Attachment 3 - Statement of Work.pdf
PDF 237 KB Posted
- Attached to
- Oil Injected Compressor
- Solicitation number
- FA460826QC094
About this file
This is a Statement of Work (SOW) for the delivery, removal, and installation of two oil-injected screw compressors at Hangar 1/Building 6604, Barksdale Air Force Base, Louisiana.
The contractor shall furnish all materials, labor, equipment, and services necessary to install two fully functional oil-injected screw compressors with a total of eight hose reels (four per compressor) within 30 days after order receipt (AOR). The work encompasses removal of existing equipment on the south side, electrical wiring to junction boxes, installation of hose reels, and complete setup on the north side including approximately 40 feet of electrical wiring and air line runs with four 100-foot retractable hose reels. A factory-trained service technician must perform startup and operational instruction, with specification sheets completed prior to scheduling. The contractor is responsible for all repairs to government facilities resulting from installation damage. Work hours are restricted to 0700-1700 on weekdays, excluding weekends and federal holidays, with the contractor responsible for coordinating base access through MSgt Jeremy Vickers.
Security requirements mandate contractor personnel obtain visitor passes (AF Form 75) following a 7-10 day background check process, with vehicles subject to inspection and markings required for company identification. The contractor must maintain a safety plan, provide appropriate personal protective equipment, report all accidents or incidents to the 2d Security Forces Squadron Law Enforcement Desk at (318) 456-2551, and comply with all Air Force Occupational Safety and Health standards and base traffic regulations. The contractor shall maintain housekeeping standards per OSHA and fire safety requirements, safeguard government property, retrieve identification media from departing employees, and ensure all base identification passes are returned upon contract completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA460826QC094
Attachment 3 – Statement of Work
Statement Of Work, Version 2, Current As Of 30 June 2026 Hangar 1/Building 6604, Screw Compressor
Delivery, Removal and Installation
817 Lindbergh Rd, Barksdale AFB, LA 71110
SCOPE / DESCRIPTION OF SERVICES: The work covered by these requirements consists of furnishing all plans, materials, labor, equipment, appliances, and performing all operations to install new screw compressors in Hangar 01 (H01) Building (Bldg.) 6604.
DELIVERY AND INSTALLATION: Thirty (30) Days AOR.
BACKGROUND: To facilitate aircraft repairs during critical 32-day Phase inspections, the 307th Maintenance Squadron requires two (2) oil-injected screw compressors. Because the aircraft is stationary during Phase, executing high-priority safety inspections is paramount. This procurement ensures maintainers have a reliable, continuous compressed air source when needed. The dual-unit setup offers essential redundancy, eliminating potential work stoppages and preventing critical delays in returning the aircraft to operational flight status.
LOCATION: 817 Lindbergh Ave H01 Bldg. 6604 Barksdale AFB, LA 71110
HOURS OF OPERATIONS: Contractors will not begin work before 0700 each workday and will conclude before 1700 each workday. Contractor is responsible for coordination of base access or arrangement of escort for the duration of the project. The contractor shall perform the services required under this contract during this time excluding Saturdays, Sundays, and Federal Holidays.
REQUIRMENTS (OVERVIEW): The work covered under this Statement of Work shall consist of furnishing all material, labor, and equipment in performing all operations necessary to install two (2) screw compressors in two (2) locations. The contractor will be responsible for and incur all labor and material costs required to repair any damage to government facilities that occurred during and as result of the installation of the screw compressors. The contractor is responsible for all work listed below:
- Delivery and installation of two (2) oil injected screw compressors in accordance with the Salient Characteristics (Attachment 2)
• It will be the responsibility of the contractor to provide ALL equipment/accessories necessary to provide two (2) fully functional screw compressors, with a total of 8 hose reels (4 per compressor).
- Factory-trained service technician to perform start-up and provide a brief operational instruction of equipment
- Completion of specification sheet is required prior to scheduling startup
South Side Work:
- Remove old compressor and dryer
- Electrical wiring from new install to junction box
- Move hose reels to end of wall (2 EA 100' will be provided, 2 EA hose reels will be responsibility of the contractor.)
- Include all required wiring, fittings, line, reels, and/or connections
North Side Work:
- Set new compressor
- Electrical from compressor to junction box (approx. 40’)
- Air line from compressor to end of wall (approx. 40’)
- Install 4ea 100’ hose retractable hose reels with hose
- Include all required wiring, fittings, line, reels, and/or connections
See “Attachment 4- South Side Photos” and “Attachment 5- North Side Photos” for further clarification.
SECURITY REQUIREMENTS: Visitor Passes: To receive a visitor pass the contractor must complete an (S5 Pass) AF Form 75 Visitors/ Vehicle Pass. The contractor should contact MSgt Jermey Vickers via email: jermey.vickers.1@us.af.mil or phone: (318) 529-3798, once the driver is 30 min from the East Gate (industrial gate), so an escort can be provided to meet the driver, and/or installation crew, to get their visitor pass. S5 Pass. Once the form is filled out, send the form back to S5 (email is on the form). S5 will conduct a background check, after 7-10 days the sponsor will meet the contractor at the East Gate Visitor Center and escort the contractors to S5 to receive a temporary I.D. for the duration of the project. The contractor vehicle must be inspected for any contraband upon arrival to East Gate anytime they need to gain access to the installation. This information will be reviewed and forwarded to 2 SFS/S5 Pass & Registration Office.
