Attachment 3_Margaret Bay_Report.pdf
PDF 5 MB Posted
- Solicitation number
- 12048924R0030
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a dock inspection report for the Margaret Bay Remote Dock located in the Ketchikan-Misty Ranger District of the Tongass National Forest in Southeast Alaska. The report was prepared by CONSOR Engineers, LLC in October 2020 under contract with the United States Department of Agriculture (USDA) Forest Service. The inspection evaluated the overall condition of the remote dock facility, including the access trestle, gangway, floating main dock, and floating finger dock, and provided detailed findings and repair recommendations. Key issues identified include insufficient dock floatation, damaged dock framing and wale, missing or deteriorated pile guides and mooring hardware, and lack of cathodic protection for the steel pile structures. The report assigns priority repair recommendations, ranging from high priority safety and structural issues to lower priority convenience and aesthetic improvements. This inspection report provides the documented field information to support future rehabilitation and repair design efforts for this remote dock facility.
The related federal contract opportunity is for the Tongass Docks and Marine Infrastructure Repairs project, specifically for the KMRD Remote Dock facilities, which include the Margaret Bay Remote Dock. The purpose is to repair various elements of these three remote dock facilities, including piles, abutments, gangways, mooring hardware, finger docks, and safety upgrades. The work may include piling repair, addressing dock floatation, installing cathodic protection, replacing dock components, installing non-slip surfaces, and improving the fender system. This project is being procured by the USDA Forest Service.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture Remote Dock and Marine Facility Inspections
Southeast Alaska/Tongass National Forest
MATOC Agreement No. 1205G219D005 Task Order No. 12010920F0013
Inspection of Margaret Bay Remote Dock Revillagigedo Island|Ketchikan-Misty Ranger District
Inspection October 6, 2020
United States Department of Agriculture
Remote Dock and Marine Facility Inspections Southeast Alaska/Tongass National Forest
Contract No. 12010920F0013
Inspection of Margaret Bay Remote Dock Revillagigedo Island | Ketchikan-Misty Ranger District
Inspected October 6, 2020
Report Date: September 29, 2021
Joshua Steiner, PE Inspection Leader CONSOR Engineers, LLC
Heath Pope, PE Vice President CONSOR Engineers, LLC
Margaret Bay Remote Dock
TABLE OF CONTENTS
1 Scope of Work and Inspection Procedure
2 Definitions, Rating Criteria, and Terminology
3 Facility Description
4 Inspection Findings
4.1 General Inspection Findings
4.2 Cathodic Protection System
4.3 Access Trestle
4.4 Pin and Hanger System
4.5 Gangway
4.6 Guide Piles
4.7 Pile Guides
4.8 Docks
5 Repair Recommendations
Appendix A Damage Rating Criteria ..................................................................................................... A-1
Appendix B Facility Sketches ................................................................................................................. B-1
Appendix C Photos ................................................................................................................................ C-1
1 SCOPE OF WORK AND INSPECTION PROCEDURE
In October 2020, CONSOR Engineers, LLC performed inspections of 16 Forest Service dock facilities in
Southeast Alaska. These inspections were performed with the assistance of Mott MacDonald and R&M
Engineering for SCJ Alliance, under contract to the United States Department of Agriculture (USDA).
The purpose of these inspections was to document and assess the dock facility's existing condition, develop rehabilitation/repair recommendations, and provide the documented field information for the future rehabilitation/repair engineering design and contractor bidding phases. The services performed included a Repair Design Inspection of the accessible underwater and above water structural elements composing the facilities and preparation of inspection reports summarizing the findings and repair recommendations. All inspections were performed in accordance with ASCE MOP 130: Waterfront
Facilities Inspection and Assessment.
The dock facilities were inspected by a crew of five inspectors, led by a Professional Engineer familiar with inspection of waterfront facilities. The docks were accessed by boat, and the above water inspection was performed using various hand tools, measuring devices, and cameras. The underwater inspection was performed using tethered SCUBA with hardwire communications equipment, using various hand tools, an ultrasonic thickness measuring gauge, bathycorrometer, and cameras.
2 DEFINITIONS, RATING CRITERIA, AND TERMINOLOGY
The conditions of the dock facility and structural systems are rated in accordance with MOP 130 according to the Condition Assessment Rating below. Additionally, the inspected structural elements are assigned damage ratings from Minor to Severe, shown in Appendix A.
CONDITION ASSESSMENT RATINGS
6 – Good No visible damage or only minor damage noted. Structural elements may show very minor deterioration, but no overstressing observed. No repairs are required.
