Attachment 3 - Statement of Work.pdf

PDF 44 KB Posted

Attached to
2 MUNS Air Compressor Repair
Solicitation number
FA460824QC129
Issued by

About this file

This document is a Statement of Work (SOW) for the installation of a new starter kit in an Ingersol Rand SIERRA - H150A air compressor located at Building 7710 at Barksdale AFB, Louisiana. The scope of work includes removing the bad starter relay kit and condensate valve kits, installing new replacement parts, and testing the air compressor for functionality and proper operation. The work is to be performed by a qualified contractor over a 30-day period. No permits are required. The government will coordinate base and area access for the contractor and monitor the installation.

This SOW is related to a federal contract opportunity, Solicitation Number FA460824QC129, for the repair of an air compressor for the 2 MUNS/MXWMS at Barksdale AFB. The solicitation is a combined synopsis/solicitation for commercial items set aside for small businesses under NAICS code 333912. Quotes are due by 1:30 PM CDT on July 10, 2024. The contracting office is the 2d Contracting Squadron at Barksdale AFB.

View the file

Other files

File Type Posted
Attachment 1 - Provisions and Clauses .pdf PDF
Attachment 2 - Equipment List.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA460824QC129

Attachment 3

Statement of Work

Install New Starter in 7710 Facility Air Compressor for 2MUNS/MXWMS

Objective:

1. Install new starter kit in Ingersol Rand SIERRA – H150A air compressor.

Qualifications:

1. Person qualified to fix an air compressor of this scale.

Scope of Work:

1. Remove bad starter relay kit and condensate valve kits.

2. Install new starter relay kit and condensate valve kits.

3. Check functionality of air compressor.

Specifics:

1. Remove all bad parts from air compressor.

2. Replace parts with new kits.

3. Start air compressor.

4. Test for functionality, correct compression, and any shorts.

INSPECTION, TESTING and CERTIFICATION:

1. Not applicable for this equipment.

2MUNS/MXWMS Shall:

1. Coordinate contractor base and area 10 access.

2. Escort contractor to building and monitor installation.

Permits:

1. No Permits Required.

Period of Performance:

1. Delivery date will be thirty (30) days after the Receipt of Order (ARO).

Worksite Location:

1. 3900 Ammo DR, Barksdale AFB, LA 71110

Building 7710 inside boiler room

Contractor Working Days/Hours:

1. Working Days: Monday, Tuesday, Wednesday, Thursday, and Friday

2. Working Hours: 7:30 A.M. – 5:00 P.M.

File details come from the government source that posted it. Updated .