Attachment 3 - Performance Work Statement.pdf

PDF 962 KB Posted

Attached to
Petroleum, Oil and Lubricant Underground Tank Testing at Grand Forks AFB, ND
Solicitation number
FA465924QM010
Issued by

About this file

This document is a Performance Work Statement (PWS) for a firm-fixed price contract to provide Underground Storage Tank (UST) testing services at Grand Forks Air Force Base in North Dakota. The contractor shall perform all required federal, state, and local regulatory compliance tests for the USTs at the specified frequencies, including line tightness testing, probe functionality testing, spill bucket testing, overfill protection testing, and other inspections. The contractor must submit the required test results forms to the government within 10 days of each test. The contractor may be required to repair or replace any faulty test equipment, subject to government approval. The period of performance is one base year with four option years, with annual and three-year tests to be conducted between April and September. The contractor must have a quality control program and comply with base entry, security, and anti-terrorism requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.0 General Information:

This is a non-personal service contract to provide Underground Storage Tank (UST) testing. The government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn is responsible to the government.

1.1 Description of Services/Introduction:

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform UST testing as defined in this PWS except for those items specified as government furnished property and services. The contractor shall perform to the industry standards and contract requirements.

1.2 Background:

Grand Forks Air Force Base, ND (GFAFB), located near Grand Forks, North Dakota, is home of the 319th Reconnaissance Wing. GFAFB operates aircraft and m a n y support vehicles, that all need fuel and petroleum products, stored on site. This requires underground storage tanks that need line tightness testing, probe functionality testing, hydrostatic spill bucket testing, overfill protection, sump integrity, under dispenser containment, and submersible turbine sump testing per Department of the Air Force (DAF) instructions, Environmental Protection Agency (EPA) and North Dakota Department of Environmental Quality (ND DEQ) guidelines. Requirements can be found at: https://deq.nd.gov/WM/Publications.aspx

1.3 Objectives:

Conduct all required federal, state, local and DAF regulatory compliance tests for each GFAFB UST in the frequency specified according to the type of tank, either pressurized or safe suction, per CFR 40 Part 280, the North Dakota Administrative Code (NDAC), Chapter 33-24-08 Technical Standards and Corrective Action Requirements for Owners and Operators of USTs and the North Dakota Century Code §23.1-04-06 Underground storage tank regulations to meet tank testing compliance rules. All test data, information and associated results produced by the contractor for GFAFB USTs shall be submitted in paper form to the 319 Civil Engineer Squadron (319 CES/CEIE) on individual forms published by the ND DEQ for each sensor, spill bucket, line, overfill, alarm, associated piping/pumps, and/or probe type of test within 10 days.

1.4 Scope:

Performance Work Statement (PWS)

Petroleum, Oil, and Lubricant (POL) Underground Storage Tank Testing

The contractor shall provide all management, tools, supplies, equipment, and labor necessary to conduct and successfully complete all required regulatory tests in the mandatory frequency for GFAFB USTS, sensors, spill buckets, sumps, line tightness and associated piping to meet test compliance with all federal, state and local laws. The Contractor shall verify tank types and classifications and abide by the appropriate test types and frequencies as annotated by the ND DEQ and AF unless directed more conservatively by the Government Contracting Officer (CO) in this Contract. The contractor shall implement approved engineering practices and be trained and certified IAW the Petroleum Equipment Institute RP-1200: Testing of UST Spill, Overfill, Leak Detection and Secondary Containment manual as identified on the required ND DEQ reporting forms. The required ND DEQ forms can be found at https://deq.nd.gov/WM/Publications.aspx. A separate form must be used for each piece of equipment tested. For example, if five pump sensors were tested, the contractor may not just indicate that five sensors were tested and passed tests. The contractor must provide the test results for each sensor on the identified compliance form (A0001) by ND DEQ and 319 CES point of contact (POC). The forms must be completed in full to include listing the date of each test. Verified test failures shall be annotated in full description as a separate submittal in memorandum report format (A0002) for communication to the CO/319 CES POC to support appropriate AF planning, identification of any needed repairs and replacement of UST operations by the AF. Contractor shall submit written repair/replacement plans to CO/319 CES POC for approval 10 days before work begins (A0003).

