Attachment _3-PWS Technical exhibit C-Calendar plan.pdf

PDF 78 KB Posted

Attached to
Total ground maintenance, Camp Darby, Tirrenia (Pisa), Italy Request for Quotation W912PF20Q0061
Solicitation number
W912PF20Q0061
Issued by

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

ITEM WORK AREAS # Description

Gr as s a re as : h a of cu ts of cu ts of cu ts of cu ts of cu ts of cu ts of cu ts of cu ts of cu ts of cu ts of cu ts of cu ts

Fr eq ue nc y of cu t p er y ea r

TOT ha/year

1 DARBY 1 CHURCH 1.76 1 1 1 1 1 1 1 1 8 14

1 DARBY 2 ATHLETIC FIELD 4.16 1 1 1 1 1 1 1 7 29

1 DARBY 3 CLUB / watering system 0.55 1 1 1 1 1 1 1 1 1 9 5

1 DARBY 4 PLAYGROUND / FREE ZONE 1.76 1 1 1 1 1 1 1 1 1 9 16

1 DARBY 5 CASA TOSCANA / watering system 0.27 1 1 1 1 1 1 6 2

1 DARBY 6 HEADQUARTER 1.27 1 1 1 1 1 1 1 1 1 9 11

1 DARBY 7 MI / FREE ZONE 1.43 1 1 1 1 1 1 1 1 1 9 13

1 DARBY 8 CC 0.11 1 1 1 1 1 1 1 7 1

1 DARBY 9 SWAP / 810 3.23 1 1 1 1 1 1 6 19

1 DARBY 10 FIRE DEPT 0.21 1 1 1 1 1 1 6 1

1 DARBY 11 AF HEADQUARTER 0.53 1 1 1 1 1 1 6 3

1 DARBY 12 COMMISSARY 0.18 1 1 1 1 1 1 6 1

1 DARBY 13 CDS 0.15 1 1 1 1 1 1 1 1 1 9 1

1 DARBY 14 AF BARRACKS / LAUNDRETTE 0.47 1 1 1 1 1 1 1 7 3

1 DARBY 15 FREEDOM SQUARE / watering system 0.07 1 1 1 1 1 1 1 1 1 1 10 1

1 DARBY 16 EXTERIOR PERIMETER FENCE AREA 0.79 1 1 1 1 1 1 1 1 1 9 7

1 DEPOT 1 FREE ZONE 9.78 1 1 1 1 1 1 1 1 8 78

1 DEPOT 2 DPW 0.43 1 1 1 1 1 1 1 1 8 3

1 DEPOT 3 RCO 0.47 1 1 1 1 1 1 1 7 3

1 DEPOT 4 AFSB PADS 6.62 1 1 1 1 1 5 33

1 DEPOT 5 AFSB Shops 0.91 1 1 1 1 1 1 1 1 8 7

1 DEPOT 6 AFSB WAREHOUSES 01 13.29 1 1 1 1 1 1 1 1 8 106

1 DEPOT 7 AFSB Shop Truck / 509th 1.67 1 1 1 1 1 1 1 1 8 13

1 DEPOT 8 FREE ZONE 20.55 1 1 1 1 1 5 103

1 DEPOT 9 AFSB HEADQUARTER / watering system 0.75 1 1 1 1 1 1 1 1 1 9 7

1 DEPOT 10 MOF-WOF 8.27 1 1 1 1 1 1 1 1 8 66

1 DEPOT 11 EXTERIOR PERIMETER FENCE AREA 6.49 1 1 1 1 1 1 1 1 8 52

1 ASA 1 AF office 0.04 1 1 1 1 1 1 6 0.24

1 ASA 2 PERIMETER AREA 6.00 1 1 1 1 4 24

1 ASA 3 TOMBOLO DOCK 1.30 1 1 1 1 4 5

1 ASA 4 RESERVED AREA 2.10 1 1 2

1 ASA 5 BUNKERS AREA 14.00 1 1 1 1 4 56

1 ASA 6 BLDGS BUFFER 7.00 1 1 1 1 4 28

TOTAL HA 716

ITEM Description

Lin ea r M et er s

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Fr eq ue nc y of pr un in g tr im m in g sv c pe r y ea r

TOT

lm./year

Trimming and Pruning of Shrubs: Trimming of shrubs may be ordered twice during the year. Shrubs shall be trimmed in such a way to remove the new growth and encourage blooming. Wounds exceeding 4 cm diameter shall be treated with a wound seal compound.

300 1 1 2 600

3 Hedge Trimming: Hedge trimming may be ordered twice during the year. Any kind of plant not belonging to the hedge type shall be cut at the base.

400 1 1 2 800

ITEM Description ea. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Fr eq ue nc y of p ru ni ng

/c ut tin g / s tu m ps re m ov al re pl an tin g sv c p er y ea r

TOT

ea./year

Removal of dry with possible rise of the foliage of trees located in parks and gardens. Including operating machine, equipments, collection and transportation of waste material, excluding disposal: trees from 10 to 16 meters height.

5 1 1 2 10

Removal of dry with possible rise of the foliage of trees located in parks and gardens. Including operating machine, equipments, collection and transportation of waste material, excluding disposal: trees over 25 meters height.

5 1 1 2 10

6 Cutting of trees (high 6-12 mt.) at the park and gardens. Work shall include all necessary equipment, trucks, cleaning of area and transport to a public dump/Demanio area.

15 1 1 15

7 Cutting of trees (over 25 mt.) at the park and gardens. Work shall include all necessary equipment, trucks, cleaning of area and transport to a public dump/Demanio area.

26 1 1 26

Removal or drilling of stumps located in parks and gardens: with operating machine, collection and transportation of waste material, excluding disposal, including hole filling with topsoil: from 50 to 120 cm diameter of truck. Contractor shall take the necessary precautions to avoid damages to electric cables, water lines, telephone and sewage lines or other underground structures. Contractor shall immediately repair and restore to the original conditions the property, structures or systems damaged by him.

41 1 1 41

Replant one Mediterranean type ones; the species to be plant shall be chosen by Government within the tree species listed here: Acero Campestre, Acero riccio, Cerro, Pinus Pinea, Leccio, Quercia, Olmo, Sughero, Frassino, Carpino bianco, Pioppo bianco, Farnia, Tiglio, Prugnolo, Biancospino and shall have a trunk circumference (1 mt. high) of 10/12 cm. They shall be on pots with supports tied by plastic elastics. The temporary watering and a 4-year warranty, starting from the time the trees take root, will be enforced.

50 1 1 50

AREAS

DMC

DMC

DMC

DMC

AREAS

DMC

DMC

DMC

DMC

File details come from the government source that posted it. Updated .