Attachment 4- 570-21-701 Final Bid Drawings.pdf

PDF 18 MB Posted

Attached to
Z2DA--Project #570-21-701 EHRM Training & Admin Support
Solicitation number
36C77624B0002
Issued by

About this file

This document provides details for a federal contract opportunity for training and administrative support services. The Department of Veterans Affairs Technology Acquisition Center Austin is soliciting proposals under solicitation number 36C77624B0002 for project #570-21-701 to provide EHRM training and administrative support. An 18MB file of final bid drawings is attached. Proposals are due by the date specified in the solicitation for an award to provide the specified services. Key details include the agency involved, services required, solicitation number, and response due date.

View the file

Other files

File Type Posted
Attachment 7 - JA - Brand Name Items JA Final - Redacted.pdf PDF
36C77624B0002 0005.docx DOCX document
36C77624B0002 0004.docx DOCX document
36C77624B0002 0003.docx DOCX document
A0002 - Technical Questions and Answers.pdf PDF
36C77624B0002 0002.docx DOCX document
A0002 - Site Visit Sign-In Sheet.pdf PDF
A0002 - 570-21-701 VACCHS (Remodel Basement)_Bid Specs.pdf PDF
A0002 - 570-21-701 VACCHS (Remodel Basement)_Bid Plans.pdf PDF
36C77624B0002 0001.docx DOCX document
Attachment 6-1_VA Fresno ACM Survey Report.pdf PDF
Attachment 5 - 852.219-75 Clause for EAS.docx DOCX document
Attachment 1- 570-21-701 Final Bid Specs.pdf PDF
Attachment 6-6_Asbestos Bulk B1.pdf PDF
Attachment 6-2_VA Fresno ACM Survey Report.pdf PDF
Attachment 2 - DBA Wage Rates -Fresno County -11.29.2023.pdf PDF
Attachment 6-9_Asbestos Table- Final.xlsx XLSX spreadsheet
Attachment 6-5_VA Fresno ACM Survey Report.pdf PDF
Attachment 6-4_VA Fresno ACM Survey Report.pdf PDF
Attachment 3- Site Visit Memo EHRM Training and Admin Space Support.pdf PDF
Atachment 6 - Submittal 13_VA Fresno ACM Survey_FSS Order NoVA261-12J-2620 Asbestos Study.pdf PDF
Attachment 6-8_Asbestos Bulk_B1-floor1-2-Basement-Pharmroof.pdf PDF
Attachment 6-7_Asbestos Bulk_B1 (Floor 2).pdf PDF
Attachment 6-3_VA Fresno ACM Survey Report.pdf PDF
36C77624B0002_1.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EL 308.5

EL 308.5

BUS

B U S

BUS

65 A B

74 A B

A B

MAIN

ENTRANCE

SIGN

V A

M O N U M E N T

S

IG

N

M O N U M E N T

S

IG

N

S P E E D

B U M P

S P E E D

B U M P

STAGING AREA

G E

N E

R A

T O

R

G E

N E

R A

T O

R

G E

N E

R A

T O

R

G E

N E

R A

T O

R

G E

N E

R A

T O

R

H Y

D R

O N

IC

S

U T

IL

IT

Y P

A D

U T

IL

IT

Y

V A

U L T

FUEL TANK #2FUEL TANK #1

TANK

O2

TANK

O2

TANK

DIESEL

TANK

DIESEL

B-31

COMMUNITY

B-1

MAIN

B-3

ENGINEERING

PUMPHOUSE

B-7

GASOLINE PUMP

B-4

MAIN

B-19 B-19A

GENERATOR

B-2

BOILER PLANT

WAREHOUSE

B-32

O P

C

A N

C

IL

L A

R Y

OPC

OUTPATIENT

B-5

PUMPHOUSE

MENTAL

B-25

B-34

MENTAL HEALTH

HEALTH

FREEDOM

CLINIC

HOSPITAL B-24

LIBERTY

BLDG

LIVING

CENTER

VALOR BLDG

BLDG

B-27

MENTAL HEALTH

INDEPENDENCE BLDG

& TANKS

B-8

STORAGE SHEDS

B-36

BARN

B-24

AUDITORIUM

B-24

TOILETS

B-24

ELEVATOR

B-24 BREEZEWAY

& STAIRS

SWITCHGEARSWITCHGEAR

B-22

CHILLER

B-22A

CHILLER

T-5

ENGR. TRAILER

W A

L K

O F

H O

N O

R

MODULAR 2

LOT C

B-18

ELEVATOR

B-17

LIQUID OXYGEN

STORAGE CANOPY

SHELTER

SMOKING

BBQ

CLC

BUILDING

MOTORCYCLES

YIELD

YIELD

P A R K

IN

G

L O T

HP

A R K

IN

G

L O T

H

PARKING LOT

APARKING LOT

B

P A R K

IN

G

L O T

C

PARKING LOT

E

P A R K

IN

G

L O T

F

PARKING LOT

G

PARKING LOT

D

WAP

FA FA

FAAREA OF WORK

@ BASEMENT

HARVARD AVENUE

F R

E S

N O

S T

R E

E T

N O

R T

H A

N G

U S

S T

R E

E T

CLINTON AVENUE

VA Project Number

Building Number

Drawing Number

Project Title

Location:

PhaseDrawing Title

Approved:

Issue Date Checked Drawn

StampARCHITECT / ENGINEER OF RECORDCONSULTANT

VA FORM 08 - 6231

Revisions:

MA Architects, Inc.

385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net

Planning - Architecture - Interiors

Project Number

U.S. Department of Veterans Affairs

Basement Renovation

SO/KB

GI-000

COVER SHEET

570-21-701

SMc

VA Central California Healthcare System 2615 E. Clinton Ave, Fresno, CA 93703

02.15.2023

BID DOCUMENTS

FULLY

SPRINKLERED

22006

PROJECT

SITE

RENOVATE APPROXIMATELY 3,500 SF OF BASEMENT SPACE IN THE MAIN

HOSPITAL BUILDING (BLDG 1) INTO TRAINING AND ADMIN SUPPORT SPACES,

INCLUDING A CONFERENCE ROOM, BREAK ROOM, STORAGE AND NEW

ENCLOSURE AROUND EXISTING MECHANICAL AND PLUMBING UTILITIES

NEW FLOORING, CEILING, LIGHTING AND ROOM SIGNAGE TO BE INCLUDED

IN SCOPE OF WORK. PHASING SCOPE TO INCLUDE RELOCATION OF OFFICE

OCCUPANCY INTO A TEMPORARY SPACE DURING CONSTUCTION.

PROJECT DESCRIPTION

VICINITY MAP

PROJECT TEAM

FACILITY

Department of Veteran Affairs VA Sierra Pacific Network 2615 E. Clinton Avenue Fresno, CA 93703

Contact: Ryan P. Gardner P: 559.230.7780 E: ryan.gardner@va.gov

ARCHITECT

MA|Architects, Inc.

385 Van Ness Ave., Suite 110 Torrance, CA 90501

Contact: Steven A. McCaslin P: 424.302.5271 E: s.mccaslin@ma-architects.net

MECHANICAL, ELECTRICAL, & PLUMBING ENGINEER

MEP Energy Solutions Group, Inc.

79705 Star Flower Trail La Quinta, CA 92253

Contact: Ryan Galaz P: 714.975.3501 E: rgalaz@mepesg.com

FIRE ALARM ENGINEER

QA Engineering 1409 Ortiz Dr. SE Albuquerque, NM 87108

Contact: Robert Quintana P: 505.600.2469 E: robert@qaengineering.com

FIRE SPRINKLER ENGINEER

Wiss, Janney, Elstner Associates 16496 Bernardo Center Drive Suite 208 San Diego, CA 92128

Contact: Jim Madden P: 858.987.6726 E: jmadden@wje.com

ENVIROMENTAL ENGINEER

Millenium Consulting Associates 401 Roland Way, Suite 250 Oakland, CA 94621

Contact: Scott Nunes P: 925.808.6700 E: snunes@mecaenviro.com

PROJECT DATA

PROJECT ADDRESS: 2615 E. Clinton Ave.

Fresno, CA 93703

CONSTRUCTION TYPE: TYPE I, SPRINKLERED

STORIES: 7 STORIES + BASEMENT + SUB-BASEMENT +

PENTHOUSE

BLDG. OCCUPANCY : HEALTHCARE

AREA OF WORK: APPROX. 3,500 SF (@ BASEMENT)

DEPARTMENT OF VETERANS AFFAIRS

VA Central California Healthcare System

2615 E. Clinton Ave, Fresno, CA 93703

Remodel Basement for Training & Admin Support

Not to Scale

Reference Site Plan

DEDUCT ALTERNATES

TBD

VA Project No. 570-21-701

Rev. Date Description

02.15.2023 100% Contract Documents - Issue for Bid

02/14/2023

Exp. 12.31.2023

APPLICABLE STANDARDS:

VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/).

2021 International Building Code (IBC) (Only when specifically referenced in VA Design Documents, see notes below)

2021 NFPA 101 Life Safety Code

2019 NFPA 241 Standard for Safeguarding Construction, Alteration, and Demolition Operations

2018 NFPA National Fire Codes with the exception of NFPA 5000 and NFPA 900

Occupational, Safety and Health Administration (OSHA) Standards

2019 VA Seismic Design Requirements, H-18-8

2020 National Electrical Code (NEC) (NFPA 70)

2018 International Plumbing Code (IPC)

2019 Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1.

2017 ASME Boiler and Pressure Vessel Code

ASME Code for Pressure Piping

2015 Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13)

Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318)

Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC)

Energy policy Act of 2005 (EPAct)

DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High- Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435.

Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU)

Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management.

The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01 00 00 of the VA Master Construction Specification.

Ventilation for Acceptable Indoor Air Quality – ASHRAE Standard 62.1- 2016.

Safety Standard for Refrigeration Systems – ASHRAE Standard 15 – 2016.

UNLESS OTHERWISE SPECIFIED, SPECIFIC REFERENCES TO CODES, REGULATIONS, STANDARDS, MANUFACTURERS' INSTRUCTIONS, OR REQUIREMENTS OF REGULATORY AGENCIES, SHALL MEAN

THE LATEST EDITION OF EACH IN EFFECT AT THE DATE OF PROJECT SUBMISSION (U.N.O.)

GENERAL NOTES:

1. THE FOLLOWING GENERAL NOTES APPLY TO THE ENTIRE SET OF DRAWINGS LISTED BY

THE "INDEX OF DRAWINGS".

2. FOR GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS APPLICABLE ONLY TO THE

DRAWINGS OF ONE DISCIPLINE, REFER TO THE DRAWINGS OF THAT DISCIPLINE - SEE

"INDEX OF DRAWINGS".

3. APPLICABLE PORTIONS OF THE CODES, REGULATIONS, AND STANDARDS LISTED HERE ARE

INCORPORATED BY REFERENCE INTO THE REQUIREMENTS OF THIS CONTRACT AND

ESTABLISH MINIMUM REQUIREMENTS WITH WHICH THE WORK MUST COMPLY.

