seed or propagule preparation and initial installation. | Per Hour |
| 13 | Planting-basin maintenance, including adding mulch and removing unwanted plants. | Per Hour |
| 14 | Collection and preparation of seeds, vegetative propagules, and divisions, excluding work included in an applicable planting rate. | Per Hour |
| Mowing | | |
| 15 | Mowing and routine vegetation trimming of vacant City-owned lots, including routine cleanup. | Per Hour |
| 16 | Mowing and routine vegetation trimming of landscaped areas adjacent to building entryways, property perimeters, and fence lines, including routine cleanup. | Per Hour |
| 17 | Brush Clearing and Vegetation Height Reduction for dense brush, woody vegetation, saplings, and overgrown non-tree vegetation beyond routine mowing or weed abatement, including routine cleanup. | Per Hour |
| Pesticide Application and Pest Control | | |
| 18 | Pesticide Application and Pest Control Services, including authorized ant-control measures. | Per Hour |
| Herbicide Application | | |
| 19 | Herbicide Application Services to vegetation and trees as needed. | Per Hour |
| Minor Irrigation System Maintenance | | |
| 20 | Minor irrigation component repair, cleaning, adjustment, and maintenance, excluding diagnostics and controller programming. | Per Hour |
| 21 | Irrigation System Diagnostics and Controller Programming | Per Hour |
| Living Roof Maintenance | | |
| 22 | Routine Living Roof Maintenance, excluding diagnostic testing, drainage inspection, and irrigation-system testing. | Per Hour |
| 23 | Living Roof Diagnostics, Drainage Inspection, and Irrigation System Testing | Per Hour |
| As-Needed After Hours or Weekend Cleanup Services. |
| All standard cleanup services are all‑inclusive of labor and equipment necessary to perform immediate hazard mitigation and debris removal. |
(Standard Cleanup) Picking up and removing small limbs, clearing pedestrian paths, light raking, removing debris by hand.
(Specialized Cleanup) Requires mechanical cutting, chainsaws, chippers, loaders, or powered equipment.
| 24 | Standard Cleanup Labor — Normal Business Hours – debris clearing to include Hazard Stabilization and Temporary Safety Measures. | Per Hour |
| 25 | Standard Cleanup Labor – After Hours - mobilization, on‑site work to include Hazard Stabilization and Temporary Safety Measures. | Per Hour |
| 26 | Standard Cleanup Labor – Weekend - mobilization, on‑site work to include Hazard Stabilization and Temporary Safety Measures. | Per Hour |
| 27 | Standard Cleanup Labor – Holiday - mobilization, on‑site work to include Hazard Stabilization and Temporary Safety Measures. | Per Hour |
| 28 | Specialized Cleanup Labor – Normal business hours - debris clearing to include Hazard Stabilization and Temporary Safety Measures. | Per Hour |
| 29 | Specialized Cleanup Labor – After Hours - mobilization, on‑site work to include Hazard Stabilization and Temporary Safety Measures. | Per Hour |
| 30 | Specialized Cleanup Labor – Weekend - mobilization, on‑site work to include Hazard Stabilization and Temporary Safety Measures. | Per Hour |
| 31 | Specialized Cleanup Labor – Holiday - mobilization, on‑site work to include Hazard Stabilization and Temporary Safety Measures. | Per Hour |
| As-Needed Maintenance Supervisor | | |
| 32 | As-Needed Maintenance Supervisor Rate. (Upon Request for Site Visits). | Per Hour |
Travel Expenses Billable only for travel to and from locations more than 20 miles from the nearest City boundary; mileage included.