If a pass is approved, the 2 SFS/S5 Pass & Registration Office will issue an AF Form 75 (Visitor Pass) to the contractor and his/her employees upon completion of screening process for the duration of the contract.
The screening process takes time, and the contractor shall visit the Commercial Visitor Control Center prior to expecting base entry to receive required forms and instruction on the application process, to include estimated time of receiving the visitor pass. Other option is for the contractor to contact MSgt Jermey Vickers via email: jermey.vickers.1@us.af.mil or phone: (318) 529-3798, once the driver is 30 min from the east gate (industrial gate), so an escort can be provided to meet the driver, and/or installation crew, to get their visitor pass. Although contractors will not be issued vehicles passes, vehicles are subject to search while on the installation. Employee privately owned vehicles will not be allowed access to restricted/controlled areas without a free zone being established. All Contractor vehicles should have markings with the company name for quick identification of ownership and notification if they are involved in an incident. Conduct Requirements: The contractor shall ensure that his/her employees comply with all base traffic regulations and properly conduct themselves while on the base.
Retrieving Identification Media. The Contractor shall be responsible for retrieving all identification media including vehicle passes from employees who depart for any reason before the contract expires (e.g., terminate for cause, retirement, etc.)
The Contractor and contractor employees shall comply with base traffic regulations.
Weapons, Firearms, Ammunition. Contractor employees are prohibited from possessing weapons, firearms, and ammunition on themselves or within their contractor or privately owned vehicles while on base.
The Contractor shall be responsible for safeguarding all government property, and controlled forms provided for contractor use. At the end of each work period, Contractor shall secure all Government facilities, equipment, and materials.
SAFETY: The Contractor shall have a safety plan for their employees. The Contractor shall instruct each employee in the recognition and avoidance of unsafe conditions and regulations to his or her work environment to control or eliminate any hazards or other exposure to illness or injury. The Contractor shall provide their employees appropriate Personal Protective Equipment (PPE) and mandate proper wear.
Accident/Incident Reporting and Investigation. Contractor shall record and report to the 2d Security mailto:jermey.vickers.1@us.af.mil
Forces Squadron Law Enforcement Desk at (318) 456-2551 all available facts relating to each instance of accidental damage to Government property or injury to either Contractor or Government personnel. The Contractor shall secure the accident scene and wreckage until released by the accident investigative authority through the 2d Security Forces Squadron POC. If the Government elects to investigate the incident, the Contractor shall cooperate fully and assist the Government personnel until the investigation is complete.
HOUSEKEEPING: The Contractor shall keep all facilities and work areas clean and neat IAW industry, Occupational, Safety and Administration (OSHA), fire and safety standards.
PROJECT LIAISONS:
MSgt Jermey Vickers, jermey.vickers.1@us.af.mil, (318) 529-3798
OMBUDSMAN – AFGSC
(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.
(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).
(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, for AFGSC (Air Force Global Strike Command) acquisitions please contact the Director of Contracts, Air Force Installation Contracting Center, Operating Location - Global Strike (AFICC/KG OL-GSC) via the following e-mail workflow address: ig.afica_kg.workflow@us.af.mil. Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256- 2431.
(d) The ombudsman has no authority to render a decision that binds the agency.
(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the contracting officer.
Health and Safety on Government Installations
(a) In performing work under this contract on a Government installation, the contractor shall:
(1) Take all reasonable steps and precautions to prevent accidents and preserve the health and safety of mailto:ig.afica_kg.workflow@us.af.mil contractor and Government personnel performing or in any way coming in contact with the performance of this contract; and
(2) Take such additional immediate precautions as the contracting officer may reasonably require for health and safety purposes.
(b) The contracting officer may, by written order, direct Air Force Occupational Safety and Health (AFOSH) Standards and/or health/safety standards as may be required in the performance of this contract and any adjustments resulting from such direction will be in accordance with the Changes clause of this contract.
(c) Any violation of these health and safety rules and requirements, unless promptly corrected as directed by the contracting officer, shall be grounds for termination of this contract in accordance with the Default clause of this contract.
Contractor Access to Air Force Installations
(a) The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Department of the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid drivers license, current vehicle registration, valid vehicle insurance certificate, and any additional requirements to comply with local security procedures to obtain a vehicle pass.
(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
(d) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with any additional requirements to comply with AFI 31-101, Integrated Defense, and AFI 31-501, Personnel Security Program Management citing the appropriate paragraphs as applicable.
(e) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
(f) The contractor shall provide an after-hours contact number or after-hours email in the Emergency Mass Notification System (EMNS) for each of their personnel, whose normal place of duty is on a DoD installation or within a DoD facility. The contractor shall comply with any additional requirements in DAFMAN 10-206 for emergency operational reporting. Foreign Nationals may participate and may remove themselves from the Emergency Mass Notification System at any time. To update information, personnel can access the globe icon on their system desktop screens and choose the "Access Self- Service" option.
(g) Failure to comply with these requirements may result in withholding of final payment.
****************************** End Of Statement Of Work ******************************
| Statement Of Work, Version 2, Current As Of 25 June 2026 |
| PROJECT LIAISONS: |
| OMBUDSMAN – AFGSC |
| Health and Safety on Government Installations |
| Contractor Access to Air Force Installations |
File details come from the government source that posted it. Updated .