Attachment 3 - Schedule of Items.xlsx
XLSX spreadsheet 276 KB Posted
- Attached to
- Midgley Bridge Observation Site Parking Lot
- Solicitation number
- 127EAX26Q0068
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items document for the Midgley Bridge Observation Site Parking Lot resurfacing project located at the Coconino National Forest's Red Rock Ranger District in Arizona. The schedule outlines line items for both base bid and optional bid work, with estimated quantities and pay units for pricing purposes. Base bid items include mobilization, construction staking, sampling and testing, clearing and grubbing, asphalt milling, excavation and compaction, subgrade preparation, riprap installation, aggregate base course, hot asphalt concrete placement, traffic and parking signage, concrete parking bumpers, entrance sign work, kiosk relocation, trail surfacing with decomposed granite, drainage pipe installation with geotextile, split-rail fencing, pavement markings, and landscape boulders. Optional bid items consist of entrance-area asphalt milling, millings compaction, hot asphalt concrete, safety edge application, crosswalk striping, and trail riprap slope reinforcement.
The government solicitation (127EAX26Q0068) issued by the Department of Agriculture Forest Service sets an organized site visit for August 18, 2026 at 10:00 am local time, with Requests for Information due August 24, 2026 at 1:00 pm Central Daylight Time and quotes due September 1, 2026 at 1:00 pm Central Daylight Time. Contractors must provide unit prices and total costs for each line item, with payment measured through various units including lump sum (LS), square feet (SF), square yards (SY), cubic yards (CY), tons (TN), linear feet (LF), and each (EA). The project scope encompasses complete parking lot renovation including pavement removal and replacement, storm water management infrastructure, site re-striping, signage installation, traffic delineators, and wheel stops.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 127EAX26Q0068 - Midgley Observation Site Parking Lot.pdf | ||
| 127EAX26Q0068 - Midgley Observation Site Parking Lot.pdf | ||
| Attachment 5 - Drawings.pdf | ||
| Attachment 4 - Fire Plan.docx | DOCX document | |
| Attachment 2 - Specifications.docx | DOCX document | |
| Attachment 6 - Wage Determination.pdf | ||
| Attachment 1 - Statement of Work.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Parking lot resurface
| Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 |
| SCHEDULE OF ITEMS | ||||||
| Project: | MIDGLEY BRIDGE OBSERVATION SITE PARKING LOT | Region: | Southwest Region 3 | |||
| Forest: | Coconino National Forest | District: | Red Rock Ranger District |
| BASE BID | |||||
| Item | |||||
| Number | Schedule of Item Desciption | Method of | |||
| Measure | Estimated | ||||
| Quantity | Pay | ||||
| Unit | Unit Price | Total Cost | |||
| 151(01) | Mobilization | LSQ | 1 | LS | |
| 107(01) | Biomonitoring | LSQ | 1 | LS | |
| 152(01) | Construction Staking | LSQ | 1 | LS | |
| 154(01) | Sampling and Testing (Subgrade, ABC, DG, Asphalt, PCC) | LSQ | 1 | LS | |
| 157(1) | Soil Erosion and Sediment Control | LSQ | 1 | LS | |
| 203(01) | Asphalt Removal | AQ | 11000 | SF | |
| 204(02) | Subgrade Preparation, Rough and Finished Grading | AQ | 11000 | SF | |
| 251(01) | Riprap for Drain Pipe Area | AQ | 1 | CY | |