The contractor shall be responsible to replace and/or repair unresponsive test probe sensors, wires and flexible piping necessary to support test operation and completion only (A0004). Contract repairs are limited to functionality of test and leak detection requirements. This does not include repairs for structural tank leaks identified or other faulty infrastructure noted specific to the operating UST system resultant of conducting the tank tests. Only test failures due to faulty test equipment shall be repaired and/or replaced by the contractor. All test equipment repairs or replacement conducted by the contractor must be approved by CO/319 CES POC prior to repair. If a repair order is approved by the CO/319 CES POC that approval authorization shall include conducting a tank re-test to ensure proper functioning of equipment as well as to meet regulatory tank compliance needs. The re-test will include submittal of another ND DEQ form (All ND DEQ forms are available at https://deq.nd.gov/WM/Publications.aspx) to include updated test results and data to the government.

1.5 Period of Performance:

The Period of Performance (PoP) shall be for one (1) Base Year of twelve (12) months with four

(4) option years. This will include one annual probe functionality test and report for each tank and the required annual line tightness tests to be completed within each PoP for every tank and its associated piping listed as listed in the estimated work load. In addition, the base year and 3rd option year should include all 3-year tank tests required for pressurized systems and piping along with associated report forms. All annual and 3-year tests should be conducted between the months of April and September to plan for limited UST access due to typical winter snow cover and negative air temperatures present at Grand Forks AFB. ND DEQ compliance testing is based on a 12-month calendar.

1.6 Quality Control Program:

The contractor shall develop and maintain an effective Quality Control Program (QCP) to ensure services are performed in accordance with (IAW) this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is how they assure themselves that their work complies with the requirement of the contract. This shall be delivered to the Contracting Officer (CO) and/or 319 CES POC within thirty (30) calendar days after contract award. One (1) copy of a comprehensive written QCP shall be submitted to the CO and/or 319 CES POC within five (5) calendar days when any changes are made thereafter for review and acceptance by the CO and/or 319 CES POC. After acceptance of the QCP changes, the contractor will receive, in writing, acceptance or denial of any proposed changes from the contractor’s QCP.

1.6.1 Recognized Holidays:

Contractor is not required to work on any of the following federal holidays.

New Year’s Day – 1 January Martin Luther King Day – 3rd Monday in January President’s Birthday – 3rd Monday in February Memorial Day – last Monday in May Juneteenth – 19 June Independence Day – 4 July Labor Day – 1st Monday in September Columbus Day – 2nd Monday in October Veteran’s Day – 11 November Thanksgiving Day – 4th Thursday in November Christmas Day – 25 December

1.6.2 Hours of Operation:

The contractor is responsible for conducting business, between the hours of 7:30am to 4:30pm, local time, Monday thru Friday, except federal holidays mentioned above, or when the government facility is closed due to local or national emergencies, administrative closings, or similar government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The contractor must, at all times, maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the government facility is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.3 Place of Performance:

The work to be performed under this contract will be performed at Grand Forks Air Force Base, ND. Contractor will coordinate scheduled work 14 days prior to beginning any tank inspections. An Air Force Form 74 will be provided to the contractor to be filled out and returned to the 319 CES POC to allow base access if personnel are not currently allowed base access. Escorts will be provided if access is required in controlled areas.

1.6.4 Type of Contract:

The government will award a firm fixed price contract.

1.6.5 BASE ENTRY PROCEDURES AND AIRFIELD SECURITY REQUIREMENTS:

1.6.5.1 Special Provisions For Working On or Near the Airfield

By basic definition, all areas within the airfield fence are considered on the airfield. This is a controlled area, and entry can be gained by escort from owner/user of the area or obtaining a flight line badge. Projects requiring airfield access will have special provisions in the individual RFPs, in addition to what is contained in this section.

