Attachment 3 Project Drawings Area of Work.pdf
PDF 570 KB Posted
- Solicitation number
- 36C26123R0024
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 4 VAMC Mather RO Water Plans.pdf | ||
| Attachment 1 Statement of Work (SOW).pdf | ||
| 36C26123R0024.docx | DOCX document | |
| Attachment 2 Project Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HAC
STERILIZER
MECHANICAL
ROOM
STORAGE
33 SF
154 SF
133 SF
PREP/
ASSEMBLY
STERIZATION
853 SF
EQUIPMENT
WASH
1E266
122 SF
CLEAN
STORAGE
378 SF
CART WASH
43 SF
UIPMENT
U-TOILET
52 SF
52 SF
REPAIR
1E259
CORRIDOR
168 SF
U-LOCKER
1E277
57 SF
U-LOCKER
58 SF
1E276
SPATCH 78 SF 27 SF
1E255
LOUNGE
89 SF
61 SF
29 SF
OPEN OFFICE
493 SF
IT
965 SF
OFFICE
149 SF
LOCKERS
120 SF
ELECTRICAL
ROOM
464 SF
1E265 1E267
1E263
1E268
1E261
1E277A 1E279A
1E279
1E276A
1E271 1E270
1E273
1E284
1E262
1E274
1E280A
1E280
1E275
1E272
PREP/
ASSEMBLY
STERIZATION
853 SF
EQUIPMENT
WASH
CART WASH
52 SF 52 SF
U-LOCKER U-LOCKER
57 SF 58 SF
CORRIDOR CORRIDOR
78 SF 27 SF
LOUNGE
89 SF
61 SF
29 SF
1E277A 1E279A
SH
O
W
ER
SH
O
W
ER
1E268
1E266
1E284
1E277 1E279
1E276 1E276A
1E274
1E280A
1E280
| HAC |
| STERILIZER MECHANICAL ROOM |
| PREP/ ASSEMBLY STERIZATION |
| EQUIPMENT WASH |
| CLEAN STORAGE |
| CART WASH |
| UIPMENT |
| U-TOILET |
| U-TOILET |
| REPAIR |
| CORRIDOR |
| U-LOCKER |
| U-LOCKER |
| CORRIDOR |
| CORRIDOR |
| LOUNGE |
| HAC |
| HAC |
| OPEN OFFICE |
| IT |
| OFFICE |
| LOCKERS |
| ELECTRICAL ROOM |
| PREP/ ASSEMBLY STERIZATION |
| EQUIPMENT WASH |
| CART WASH |
| U-TOILET |
| U-TOILET |
| U-LOCKER U-LOCKER |
| CORRIDOR CORRIDOR |
| LOUNGE |
| HAC |
| HAC |
| 29 SF |
File details come from the government source that posted it. Updated .