| 301(01) | Aggregate Base Course, 6" Compacted Depth | AQ | 11000 | SF | |
| 404(01) | Minor Hot Asphalt Concrete, 4" Depth, PG 70‐10 | AQ | 11000 | SF | |
| 404(02) | Minor Hot Asphalt Concrete, Maricopa Edge | AQ | 300 | LF | |
| 600(01) | Traffic and Parking Signs w/ Posts | AQ | 5 | EA | |
| 600(02) | Precast Concrete Parking Stops | AQ | 11 | EA | |
| 601(01) | Storm Drain Outfall Structure | AQ | 1 | EA | |
| 602(1) | 18" Corrogated Steel Pipe | AQ | 160 | LF | |
| 604(01) | Precast Concrete Catch Basin | AQ | 3 | EA | |
| 609(01) | Concrete Curb | AQ | 210 | LF | |
| 609(02) | Concrete V Ditch | AQ | 210 | LF | |
| 633(01) | Traffic Delineator | AQ | 12 | EA | |
| 634(01) | Permanent Pavement Markings | LSQ | 1 | LS | |
| 635(01) | Temporary Traffic Control | LSQ | 1 | LS | |
| BASE BID TOTAL |
Page001
| Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 |
| SCHEDULE OF ITEMS | ||||||
| Project: | Parking Lot Resurfacing | Region: | Southwest Region 3 | |||
| Forest: | Coconino National Forest | District: | Red Rock Ranger District |
| Base Bid Line Items | |||||||
| Item | |||||||
| Number | Schedule of Item Desciption | Method of | |||||
| Measure | Estimated | ||||||
| Quantity | Pay | ||||||
| Unit | Unit Price | Total Cost | |||||
| 151(01) | Mobilization | LSQ | 1 | LS | $ | $ | |
| 152(01) | Construction Staking | LSQ | 1 | LS | $ | $ | |
| 154(01) | Sampling and Testing (Subgrade, ABC, DG, Asphalt) | LSQ | 1 | LS | $ | $ | |
| 201(01) | Clearing and Grubbing, Remove Features and Trees | LSQ | 1 | LS | $ | $ | |
| 201(02) | Asphalt Milling | AQ | 1 | SF | $ | $ | |
| 204(01) | Excavation, Embankment, and Compaction | LSQ | 1 | LS | $ | $ | |
| 204(02) | Subgrade Preparation, Rough and Finished Grading | AQ | 1 | SY | $ | $ | |
| 251(01) | Riprap for Drain Pipe Area | AQ | 1 | CY | $ | $ | |
| 301(01) | Aggregate Base Course, 9" Compacted Depth | AQ | 1 | TN | $ | $ | |
| 404(01) | Minor Hot Asphalt Concrete, 3" Depth, PG 70‐10 | AQ | 1 | TN | $ | $ | |
| 404(02) | Minor Hot Asphalt Concrete, Safety Edge | AQ | 1 | LF | $ | $ | |
| 600(01) | Traffic and Parking Signs w/ Posts | AQ | 1 | EA | $ | $ | |
| 600(02) | Entrance Sign, Base, Mortar and Rockwork | LSQ | 1 | LS | $ | $ | |
| 600(03) | Concrete Parking Bumpers | AQ | 1 | EA | $ | $ | |
| 600(04) | Kiosk Relocation, Re‐finishing | LSQ | 1 | LS | $ | $ | |
| 600(05) | Trail Surfacing, Decomposed Granite, Stabilizer | AQ | 1 | SF | $ | $ | |
| 602(1) | Drain Pipe, Woven and Non‐Woven Geotextile | LSQ | 1 | LS | $ | $ | |
| 619(01) | FUTS Fence, 3‐Rail | AQ | 1 | LF | $ | $ | |
| 634(01) | Permanent Pavement Markings | LSQ | 1 | LS | $ | $ | |
| 700(01) | Landscape Boulders | AQ | 1 | EA | $ | $ | |
| BASE BID TOTAL | $ | ||||||
| Option Bid Line Items | |||||||
| Item | |||||||
| Number | CLIN Description | Method of | |||||
| Measure | Esitmated | ||||||
| Quantity | Pay | ||||||
| Unit | Unit Price | Total Cost | |||||
| 201(03) | Entrance ‐ Asphalt Milling | AQ | 1 | SF | $ | $ | |
| 204(03) | Entrance ‐ Millings Compaction | AQ | 1 | SF | $ | $ | |
| 404(03) | Entrance ‐ Minor Hot Asphalt Concrete | AQ | 1 | TN | $ | $ | |
| 404(04) | Entrance ‐ Minot Hot Asphalt Safety Edge | AQ | 1 | LF | $ | $ | |
| 634(02) | Entrance ‐ Crosswalk Striping | LSQ | 1 | LS | $ | $ | |
| 251(02) | Trail ‐ Riprap Slope Reinforcement | AQ | 1 | CY | $ | $ | |
| OPTION BID TOTAL | $ |