THIS PROJECT AND ALL PARTS OF THE WORK ASSOCIATED WITH THE PROJECT -

INCLUDING MATERIALS, METHODS, ASSEMBLIES, ETC - SHALL COMPLY WITH ALL

APPLICABLE GOVERNING RULES, CODES, REGULATIONS, ORDINANCES, AND LAWS OF ALL

FEDERAL, STATE, DISTRICT, TERRITORIAL, AND LOCAL GOVERNMENT AUTHORITIES HAVING

JURISDICTION OVER THE DESIGN, CONSTRUCTION, AND OCCUPANCY OF THE PROJECT,

WHETHER LISTED BY THE CONTRACT DOCUMENTS OR NOT. NO PART OF THE CONTRACT

DOCUMENTS SHALL BE CONSTRUED TO REQUIRE OR PERMIT WORK CONTRARY TO AN

APPLICABLE GOVERNING RULE, CODE, REGULATION, ORDINANCE, OR LAW.

NO PART OF THE CONTRACT DOCUMENTS SHALL BE CONSTRUED TO REQUIRE OR PERMIT

WORK CONTRARY TO AN APPLICABLE GOVERNING RULE, CODE, REGULATION, ORDINANCE,

OR LAW.

4. INSTALL ALL MANUFACTURED ITEMS, MATERIALS, AND EQUIPMENT IN STRICT

ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS.

5. SCHEDULE CONSTRUCTION WORK HOURS TO ACCOMMODATE THE OPERATION OF THE

FACILITY.

6. THE ARCHITECTURAL DRAWINGS ARE A PART OF A LARGER SET OF DRAWINGS WHICH,

WHEN COMPLETE, CONSISTS OF ALL DRAWINGS LISTED BY THE INDEX OF DRAWINGS. THE

SET OF DRAWINGS, WHEN COMPLETE, CONSISTS OF ALL DRAWINGS LISTED BY THE "INDEX

OF DRAWINGS". PARTIAL SETS OF DRAWINGS ARE INCOMPLETE.

THE WORK DESCRIBED BY THE DRAWINGS OF ANY ONE DISCIPLINE MAY BE AFFECTED BY

THE WORK DESCRIBED ON DRAWINGS OF ANOTHER DISCIPLINE OR MANUFACTURE

INSTALLATION REQUIREMENTS. SHOULD THEY DISAGREE IN THEMSELVES, OR WITH EACH

OTHER, BIDS SHALL BE BASED ON THE MOST EXPENSIVE COMBINATION OF QUALITY AND

QUANTITY OF WORK INDICATED. ANY DISCREPANCY BETWEEN THESE DOCUMENTS SHALL

BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION.

7. THE ARCHITECTURAL FLOOR PLANS, REFLECTED CEILING PLANS, SECTIONS, AND

ELEVATIONS ILLUSTRATE THE DESIGN INTENT. THE ARCHITECTURAL DRAWINGS

ESTABLISH AND COORDINATE THE FINISHED APPEARANCE AND LOCATION OF MANY, BUT

NOT ALL, EXPOSED ELEMENTS OF THE WORK. THE STRUCTURAL, MECHANICAL,

ELECTRICAL, PLUMBING, OTHER DRAWINGS, AND JOB SPECIFICATIONS ARE

SUPPLEMENTARY TO ARCHITECTURAL WORKING DRAWINGS. THE WORK DESCRIBED BY

THE DRAWINGS OF ANY ONE DISCIPLINE MAY BE AFFECTED BY THE WORK DESCRIBED ON

DRAWINGS OF ANOTHER DISCIPLINE OR MANUFACTURER INSTALLATION REQUIREMENTS.

SHOULD THEY DISAGREE IN THEMSELVES, OR WITH EACH OTHER, BIDS SHALL BE BASED

ON THE MOST EXPENSIVE COMBINATION OF QUALITY AND QUANTITY OF WORK INDICATED.

ANY DISCREPANCY BETWEEN THESE DOCUMENTS SHALL BE IMMEDIATELY BROUGHT TO

THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION.

8. THE SPECIFICATIONS ARE INTENDED TO COMMUNICATE THE DETAILED PROPERTIES AND

QUALITY OF THE INDIVIDUAL MATERIALS, ASSEMBLIES, AND SYSTEMS THAT COMPRISE THE

WORK; THE FUNCTIONAL AND PERFORMANCE REQUIREMENTS FOR THE INDIVIDUAL PARTS

OF THE WORK; AND THE FABRICATION AND INSTALLATION REQUIREMENTS FOR INDIVIDUAL

PARTS OF THE WORK - THE SPECIFICATIONS TAKE PRECEDENCE OVER THE DRAWINGS

WITH RESPECT TO INFORMATION OF THIS NATURE.

9. PROPRIETARY PRODUCTS OR ASSEMBLIES UTILIZED AS "BASIS OF DESIGN":

• ON OCCASION, THE DRAWINGS MAY REFER TO A SINGLE PROPRIETARY PRODUCT

OR ASSEMBLY WHILE THE SPECIFICATIONS LIST TWO OR MORE ACCEPTABLE

MANUFACTURES AND/OR PRODUCTS, WHEN THIS OCCURS, THE PRODUCT OR

ASSEMBLY ILLUSTRATED BY THE DRAWINGS IS THE "BASIS OF DESIGN" PRODUCT OR

ASSEMBLY.

• THE DIMENSIONS, MOUNTING HEIGHTS, CLEARANCES, AND ACCESS REQUIREMENTS

OF SPECIFIED PRODUCTS AND ASSEMBLIES OTHER THAN THE "BASIS OF DESIGN"

MAY VARY FROM THAT SHOWN BY THE DRAWINGS.

• THE CONTRACTOR MAY UTILIZE ANY OTHER SPECIFIED PRODUCT OR ASSEMBLY IN

LIEU OF THE "BASIS OF DESIGN" PRODUCT OR ASSEMBLY, AS APPROVED BY

GOVERNMENT’S REPRESENTATIVE. HOWEVER, THE CONTRACTOR IS RESPONSIBLE

(AT NO ADDITIONAL EXPENSE TO THE GOVERNMENT) FOR ALL COORDINATION AND

REVISIONS TO DIMENSIONS AND/OR DETAILS NECESSARY TO ACHIEVE THE SAME

FUNCTIONAL AND AESTHETIC DESIGN INTENT AS ILLUSTRATED BY THE "BASIS OF

DESIGN" SHOWN BY THE CONTRACT DOCUMENTS.

10. THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS ARE RESPONSIBLE FOR

EXAMINING CONTRACT DOCUMENTS, FIELD CONDITIONS, AND CONFIRMING THAT WORK IS

BUILDABLE AS SHOWN BEFORE PROCEEDING WITH CONSTRUCTION. IT IS NOT INTENDED

THAT THE CONTRACT DOCUMENTS INCLUDE EACH & EVERY SUB-SYSTEM AND/OR SUB-

COMPONENT NECESSARY TO FULLY AND PROPERLY COMPLETE THE WORK. SUB-SYSTEMS,

SUB-COMPONENTS OR DETAILS REQUIRED OR NORMALLY INCLUDED AS TRADE PRACTICE

MAY NOT BE SPECIFICALLY MENTIONED NOR SHOWN.

THE GENERAL CONTRACTOR IS RESPONSIBLE FOR OBTAINING CLARIFICATION FROM THE

ARCHITECT BEFORE PROCEEDING WITH WORK IN QUESTION OR RELATED WORK.

11. THE ARCHITECT / ENGINEERS SHALL NOT HAVE CONTROL OR CHARGE OF AND SHALL NOT

BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCE ON

PROCEDURE, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE

WORK, ALL OF WHICH SHALL BE THE SOLE RESPONSIBILITY OF THE GENERAL

CONTRACTOR.

12. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF

ALL SUBCONTRACTORS, TRADES, AND SUPPLIERS WITH ALL REQUIREMENTS OF THE

CONTRACT DOCUMENTS BEFORE COMMENCING CONSTRUCTION, AND TO ASSURE THAT

ALL PARTIES ARE AWARE OF ALL REQUIREMENTS, REGARDLESS OF WHERE THE

REQUIREMENTS OCCUR IN THE CONTRACT DOCUMENTS, WHICH MIGHT AFFECT THE WORK

OF THAT PARTY.

CONTRACTOR SHALL SUPPLY ALL LABOR, MATERIALS, EQUIPMENT, TOOLS AND SERVICES

NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF ALL WORK SHOWN,

DESCRIBED, OR REASONABLY IMPLIED, BUT NOT LIMITED TO THAT EXPLICITLY INDICATED

IN THE CONTRACT DOCUMENTS.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, FITTING OR PATCHING THAT

MAY BE REQUIRED TO COMPLETE WORK OR TO MAKE ITS SEVERAL PARTS FIT TOGETHER.

GENERAL NOTES CONTINUED:

13. THE THE CONTRACTOR SHALL, IN ADVANCE OF THE WORK, PREPARE COORDINATION

DRAWINGS SHOWING THE LOCATION OF OPENINGS THROUGH SLABS, THE PIPE SLEEVES

AND HANGER INSERTS, AS WELL AS THE LOCATION AND ELEVATION OF UTILITY LINES,

INCLUDING, BUT NOT LIMITED TO, CONVEYOR SYSTEMS, PNEUMATIC TUBES, DUCTS, AND

CONDUITS AND PIPES TWO INCHES AND LARGER IN DIAMETER. THESE DRAWINGS,

INCLUDING PLANS, ELEVATIONS, AND SECTIONS AS APPROPRIATE, SHALL CLEARLY SHOW

THE MANNER IN WHICH THE UTILITIES FIT INTO THE AVAILABLE SPACE AND RELATE TO

EACH OTHER AND TO EXISTING BUILDING ELEMENTS. DRAWINGS SHALL BE OF

APPROPRIATE SCALE TO SATISFY THE PREVIOUSLY STATED PURPOSES, BUT NOT SMALLER

THAN 3/8-INCH SCALE. DRAWINGS MAY BE COMPOSITE (WITH DISTINCTIVE COLORS FOR

THE VARIOUS TRADES) OR MAY BE SEPARATE BUT FULLY COORDINATED DRAWINGS (SUCH

AS SEPIAS OR PHOTOGRAPHIC PAPER REPRODUCIBLE) OF THE SAME SCALE. SEPARATE

DRAWINGS SHALL DEPICT IDENTICAL BUILDING AREAS OR SECTIONS AND SHALL BE

CAPABLE OF BEING OVERLAID IN ANY COMBINATION. THE SUBMITTED DRAWINGS FOR A

GIVEN AREA OF THE PROJECT SHALL SHOW THE WORK OF ALL TRADES THAT WILL BE

INVOLVED IN THAT PARTICULAR AREA. COMPLETE COMPOSITE DRAWINGS OR SIX

COMPLETE SETS OF SEPARATE REPRODUCIBLE DRAWINGS SHALL BE RECEIVED BY THE

GOVERNMENT NOT LESS THAN 20 DAYS PRIOR TO THE SCHEDULED START OF THE WORK

IN THE AREA ILLUSTRATED BY THE DRAWINGS, FOR THE PURPOSE OF SHOWING THE

CONTRACTOR’S PLANNED METHODS OF INSTALLATION. THE OBJECTIVES OF SUCH

DRAWINGS ARE TO PROMOTE CAREFULLY PLANNED WORK SEQUENCE AND PROPER

TRADE COORDINATION, IN ORDER TO ASSURE THE EXPEDITIOUS SOLUTIONS OF

PROBLEMS AND THE INSTALLATION OF LINES AND EQUIPMENT AS CONTEMPLATED BY THE

CONTRACT DOCUMENTS WHILE AVOIDING OR MINIMIZING ADDITIONAL COSTS TO THE

CONTRACTOR AND TO THE GOVERNMENT. IN THE EVENT THE CONTRACTOR, IN

COORDINATING THE VARIOUS INSTALLATIONS AND IN PLANNING THE METHOD OF

INSTALLATION, FINDS A CONFLICT IN LOCATION OR ELEVATION OF ANY OF THE UTILITIES

WITH THEMSELVES, WITH STRUCTURAL ITEMS OR WITH OTHER CONSTRUCTION ITEMS,

HE/SHE SHALL BRING THIS CONFLICT TO THE ATTENTION OF THE CONTRACTING OFFICER

IMMEDIATELY. IN DOING SO, THE CONTRACTOR SHALL EXPLAIN THE PROPOSED METHOD

OF SOLVING THE PROBLEM OR SHALL REQUEST INSTRUCTIONS AS TO HOW TO PROCEED

IF ADJUSTMENTS BEYOND THOSE OF USUAL TRADES’ COORDINATION ARE NECESSARY.

