This is a Statement of Work for electrical and data infrastructure work at the Coeur d'Alene Interagency Dispatch Center, located at 3260 W Nursery Road, Coeur d'Alene, ID 83815, under contract number 1240LU26Q0054 with the Idaho Panhandle National Forest.
The contractor must disconnect and relocate three existing power poles and reroute power circuits from the electrical panel through ceiling space to serve twelve existing desks and twelve new desks (eight console-style desks in the room center and four cubicle-style desks along the wall). Each desk requires two dedicated 120-volt 20-amp duplex receptacles on new circuits routed from the existing panel, with routing overhead in ceiling space to power poles or walls utilizing desk chase ways where possible. Previously disconnected electrical must be reinstalled through drop poles. The contractor must also provide new data cabling at twelve new stations with four cables per desk, routed to the second-floor data room in existing conduits, and reinstall data cables at twelve previously existing desks. The estimated price range is between $25,000 and $100,000. Work must be conducted between May 8, 2026, and July 1, 2026, with actual construction time not exceeding seven days of continuous operation with no shutdowns. The office operates Monday through Friday from 0730 to 1600 hours. No official site visit will be conducted, though contractors are encouraged to visit the site independently. The contract must be completed by July 1, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. PROJECT DESCRIPTION AND LOCATION
(a) Description of Work.
Disconnect and relocate the 3 previously installed power poles to feed existing desks and reroute power circuits from panel to ceiling space and down power poles. Extend power to existing receptacle under each desk, including the eight new console desks in the center of the room and four cubicle style desks along the wall, and utilizing desk chase way for routing, where possible. Provide new power so each desk has 2 dedicated 120v 20amp duplex receptacle new circuits to be routed from existing panel in room. All to be routed overhead in ceiling space to power pole or wall. The electrical that has been previously disconnected from existing desks will need to be routed and reinstalled through drop poles.
Provide new data cabling at (12) new stations, with four cables at each desk. New cables will need to be routed to the 2nd-floor data room in existing conduits. Data cables will need to be reinstalled at the twelve previously existing desks.
(b) Project Location
The project site is located at:
Coeur d'Alene Interagency Dispatch Center 3260 W Nursery Road Coeur d'Alene, ID 83815
Office is open from 0730-1600, Monday through Friday.
(c) Price Range. Between $25,000 and $100,000.
(d) Site Visit: No official Site Visit will be conducted. Contractors are encouraged and expected to visit the site.
(e) Start Work. Work will be conducted between 05/08/2026 through 07/01/2026. Actual construction time shall be no more than 7 days run continuously with no shutdown.
(f) Period of Performance. Contract is to be completed by 07/01/2026.
2. SPECIFICATIONS
Disconnect and relocate the 3 previously installed power poles to feed existing desks and reroute power circuits from panel to ceiling space and down power poles. Extend power to existing receptacle under each desk, including the eight new console desks in the center of the room and four cubicle style desks along the wall, and utilizing desk chase way for routing, where possible. Provide new power so each desk has 2 dedicated 120v 20amp duplex receptacle new circuits to be routed from existing panel in room. All to be routed overhead in ceiling space to power pole or wall. The electrical that has been previously disconnected from existing desks will need to be routed and reinstalled through drop poles.
Idaho Panhandle National Forest Coeur d'Alene Electrical Work
1240LU26Q0054
Provide new data cabling at (12) new stations, with four cables at each desk. New cables will need to be routed to the 2nd-floor data room in existing conduits. Data cables will need to be reinstalled at the twelve previously existing desks.
3. PROJECT DRAWINGS
The following drawings are applicable to this solicitation.
1. PROJECT DESCRIPTION AND LOCATION
File details come from the government source that posted it. Updated .