This document is a Submittal Register for the Pintle Supply Contract at the Mel Price Locks and Dam in Alton, Illinois. It lists the required submittals for this contract, including a Fabrication Schedule, Fabricator Quality Control Plan, As-Fabricated Drawings and Models, Shop Drawings, Material Test Reports, Quality Control Procedures, and Shipping Documents.
The related federal contract opportunity is for the Pintle Socket Supply at the Mel Price Locks & Dam. The contractor shall generate and fabricate mold patterns based on government-supplied drawings, and provide custom fabricated castings including one left side and one right side as base items, with optional quantities of two left side and two right side castings. The contractor shall be responsible for all labor, materials, delivery, and incidentals to generate, fabricate, and deliver the molds and castings to the project site. Questions are due by 10:00am CST on August 12, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 2 PAGES
Mel Price Lock and Dam Pintle Supply Contract
01 32 16.00 20 SD-01 Preconstruction Submittals
1.2 GFabrication Schedule
SD-07 Certificates
1.4Monthly Updates
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GFabricator Quality Control (FQC)
Plan
01 78 00 SD-11 Closeout Submittals
1.3.1 G EC-DFinal As-Fabricated Drawings and
Models
1.2.2Casting Mold Patterns
05 50 14 SD-01 Preconstruction Submittals
2.1.2.2 GWork Plan
SD-02 Shop Drawings
1.3.1.2 GShop Drawing
1.3.1Detail Drawings
SD-03 Product Data
1.3.2 GList Of Materials
3.2.2Lubrication
SD-06 Test Reports
1.3.3 GMaterial Test Reports
1.3.4Nondestructive Testing Reports
SD-07 Certificates
1.3.5 GQuality Control Procedures
2.1.2.2 GQuality Control Procedures
1.3.6 GShipping Documents
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 2 PAGES
Mel Price Lock and Dam Pintle Supply Contract
05 50 14 2.1.2.2.1Nondestructive Testing Personnel
09 97 02 SD-03 Product Data
Part 2 GManufacturer's MSDS Product
Data Sheet
2.5 GManufacturer's SlipCertification
Document
SD-04 Samples
Part 2 GProduct Samples
2.1 GSpecial Paint Formulas
2.3.3 GSolvent And Thinners
SD-06 Test Reports
3.4Inspection Reports
SD-07 Certificates
1.4.2 GQualified Coating Applicator
1.4.3Coating Thickness Gage
Qualification
1.4.1 GSspc Qp 1 Or Sspc Qp 3 (Or Aisc
Spe) Certificate
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
File details come from the government source that posted it. Updated .