UTILITIES INSTALLATION WORK WILL NOT PROCEED IN ANY AREA PRIOR TO THE

SUBMISSION AND COMPLETION OF THE GOVERNMENT REVIEW OF THE COORDINATED

DRAWINGS FOR THAT AREA, NOR IN ANY AREA IN WHICH CONFLICTS ARE DISCLOSED BY

THE COORDINATION DRAWINGS, UNTIL THE CONFLICTS HAVE BEEN CORRECTED TO THE

SATISFACTION OF THE CONTRACTING OFFICER. IT IS THE RESPONSIBILITY OF THE

CONTRACTOR TO SUBMIT THE REQUIRED DRAWINGS IN A TIMELY MANNER CONSISTENT

WITH THE REQUIREMENTS TO COMPLETE THE WORK COVERED BY THIS CONTRACT WITHIN

THE PRESCRIBED CONTRACT TIME.

14. CONTRACTOR SHALL SUPPLY ALL LABOR, MATERIALS, EQUIPMENT, TOOLS AND SERVICES

NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF ALL WORK SHOWN,

DESCRIBED, OR REASONABLY IMPLIED, BUT NOT LIMITED TO THAT EXPLICITLY INDICATED

IN THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL

CUTTING, FITTING OR PATCHING THAT MAY BE REQUIRED TO COMPLETE WORK OR TO

MAKE ITS SEVERAL PARTS FIT TOGETHER. THE GENERAL CONTRACTOR IS RESPONSIBLE

TO REVIEW AND COORDINATE THE WORK OF ALL SUBCONTRACTORS, TRADES, AND

SUPPLIERS WITH ALL REQUIREMENTS OF THE CONTRACT DOCUMENTS.

15. ALL WORK NOTED "N.I.C." OR "NOT IN CONTRACT" IS TO BE ACCOMPLISHED BY A

CONTRACTOR OTHER THAN THE GENERAL CONTRACTOR AND IS NOT TO BE PART OF THE

CONSTRUCTION AGREEMENT. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE TO

COORDINATE WITH ALL "OTHER" CONTRACTORS PER REQUIREMENTS ESTABLISHED BY

GOVERNMENT, WHICH ARE UNDER SEPARATE CONTRACT WITH THE GOVERNMENT.

16. ANY WORK INSTALLED IN CONFLICT WITH THE CONTRACT DRAWINGS, CODE

REQUIREMENTS OR MANUFACTURER REQUIREMENTS WITHOUT THE PRIOR APPROVAL OF

THE GOVERNMENT AND THE ARCHITECT SHALL BE CORRECTED AT THE CONTRACTOR'S

EXPENSE. THE CONTRACTOR SHALL PROMPTLY CORRECT ALL WORK REJECTED BY THE

GOVERNMENT AS DEFECTIVE OR AS FAILING TO CONFORM TO THE CONTRACT

DOCUMENTS WHETHER OBSERVED BEFORE OR AFTER SUBSTANTIAL COMPLETION AND

WHETHER OR NOT FABRICATED, INSTALLED OR COMPLETED. THE CONTRACTOR SHALL

BEAR ALL COSTS OF CORRECTING SUCH REJECTED WORK, NOT TO BE REIMBURSED.

17. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR COORDINATION OF THE WORK OF

THE TRADES, SUBCONTRACTORS, AND MATERIAL SUPPLIERS. THE CONTRACTOR SHALL,

IN ADVANCE OF THE WORK, PREPARE COORDINATION DRAWINGS SHOWING THE LOCATION

OF OPENINGS THROUGH SLABS, THE PIPE SLEEVES AND HANGER INSERTS, AS WELL AS

THE LOCATION AND ELEVATION OF UTILITY LINES, INCLUDING, BUT NOT LIMITED TO,

CONVEYOR SYSTEMS, PNEUMATIC TUBES, DUCTS, AND CONDUITS AND PIPES 2 INCHES

AND LARGER IN DIAMETER. THESE DRAWINGS, INCLUDING PLANS, ELEVATIONS, AND

SECTIONS AS APPROPRIATE, SHALL CLEARLY SHOW THE MANNER IN WHICH THE UTILITIES

FIT INTO THE AVAILABLE SPACE AND RELATE TO EACH OTHER AND TO EXISTING BUILDING

ELEMENTS.

VA Project Number

Building Number

Drawing Number

Project Title

Location:

PhaseDrawing Title

Approved:

Issue Date Checked Drawn

StampARCHITECT / ENGINEER OF RECORDCONSULTANT

VA FORM 08 - 6231

Revisions:

MA Architects, Inc.

385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net

Planning - Architecture - Interiors

Project Number

U.S. Department of Veterans Affairs

Basement Renovation

MA Arch

GI-001

APPLICABLE STANDARDS & SHEET

INDEX

570-21-701

SMc

VA Central California Healthcare System 2615 E. Clinton Ave, Fresno, CA 93703

02.15.2023

BID DOCUMENTS

FULLY

SPRINKLERED

22006

APPLICABLE STANDARDS

ARCHITECTURAL

AD-210 ENLARGED DEMOLITION PLAN

AD-310 ENLARGED DEMOLITON REFLECTED CEILING PLAN

AE-210 ENLARGED RENOVATION PLAN

AE-310 ENLARGED RENOVATION REFLECTED CEILING PLAN

AE-800 DOOR / FINISH SCHEDULES

AE-900 TYPICAL PARTITION DETAILS

AE-901 TYPICAL PARTITION DETAILS

AE-902 TYPICAL CASEWORK DETAILS

AE-903 TYPICAL CEILING DETAILS

GENERAL

GI-000 COVER SHEET

GI-001 APPLICABLE STANDARDS & SHEET INDEX

GI-002 ABBREVIATIONS & SYMBOLS

GI-100 FIRE LIFE SAFETY PLAN

GI-210 OVERALL BASEMENT PLAN

MECHANICAL

M-0.1 LEGEND, SCHEDULES, GENERAL NOTES & ABBREVIATIONS

M-0.2 MECHANICAL DETAILS

MD-2.0 MECHANICAL DEMO PLAN

MH-2.1 MECHANICAL FLOOR PLAN

PLUMBING

P-0.1 PLUMBING LEGEND, SCHEDULES, NOTES, DETAILS & ABBREVIATIONS

PD-2.0 PLUMBING DEMO PLAN

PP-2.1 PLUMBING FLOOR PLAN

ELECTRICAL

E-0.1 LEGEND, GENERAL NOTES & ABBREVIATIONS

E-0.2 DETAILS & SCHEDULES

E-4.1 SINGLE LINE DIAGRAM & PANEL SCHEDULES

ED-2.0 ELECTRICAL DEMO LIGHTING PLAN

EL-2.1 ELECTRICAL LIGHTING PLAN

ED-3.0 ELECTRICAL DEMO POWER PLAN

EP-3.1 ELECTRICAL POWER PLAN

FIRE ALARM & FIRE SPRINKLER

F-001 SYMBOLS, LEGEND & GENERAL NOTES

FD-210 ENLARGED DEMOLITON FIRE ALARM PLAN

FA-210 ENLARGED FIRE ALARM PLAN

FD-310 ENLARGED DEMOLITION FIRE SPRINKLER PLAN

FX-310 ENLARGED RENOVATION FIRE SPRINKLER PLAN

HAZARDOUS MATERIALS

HM-210 ENLARGED DEMOLITION/ABATEMENT PLAN

SHEET INDEXPROJECT GENERAL NOTES CONT. PROJECT GENERAL NOTES

Rev. Date Description

02.15.2023 100% Contract Documents - Issue for Bid

ABC

A

AGGREGATE BASE COURSE

BB

B

BULLETIN BOARD

BD BOARD

BD FT

BHMA

BOARD FEET (FOOT)

BUILDER'S HARDWARE MANUFACTURER'S

ASSOCIATION

BI FLD DR BIFOLDING DOORS

BEV BEVEL

BITUM BITUMINOUS

BKG BACKING

BLD BUILD

CAB

C

CABINET

CB CATCH BASIN

CCT

CG

CUBICLE CURTAIN TRACK

CORNER GUARD

CEM

CER

CEMENT, CEMENTITIOUS

CERAMIC

CCTV CLOSED CIRCUIT TELEVISION

CH BD CHALKBOARD

CI CAST IRON

CJ CONTROL JOINT

CL

CLG

CLR

CMU

CNTR

COL

CONC

CONF

CONN

CONSTR

CONT

CONTR

CORR

CPT

CSK

CSP

CSWK

CU

CW

CENTER LINE

CEILING

CLEAR

CONCRETE MASONRY UNIT

COUNTER

COLUMN

CONCRETE

CONFERENCE

CONNECTION

CONSTRUCTION

CONTINUOUS

CONTRACTOR

CORRUGATED

CARPET

COUNTERSUNK

COMBINATION STANDPIPE

CASEWORK

CUBIC

COLD WATER

D

D

DEPTH

DBL DOUBLE

DBL ACT DOUBLE ACTING

DEG DEGREE

DEMO DEMOLISH

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DIFF DIFFUSER

DIM DIMENSION

DIM PT DIMENSION POINT

DISP DISPENSER

DIST DISTANCE

DN DOWN

DR DRAIN

DS DOWNSPOUT

DSP DRY STANDPIPE

DT DRAPERY TRACK

DWG DRAWING

DWGS DRAWINGS

(E)