5 – Satisfactory Limited minor to moderate defects or deterioration observed but no overstressing observed. No repairs are required.
4 – Fair All primary structural elements are sound but minor to moderate defects or deterioration observed. Localized areas of moderate to advanced deterioration may be present but do not significantly reduce the load-bearing capacity of the structure.
Repairs are recommended, but the priority of the recommended repairs is low.
3 – Poor Advanced deterioration or overstressing observed on widespread portions of the structure but does not significantly reduce the load-bearing capacity of the structure.
Repairs may need to be carried out with moderate urgency.
2 – Serious Advanced deterioration, overstressing, or breakage may have significantly affected the load-bearing capacity of primary structural components. Local failures are possible and loading restrictions may be necessary. Repairs may need to be carried out on a high-priority basis with urgency.
1 – Critical Very advanced deterioration, overstressing, or breakage has resulted in localized failure(s) of primary structural components. More widespread failures are possible or likely to occur, and load restrictions should be implemented as necessary. Repairs may need to be carried out on a very high-priority basis with strong urgency.
3 FACILITY DESCRIPTION
The facility at Margaret Bay includes a steel pipe pile-supported access trestle, gangway, floating main dock, and floating finger dock.
The floating main dock is a timber frame with plastic coated foam floatation secured by four steel pipe guide piles, rigidly connected at the top with steel pipes of the same dimension. The perimeter of the dock has a timber curb on timber chocks, with various mooring hardware mounted to the curb. The fender system consists of rubber tires attached on all faces of the dock.
The floating finger dock is a timber frame with timber log floatation secured by two steel pipe guide piles. There is no curb present on the dock and the mooring hardware is connected directly to the deck.
The fender system consists of rubber tires attached on the inshore, offshore, and left faces of the dock.
The general layout of the facility is shown below.
Figure 1: General Layout
Access to the dock is provided by a steel gangway connected to the access trestle.
The access trestle is 62 ft long x 6 ft wide with a 42 in. high handrail. The access trestle is supported by four bents, each consisting of two steel pipe piles with a W8x31 steel pile cap. The bents support timber stringers with a timber deck and timber handrail.
The steel gangway is 65 ft long x 63 in. wide with a 42 in. high handrail and top and bottom transition plates. The gangway surface is constructed of metal grating with 30 in. long x 3/4 in. square stock treads on the left half. The gangway is connected to the access trestle by pin and hanger assemblies and supported by the dock with a skid-style landing consisting of steel channels without UHMW (ultra-high molecular weight) material.
The water depths at the site vary from 14.3 ft to 29.5 ft relative to Mean Lower Low Water and are referenced to Tide Station 9450460 Ketchikan, AK.
This facility is typically used by recreational boaters for pedestrian access to the shore. There were six vessels present at the time of inspection, varying from 10 ft to 50 ft in overall length. There were no Forest
Service barges present at the time of inspection.
Drawings and photos are presented in Appendix B: Facility Sketches and Appendix C: Photos, respectively.
4 INSPECTION FINDINGS
4.1 GENERAL INSPECTION FINDINGS
Overall, the facility is in fair condition, primarily due to damage to the floating finger dock wale and insufficient floatation of both the main and finger dock. Detailed inspection findings for the individual structural components are presented below.
4.2 CATHODIC PROTECTION SYSTEM
There was no cathodic protection system observed at the site. Pile thickness and cathodic potential measurements are presented in Section 4.6 Guide Piles.
4.3 ACCESS TRESTLE
The access trestle is in satisfactory condition with limited minor deficiencies described below.
HANDRAIL
No deficiencies were observed on the timber handrail at the time of inspection. There is more than 4 in.
of clear space between intermediate rails.
DECK
No deficiencies were observed on the timber deck planks at the time of inspection. The timber decking has minor algae growth on the bottom.
FRAMING
The trestle framing exhibits minor rot and algae growth on the bottom of the stringers.
STEEL PILE CAPS
No deficiencies were observed at the time of inspection.
STEEL PIPE PILES AND TIMBER BRACING
The piles exhibited minor surface corrosion. The offshore pile bent has timber cross braces with no observed deficiencies at the time of inspection.
4.4 PIN AND HANGER SYSTEM
The pin and hanger system is in satisfactory condition with minor surface corrosion. There is no redundant safety system.
