Attachment 3 - Markings Packaging Delivery and Inspection.pdf

PDF 713 KB Posted

Attached to
Global Navigation Satellite System (GNSS) Federal contract opportunity
Solicitation number
70Z04424RESD52401
Issued by
Department of Homeland Security US Coast Guard

About this file

This document is an attachment titled "Marking, Packaging, Delivery, and Inspection / Acceptance Requirements for Items" related to a federal contract opportunity for a Global Navigation Satellite System (GNSS) simulator for the United States Coast Guard Academy (USCGA).

The key details are:

  • The parts ordered under this contract must be individually preserved and packaged according to ASTM and military standards, with appropriate markings and barcoding.
  • Delivery is required to the USCGA in New London, CT.
  • Major components must be shrink-wrapped or otherwise sealed to prevent water damage, and documents must be sealed in waterproof bags.
  • Packaging and shipping must comply with ASTM D3951-98 standards, or if that is inadequate, MIL-STD-2073-1E.
  • The contractor must provide a Material Inspection and Receiving Report (DD Form 250) or Commercial Bill of Lading, as well as a packing slip with details on each item, with copies provided to the Contracting Officer.
  • Evaluations and reports must be delivered within 15 days of part delivery to the Contracting Officer.

View the file

Other files for this federal contract opportunity

Other files attached to Global Navigation Satellite System (GNSS), newest first.
File Type Posted
FAR 52.204-23 Class Deviation 2020-05, Revision 3.pdf PDF
SF-30 70Z04424RESD52401_Amendment 0002.pdf PDF
SF-30 70Z04424RESD52401_Amendment 0001.pdf PDF
Attachment 1 - GPS Simulator Specifications.pdf PDF
Attachment 2 - Price Schedule 70Z04424RESD52401.xlsx XLSX spreadsheet
Attachment 4 - DHS_Form_700-21.pdf PDF
Combined Synopsis_Solicitation_GNSS 70Z04424RESD52401.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 3

Marking, Packaging, Delivery, and Inspection / Acceptance Requirements for Items

SOLICITATION: 70Z04424RESD52401

083-8.4 All parts ordered under this Contract shall be individually preserved and packaged in accordance with ASTM D 3951, ASTM D3951-10, and MIL-STD-2073-1E. All parts under this contract shall also have appropriate markings in accordance with MIL-STD-129P and MIL-STD-130N. When applicable, specific OEM preservation, packaging, packing, and marking requirements directing a higher standard than referenced shall be adhered to. Bar coding is required in accordance with MIL-STD-129P paragraph 5.1.10.1/page 73 Linear (Code 39) bar code symbology, linear (Code 39) symbols shall be in accordance with ISO/IEC 16388, and ISO/IEC 16388. The barcode is to only contain the stock number provided by the Coast Guard. Marking shall be placed on the container top or one long side (any side if container is square).

The marking for all parts shall be formatted as specified below with each data field populated:

Stock Number (NSN):

NIIN:

Part Number:

Contract Number:

1. Background

1.1. C5ISC is preparing to purchase a commercial Global Navigation Satellite System (GNSS) simulator for the United States Coast Guard Academy (USCGA).

2. Requirements

2.1. Delivery Locations:

2.1.1. The delivery order quantity of Global Navigation Satellite System (GNSS) simulator for testing shall be delivered to the below location (Due in numbers are not required):

U.S. Coast Guard Academy (peec) School of Engineering and Cyber Systems Department of Electrical Engineering and Computing Attn: Mr. Dave Fournier 27 Mohegan Avenue New London, CT 06320

2.2. The awarded contract lists the required items including the quantity, Part Nomenclature, Stock Number (NSN), Part Number, CAGE, Due-In Numbers, Unit of Issue for all items, and destination.

2.3. Preservation

2.3.1. Major components shall be shrink-wrapped or otherwise covered and sealed to prevent water damage. To prevent adhesion between protective coverings and painted surfaces, protective coverings shall not be applied until the paint has cured.

2.3.2. Documents and other enclosures shall be sealed in a waterproof plastic bag, which shall be permanently affixed to the inside of the shipping container in a conspicuous location when the container is opened.

2.4. Packaging, handling, shipping, and transportation procedures shall be in accordance with ASTM D3951-98 (Reapproved 2004) Standard Practice for Commercial Packaging. If commercial practices cannot adequately protect and preserve the equipment, the contractor shall package, handle, ship and transport equipment in accordance with MIL-STD-2073-1E Standard Practice for Military Packaging dated May 23, 2008.