E

EXISTING

EA EACH

EDR EQUIPMENT DRAWING

EG EDGE GUARD

EIFS EXTERIOR INSULATION FINISH SYSTEM

EL ELEVATION

ELAST ELASTOMERIC

ELEC ELECTRICAL

ELEV ELEVATOR

EMER EMERGENCY

ENCL ENCLOSURE

ENGR ENGINEER

EOS EDGE OF SLAB

EP ELECTRICAL PANEL

EPB ELECTRICAL PANEL BOARD

EPDM ETHYLENE PROPYLENE DIENE MONOMER

EQ EQUAL

EQL SP EQUALLY SPACED

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ESCAL ESCALATOR

EST ESTIMATE(D)

EWC ELECTRIC WATER COOLER

EXC EXCAVATED

EXH EXHAUST

EXP EXPANSION

EXP JT EXPANSION JOINT

FURN FURNITURE

FXTR FIXTURE

G

G

GAS

H

H

HIGH

GA GAUGE, GAGE

GAL GALLON

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GFRC GLASS FIBER REINFORCED CONCRETE

GFRG GLASS FIBER REINFORCED GYPSUM

GFRP GLASS FIBER REINFORCED PLASTIC

GLU LAM GLUE LAMINATED

GLZ GLAZING

GR GRADE OR GRADING

GVL GRAVEL

GYP GYPSUM

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

ID

I

INSIDE DIAMETER

JAN

J

JANITOR

KG

K

KILOGRAM

L

L

LENGTH, LONG

M

(N) N

NA

NAAMM

NAT

NATL

NC

NCOMBL

NEC

NEG

NEMA

NEUT

NFC

NFPA

NIC

NO

NOM

NR

NRC

NRCA

NRP

NS

NUM

N

NEW

NORTH

NOT APPLICABLE

NATIONAL ASSOCIATION OF

ARCHITECTURAL METAL MANUFACTURERS

NATURAL

NATIONAL

NOISE CRITERIA

NONCOMBUSTIBLE

NATIONAL ELECTRICAL CODE

NEGATIVE

NATIONAL ELECTRICAL MANUFACTURERS

ASSOCIATION

NEUTRAL

NATIONAL FIRE CODE

NATIONAL FIRE PROTECTION

ASSOCIATION

NOT IN CONTRACT

NUMBER

NOMINAL

NOISE REDUCTION

NOISE REDUCTION COEFFICIENT

NATIONAL ROOFING CONTRACTORS

ASSOCIATION

NONREMOVABLE

NARROW STILE

NUM NUMERAL

P

QA

QC

QRY

QT

QTB

QTF

QTR

QTY

QUAD

QUAL

Q

QUALITY ASSURANCE

QUALITY CONTROL

QUARRY

QUARRY TILE

QUARRY TILE BASE

QUARRY TILE FLOOR

QUARTER

QUANTITY

QUADRANT

QUALITY

R

R

RISER

S

SA

SALV

SAMP

SAN

SAT

SATC

SB

SBS

SBSTR

SC

SCH

SCHED

SCHEM

SCP

SCRN

SCT

SCWD

SD

SDG

SECT

SEG

SEL

SEP

SF

SFTWD

SGD

SGL

SHR

SHR HD

SHRH

SHT

SHT MTL

SHTHG

SHV

SIM

SJ

SJI

SK

SKLT

SLD WDW

SLDG

SLNT

SM

SMK

SND

SND INS

SNDU

SPEC

SPKLR

SPKR

SPLY

SQ

SQ IN

SQ YD

SS

SST

ST

STC

STD

STIF

STL JST

STL LNTL

STL PL

STL RF DK

STL TB

STL TR

STNLS

STOR

STR

STRUCT

SUB

SURF

SUSP

SUSP CLG

SV

SW

SWDR

SYM

SYNTH

SYS

SOUTH

SUPPLY AIR

SALVAGE

SAMPLE

SANITARY

SUSPENDED ACOUSTICAL TILE

SUSPENDED ACOUSTICAL TILE CEILING

SPLASH BLOCK

STYRENE BUTADIEN STYRENE

SUBSTRATE

SHADING COEFFICIENT OR SOLID CORE

SCHOOL

SCHEDULE

SCHEMATIC

SCUPPER

SCREEN

STRUCTURAL CLAY TILE

SOLID CORE WOOD DOOR

SHOP DRAWINGS, SMOKE DETECTOR,

OR SOAP DISPENSER

SIDING

SECTION

SEGMENT

SELECT

SEPARATE

SQUARE FOOT (FEET)

SOFTWOOD

SLIDING GLASS DOOR

SINGLE

SHOWER

SHOWER HEAD

SHOWER DRAIN

SHEET

SHEET METAL

SHEATHING

SHELVING

SIMILAR

SCORED JOINT

STEEL JOIST INSTITUTE

SKETCH

SKYLIGHT

HORIZONTAL SLIDING WINDOW

SLIDING

SEALANT

SHEET METAL

SMOKE

SANITARY NAPKIN DISPENSER

SOUND INSULATION

SANITARY NAPKIN DISPOSAL UNIT

SPECIFICATION

SPRINKLER

SPEAKER

SUPPLY

SQUARE

SQUARE INCH

SQUARE YARD

SANITARY SEWER OR SERVICE SINK

STAINLESS STEEL

STAIRS OR STREET

SOUND TRANSMISSION CLASS

STANDARD

STIFFENER

STEEL JOIST

STEEL LINTEL

STEEL PLATE

STEEL ROOF DECK

STEEL TUBE

STEEL TRUSS

STAINLESS

STORAGE

STRINGERS

STRUCTURAL

SUBSTITUTE

SURFACE

SUSPEND

SUSPENDED CEILING

SHEET VINYL

SWITCH

SWING DOOR

SYMBOL

SYNTHETIC

SYSTEM

T T&G T&M

TB

TCA

TCP

TD

TECH

TEL

TEMP

TER

THD

THERM

THK

THRES

THRU

THRUOUT

TK BD

TMPD

TMPD GL

TN

TO

TO FDN

TOB

TOM

TOP

TOS

TOW

TPD

TPH

TR

TRANS

TRANS WD FIN

TRTD

TS

TSTAT

TV

TYP

T

TREAD

TONGUE AND GROOVE

TIME AND MATERIALS

THROUGH BOLT OR TOWEL BAR

TILE COUNCIL OF AMERICA

TELEPHONE CONTROL PANEL TEMPERATURE

TRAFFIC CONTROL PLAN

TOWEL DISPENSER

TECHNICAL

TELEPHONE

TEMPERATURE OR TEMPORARY

TERRAZZO

THREAD

THERMAL

THICKNESS

THRESHOLD

THROUGH

THROUGHOUT

TACKBOARD

TEMPERED

TEMPERED GLASS

TRUE NORTH

TOP OF

TOP OF FOUNDATION

TOP OF BEAM

TOP OF MANSORY

TOP OF PARAPET

TOP OF STEEL

TOP OF WALL

TOILET PAPER DISPENSER

TOILET PAPER HOLDER

TOWEL BACK

TRANSOM

TRANSPARENT WOOD FINISH

TREATED

TENSILE STRENGHTH OR TUBE STEEL

THERMOSTAT

TELEVISION

TYPICAL

W

W

WEST

XFMR

X BRACE

XPS

X

TRANSFORMER

CROSS BRACE

EXTRUDED POLYSTYRENE BOARD

(INSULATION)

YD

YR

Y

YARD

YEARHB HOSE BIBB

HC HOLLOW CORE

HD HEAD

HDBD HARDBOARD

HDW HARDWARE

HDWD HARDWOOD

HGT HEIGHT

HM HOLLOW METAL

HNDRL HANDRAIL

HORIZ HORIZONTAL

HPT HIGH POINT

HR HOUR

HVAC HEATING-VENTILATION-AIR CONDITIONING

IN INCH

INCAND INCANDESCENT

INCL INCLUDE, INCLUDING

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INV INVERT

IVT INTRAVENOUS TRACK

JST JOIST

JT JOINT

KIT KITCHEN

KPL KICK PLATE

KS KNEE SPACE

LAB LABORATORY

LAD LADDER

LAM LAMINATE

LAM GL LAMINATED GLASS

LAU LAUNDRY

LAV LAVATORY

LBR LUMBER

LBS POUND

LD BRG LOAD-BEARING

LDR LEADER

LED LIGHT EMITTING DIODE

LH LEFT HAND

LHR LEFT HAND REVERSE

LIB LIBRARY

S

MACH

MACH RM

MAINT

MAN

MATL

MATV

MAX

MB

MCB

MD

ME

MEAS

MECH

MECH RM

MED

MED

MEK

MEL

MEMB

MEMO

MEZZ

MF

MFD

MFG

MFR

MFR REC

MGT

MH

MIC

MID

MIL STD

MIN

MIRR

MISC

MIT

MKR

ML

MLDG

MLWK

mm

PAR

PARA

PART

PAT

PA

PB

PBD

PC

PCA

PCC

PCCP

PCD

PCF

PCP

PED

PEN

PEND

PERF

PERM

PERIM

PERP

PGBD

PHAR

PHOTO

PHS

PKG

PI

PL

PL GL

PLAM

PLAS

PLBG

PLYWD

PMTL

PNEU

PNL

PO

PO

POLY

PR

PRCST

PREFAB

PREFIN

PRELIM

PREP

PRESS

PREV

PRKG

PRMLD

PROJ

PROP

PSF

PSI

PT

PTD

PTN

PVC

PVG

PWR

PARALLEL OR PARAPET

PARAGRAPH

PARTIAL

PATTERN

PUBLIC ADDRESS

PUSHBUTTON

PARTICLEBOARD

PIECE, POLYCARBONATE OR PORTLAND

CEMENT

PORTLAND CEMENT ASSOCIATION

PRECAST CONCRETE

CONCRETE PAVEMENT

PAPER CUP DISPENSER

POUNDS PER CUBIC FOOT

PORTLAND CEMENT PLASTER

PEDESTAL

PENETRATE

PENDANT

PERFORATED

PERMANENT

PERIMETER

PERPENDICULAR

PEGBOARD

PHARMACY

PHOTOGRAPH

PHILLIPS HEAD SCREW

PACKAGE

POINT OF INTERSECTION

PROPERTY LINE

PLATE GLASS

PLASTIC LAMINATE

PLASTER OR PLASTIC

PLUMBING

PLYWOOD

PAINTED METAL

PNEUMATIC

PANEL

POST OFFICE PURCHASE ORDER

PURCHASE ORDER POST OFFICE

POLYETHYLENE (PLASTIC)

PAIR

PRECAST

PREFABRICATE

PREFINISH

PRELIMINARY

PREPARATION

PRESSURE

PREVIOUS

PARKING

PREMOLDED

PROJECT

PROPERTY

POUNDS PER SQUARE FOOT

POUNDS PER SQUARE INCH

PAINT, PNEUMATIC TUBE, OR

PRESSURE TREATED

PAPER TOWEL DISPENSER

PARTITION

POLYVINYL CHLORIDE (PLASTIC)

