Attachment 3 Market_Research_RFI_Survey.docx
DOCX document 27 KB Posted
- Attached to
- SOURCES SOUGHT: THIS IS A SOURCES SOUGHT NOTICE FOR INFORMATION AND PLANNING PURPOSES ONLY!
- Solicitation number
- FA500023B0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 4 SCA Wage Determination 15-5681.txt | TXT text file | |
| Attachment 2 Drawings.pdf | ||
| Attachment 1 PWS_9February2023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JBER ALASKA
Deconstruction/Demolition Unaccompanied Housing Buildings: 455,456, 457 and 458
Company Name:
UEI: Cage Code:
Business Size: Please select all that is relevant to NAICS: 238910
| Small Business: | 8(a) Certified – Expiration date: |
| Woman-Owned SB: | Native American Owned: |
Economically Disadvantaged Woman-Owned SB:
Service-Disabled Veteran Owned SB: HUBZone Certified:
Point of Contact:
| Phone: |
| Email: |
Alternate POC:
| Phone: |
| Email: |
Service Description:
Requirement: Demolish/Deconstruct Unaccompanied Housing Buildings: 455,456, 457, and 458 Provide all labor, materials, and equipment necessary to complete the work for the demolition, removal, and/ or disposal of four separate, three-story, wood framed buildings, in accordance with the PWS, the attached specifications, and drawings. The Contractor shall comply with all applicable Federal, State, and Local regulations. Please see attached drawings for approximate dimensions and locations. Contractors shall not rely on drawings and are responsible for field verifying all measurements and locations of utilities to be demolished prior to work start. The Contractor will coordinate with Doyon Utilities, who will be responsible for Utility demolition, for any needed utilities (Water, electric, gas) for demolition purposes.
JBER AK FMS Market Research Request For Industry Information
1) Please indicate the NAICS code you usually claim for demolishing/deconstructing Buildings:
2) Please select all demolishing/deconstructing Buildings service your organization can provide:
3) Please indicate any experience providing demolishing/deconstructing buildings service for different entities:
4) Please list any recent experience providing demolishing/deconstructing buildings service for military, governmental or commercial facilities (please indicate which); be sure to list any contract numbers and point of contact information (Please attach a separate document if necessary):
5) Please use the rating scale below to select the answer that best describes your organization’s knowledge, experience, and qualifications in the following areas (a-k) below:
Expert = Currently performing the task for more than 5 years.
Advanced = Currently performing the task for at least 3 to 5 years.
Intermediate = Have performed the task within the past 3 years for more than 1 year.
Learner = Have some experience performing the task for less than 1 year within the past 3 years.
Apprentice = Have knowledge and qualifications to perform the task but no experience.
Inexperienced = Do not have the knowledge, qualifications, and experience to perform the task
a) Demolishing/deconstructing multiple facilities under one contract:
b) Removing all materials from the demolition site in (100%) compliance with a performance work statement (PWS) and applicable environmental laws and regulations:
c Disposing of material removed from a demolition site in accordance with a PWS and applicable environmental laws and regulations:
d) Providing an accurate inventory of HAZMAT to include type, volume, and location:
e) Performing all site restoration work as described in a PWS:
f) Providing a site-specific safety plan written by a certified safety professional and approved by the Government:
g) Appointing a project manager to serve as the single point-of-contact and liaison between the Contractor and the Government representative for all work under the contract:
h) Performing Hazardous materials/hazardous waste abatement in accordance with PWS and applicable environmental laws and regulations:
i) Coordinating with utilities service providers to shut down utilities that affect demolition/deconstruction facilities:
j) Preparing and submitting all required notifications to Alaska Occupational Safety and Health (AKOSH) and EPA Region 10 consistent with notification requirements for ACM and regulated ACM found in 40 CFR 61 Subpart M:
k) Providing a complete hazardous materials and hazardous waste survey:
File details come from the government source that posted it. Updated .