33 Hourly travel time to and from locations more than 20 miles outside the nearest City boundary. Per Hour
| Short-notice (less than 48 hours notice) and emergency (immidiatate need, must mobilize and arrive onsite within 2 hours) premiums apply only to eligible hourly services when authorized in writing by the requesting City department. | | | |
| Short-Notice Premium (%) | | |
| Emergency Premium (%) | | |
| Rate Category | Evaluation Weight | Evaluated Hourly Rate |
| Standard Services | 70% | ERROR:#DIV/0! |
| Short-Notice Services | 20% | ERROR:#DIV/0! |
| Emergency Services | 10% | ERROR:#DIV/0! |
| Evaluated Hourly Rate (Line 1 - 33): | | ERROR:#DIV/0! |
Required Materials for Non-Standard Maintenance - By request Only Not Evaluated, however, If two or more responsive and responsible Bidders have the same Evaluated Hourly Rate, the Bidder offering the lower uniform material markup will be the tiebreaker.
| Incidental consumable materials and minor quantities of Standard Materials are included in the applicable service rate. Non-Standard Materials and substantial quantities of Standard Materials may be charged under this line only after written authorization. | | |
| 34 | Non-Standard Materials and Substantial Quantities of Standard Materials (Plants, Trees, Irrigation Supplies, Miscellaneous Materials) | Markup over Cost |
Aggregate 2 Attachment 5 - Price Proposal Template - Aggregate 2
| Department: | OCA on behalf of RED |
| Sourcing Event ID: | 0000009416 |
| Proposer's Name: | |
| Instructions: | Proposers shall complete all YELLOW cells for ALL LINES in their entirety within EACH AGGREGATE. Failure to do so will result in a rejected Proposal. All prices shall be exclusive of sales tax. The lowest “Evaluated Hourly Rate” for each Aggregate will be deemed the Lowest Proposed Price for that Aggregate. |
The City may reject a bid as materially unbalanced if one or more line-item prices are nominal, materially overstated, or materially understated in relation to the work, or if the pricing creates a reasonable doubt that award will result in the lowest ultimate cost to the City.
Each required line must contain a numeric rate or markup; blank, conditional, “included,” or “N/A” entries are not permitted. An offered rate or markup of zero will be binding and means the applicable line will be provided at no additional charge
| Will City Award Primary and Secondary Contracts for each Aggregate? | No |
| Must Proposers Bid on All Aggregates? | No |
| May Proposers offer equal/substitute to products named below? | No |
| Aggregate 2 | | |
| Hourly rates are all-inclusive of labor, supervision, ordinary tools and equipment, routine cleanup, incidental consumable materials, and minor quantities of Standard Materials, except for separately priced items identified below. Travel within the City and within twenty (20) miles outside the City’s boundaries is included in the applicable hourly rate. | | |
| Line | General Description of Service | |
| See Scope of Work in Attach 1B Appendix A for details of each bid header | | Unit of Measure | Offered Rate |
| Pruning and Deadheading | | |
| 1 | Pruning and deadheading of non-tree vegetation (i.e.-shrubs, bushes, plants, and hedges), including routine cleanup. | |
| | Per Hour | |
| Weed Abatement | | |
| 2 | Routine weed abatement by manual or mechanical methods, including cutting, hand-pulling, trimming, raking, collection, hauling, lawful disposal, and cleanup. Excludes pesticide and herbicide application and separately authorized brush clearing. | Per Hour |
| Planting and Plant Management | | |
| 3 | Planting of non-tree vegetation, including ordinary planting-area preparation, installation, backfilling, initial watering, routine soil-amendment incorporation, minor basin formation, routine staking, and cleanup. | Per Hour |
| 4 | Planting of trees, including ordinary planting-area preparation, installation, backfilling, initial watering, routine soil-amendment incorporation, basin formation, routine staking, and cleanup. | Per Hour |
| 5 | General plant-management labor not separately priced under another Planting and Plant Management line. | Per Hour |
| 6 | Soil-amendment, fertilizer, planting-media, and soil-conditioning work in existing planting areas, excluding work included in an applicable planting rate. | Per Hour |
| 7 | Installation, adjustment, maintenance, decontamination, or removal of plant-protection tubes, cages, stakes, minor fencing, and browse-protection measures. | Per Hour |
| 8 | Installation, monitoring, and removal of solarization materials for areas not exceeding twenty feet by twenty feet. | Per Hour |
| 9 | Hydroseeding and native-plant establishment, including seed or propagule preparation and initial installation. | Per Hour |
| 10 | Planting-basin maintenance, including adding mulch and removing unwanted plants. | Per Hour |
| 11 | Collection and preparation of seeds, vegetative propagules, and divisions, excluding work included in an applicable planting rate. | Per Hour |
| Mowing | | |
| 12 | Mowing and routine vegetation trimming of vacant City-owned lots, including routine cleanup. | Per Hour |
| 13 | Mowing and routine vegetation trimming of landscaped areas adjacent to building entryways, property perimeters, and fence lines, including routine cleanup. | Per Hour |
| 14 | Brush Clearing and Vegetation Height Reduction for dense brush, woody vegetation, saplings, and overgrown non-tree vegetation beyond routine mowing or weed abatement, including routine cleanup. | Per Hour |
| As Needed After Hours or Weekend Cleanup Services. |
| All standard cleanup services are all‑inclusive of labor and equipment necessary to perform immediate hazard mitigation and debris removal. |
(Standard Cleanup) Picking up and removing small limbs, clearing pedestrian paths, light raking, removing debris by hand.