PAVING

POWER

RA RETURN AIR

RAD RADIUS

RB RESILIENT BASE

RCP REFLECTED CEILING PLAN

RCPT RECEPTACLE

RD ROOF DRAIN

RECT RECTANGULAR

REF REFERENCE

REFR REFRIGERATOR

REG REGISTER

REINF REINFORCE (D) (ING) (MENT)

REQD REQUIRED

REQT REQUIREMENT

RESIL RESILIENT

RET RETURN

REV REVISION

RF RESILIENT FLOORING

RH RIGHT HAND

RHMS ROUND HEAD MACHINE SCREW

RHWS ROUND HEAD WOOD SCREW

RM ROOM

RND ROUND

RO ROUGH OPENING

ROW RIGHT OF WAY

RWL RAIN WATER LEADER

UC

U

UNDER COUNTER

UL UNDERWRITERS LABORATORIES

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTABLE POWER SUPPLY

UTIL

UCD

UGND

ULT

UNFIN

UR

UV

UTILITY

UNDERCUT DOOR

UNDERGROUND

UNTIMATE

UNFINISH

URINAL

ULTRAVIOLET

W/ WITH

W/O WITHOUT

WC WATER CLOSET OR WALL COVERING

WD WOOD

WDW WINDOW

WGL WIRE GLASS

WCHR WHEELCHAIR

WM WIRE MESH

WO WHERE OCCURS

WPT WORKING POINT

WR WATER RESISTANT

WSCT WAINSCOT

WSP WET STANDPIPE

WT WEIGHT

WTHPRF WEATHERPROOF

WTRPRF WATERPROOF

WWF WELDED WIRE FABRIC

WWM

WARR

WBL

WC WL HNG

WCL WL MTD

WF

WFAB

WFR

WFS

WH

WHSE

WLD

WP

WPD

WPM

WS

WELDED WIRE MESH

WARRANTY

WOOD BLOCKING

WATER CLOSET, WALL HUNG

WATER COOLER, WALL HUNG

WIDE FLANCE

WALL FABRIC

WOOD FRAME

WOOD FURRING STRIPS

WATER HEATER

WAREHOUSE

WELDED

WATERPROOFING

WATER PRESSURE DROP

WATERPROOF MEMBRANE

WEATHERSTRIP

CCR CARD CONTROL READER

BLDG BUILDING

CT CERAMIC TILE

F

F/F FACE TO FACE

FA FIRE ALARM

FAS FIRE ALARM STATION OR FASCIA

FB FLAT BAR

FCU FAN COIL UNIT

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FDN FOUNDATION

FEC FIRE EXTINGUISHER CABINET

FE FIRE EXTINGUISHER

FF FINISH FACE

FHC FIRE HOSE CABINET

FHMS FLAT HEAD MACHINE SCREW

FHWS FLAT HEAD WOOD SCREW

FHY FIRE HYDRANT

FLAM FLAMMABLE

FLASH FLASHING

FLEX FLEXIBLE

FLUOR FLUORESCENT

FO FACE OF OR FINISHED OPENING

FSB FOLDING SHOWER BENCH

FSTNR FASTENER

FT FOOT, FEET

O/O O

OA

OC

OCC

OCT

OD

OD

OF/CI

OFD

OFF

OF/OI

OH

OH DR

OPH

OPNG

OPP

OPR

OPT

OR

ORD

ORG

ORIG

ORN

OSHA

OUT

OZ

OVHD

O

OUT TO OUT

OXYGEN

OUTSIDE AIR OR OVERALL

ON CENTER

OCCUPY

OCTAGON

OUTSIDE DIAMETER OUTSIDE

DIMENSION

OUTSIDE DIMENSION OUTSIDE

DIAMETER

OWNER FURNISHED/CONTRACTOR

INSTALLED

OVERFLOW DRAIN

OFFICE

OWNER FURNISHED/OWNER INSTALLED

OVERHANG

OVERHEAD (COILING) DOOR

OPPOSITE HAND

OPENING

OPPOSITE

OPERABLE

OPTIONAL

OPERATING ROOM OR OUTSIDE RADIUS

ORDNANCE OR OVERFLOW ROOF

DRAIN

ORGANIC

ORIGINAL

ORNAMENTAL

OCCUPATIONAL SAFETY AND HEALTH

ADMINSTRATION

OUTLET

OUNCE

OVERHEAD

VAC

V

VACUUM

VB VALVE BOX

VCT VINYL COMPOSITION TYLE

VERT VERTICAL

VEST VESTIBULE

VIT VITREOUS

VP VENT PIPE

VOL VOLUME

VWC VINYL WALL COVERING

ABBREVIATIONS SYMBOLS

ANGLE

@ AT

C CENTER LINEL

Ø DIAMETER

= EQUAL

> GREATER THAN

< LESS THAN

± PLUS OR MINUS (TOLERANCE)

# POUND(S)

' FOOT OR FEET

" INCH OR INCHES

FOF FACE OF FINISH

HSS HOLLOW STRUCTURAL STEEL

SYMBOLS LEGENDS

SHEET

X

NORTH IDENTIFIER

ELEVATION

IDENTIFIER

KEY NOTE TAG

GRID LINES

CALL-OUT IDENTIFIER

? PHOTOGRAPH

LOCATIONS

+? CEILING TAG

? WALL TYPE TAG

SHEET #

REF # ON SHEET

WINDOW TAG

DOOR TAG?

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT

AAMA

AIR CONDITIONING UNIT

AMERICAN ARCHITECTURAL

MANUFACTURERS ASSOCIATION

A/E ARCHITECT / ENGINEER

AB ANCHOR BOLT

AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE

ACI AMERICAN CONCRETE INSTITUTE

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACST ACOUSTIC

ACS PNL ACESS PANEL

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADH ADHESIVE

ADDN ADDITION

ADJ ADJACENT, ADJOINING, OR ADJUSTABLE

ADMIN ADMINISTRATION

ADB AUTOMATIC DOOR BOTTOM

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGC ASSOCIATED GENERAL CONTRACTORS

AGA AMERICAN GAS ASSOCIATION

AGGR AGGREGATE

AHJ AUTHORITY HAVING JURISDICTION

AHR ANCHOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF ARCHITECTS

ALT ALTERNATE

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

ALT NO ALTERNATE NUMBER

ALUM ALUMINUM

AMP AMPERE

AMT AMOUNT

ANOD ANODIZE

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

ANT ANTENNA

APA AMERICAN PLYWOOD ASSOCIATION

APPD APPROVED

APPROX APPROXIMATE

APT APARTMENT

AR AS REQUIRED

ARCH ARCHITECT

ASB ASBESTOS

ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION

ASKLR AUTOMATIC SPRINKLER

ASPH ASPHALT

ASSN ASSOCIATION

ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS

ATCH ATTACHMENT

ATM AUTOMATIC TELLER MACHINE

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AVE AVENUE

AVG AVERAGE

AW ACID WASTE

AWI ARCHITECTURAL WOODWORKING INSTITUTE

AWPA AMERICAN WOOD PRESERVERS' ASSOCIATION

AWS AMERICAN WELDING SOCIETY

AWT ACOUSTICAL WALL TREATMENT

BLKT BLANKET

BLVD BOULEVARD

BM

BR

BEAM OF BENCHMARK

BEDROOM

BRCG

BRDG

BRACING

BRIDGING

BOT BOTTOM

BRDG JST BRIDGING JOIST

BRG BEARING

BRG PL BEARING PLATE

BRKT BRACKET

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BU BUSHEL

BUR BUILT–UP ROOFING

C CELCIUS CHANNEL

C CONC CAST CONCRETE

C TO C

CBB

CENTER TO CENTER

CEMENTITIOUS (BACKER) BOARD

CC

CCW

CUBIC CENTIMETER

COUNTERCLOCKWISE

CAC CEILING ATTENUATION CLASS

CD CONSTRUCTION DOCUMENTS OR CONTRACT

DOCUMENTS

CF CONTRACTOR FURNISHED

CF/CI

CF/OI

CONTRACTOR FURNISHED/CONTRACTOR

INSTALLED

CONTRACTOR FURNISHED/CONTRACTOR

INSTALLED

C LABEL CLASS C DOOR

CFLG

CFM

COUNTERFLASHING

CUBIC FEET PER MINUTE

CFS CUBIC FEET PER SECOND

CG CENTER OF GRAVITY OR CORNER GUARD

CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS

CHEM

CHFR

CHK

CI

CIP

CIR

CIRC

CNR

CNTR

CO

CONC FLR

COND

CONF

CORR

CMP

CRS

CRSI

CHEMICAL

CHAMFER

CHECK

CAST IRON

CAST–IN–PLACE

CIRLCE

CIRCULAR

CORNER

COUNTER

CARBON MONOXIDE, CERTIFICATE OF

OCCUPANCY, CLEANOUT, OR COMPANY

CONCRETE FLOOR

CONDENSER OR CONDITION

CONFERENCE

CORRIDOR

CRITICAL PATH METHOD

COLD ROLLED STEEL

CONCRETE REINFORCING STEEL INSTITUTE

CPRS COMPRESSIBLE

CSB CONCRETE SPLASH BLOCK

CSG CASING

CSK

CSWK

COUNTER SUNK

CASEWORK

CTB

CTF

CERAMIC TILE BASE

CERAMIC TILE FLOOR

CSMT CASEMENT

CTG

CSI CONSTRUCTION SPECIFICATIONS INSTITUTE

COATING

CTRL CONTROL

CU FT

CU IN

CUBIC FEET

CUBIC INCH

CTR CENTER CONTOUR

CU YD CUBIC YARD

CURT

CYL

CURTAIN

CYLINDER

CYL L CYLINDER LOCK

D LABEL CLASS D DOOR

DAT DATUM

DB DECIBEL

DBL GLZ DOUBLE GLAZE

DC DIRECT CURRENT

DEL DELETE

DIR DIRECTION

DIV DIVIDE OR DIVISION

DL DEAD LOAD

DOC DOCUMENT

DOUG FIR DOUGLAS FIR

DOZ DOZEN

DR CL DOOR CLOSER

DR FR DOOR FRAME

DR OPNG DOOR OPENING

DSGN DESIGN

DW DISHWASHER

DWTR DUMBWATER

E EAST

E LABEL CLASS E DOOR

EFF EFFICIENCY

EFS EXTERIOR FINISH SYSTEM

EJ EXPANSION JOINT

EMER SHR EMERGENCY SHOWER

ENCL ENCLOSURE

ENVIR ENVIRONMENT

EPA ENVIRONMENTAL PROTECTION AGENCY

EPO EMERGENCY POWER OFF

EPS EXPANDED POLYSTRYRENE BOARD

(INSULATION)

