Attachment 3 - MPLD Pintle Supply Submittal Register.pdf

PDF 42 KB Posted

Attached to
Pintle Socket Supply, Mel Price Locks & Dam, Alton, IL.
Solicitation number
W912P924Q3429
Issued by

About this file

This document is a Submittal Register for the Pintle Supply Contract at the Mel Price Locks and Dam in Alton, Illinois. It lists the required submittals for this contract, including a Fabrication Schedule, Fabricator Quality Control Plan, As-Fabricated Drawings and Models, Shop Drawings, Material Test Reports, Quality Control Procedures, and Shipping Documents.

The related federal contract opportunity is for the Pintle Socket Supply at the Mel Price Locks & Dam. The contractor shall generate and fabricate mold patterns based on government-supplied drawings, and provide custom fabricated castings including one left side and one right side as base items, with optional quantities of two left side and two right side castings. The contractor shall be responsible for all labor, materials, delivery, and incidentals to generate, fabricate, and deliver the molds and castings to the project site. Questions are due by 10:00am CST on August 12, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 2 PAGES

Mel Price Lock and Dam Pintle Supply Contract

01 32 16.00 20 SD-01 Preconstruction Submittals

1.2 GFabrication Schedule

SD-07 Certificates

1.4Monthly Updates

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GFabricator Quality Control (FQC)

Plan

01 78 00 SD-11 Closeout Submittals

1.3.1 G EC-DFinal As-Fabricated Drawings and

Models

1.2.2Casting Mold Patterns

05 50 14 SD-01 Preconstruction Submittals

2.1.2.2 GWork Plan

SD-02 Shop Drawings

1.3.1.2 GShop Drawing

1.3.1Detail Drawings

SD-03 Product Data

1.3.2 GList Of Materials

3.2.2Lubrication

SD-06 Test Reports

1.3.3 GMaterial Test Reports

1.3.4Nondestructive Testing Reports

SD-07 Certificates

1.3.5 GQuality Control Procedures

2.1.2.2 GQuality Control Procedures

1.3.6 GShipping Documents

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 2 PAGES

Mel Price Lock and Dam Pintle Supply Contract

05 50 14 2.1.2.2.1Nondestructive Testing Personnel

09 97 02 SD-03 Product Data

Part 2 GManufacturer's MSDS Product

Data Sheet

2.5 GManufacturer's SlipCertification

Document

SD-04 Samples

Part 2 GProduct Samples

2.1 GSpecial Paint Formulas

2.3.3 GSolvent And Thinners

SD-06 Test Reports

3.4Inspection Reports

SD-07 Certificates

1.4.2 GQualified Coating Applicator

1.4.3Coating Thickness Gage

Qualification

1.4.1 GSspc Qp 1 Or Sspc Qp 3 (Or Aisc

Spe) Certificate

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

File details come from the government source that posted it. Updated .