(Specialized Cleanup) Requires mechanical cutting, chainsaws, chippers, loaders, or powered equipment.
| 15 | Standard Cleanup Labor — Normal Business Hours – debris clearing to include Hazard Stabilization and Temporary Safety Measures. | Per Hour |
| 16 | Standard Cleanup Labor – After Hours - mobilization, on‑site work to include Hazard Stabilization and Temporary Safety Measures. | Per Hour |
| 17 | Standard Cleanup Labor – Weekend - mobilization, on‑site work to include Hazard Stabilization and Temporary Safety Measures. | Per Hour |
| 18 | Standard Cleanup Labor – Holiday - mobilization, on‑site work to include Hazard Stabilization and Temporary Safety Measures. | Per Hour |
| 19 | Specialized Cleanup Labor – Normal business hours - debris clearing to include Hazard Stabilization and Temporary Safety Measures. | Per Hour |
| 20 | Specialized Cleanup Labor – After Hours - mobilization, on‑site work to include Hazard Stabilization and Temporary Safety Measures. | Per Hour |
| 21 | Specialized Cleanup Labor – Weekend - mobilization, on‑site work to include Hazard Stabilization and Temporary Safety Measures. | Per Hour |
| 22 | Specialized Cleanup Labor – Holiday - mobilization, on‑site work to include Hazard Stabilization and Temporary Safety Measures. | Per Hour |
| As-Needed Maintenance Supervisor | | |
| 23 | As-Needed Maintenance Supervisor Rate. (Upon Request for Site Visits). | Per Hour |
Travel Expenses 'Billable only for travel to and from locations more than 20 miles from the nearest City boundary; mileage included.
24 Hourly travel time to and from locations more than 20 miles outside the nearest City boundary Per Hour
| Short-notice (less than 48 hours notice) and emergency (immidiatate need, must mobilize and arrive onsite within 2 hours) premiums apply only to eligible hourly services when authorized in writing by the requesting City department. | | | |
| Short-Notice Premium (%) | | |
| Emergency Premium (%) | | |
| Rate Category | Evaluation Weight | Evaluated Hourly Rate |
| Standard Services | 70% | ERROR:#DIV/0! |
| Short-Notice Services | 20% | ERROR:#DIV/0! |
| Emergency Services | 10% | ERROR:#DIV/0! |
| Evaluated Hourly Rate (Line 1 - 24): | | ERROR:#DIV/0! |
Required Materials for Non-Standard Maintenance - By request Only Not Evaluated, however, If two or more responsive and responsible Bidders have the same Evaluated Hourly Rate, the Bidder offering the lower uniform material markup will be the tiebreaker.
| Incidental consumable materials and minor quantities of Standard Materials are included in the applicable service rate. Non-Standard Materials and substantial quantities of Standard Materials may be charged under this line only after written authorization. | | |
| 25 | Non-Standard Materials and Substantial Quantities of Standard Materials (Plants, Trees, Miscellaneous Materials) | Markup over Cost |