ERD EXISTING ROOF DRAIN

ESC ESCAPE OR ESCUTCHEON

ESMT EASEMENT

ESP ESPECIALLY

ETC ET CETERA

EW EACH WAY

EWS EYE WASH STATION

EXH EXHAUST

EXIST EXISTING

EXP BT EXPANSION BOLT

EXST GR EXISTING GRADE

EXT EXTERIOR, EXTERNAL, OR

EXTINGUISHER

EXT GR EXTERIOR GRADE

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

F FAHRENHEIT OR FEMALE

FAB FABRIC

FAC FACTOR

FACIL FACILITY

FAS BD FASCIA BOARD

FCO FLOOR CLEANOUT

FCTY FACTORY

FDTN FOUNDATION

FF EL FINISH FLOOR ELEVATION

FF&E FURNITURE, FIXTURE, AND EQUIPMENT

FH FLAT HEAD

FIG FIGURE

FIL FILLET

FIN FINISH

FHP FULL HEIGHT PARTITION

FLG FLOORING

FLR FLOOR

FIN WD FINISH WOOD

FIXT FIXTURE

FLDG FOLDING

FL FLOORLINE

FLUOR FIX FLUORESCENT FIXTURE

FM FACTORY MUTUAL

FLR FIN FLOOR FINISH

FLR SK FLOOR SINK

FRZ FREEZER

FM–G FACTORY MUTUAL GLOBAL

FOC FACE OF CONCRETE OR FACE OF CURB

FOF FACE OF FINISH

FOM FACE OF MANSORY

FOS FACE OF SLAB OR FACE OF STUD

FOUNT FOUNTAIN

FOW FACE OF WALL

FP FIRE PROTECTION OR FIREPROOF

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FIRE RATING, FIRE RESISTANT, OR FRAME

FREQ FREQUENCY

FRMG FRAMING

FRP FIBER REINFORCED POLYESTER OR

FIBERGLASS REINFORCED PLASTIC

FR SINK FLUSHING RIM SINK

FS FEDERAL SPECIFICATION

FURG FURRING

FWC FABRIC WALLCOVERING

FUT FUTURE

GD GUARD

GDR GUARD RAIL

GEN GENERAL OR GENERATOR

GL GLASS

GI GRAB BAR OR GALVANIZED IRON

GC GENERAL CONTRACTOR

GFRC GLASS FIBER REINFORCED CONCRETE

GFRG GLASS FIBER REINFORCED GYPSUM

GL GLASS

GL BLK GLASS BLOCK

GR FL GROUND FLOOR

GRAN GRANITE

GRTG GRATING

GSB GYPSUM SHEATHING BOARD

GSM GALVANIZED SHEET METAL

GSU GLAZED STRUCTURAL UNIT

GT GROUT

GUAR GUARANTEE

GUT GUTTER

GRTG GRATING

GSB GYPSUM SHEATHING BOARD

GSM GALVANIZED SHEET METAL

GSU GLAZED STRUCTURAL UNIT

H PLAM HIGH PRESSURE PLASTIC LAMINATE

HAZ MAT HAZARDOUS MATERIALS

HCWD HOLLOW CORE WOOD DOOR

HDNR HARDENER

HDO HIGH DENSITY OVERLAY

HDR HEADER

HEPA HIGH EFFICIENCY PARTICULATE AIR

(FILTER)

HEX HEXAGON

HF HIGH FREQUENCY

HGR HANGER

HMD HOLLOW METAL DOOR

HMDF HOLLOW METAL DOOR AND FRAME

HMF HOLLOW METAL FRAME

HO HOLD OPEN

HOSP HOSPITAL

HP HIGH PRESSURE OR HORSEPOWER

HQ HEADQUARTERS

HS HEAT-STRENGTHENED (GLASS) OR

HIGH STRENGTH

HSE HOUSE

HSKPG HOUSEKEEPING

HST HOIST

HT HEIGHT

HVY HEAVY

HW HOT WATER

HYD HYDRANT

HYDR HYDRAULIC

I INTERSTATE (HIGHWAY) OR MOMENT

OF INERTIA

IAQ INDOOR AIR QUALITY

IBC INTERNATIONAL BUILDING CODE

ID NO IDENTIFICATION NUMBER

ILLUM ILLUMINATION

IND INDEPENDENT OR INDUSTRIAL

INFO INFORMATION

INSUL INSULATION

INTERCOM INTERCOMMUNICATION

INTL INTERNATIONAL

IRMA INVERTED ROOF MEMBRANE ASSEMBLY

IWH INSTANTANEOUS WATER HEATER

J-BOX JUNCTION BOX

KD KILN DRIED

KO KNOCKOUT

LIN LINEAR

LINO LINOLEUM

LIQ LIQUID

LKR LOCKER

LKR RM LOCKER ROOM

LKWASH LOCKWASHER

LL LEAD LINED

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMST LIMESTONE

LNDSCP LANDSCAPE

LR LIVING ROOM

LRG LARGE

LRV LOUVERED ROOF VENT

LS LUMP SUM

LT LIGHT

LT GA LIGHT GAGE

LT WT LIGHTWEIGHT

LTG LIGHTING

LTNG LIGHTNING

LVD LOUVERED

LVR LOUVER

LWC LIGHTWEIGHT CONCRETE

LWIC LIGHTWEIGHT INSULATING CONCRETE

LYR LAYER

MACHINE

MACHINE ROOM

MAINTENANCE

MANUAL

MATERIAL

MASTER ANTENNA TELEVISION SYSTEM

MAXIMUM

MACHINE BOLT

METAL CORNER BEAD

DECK

MECHANICAL ENGINEER

MEASURE

MECHANICAL

MECHANICAL ROOM

MEDICAL MEDIUM

MEDIUM MEDICAL

METHYL ETHYL KETONE

MELAMINE

MEMBRANE

MEMORANDUM

MEZZANINE

MILL FINISH

MANUFACTURED

MANUFACTURING

MANUFACTURER

MANUFACTURER'S RECOMMENDATION

MANAGEMENT

MANHOLE

MICROPHONE

MIDDLE

MILITARY STANDARD

MINIMUM MINUTE

MIRROR

MISCELLANEOUS

MITER

MARKER

METAL LATH

MOLDING (MOULDING)

MILLWORK

MILLIMETER

MO

MOD

MOD BIT

MON

MOPR

MR

MS

MTD

MTG

MTL

MULL

MW

MWP

MASONRY OPENING OR MOTOR

OPERATED

MODEL, MODIFY OR MODULE

MODIFIED BITUMEN

MONITOR

MOP RACK

MOISTURE RESISTANT

MACHINE SCREW OR MOP SINK

MOUNTED

MOUNTING

METAL

MULLION

MICROWAVE

MEMBRANE WATERPROOFING

RCVT

RLG

RS

RT

RV

RVS

RFI

RFP

RECEIVER

RAILING

ROUGH OPENING

RIGHT

ROOF VENT

REVERSE

REQUEST FOR INFORMATION

REQUEST FOR PROPOSAL

STUD WIDTH PARTITION WIDTHPARTITION TYPE DESIGNATION = 'X'

NON-RATED PARTITION = N

ACOUSTICAL RATED PARTITION = A

SHAFT PARTITION = S

FURRED PARTITION = F

REFER TO PARTITION DETAIL FOR COMPLETE LEGEND & FURTHER INFORMATION.

#X#

PARTITION

TYPE

STUD WIDTH

FIRE RATING

VA Project Number

Building Number

Drawing Number

Project Title

Location:

PhaseDrawing Title

Approved:

Issue Date Checked Drawn

StampARCHITECT / ENGINEER OF RECORDCONSULTANT

VA FORM 08 - 6231

Revisions:

MA Architects, Inc.

385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net

Planning - Architecture - Interiors

Project Number

U.S. Department of Veterans Affairs

Basement Renovation

Author

GI-002

ABBREVIATIONS & SYMBOLS

570-21-701

SMc

VA Central California Healthcare System 2615 E. Clinton Ave, Fresno, CA 93703

02.15.2023

BID DOCUMENTS

FULLY

SPRINKLERED

22006

ABBREVIATIONS

Rev. Date Description

02.15.2023 100% Contract Documents - Issue for Bid

CHUTE

TO BUILDING

OUTPATIENT CLINIC

B1B16G B1B17A

B1B15

B1B03C

B1B06

B1B01

B1A02

B1B16A

SUITE B1B16

B1B16E

B1A03

B1B03B

B1B08

B1B14A

B1B14B

B1B14B.1

B1B16B

B1B03

B1A04

B1B16D

B1B04

B1B06A

B1B13

B1B10

B1B14

B1B07

B1B09

B1B02

B1B03A

B1A06

B1B17

B1B16C

B1B12A

B1B11A

B1B05

B1B11

B1B16F

B1B16G.1

B1B16G2

B1B07A

B1B12

B1A05

B1B04C

B1B-5 B1B-4

B1B-3

B1-1

B1B00

B1A-2

B1A-1

S-4 S-3

B1B-2

B1B-1

P-2

P-1

B1B-1.1

STORAGE

CORRIDOR

SALAD PREP. AREA

SERVICE

CLOTHING ROOM

CORRIDOR

PASSENGER

ELEVATOR

ELEVATOR LOBBY

DRY

SUITE LOBBY

NUTRITION CLINIC

STORAGE

SERVICE

LAUNDRY

CHUTE

VAULT

MECHANICAL

ELEVATOR ELEVATOR

STAIR

NO. 2

DUMBWAITER

NO. 1

DUMBWAITER

NO. 2

HOUSEKEEPING

STORAGE

DUMBWAITER

NO. 3

LAUNDRY

ELEVATOR

PASSENGER

OFFICE

LOCKER ROOM

KITCHEN DISHWASHING AREA

REFRIGERATOR

CORRIDOR

IRM

SERVICE

SERVER ROOM

MECHANICAL

EMS OFFICE

AREA

IRM SERVICEOFFICE

CORRIDOR

UPS

OFFICE

STORAGE

IRMS OFFICE

IRMS OFFICE

MENS

REST

ROOM

WOMEN'S

REST

ROOM

LOCKERS

IRM CUSTOMER SUPPORT IRM CUSTOMER SUPPORT

CHASE

MECHANICAL

OFFICE OFFICE

CART

WASHER

DRY GOODS

MECHANICAL

CLOSET

WALK-IN

NUTRITION FOOD

DIETICIAN

CLINIC NUTRITION &

CHIEF

FOOD SERVICE

EMPLOYEE DINING

STORAGE

CHEMICAL

INGREDIENT CONTROL

BIOMEDICAL

ENGINEERING

BIOMEDICAL

ENGINEERING

IRM

IRM SERVICE

CHIEF

COMMUNICATIONS

SOILED LAUNDRY

LOST & FOUND

HVAC

MACHINE ROOM

CORRIDOR

STORAGE

WOMEN'S

CORRIDOR

CORRIDOR

CORRIDOR

& SHOWER

CANTEEN

CORRIDOR

DRYERS

ELECTRICAL

STORES

HR

HR

HR

HRDN.

UP

DN.

FD

CLEAR SPACE CENTERED

ON TACTILE CHARACTERS

REFUGE

AREA OF

AREA OF

REFUGE

AREA OF

REFUGE

8"

M in

0"

M ax

3/ 8"

3/ 8"

/8

2"

WALL SIGNAGE

PER IBC 11B-703

1’−6"

LIFE SAFETY LEGEND:

NOTE:

-CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCEMENT OF

WORK.