1.6.5.2 Coordination of Work

The contractor shall coordinate airfield work (design and construction) through the base operations, Security Forces, Civil Engineering and the contracting officer (CO). The contractor shall contact Base Operations for daily construction restrictions involving the flight line, taxiway, and runway areas, and shall comply with DOD FAR SUP 252.236-7005, Airfield Safety Precautions, AFI 13-213, Airfield Management, Grand Forks AFBI 24-101 Flightline Driving..

1.6.5.3 Closures

All runway or taxiway closures will require the coordination of Base Operations through the CO not less than fourteen (14) calendar days prior to the requested closure, unless otherwise provided for in these specifications. The contractor will make the maximum utilization of time during the requested closure period, and schedule his/her operations in phases if necessary so as to minimize the effect of construction closures on normal base operations. Upon completing the work requiring the closure, the contractor shall immediately notify the CO so normal operations may resume.

1.6.5.4 Personnel Safety Precautions

Jet aircraft operating on the runways, taxiways, and aprons make the area of construction a zone of high level noise. The contractor shall take the necessary precautions, such as the use of ear plugs or muffs to prevent injury to the auditory systems of all personnel working in the area.

1.6.5.5 Restrictions

The government does not allow personal use vehicles inside the flight line fence. The con-tractor’s employees and subcontractors shall park their personal vehicles in authorized parking lots outside the flight line fence. Personnel requiring entry to the flight line shall be escorted by owner/user of the area or possess a line badge. Contractor vehicles required in the performance of the work shall have a company sign (minimum size 6 inches by 18 inches) on both front doors. No contractor vehicles, equipment, or personnel shall be on or crossing any active runway or taxiway, except during construction period closures as outlined herein, or when the escort requests and gains clearance from the control tower. The contractor shall NOT open a trench unless material is on hand and ready for placing in the trench. As soon as practicable after placing material and obtaining approval for the work, the contractor shall backfill and compact trenches as required by the contract.

1.6.5.6 Cleanliness of Work Area

The contractor shall maintain the cleanliness of taxiway, runway, and apron pavements at all times in order to prevent foreign object damage (FOD). The contractor shall remove all materials and equipment to a safe distance from the runway as required by base operations.

1.6.5.7 Emergencies

There may be periods when the government, due to declared aircraft emergencies, will require the contractor to vacate the work site and move his/her personnel and equipment a distance of several hundred feet away from the work site. Such removals, when ordered, will come on short notice and require expeditious action.

1.6.5.8 Airfield Security Restrictions.

The government will not grant access to restricted areas for the contractor and/or subcontractors without a proper escort from owner/user of the area or establishment of a Free Zone. Five (5) work days prior to commencing work, the contractor shall submit, in writing, a list of all personnel who will perform work in the restricted area.

1.6.5.9 Security forces will be included in the contracts Multi-functional Team.

1.6.6 Restricted/Controlled Areas Entry Procedures

Security requirements for Air Force facilities under control of Grand Forks Air Force Base are specific and rigidly enforced. Levels of security include Restricted and Controlled areas.

Differing degrees of security are enforced at each area. Minimum security requirements, common not only to each of these secure areas, are also required for entry onto Grand Forks AFB. Questions of clarification on locations or procedures for controlled/restricted areas contact Security Forces at 701 747-4234. These minimum requirements are outlined below.

1.6.6.1 Restricted Areas

Restricted areas are identified in GFAFBI 31-101 Grand Forks AFB Installation Security Instructions and include the Command Post (CP) and Mass Parking Area (MPA). Each area is fenced or conspicuously identified by posted signs and red Lines.

1.6.6.2 Controlled Areas

Controlled areas include many base facilities; only a few of are located within the base aircraft flight-line controlled area. Each of these areas is identified in GFAFBI 31-101 and each is conspicuously identified by posted signs.