2.4.1. Each Part shall be packaged separately, or in its designated unit of issue.

2.4.2. All parts shall be identified and accounted for by their NSN or ACN on the packing list.

2.4.3. Large parts shall be shrink-wrapped or otherwise covered and sealed to prevent water damage. Small parts shall be enclosed in clear plastic packaging.

2.4.4. Multiple identical parts may be repackaged in designated quantity units (box lot, case lot, pair, etc) for shipping purposes. The packaging shall be identified by the words MULTI- PACK and the quantity per package.

2.4.5. Documents and other enclosures shall be sealed in a waterproof plastic bag, which shall be permanently affixed to the inside of the shipping container in a conspicuous location. The last line of the package label shall contain the words "DOCUMENTS ENCLOSED"

2.4.6. Where Pull Test Certificates or other required certifications are attached directly to the Part, (versus loose and enclosed), the last line of the package label shall contain the words

"CERTIFICATION ATTACHED."

2.5. PARTS - CONTAINERS: Parts shall be packed in containers meeting ASTM D 3951 and the requirements herein.

2.5.1. Containers with special packing/unpacking instructions shall be stenciled "CAUTION

- THIS ITEM MAY BE SERIOUSLY DAMAGED UNLESS UNPACKING

INSTRUCTIONS ARE FOLLOWED CAREFULLY.” followed by a notation of the location of instructions.

2.5.2. General items:

2.5.2.1. General components weighing less than 70 lbs may be packaged in commercial reinforced cardboard packaging, or its equivalent, or packaged in a skid mounted shipping container. If packaged in a skid mounted shipping container then containers shall be completely enclosed and structurally suitable for stacking at least 2-high. The containers shall be suitable for inside covered stowage.

Containers shall be assembled with screws to permit ease of removal of the cover or lid from the base.

2.5.2.2. Reinforced cardboard packaging shall be sealed but shall be suitable for being opened (without total packaging destruction) for inspection, resealing, and subsequent shipment to the fleet.

2.5.2.3. The reinforced cardboard packaging shall be completely enclosed and suitable for stacking. The packaging shall be suitable for long-term inside storage in a warehouse.

2.5.3. Small items:

2.5.3.1. Small items which can fit into express carrier standard packaging (maximum 17.5 in x 12.5 in x 3 in box. or 38 x 6 x 6 x 6 triangular tube) for shipment with appropriate cushioning may be sealed in clear plastic packaging, or packaged in a commercial reinforced cardboard packaging. If packaged in a cardboard package then the requirement for general packaging applies.

2.5.3.2. Plastic packaging shall be 6 mil thickness and sufficiently clear for part inspection.

Plastic packaging shall have provision for breathing to prevent condensation unless the packaging provides a hermetic seal.

2.6. DURABILITY The contractor shall ensure that all deliverables, when packed in separate shipping containers, shall be capable of being transported on standard transportation systems, commercial or military carriers. The contractor shall preserve, package, and mark the containers to ensure complete delivery at destination without damage or deterioration due to the hazards of shipping, handling or storage.

2.6.1. PARTS - PACKING AND CRIBBING: Restraints, packing and cribbing shall restrain and protect the parts within their packaging from damage during shipment and storage:

2.6.1.1. The internal packaging material shall be sufficient to prevent damage during shipment, handling and storage. Preservation protection shall be sufficient to prevent corrosion, deterioration or decay during warehouse storage for a period of at least one year.

2.6.1.2. Cribbing shall be provided to prevent damage during shipment.

2.6.1.3. Loose fill & Styrofoam packing materials shall not be used.

2.7 MATERIAL INSPECTION AND RECEIVING REPORT At the time of each delivery for supplies under this contract, the contractor shall prepare and furnish to the Coast Guard a properly completed DD Form 250 Material Inspection and Receiving Report or Commercial Bill of Lading.

2.7.1 A packing slip shall be prepared for each box or shipping container. The packaging slip shall include the following information: (1) National Stock Number, (2) Part Number, (3) Nomenclature, (4) Serial Number, (5) Contract Number, (6) Delivery Order Number (if applicable), (7) Line Item Number, and (8) Quantity, (9) Due-In Number.

2.7.1.1 One copy of the packaging slip shall be submitted with the shipment and shall be attached to the outside of the shipping carton inside a waterproof, clear envelope;

2.7.1.2 One copy shall be sent to the Contracting Officer upon shipment and shall be clearly marked “Information Only”;

2.7.1.3 And one copy shall be attached to the original invoice when submitted to the payment office.

2.8 DELIVERY OF REPORTS Evaluations and reports, not otherwise specified, shall be delivered within 15 days of delivery of parts to the Contracting Officer.

File details come from the government source that posted it. Updated .