-DIMENSIONS: WALL DIMENSIONS ARE FACE OF FINISHED FACE TO FINISHED

FACE UNLESS NOTED OTHERWISE. WINDOW / DOOR DIMENSIONS ARE TO

CENTER LINE OF WINDOW / DOOR WHERE SHOWN.

-WHERE DIMENSION IS PRECEEDED BY A (±) SYMBOL, THIS

REPRESENTS/ALLOWS A "FLOAT" IN LAYING OUT THE WORK. CONTRACTOR

IS TO NOTIFY ARCHITECT IN WRITING, PRIOR TO FRAMING, IF DIMENSION

EXCEED ±2" FOR DIRECTION ON HOW TO PROCEED.

NEW ACOUSTICAL / NON-RATED PARTITION

(4" STUD U.N.O.)

(E) ACOUSTICAL / NON-RATED PARTITION

(E) PARTITION TO BE DEMOLISHED

(E) 1-HOUR RATED FIRE PARTITION

(E) 2-HOUR RATED FIRE BARRIER

1192 SF

Training B1A01E

650 SF

Business Center B1A01

727 SF

Copier/Accessory Area

B1A01F

174 SF

Break Room B1A01B

214 SF

Mechanical B1A01A

242 SF

Conference Room

B1A01C

54 SF

Storage B1A01D

AE-902 4

OCCUPANCY CALCULATIONS:

BUSINESS CENTER:

NET FLOOR AREA: 650sf OCC. LOAD FACTOR: 650/150sf (BUSSINESS AREAS)

= 4 OCCUPANTS

TRAINING:

NET FLOOR AREA: 1192sf OCC. LOAD FACTOR: 1192/50sf (CONCENTRATED BUSINESS AREA)

= 24 OCCUPANTS

TOTAL OCCUPANTS = 28 OCCUPANTS

REQUIRED EXIT= 1

VA Project Number

Building Number

Drawing Number

Project Title

Location:

PhaseDrawing Title

Approved:

Issue Date Checked Drawn

StampARCHITECT / ENGINEER OF RECORDCONSULTANT

VA FORM 08 - 6231

Revisions:

MA Architects, Inc.

385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net

Planning - Architecture - Interiors

Project Number

U.S. Department of Veterans Affairs

Basement Renovation

MA Arch

GI-100

FIRE LIFE SAFETY PLAN

570-21-701

SMc

VA Central California Healthcare System 2615 E. Clinton Ave, Fresno, CA 93703

02.15.2023

BID DOCUMENTS

FULLY

SPRINKLERED

22006

Key Notes

001 (E) ACCESSIBLE PATH OF TRAVEL.

002 (E) ACCESSIBLE ENTRANCE.

010 PROVIDE TACTILE EXIT SIGNS NOTING "EXIT ROUTE".

3/8" = 1'-0"

TYP. TACTILE ACCESSIBILITY SIGNAGE

1/8" = 1'-0"

Fire Life Safety Plan

Rev. Date Description

02.15.2023 100% Contract Documents - Issue for Bid

CHUTE

B1A01.1

B1A01

B1A01C B1A01A

B1A01D

B1A01E B1A01B

B1A01.2

B1A01

STORAGE

MECH.

ROOM

TELE

OFFICE

OFFICE

SUITE

HEALTH

INFORMATION

MANAGEMENT

MECH

OFFICE

SUITE

VESTIBULE

TO BUILDING

OUTPATIENT CLINIC

B1B04A

B1B16G B1B17A

B1B15

B1B03C

B1B06

B1B01

B1A02 B1A08

B1A09 B1A07

B1B16A

SUITE B1B16

B1B16E

B1A03

B1B03B

B1B08

B1B14A

B1B14B

B1B14B.1

B1B16B

B1B03

B1A11

B1A12B.1

B1A12A

B1A12B

B1A12

B1A13A

B1A08A.2

B1A08A.1

B1A08A

B1A10

B1A04

B1B16D

B1B04

B1B06A

B1B13

B1B10

B1B14

B1B07

B1B09

B1B02

B1B04B

B1B04B.1

B1B03A

B1A06

B1B17

B1B16C

B1B12A

B1B11A

B1B05

B1B11

B1B16F

B1B16G.1

B1B16G2

B1B07A

B1B12

B1A05

B1B04C

B1B-5 B1B-4

B1B-3

B1-1

B1B00

B1A-2

B1A-5

B1A13

B1A-1

B1A-3

B1A-4

S-4 S-3

B1B-2

B1B-1

P-2

P-1

B1B-1.1

STORAGE

CORRIDOR

SALAD PREP. AREA

CORRIDOR

KITCHEN

SERVICE

CLOTHING ROOM

STAIR

NO. 1

CORRIDOR

PASSENGER

ELEVATOR

ELEVATOR LOBBY

MEAT FREEZER

SALAD

COLD BOX 4

DRY

SUITE LOBBY

NUTRITION CLINIC

STORAGE

SERVICE

LAUNDRY

CHUTE

MEAL PRE-PREP

VAULT

MECHANICAL

ELEVATOR ELEVATOR

AUTOPSY

STAIR

NO. 2

DUMBWAITER

NO. 1

DUMBWAITER

NO. 2

HOUSEKEEPING

STORAGE

DUMBWAITER

NO. 3

MECHANICAL

LAUNDRY

ELEVATOR

PASSENGER

OFFICE

LOCKER ROOM

VEGETABLE FREEZER

REFRIG.

BOX 5

COLD BOX 1

KITCHEN DISHWASHING AREA

REFRIGERATOR

CORRIDOR

IRM

SERVICE

SERVER ROOM

MECHANICAL

INFORMATION

SUPERVISOR

SERVICE

EMS OFFICE

AREA

IRM SERVICEOFFICE

CORRIDOR

CORRIDOR

UPS

OFFICE

STORAGE

IRMS OFFICE

IRMS OFFICE

MENS

REST

ROOM

WOMEN'S

REST

ROOM

LOCKERS

IRM CUSTOMER SUPPORT IRM CUSTOMER SUPPORT

CHASE

MECHANICAL

REST ROOM

FILE

OFFICE OFFICE

KITCHEN PREPARATION AREA

CART

WASHER

DRY GOODS

MECHANICAL

CLOSET

WALK-IN

ELECTRICAL

NUTRITION FOOD

DIETICIAN

CLINIC NUTRITION &

CHIEF

FOOD SERVICE

EMPLOYEE DINING

STORAGE

CHEMICAL

NUTRITION & FOOD DIET

NUTRITION

& FOOD

NUTRITION

PRODUCTION

MANAGER

FOOD

COLD BOX 6

COLD

CORRIDOR

STORAGE

OFFICE

TELECOMMUNICATION

OPERATORS

TELEPHONE

OFFICE

BREAKROOMRESTROOM

COLD BOX 7

COLD BOX 8COLD FOOD PREP

COLD BOX 3

INGREDIENT CONTROL

MEAT PREP.

CHEFS

BIOMEDICAL

ENGINEERING

BIOMEDICAL

ENGINEERING

IRM

IRM SERVICE

CHIEF

COMMUNICATIONS

SOILED LAUNDRY

LOST & FOUND

HVAC

MACHINE ROOM

CORRIDOR

STORAGE

WOMEN'S

CORRIDOR

CORRIDOR

CORRIDOR

& SHOWER

CANTEEN

CORRIDOR

DRYERS

ELECTRICAL

STORAGE

STORES

HR

HR

HR

HR

HR

X

10.A 10 11

1 2 3 4 5 6 7 8

Y

Z

Y

Z

A

B

C

D

E

F

G

12 13 14 15 16 17 18

H

X

DN.

UP

DN.

UP

DN.

AD-210

VA Project Number

Building Number

Drawing Number

Project Title

Location:

PhaseDrawing Title

Approved:

Issue Date Checked Drawn

StampARCHITECT / ENGINEER OF RECORDCONSULTANT

VA FORM 08 - 6231

Revisions:

MA Architects, Inc.

385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net

Planning - Architecture - Interiors

Project Number

U.S. Department of Veterans Affairs

Basement Renovation

Author

GI-210

OVERALL BASEMENT PLAN

570-21-701

SMc

VA Central California Healthcare System 2615 E. Clinton Ave, Fresno, CA 93703

02.15.2023

BID DOCUMENTS

FULLY

SPRINKLERED

22006

1" = 10'-0"

Overall Basement Plan

Rev. Date Description

02.15.2023 100% Contract Documents - Issue for Bid

Restroom B1B13

130 SF

Men's Women's Restroom

B1B12

148 SF

Women's Lockers B1B12A

99 SF

Service EMS Office

B1B10

324 SF 26 SF

Chase B1B09

Elevator S-4

76 SF 107 SF

Service Elevator

S-3 IRM Storage

B1B01

94 SF

Passenger Elevator

P-1

77 SF

Corridor B1-B

432 SF

TO BUILDING OUTPATIENT CLINIC

Passenger Elevator

P-2

77 SF

Laundry Chute B1A02

161 SF

E

Corridor B1A-1

296 SF

6 7

Housekeeping B1A05

71 SF

+72"

72 SF

Office B1A01C

130 SF

Office B1A01A

Dry Stores

73 SF

F

OIT Laptop Distribution

B1A01

2810 SF 108 SF

Office B1A01.1

Ingredient Control Dry

Goods B1A06

460 SF

74 SF

Comm B1A01.2

Mechanical

WB-106C

37 SF

FD

G

Storage B1A01E

51 SF

H

Mechanical

WB-106B

75 SF

Basement Level (Demolition) 1/4" = 1'-0"

A1

A1

A1

A1

A1

A1

GENERAL NOTES - HAZARDOUS MATERIALS

1. HAZARDOUS MATERIAL ABATEMENT PLANS AND SPECIFICATIONS HAVE BEEN

PREPARED ON THE BASIS OF EXISTING DOCUMENTS AND SITE INSPECTIONS. LOCATION OF

MATERIALS SCHEDULED FOR ABATEMENT ARE GENERAL IN NATURE. DRAWINGS ARE

INTENDED TO PROVIDE AN APPROXIMATE LOCATION OF MATERIALS TO BE REMOVED.

CONTRACTOR IS RESPONSIBLE FOR LOCATING, ACCESSING, AND REMOVING ALL THAT WILL

BECOME OR HAVE THE POTENTIAL TO BECOME DISTURBED.

2. THESE DRAWINGS ARE NOT TO BE CONSIDERED A STAND-ALONE DOCUMENT.

COORDINATE ALL HAZARDOUS MATERIAL RELATED WORK ASSOCIATED WITH DEMOLITION

ACTIVITIES SPECIFIED ELSEWHERE IN THE CONTRACT DOCUMENTS.

3. HAZARDOUS MATERIALS INCLUDING ASBESTOS-CONTAINING MATERIALS HAVE BEEN

IDENTIFIED. THESE MATERIALS MUST BE REMOVED PRIOR TO DEMOLITION OF THE

STRUCTURE.

