The file's text, extracted by GovTribe without its formatting.
SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES
ON FEDERAL HIGHWAY PROJECTS
Specification List
Project Name: Mizpah culvert Replacement, Arapahoe-Roosevelt National Forest Specification Number
| Title |
| Date Prepared: 2/11 (Latest Revision Date) |
| 101 |
| Terms, format, and definitions |
| 2003 |
| SCR 101 |
| Terms, format, and definitions |
| 02/11 |
| 102 |
| Bid, Award, and Execution of Contract |
| 2003 |
| SCR 102 |
| Bid, Award, and Execution of Contract |
| 02/11 |
| SCR 103 |
| Scope of Work |
| 02/11 |
| SCR 104 |
| Control of Work |
| 02/11 |
| 105 |
| Control of Material |
| 2003 |
| SCR 105 |
| Control of Material |
| 02/11 |
| 106 |
| Acceptance of Work |
| 2003 |
| SCR106 |
| Acceptance of Work |
| 02/11 |
| 107 |
| Legal Relations and Responsibilities to the Public |
| 2003 |
| SCR 107 |
| Legal Relations and Responsibilities to the Public |
| 02/11 |
| 108 |
| Prosecution and Progress |
| 2003 |
| SCR 108 |
| Prosecution and Progress |
| 02/11 |
| 109 |
| Measurement and Payment |
| 2003 |
| SCR 109 |
| Measurement and Payment |
| 02/11 |
| 152 |
| Construction Surveying and Staking |
| 2003 |
| SCR 152 |
| Construction Surveying and Staking |
| 02/11 |
| 153 |
| Contractor Quality Control |
| 2003 |
| SCR 153 |
| Contractor Quality Control |
| 02/11 |
| SCR 154 |
| Contractor Sampling and Testing |
| 02/11 |
| 155 |
| Schedules for Construction Contracts |
| 2003 |
| SCR 155 |
| Schedules for Construction Contracts |
| 02/11 |
| SCR 156 |
| Public Traffic |
| 02/11 |
| 157 |
| Soil Erosion Control |
| 2003 |
| SCR 157 |
| Soil Erosion Control |
| 02/11 |
| 201 |
| Clearing and Grubbing |
| 2003 |
| SCR 201 |
| Clearing and Grubbing |
| 02/11 |
| 203 |
| Removal of Structures and Obstructions |
| 2003 |
| SCR 203 |
| Removal of Structures and Obstructions |
| 02/11 |
| SCR 204 |
| Excavation and Embankment |
| 02/11 |
| 208 |
| Structure Excavation and Backfill for Select Major Structures |
| 2003 |
| SCR 208 |
| Structure Excavation and Backfill for Select Major Structures |
| 02/11 |
| 209 |
| Structure Excavation and Backfill |
| 2003 |
| 252 |
| Special Rock Embankment and Rock Buttress |
| 2003 |
| 301 |
| Untreated Aggregate Courses |
| 2003 |
| SCR 301 |
| Untreated Aggregate Courses |
| 02/11 |
| SCR 320 |
| Stockpiled Aggregates |
| 02/11 |
| 552 |
| Structural Concrete |
| 2003 |
| SCR 552 |
| Structural Concrete |
| 02/11 |
| 554 |
| Reinforcing Steel |
| 2003 |
| SCR 554 |
| Reinforcing Steel |
| 02/11 |
| SCR 590 |
| Precast Concrete Structures |
| 02/11 |
| 625 |
| Turf Establishment |
| 2003 |
| SCR 625 |
| Turf Establishment |
| 02/11 |
| 633 |
| Permanent Traffic Control |
| 2003 |
| 635 |
| Temporary Traffic Control |
| 2003 |
| SCR 635 |
| Temporary Traffic Control |
| 02/11 |
| SCR 648 |
| Stream Simulation |
| 02/11 |
| SCR 709 |
| Reinforcing Steel and Wire Rope |
| 02/11 |
| SCR 714 |
| Geotextile and Geocomposite Drain Material |
| 02/11 |
Note: All of the specifications cited are applicable to this project. The Special Contract Requirements (SCR) are included with this solicitation. The other Specifications are within the 2003 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. Other specifications referred to within these specifications (even though not specifically listed herein) are also fully applicable to this project.