About this file
This is a vendor pricing sheet for the TD-208 Pusher Tug FY26 Dry Docking project, which establishes the Government's Independent Government Cost Estimate (IGCE) for competitive solicitation purposes. The sheet itemizes 17 distinct line items required for a 45-day dry-docking period at a contractor facility in the Hampton Roads area (James River, Elizabeth River branches, York River, Mobjack Bay, and tributaries). Services include drydocking, plate renewal and structural repairs, ultrasonic testing (100 readings), zinc replacements (12 units), hull cleaning and painting, fuel tank cleaning and inspection, refueling to 80% capacity (280 gallons), coolant system servicing (60 gallons), transom-mounted transducer/chartplotter installation, removal and reinstallation of the main rudder and both flanking rudders, propeller removal and reinstallation with PropSpeed application, propeller shaft removal and reinstallation with PropSpeed application, removal and installation of four main deck hatches, trials and tests, and supplemental materials and labor.
The pricing sheet contains columns for quantity, unit of measure, materials cost, estimated labor hours, labor rate, amount, and total amount, though specific pricing values are not populated in the provided template. The vessel will be delivered by the Maritime Administration (MARAD) within three working days of notice to proceed, with MARAD assuming custody and re-delivery upon completion of all accepted work. MARAD will maintain a representative on-site during most production days throughout the performance period.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combined synopsis rev1.pdf | ||
| Attachment 1 Statement of work.pdf | ||
| Combined synopsis.docx | DOCX document | |
| Attachment 2 TD208.Government Furnished Equipment List.pdf | ||
| Attachment 4 E-Invoicing Instructions.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
TD208 - 2026 YARD AVAILABILITY - IGCE
| Line item # | Description | Quantity | Unit | Materials | Est. Labor Hrs | Labor Rate | Amount | Total Amount |
| 1 | SERVICES | 1 | JOB | |||||
| 2 | DRYDOCKING | 1 | JOB | |||||
| 3 | PLATE RENEWAL AND STRUCTURAL REPAIRS | 1 | JOB | |||||
| 4 | ULTRASONIC TESTING | 100 | RDGS | |||||
| 5 | ZINCS REPLACEMENTS | 12 | EA | |||||
| 6 | HULL CLEANING AND PAINTING | 1 | JOB | |||||
| 7 | FUEL TANK CLEANING AND INSPECTION | 1 | JOB | |||||
| 7.1.10. | REFUEL TANKS TO 80% CAPACITY | 280 | GAL | |||||
| 8 | COOLANT SYSTEM (KEEL COOLERS) | 60 | GAL | |||||
| 9 | INSTALL TRANSOM MOUNTED TRANSDUCER/CHARTPLOTTER | 1 | JOB | |||||
| 10 | REMOVE, INSPECT, AND REINSTALL THE MAIN RUDDER | 1 | JOB | |||||
| 11 | REMOVE, INSPECT, AND REINSTALL THE FLANKING RUDDERS | 1 | JOB | |||||
| 12 | REMOVE, INSPECT, AND REINSTALL BOTH PROPELLERS | 1 | JOB | |||||
| 12.1.4. | APPLY PROPSPEED TO BOTH PROPELLERS | 1 | JOB | |||||
| 13 | REMOVE, INSPECT, AND REINSTALL BOTH PROPELLER SHAFTS | 1 | JOB | |||||
| 13.1.8. | APPLY PROPSPEED TO BOTH SHAFTS | 1 | JOB | |||||
| 14 | REMOVE FOUR (4) MAIN DECK HATCHES | 4 | JOB | |||||
| 15 | INSTALL FOUR (4) MAIN DECK HATCHES | 1 | JOB | |||||
| 16 | TRIALS AND TESTS | 1 | JOB | |||||
| 17 | SUPPLIMENTAL MATERIAL AND LABOR | 1 | JOB | |||||