Attachment 3 - Performance Work Statement.docx
DOCX document 20 KB Posted
- Attached to
- CONUS and OCONUS Shipping Services
- Solicitation number
- W91ZLK-21-R-0004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers 072121.pdf | ||
| Attachment 4 - Quality Assurance Surveillance Plan.docx | DOCX document | |
| Combined SS 071621.DOCX | DOCX document | |
| Attachment 2 - Provisions and Clauses.docx | DOCX document | |
| Attachment 1 - Sample Task Order.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYNOPSIS/SOLICITATION
W91ZLK-21-R-0004
Attachment 3 – Performance Work Statement
PERFORMANCE WORK STATEMENT
CONUS and OCONUS Shipping Services for CBARR
1.0 SCOPE. The U.S. Army Combat Capabilities Development Command - Chemical Biological Center (CCDC-CBC) Chemical Biological Applications & Risk Reduction (CBARR) Business Unit requires shipping services for equipment and supplies moving between Aberdeen Proving Ground, MD, other CONUS sites, and various sites around the globe.
1.1 Background. CBARR conducts chemical weapon destruction operations, environmental monitoring and sampling, and analysis of chemical destruction technologies at sites around the world. CBARR currently has operations in Australia and plans to maintain this long-term relationship, with several additional planned projects.
1.2 Objective. The objective of this contract is to provide CBARR with shipping services for equipment and materials moving between CONUS and OCONUS sites, including those listed below.
2.0 APPLICABLE DOCUMENTS.
2.1 Australia Department of Immigration and Border Protection Notice #2017/42, Changes to Import Processing Charges for Importation of Goods Under Status of Forces Agreements.
3.0 REQUIREMENTS. The contractor shall ship parcels between CONUS and OCONUS sites in support of CBARR operations. Parcels will include small boxes that are under a pound, large shipments on a pallet, and oversized items exceeding 1,000 pounds. Some parcels may contain hazardous material shipments (i.e. items with sources, industrial chemicals). Business hours at CBARR are 0800-1600L, Monday through Friday, excluding federal holidays.
3.1 Locations where parcels shall be picked up from and delivered to include, but are not limited to the following:
· Aberdeen Proving Ground, MD
· Pine Bluff Arsenal, AR
· Holloman Air Force Base, NM
· Schofield Barracks Army Base, Oahu, H
· Dugway Proving Ground, UT
· Pueblo Chemical Depot, Pueblo, CO
· Bluegrass Army Depot, Bluegrass, KY
· Melborne, Australia
· Hemmant, Australia
· Orchard Hills, Australia
3.1.1 Parcels shall be picked up within 2 business days for delivery.
3.2 Air freight shipments shall arrive on location within 10 business days.
3.3 Sea freight shipments shall arrive on within 60 business days.
3.4 Expedited shipping services requires items on location within 10 business days.
3.5 Parcels will be packaged prior to pick up by the government.
3.6 Parcels will be delivered to/received by a specified Government Point of Contract and monitored by the Contracting Officer’s Representative (COR).
3.7 The Contractor shall be responsible for any lost or damage after pickup and prior to delivery.
4.0 PERIOD OF PERFORMANCE. Period of performance for this effort shall be One (1) Base Year and Four (4) One (1) year Options.
| Base Year | 15 August 2021 – 14 August 2022 |
| Option Year 1 | 15 August 2022 – 14 August 2023 |
| Option Year 2 | 15 August 2023 – 14 August 2024 |
| Option Year 3 | 15 August 2024 – 14 August 2025 |
| Option Year 4 | 15 August 2025 – 14 August 2026 |
5.0 SAFETY CONSIDERATIONS. Contractor employees shall comply with the Army Safety Program (AR 385-10) and all applicable Occupational Safety and Health Standards.
6.0 SECURITY CONSIDERATIONS. Contractor personnel will be required to check in at security checkpoint of Aberdeen Proving Ground, Edgewood Area. Contractors shall provide photo ID, and be prepared to have their vehicles searched. Contractor personnel will be issued a Visitor’s Badge at the facility and be accompanied by a Government escort at all times. (The contractor shall not be required to: have access to classified material; to generate classified material; or to store classified material at the contractor’s or government facility or whether access to the RDECOM Local Area Network is required.)
Contractor and all associated subcontractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
7.0 ENVIRONMENTAL CONSIDERATIONS.
7.1 Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and installation regulations and policies. Contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200-1, and any specifications within this contract to the Contracting Officer Representative (COR) as well as the Director of Engineering & Public Works.
7.2 Contractor shall immediately report any nonconformance and/or noncompliance with applicable Federal, State or Local environmental laws, Army and installation environmental regulations or policies to the COR and Director of Engineering & Public Works.
8.0. Quality Assurance Surveillance Plan (QASP): (See Attached)
9.0 Accounting for Contract Services: The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via www.beta.sam.gov. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each government fiscal year and must be reported by 31 October of each calendar year.
File details come from the government source that posted it. Updated .