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INVESTIGATING AND COORDINATING

ALL WORK UNDER THIS CONTRACT TO DETERMINE TILE EXTENT OF HAZARDOUS MATERIALS

RELATED WORK. CAREFULLY COORDINATE ALL DEMOLITION ACTIVITIES TO ENSURE THE

EXTENT OF DEMOLITION IS LIMITED TO WHAT IS REQUIRED BY THE CONTRACT DOCUMENTS.

5. THE CONTRACTOR SHALL COORDINATE THE REMOVAL OF ALL FURNITURE, FIXTURES,

CASEWORK, FIXED AND MOVEABLE OBJECTS, NON-HAZARDOUS PARTITION WALLS, FINISHES,

ETC., PRIOR TO HAZARDOUS MATERIAL ABATEMENT. REFER TO THE CONTRACT DOCUMENTS

FOR ITEMS SCHEDULED FOR SALVAGE AND REUSE. ANY WORK THAT COULD IMPACT KNOWN

OR ASSUMED HAZARDOUS MATERIALS SHALL BE CONDUCTED WITHIN A NEGATIVE PRESSURE

ENCLOSURE IN ACCORDANCE WITH REQUIREMENTS HEREIN.

6. TO THE EXTENT POSSIBLE, THE CONTRACTOR SHALL CONSTRUCT CONTAINMENT AREAS

TO THE FULL EXTENT OF EACH AREA OR WORK ON EACH FLOOR OR WORK AREA. ADDITIONAL

CLEARANCE SAMPLES RESULTING FROM SEPARATION OF CONTAINMENT AREAS INTO

MULTIPLE CONTAINMENTS WILL BE BACKCHARGED TO THE CONTRACTOR.

7. CONTRACTOR SHALL CAREFULLY SCHEDULE AND COORDINATE ALL PHASES OF

HAZARDOUS MATERIAL RELATED WORK TO ENSURE THAT UNPROTECTED PERSONNEL AND

WORK AREAS ARE NOT EXPOSED TO HAZARDOUS SUBSTANCES. THIS INCLUDES THE

COORDINATION OF ALL DEBRIS CLEANUP, SOFT DEMOLITION, ABATEMENT AND OTHER

CONSTRUCTION ACTIVITIES.

8. ALL SUBMITTALS REQUIRED BY THE PROJECT SPECIFICATIONS MUST BE APPROVED BY

THE VETERANS ADMINISTRATION'S CERTIFIED INDUSTRIAL HYGIENIST (VA CIH) PRIOR TO THE

START OF ANY HAZARDOUS MATERIAL RELATED WORK. REFER TO HAZARDOUS MATERIAL

SPECIFICATIONS.

9. THE CONTRACTOR'S HAZARDOUS MATERIAL ABATEMENT SUBCONTRACTOR SHALL

COORDINATE ALL NECESSARY PRE-ABATEMENT, POST ABATEMENT INSPECTION AND

ABATEMENT RECORD DOCUMENTS FOR REVIEW AND APPROVAL BY THE VA CIH.

10. PROVIDE, OPERATE, AND MAINTAIN MAGNEHELIC GAUGES OR CIRCULAR CHART

RECORDERS OF APPROPRIATE RANGE AT THE ENTRANCE TO EACH WORK AREA DURING

ASBESTOS ACTIVITIES. NO ASBESTOS SHALL BE CONDUCTED UNLESS THE SYSTEM IS

INSTALLED, OPERATING, AND RECORDING CORRECTLY.

11. ALL DIFFERENTIAL AIR PRESSURE UNITS AND VACUUMS MUST BE CHALLENGE TESTED

(DOP EQUIVALENT) ON-SITE PRIOR TO USE.

12. ALL POLYETHYLENE SHEETING AND CONSTRUCTION MATERIALS SHALL BE FIRE

RETARDANT.

13. CONTRACTOR SHALL INSTALL AND ADEQUATE NUMBER OF CLEAR VIEW PORTS TO

EACH WORK AREA. ALL VIEW PORTS SHALL HAVE A MINIMUM DIMENSION OF 18" BY 18".

14. FINAL CLEARANCE FOR ALL ABATEMENT-RELATED WORK WILL BE CONDUCTED BY THE

VA CIH.

ABATEMENT PHASE - PROJECT INTENT

THIS PROJECT INVOLVES THE

PREPARATION, ABATEMENT, AND

RENOVATION OF THE BASEMENT OF

BUILDING 1 OF THE VETERANS

ADMINISTRATION HEALTH CENTER IN

FRESNO, CA.

THE WORK WILL IMPACT REGULATED

BUILDING MATERIALS, AND COMPONENTS.

THE CONTRACTOR IS ADVISED THAT

HAZARDOUS MATERIAL PLANS AND

SPECIFICATIONS ARE NOT STAND-ALONE

DOCUMENTS. THE ABATEMENT

CONTRACTOR'S REVIEW AND

CONSIDERATION OF THE DESIGN PACKAGE

IS AN INHERENT REQUIREMENT AND IS THE

RESPONSIBILITY OF THE ABATEMENT

CONTRACTOR.

ABATEMENT KEYNOTES

A1. REMOVE MASTIC ASSOCIATED WITH

VINYL FLOOR TILE WITHIN THE CLOUDED

AREA (FLOOR TILE AND MASTIC TO BE

TREATED BOTH AS ASBESTOS-CONTAINING)

Rev. Date Description

02.14.2020 35% Schematic Design

06.19.2020 65% Design Development

10.02.2020 95% Construction Documents

11.30.2020 100% Construction Documents

HM-210

ENLARGED DEMOLITION/ABATEMENT

PLANS

570-21-701

401 Roland Way, Oakland, CA 94621 https://www.mecaenviro.com

570-21-701Basement Renovation

AuthorSMc

VA Central California Healthcare System 2615 E. Clinton Ave, Fresno, CA 93703

100% BID DOCUMENTS

FULLY

SPRINKLERED

VA Project Number

Building Number

Drawing Number

Project Title

Location:

PhaseDrawing Title

Approved:

Issue Date Checked Drawn

StampARCHITECT / ENGINEER OF RECORDCONSULTANT

VA FORM 08 - 6231

Revisions:

MA Architects, Inc.

385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net Planning - Architecture - Interiors

Project Number

AREA OF WORK

U.S. Department of Veterans Affairs

Basement Renovation

AuthorSMc

02.15.2023

BID DOCUMENTS

22006

KEY PLAN

02.15.2023 100% Contract Documents - Issue for Bid

Rev. Date Description

BID DOCUMENTS

A1

A1

A1

A1

A1

A1

+72"

FD

H

G

F

E

6 7

37 SF

Mechanical

WB-106C

52 SF

Storage B1A01E

72 SF

Office

B1A01C 130 SF

Office B1A01A

76 SF

Mechanical

WB-106B

108 SF

Office B1A01.1

74 SF

Comm B1A01.2

2792 SF

OIT Laptop Distribution

B1A01

112109

107 SF

Service Elevator

S-3

76 SF

Service Elevator

S-4

95 SF

IRM Storage B1B01

25 SF

Chase B1B09

136 SF

Laundry Chute B1A02

68 SF

Housekeeping B1A05

72 SF

Dry Stores

296 SF

Corridor B1A-1

318 SF

EMS Office B1B10

149 SF

Women's Restroom

B1B12128 SF

Men's Restroom

B1B13

100 SF

Women's Lockers B1B12A

432 SF

Corridor B1-B

459 SF

Ingredient Control Dry

Goods B1A06

104104

117117

123123123

124112

123 123

123 123

125125

126126

127 127

123 123

TYP.

TYP.

TYP.

46 SF

Passenger Elevator

P-1

46 SF

Passenger Elevator

P-2

PARTITION LEGEND:

NOTE:

-CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE COMMENCEMENT

OF WORK.

-DIMENSIONS: WALL DIMENSIONS ARE FACE OF FINISHED FACE TO

FINISHED FACE UNLESS NOTED OTHERWISE. WINDOW / DOOR

DIMENSIONS ARE TO CENTER LINE OF WINDOW / DOOR.

-ALL MTL. STUDS ARE 4" U.N.O. (MATCH FRAMING OF CURRENT

CONDITIONS AS APPLICABLE)

-WHERE DIMENSION IS PRECEEDED BY A (±) SYMBOL, THIS

REPRESENTS/ALLOWS A "FLOAT" IN LAYING OUT THE WORK.

CONTRACTOR IS TO NOTIFY ARCHITECT IN WRITING, PRIOR TO FRAMING,

IF DIMENSION EXCEED ±2" FOR DIRECTION ON HOW TO PROCEED.

(E) 1-HOUR RATED FIRE PARTITION

(E) ACOUSTICAL / NON-RATED PARTITION

(E) PARTITION TO BE DEMOLISHED

(E) 2-HOUR RATED FIRE BARRIER

VA Project Number

Building Number

Drawing Number

Project Title

Location:

PhaseDrawing Title

Approved:

Issue Date Checked Drawn

StampARCHITECT / ENGINEER OF RECORDCONSULTANT

VA FORM 08 - 6231

Revisions:

MA Architects, Inc.

385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net

Planning - Architecture - Interiors

Project Number

AREA OF WORK

U.S. Department of Veterans Affairs

Basement Renovation

MA Arch

AD-210

ENLARGED DEMOLITION PLAN

570-21-701

SMc

VA Central California Healthcare System 2615 E. Clinton Ave, Fresno, CA 93703

02.15.2023

BID DOCUMENTS

FULLY

SPRINKLERED

22006

Key Notes

101 GENERAL NOTE: REMOVE FURNITURE, SHELVING, AND

OTHER ACCESSORIES ON WALLS, CEILING AND FLOORS.

TURN OVER TO THE VA FOR STORAGE.

102 GENERAL NOTE: REMOVE & ABATE EXISTING

ASBESTOS-CONTAINING FLOOR TILE & MASTIC AND BASE.

PREP SUBSTRATE AS NEEDED TO RECEIVE NEW FLOORING

(REFER TO HM PLAN SHEETS & PROJECT SPECIFICATIONS) .

103 REMOVE PARTITIONS, DOOR ASSEMBLIES & ALL

ASSOCIATED UTILITIES; TYPICAL.

104 REMOVE FURRING AROUND STRUCTURAL COLUMN; REMOVE

EXISTING FIREPROOFING MATERIAL AND PREP FOR NEW

FIREPROOFING.

105 EXISTING AIR HANDLER UNIT TO REMAIN. PROTECT DURING

CONSTRUCTION (REFER TO MECHANICAL PLAN SHEETS)

106 EXISTING UTILITY RISERS TO REMAIN. PROTECT DURING

CONSTRUCTION (REFER TO PLUMBING PLAN SHEETS)

108 REMOVE EXISTING ELECTRICAL OUTLETS, SWITCHES, AND

DATA; TYPICAL (REFER TO ELECTRICAL PLAN SHEETS).

109 REMOVE FURRING WALLS DOWN TO CONCRETE WALL.

CLEAN AND PREP CONCRETE WALL TO RECEIVE NEW

FURRING WALL.

110 REMOVE EXISTING CABINETS, COUNTERTOP AND

ASSOCIATED PLUMBING FIXTURE.

111 REMOVE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .