Attachment_3_-_SOW_and_Map_Black_Jack_CG_revised.pdf
PDF 286 KB Posted
- Solicitation number
- 127EAX26Q0023
- Issued by
- Greenlee County, Arizona
About this file
This is a Statement of Work (SOW) document issued by the U.S. Forest Service, Southwest Region 03, for the Apache-Sitgreaves National Forest's Black Jack Campground Renovation project located in Clifton, Arizona (latitude 33°3'22.65"N, longitude 109°4'52.28"W). The project scope encompasses comprehensive campground renovation work including removal of existing site features such as signs, trees, campfire rings, and grills, followed by construction of roads, low-water crossings, parking areas, drainage channels, camping spurs, tent pads, trails, sidewalks, and an overlook slab with railing. The contractor is also responsible for installing toilets, grills, gates, firepits, and a ramada structure. The contractor must furnish all supervision, materials, equipment, vehicles, tools, labor, transportation, and lodging necessary to complete the work in accordance with the provided drawings and specifications. The project documentation includes seven attachments: Solicitation Terms and Conditions (41 pages), Schedule of Items (1 page), Statement of Work (6 pages), 100% Project Specifications (40 pages), 100% Construction Drawings (59 pages), Septic System Design (10 pages), and Gates specifications (8 pages).
This is a Total Small Business Set-Aside contract classified under North American Industry Classification System code 237990 (Other Heavy and Civil Engineering Construction). The Contracting Officer's Representative is Chris Miller (928-651-1968, christopher.miller5@usda.gov). The project is funded under the Great American Outdoors Act (GAOA). No pricing information, contract award dates, response deadlines, or bidders conference details are specified within this SOW document; bidders should reference the attached Solicitation Terms and Conditions and Schedule of Items for complete procurement parameters.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | P a g e
SOUTHWEST REGION 03
APACHE-SITGREAVES
NATIONAL FOREST
BLACKJACK CAMPGROUND
RENOVATION
STATEMENT OF WORK
U.S. FOREST SERVICE
08/27/2025
2 | P a g e
TABLE OF CONTENTS
1.0 GENERAL INFORMATION
1.1 WORK SUMMARY
1.2 PROJECT LOCATION
1.3 POINTS OF CONTACT
2.0 PROJECT SCOPE
2.1 SCOPE
2.2 SCOPE ATTACHMENTS
3.0 SCHEDULE OF ITEM DESCRIPTIONS
3.1 ABBREVIATIONS
3 | P a g e
1.0 GENERAL INFORMATION
1.1 WORK SUMMARY
Work includes removing site features, including signs, trees, campfire rings, grills, and other miscellaneous items. Constructing roads, low-water crossings, parking areas, drainage channel, camping spurs, tent pads, trails, sidewalks, overlook slab with railing, installing toilets, grills, installing gates, firepits and a ramada.
1.2 PROJECT LOCATION
From the Clifton Ranger District office head south toward AZ-75 s (0.2 mi), turn right onto AZ-75 n (486 ft), turn right onto AZ-78 E destination will be on the right (14.0 mi).
BlackJack Campground AZ-78, Clifton, AZ 85533
Latitude 33° 3'22.65"N, Longitude 109° 4'52.28"W
1.3 POINTS OF CONTACT
Contracting Officer’s Representative:
Chris Miller, 928-651-1968, christopher.miller5@usda.gov mailto:christopher.miller5@usda.gov
4 | P a g e
2.0 PROJECT SCOPE
2.1 SCOPE
The Contractor shall furnish all supervision, materials, equipment and vehicles, tools, parts, labor, transportation, lodging, and miscellaneous items for Blackjack campground renovation in accordance with the drawings, specifications, and other attachments referenced and contained herein.
No changes to the specifications, terms, or conditions of this statement of work shall be made without the prior approval of the Contracting Officer, in writing.
2.2 SCOPE ATTACHMENTS
Attachment 1 – Solicitation Terms and Conditions (41 Pages) Attachment 2 – Schedule of Items (1 Page) Attachment 3 – Statement of Work (6 Pages) Attachment 4 – 100% Project Specifications (40 Pages) Attachment 5 – 100% Construction Drawings (59 Pages) Attachment 6 – Septic System Design (10 Pages) Attachment 7 – Gates (8 Pages)
5 | P a g e
3.0 SCHEDULE OF ITEM DESCRIPTIONS
The following descriptions summarize the work for the Schedule of Items (SOI) listed below. They are not intended to be all-inclusive of the work needed to perform each item. Such work shall be considered incidental to the task and be included in the final costs to perform the work necessary.
3.1 ABBREVIATIONS
Method of Measurement
(MoM) Pay Units
AQ Actual Quantity CY Cubic Yards LSQ Lump Sum Quantity EA Each EQ Estimated Quantity LF Linear Feet EA Each LS Lump Sum
SF Square Feet TN Tons
6 | P a g e
Black Jack Campground Location Map
Located off AZ-78, Clifton AZ 85533
| 1.0 GENERAL INFORMATION |
| 1.1 WORK SUMMARY |
| 1.2 PROJECT LOCATION |
| 1.3 POINTS OF CONTACT |
| 2.0 PROJECT SCOPE |
| 2.1 SCOPE |
| 2.2 SCOPE ATTACHMENTS |
| 3.0 SCHEDULE OF ITEM DESCRIPTIONS |
| 3.1 ABBREVIATIONS |
File details come from the government source that posted it. Updated .