1.6.7 Work in Restricted/Controlled areas.

1.6.7.1 Restricted Areas

Restricted Areas: Contractor’s personnel must be escorted by Owner/User of the area when in the restricted area. Work in this area may require the creation of a free zone so the contractor’s personnel can work in the area without security escorts. The contractor shall work with the Owner/User of the restricted area to establish this area. The request to establish this free zone is to be initiated by the Owner/User of the area in question. Once the Free Zone is authorized, Security Forces will assist in the establishment of the area per GFAFBI 31-101 requirements.

Contractor personnel may need to be escorted by the Owner/User from the perimeter of the restricted area to the free zone and back out.

1.6.7.2 Controlled Areas

Controlled Areas: Contractor’s personnel must be escorted by owner/user of the area when in the controlled area. Work in this area may require the creation of a free zone so the contractor’s personnel can work in the area without security escorts. The contractor shall work with the Owner/User of the controlled area to establish this area. Once the Free Zone is authorized, Security Forces will assist in the establishment of the area per GFAFBI 31-101 requirements.

Contractor personnel may need to be escorted by the owner/user from the perimeter of the controlled area to the free zone and back out.

1.6.7.3 Free Zones

Contractors will be required to provide weighted construction barrels and rope to mark the free zone.

1.6.7.4 Opening/Closing Work Area

Contractor must contact Security Forces at 747-5351 when the area is opened or closed.

1.6.8 Minimum Security Requirements (All Areas Including Base Entry)

1.6.8.1 Visitor Passes

The Commercial Visitor Control Center will issue a SFMIS AF Form 75 (Visitor Pass) to the contractor and his/her employees upon completion of screening process for the duration of the contact. The screening process takes time, and the contractor shall visit the Commercial Visitor Control Center prior to expecting base entry to receive required forms and instruction on the application process, to include estimated time of receiving the visitor pass.

1.6.8.2 Vehicles on the Installation

Although contractors will not be issued vehicles passes vehicles are subject to search while on the installation. Employee privately owned vehicles will not be allowed access to restricted/controlled areas without a free zone being established. Company vehicles will be allowed access to restricted/controlled areas.

1.6.8.3 Contractor Vehicles

All Contractor vehicles should have markings with the company name for quick identification of ownership and notification if they are involved in an incident.

1.6.8.4 Conduct Requirements

The contractor shall ensure that his/her employees comply with all base traffic regulations and properly conduct themselves while on the base.

1.6.9 Information Protection

1.6.9.1 Security Requirements

The security manager for the Sponsoring unit (i.e LRS, CE ect.) will determine individual requirements for contractor personnel to have a background check.

Contractor personnel performing work under this contract must be able to obtain access to Grand Forks AFB, by having favorable clearance at time of the contract award.

1.6.9.2 National NACI

If a National NACI is determined to be required by the security manager, the security manager will coordinate the check with the wing Information Security Office.

1.6.10 Anti-Terrorism

1.6.10.1 All contractor employees requiring access to any Federally-controlled facility and logical access to Federally controlled information systems except for “national security systems” as defined by 44 U.S.C. 3542(b)(2), should be certified in Level 1 Anti Terrorism Training. The training is accessible from any computer with access to the World Wide Web and is available at https:/atlevel1.dtic.mil/at. The contractor is responsible for ensuring that the training has been satisfactorily completed and that valid certificates of completion have been submitted to the Customer with a copy furnished to the Contracting Officer. The Certificates are valid for one year; therefore, training shall be completed every year for the duration of the contract.

1.6.10.2 Unit anti-terrorism managers will be responsible for organizing this level 1 training.

1.6.11 Physical Security:

The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.6.12 Key Control:

The contractor shall establish and implement methods of making sure all keys/key cards issued to the contractor by the government are not lost or misplaced and are not used by unauthorized persons. If keys a re r e q u i r e d to be is su e d , t h e y w i l l be s i g n e d for by the c o n t r a c t o r . NOTE: All references to keys include key cards. No keys issued to the contractor by the government shall be duplicated. The contractor shall develop procedures covering key control that shall be included in the QCP. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the CO and/or 319 CES POC.

In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction of the CO, re-key or replace the affected lock or locks; however, the government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the next payment due the contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the government and the total cost deducted from the next payment due the contractor.

The contractor shall prohibit the use of government issued keys/key cards by any persons other than by contractor employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the CO.

1.6.13 Lock Combinations:

The contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.

1.6.14 Special Qualifications:

Contractors’ inspection team must include a Class B Operator as defined by CFR Title 40 part 280 and they must follow the Petroleum Equipment Institute RP-1200 manual for “Testing of UST Spill, Overfill, Leak Detection and Secondary Containment” as identified on the required ND DEQ reporting forms. Current training certifications will be available upon request of the CO/319 CES

POC.

1.6.15 Post Award Conference/Periodic Progress Meetings:

The contractor agrees to attend any post award conference(s) convened by the contracting activity or contract administration office IAW the Federal Acquisition Regulation (FAR), Subpart 42.5.

The CO, 319 CES POC, and other government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the CO will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the government of problems, if any are being experienced. Appropriate action shall be taken to resolve outstanding issues. M e e t i n g s can be s c h e d u l e d at any t i m e by the con t r a c t o r or the CO to e n s u r e open l i n e s of c o m m u n i c a t i on are m a i n t a i n e d . These meetings shall be at no additional cost to the government.

1.6.16 Key Personnel:

The follow personnel are considered key personnel by the government: The contractor shall provide a contract manager who shall be responsible for the performance of all work performed by the contractor. The name and contact information for this person, and an alternate, who shall have the ability to act on behalf of the contractor when the manager is absent shall be designated in writing to the CO and/or 319 CES POC. The contract manager or alternate shall have full authority to act on behalf of the contractor while work is being performed on all contract matters relating to daily operation of this contract. The contract manager, or alternate, shall be available between 7:30am and 4:30pm, local time, Monday thru Friday, except federal holidays listed above, or when the government facility is closed for administrative or other reasons.

1.6.17 Identification of Contractor Employees:

All contractor personnel attending meetings, answering government telephones, and working in other situations where their contractor’s status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are government officials. C o n t r a c t p e r s o n n e l m u s t h a v e a c o n t r a c t o r i s s u e d s h i r t , ha t or ba dge i d e n t i f y i n g t he m as an em p l o y e e of the c o n t r a c t o r ’ s c o m p a n y . They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.6.18 Data Rights

The government has unlimited rights to all documents and material produced under this contract.

All documents and materials, to include the source codes of any software, produced under this contract shall be government owned, and are the property of the government, with all rights and privileges of ownership and copyright belonging exclusively to the government. These documents and materials may not be used or sold by the contractor without written permission from the CO.

All materials must be turned over to the government, and shall be the sole property of the government, and may not be used for any other purpose. This right does not repeal, or do away with, any other government rights.

1.6.19 Organizational Conflict of Interest:

Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications, or work statements, etc.), or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR, Subpart 9.5. The contractor shall notify the CO and/or 319 CES POC immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the CO and/or 319 CES POC to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the CO, and in the event the CO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the CO may affect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

2. DEFINITIONS & ACRONYMS

2.1 Definitions:

Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

Contracting Officer: A person with authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.

Deliverable: Anything that can be physically delivered but may include non-manufactured items such as meeting minutes and/or reports.

Key Personnel: Contractor personnel that are required to be used in the performance of a contract by the Key Personnel listed in the Performance Work Statement.

Physical Security: Actions that prevent the loss or damage of government property.

Quality Assurance: The government procedures to verify that services being performed by the contractor are performed according to acceptable standards.

Quality Control: All necessary measures taken by the contractor to assure that the quality of an end product or service shall meet contract requirements.

Subcontractor: One that enters a contract with a prime contractor. The government does not have privity of contract with the subcontractor.

Workday: The number of hours per day the contractor provides services in accordance with the contract.

Workweek: Monday through Friday, unless specified otherwise.

2.1 Acronyms:

AAFES: Army & Air Force Exchange Service AFJAM: Air Force Joint Manual AGE: Air Ground Support Equipment CFR: Code of Federal Regulations CO: Contracting Officer Communications DAF: Department of the Air Force ELLD: Electronic Line Leak Detection EPA: Environmental Protection Agency FAR: Federal Acquisition Regulation GUP: Gasoline Unleaded Premium GUR: Gasoline Unleaded Regular HQ: Headquarters IAW: In Accordance With IM: Interstitial Monitoring MLLD: Mechanical Line Leak Detection NDAC: North Dakota Administrative Code ND DEQ: North Dakota Department of Environmental Quality OCI: Organizational Conflict of Interest PIPO: Phase In/Phase Out POC: Point of Contact POL: Petroleum, Oil, and Lubricant POP: Period of Performance PRT: Product Recovery Tank PRS: Performance Requirements Summary PWS: Performance Work Statement QCP: Quality Control Program TE: Technical Exhibit UST: Underground Storage Tank

3 Deliverables Schedule

Deliverable Frequency # of Copies Medium Format

Submit To

A0001 - ND DEQ Within ten (10) One (1) copy Adobe Acrobat CO and/or 319 Test Form Report business day of per tank tested. Form from the CES POC Para 1.4. test completion. ND DEQ identified at website post award conference.

A0002 - Test Within ten (10) One (1) copy Microsoft CO and/or 319 Failure Report business day of per tank tested. Office format CES POC Para 1.4 test failure compatible identified at completion post award only. conference.

A0003 - Testing Two (2) weeks One (1) copy Microsoft CO and/or 319 Plan Para 1.4 prior to start of per tank tested. Office format CES POC work. compatible identified at post award conference.

A0004 - Sensor As needed after One each Repair or CO and/or 319 Repair/Replacement CO/319 CES replace w/same CES POC Para 1.4 POC approval model identified at equipment post award conference.

4 Estimated Work Load

Tan k ID

Annual Probe Functional ity Test (State Form SFN 62153)

Line Tightne ss Test

(MLLD

= State From

SFN

62229)

Electronic Line Leak Detector Functional ity Test

(ELLD =

State Form

62238)

Tightne ss Test

(IM =

State Form

62153)

Containme nt Sump Integrity Testing - Hydrostati c Method

(SFN

62222)

3-Yr, Spill Bucket Integrity Testing - Hydrosta tic Testing Method (State Form SFN 62224)

3-Yr, Alarm Operati on Inspecti on (State Form

62146)

3-YR

Overfill Equipme nt Inspectio n - Automat ic Shutoff Device

(SFN

62218)

7 Pressurized Tanks

-1-2

Required Require d Not

Required

Not Require d

Not Required

Not

Required

-2-2

Not

Required

Not Require d

Not

Required

-1-2

Require

Require d

Not

Required

Require d d

Not Required

-3

Require d

Not

Required

-1

Not

Required

-3

Not

Required

Not Require d

9 Safe Suction Tanks

Require d

Not Required

Not Require d

Not Required

Not Required

Not Require d

Not Required

Require d

Not Required

Not Require d

Not Required

Not Required

Not Require d

Require d

Not Required

Not Require d

Not Required

Not Required

Not Require d

Not Required

Require d

Not Required

Not Require d

Not Required

Not Required

Not Require d

Not Required

Require d

Not Required

Not Require d

Not Required

Not Required

Not Require d

Not Required

Require d

Not Required

Not Require d

Not Required

Not Required

Not Require d

Not Required

Require d

Not Required

Not Require d

Not Required

Not Required

Not Require d

Not Required

Require d

Not Required

Not Require d

Not Required

Not Required

Not Require d

Not Required

-4

Require d

Not Required

Not Require d

Not Required

Not Required

Not Require d

Not Required

*PRT = Product Recovery Tank *IM = Interstitial Monitoring

File details come from the government source that posted it. Updated .