4.5 GANGWAY
The gangway, including the top and bottom transition plates, is in satisfactory condition. There is no
UHMW material on the gangway landing skid plates and there is more than 4 in. of clear space between the intermediate rails.
4.6 GUIDE PILES
The guide piles are in satisfactory condition with no significant deficiencies noted at the time of inspection. The trestle piles are 12.9 in. diameter and 1/2 in. thick, and the dock piles are 16.2 in. diameter and 1/2 in. thick. All piles exhibit surface corrosion with minor section loss. The piles at trestle Bents 1 and
2 are dry at low tide. Thickness measurements are provided in the table below (10% of piles were required to be measured).
Table 1: Pile Section Loss
Pile ø
(in.)
Material
Steel Thickness (in.) Section Loss (in.2)
Original Waterline Midheight Mudline Original
Area Remaining
Area % Section
Loss
4L (Trestle)
12.9 Steel 0.500 0.498 0.498 0.500 19.5 19.4 0.4%
6 (Dock) 16.2 Steel 0.500 0.488 0.490 0.498 24.7 24.1 2.5%
The cathodic potential readings were normal for bare carbon steel in seawater without cathodic protection. Cathodic potential readings are presented in the table below (10% of piles were required to be measured).
Table 2: Cathodic Potential Readings
Pile ø (in.) Material Cathodic Potential Readings (mV)
Waterline Midheight Mudline Average
4L (Trestle) 12.9 Steel -741 -730 -730 -734
6 (Dock) 16.2 Steel -638 -660 -662 -653
4.7 PILE GUIDES
The pile guides are in fair condition. Three of the pile guides on the main dock have missing or detached
UHMW material. The pile guides on the finger dock are too large and have no UHMW material, resulting in the dock rubbing on the pile causing abrasion of the timber.
4.8 DOCKS
The docks are in fair condition, primarily due to damage to the floating finger dock wale and insufficient floatation of both the main and finger dock. All underwater portions of the docks exhibited heavy marine growth.
The transition plate between the main dock and finger dock consists of a steel plate connected to the finger dock with two hinges. One of the hinge connections has failed and the other connection is loose.
4.8.1 Main Dock
FLOATS
The float material is plastic encased foam and is located uniformly throughout the footprint of the float.
The freeboard of the float varies from 9.5 in. to 14 in. resulting in a non-level deck surface that is typically lower at the gangway landing.
FRAMING
No deficiencies were observed at the time of inspection. The configuration of the framing system is shown in the drawings in Appendix B.
DECKING
The decking consists of 11.5 in. x 3 in. timber planks. There are three burn holes in the deck up to 7 in. x 7
in. x 3 in. deep. The deck has vegetation and algae growth concentrated around the pile guides, corners, and edges of the float. There is a T-shaped strip of composite walking surface leading from the gangway landing to the offshore face.
CURB
The curb consists of 6 in. x 6 in. timbers supported on chocks of the same dimensions spaced at varying intervals. The curbs have minor deterioration and one 4 ft long broken section.
MOORING HARDWARE
The mooring hardware consists of various sized cleats connected to the curb. There are nine loose cleats and three missing or broken cleats.
FENDER SYSTEM
There are intermittently placed tires around the perimeter of the dock with an 8 ft section of missing tires.
4.8.2 Finger Dock
FLOATS
The float material is 12 in. diameter logs. The freeboard of the float varies from 5 in. to 15 in resulting in a non-level deck surface and is typically lower at the left end.
FRAMING
The timber framing system exhibits heavy marine growth and the inshore wale is cut in two locations to fit the pile guides. The configuration of the framing system is shown in the drawings in Appendix B.
DECKING
The decking consists of 11.5 in. x 1.5 in. timber planks with minor deterioration due to vegetation and algae throughout. There are two deck planks that are unsupported by the frame in one location. The pile guides are too large for the piles and the deck and framing has been cut to fit the guides. Due to the overly large guides, the left guide pile rubs on the dock and has abraded some of the decking and loosened a cleat. The offshore left corner of the finger dock has asphalt roofing shingles overlaying the deck planks.
CURB
No curb is present on the finger dock.
MOORING HARDWARE
The mooring hardware consists of 8 in. cleats connected to the timber deck planks. There are eight loose cleats and three missing or broken cleats.
FENDER SYSTEM
There are intermittently placed tires on the left, offshore, and half the inshore face of the dock.
4.9 SAFETY LADDER
There is no safety ladder present at the site presenting a hazard in the event of a fall.
5 REPAIR RECOMMENDATIONS
The following table summarizes the repair recommendations for this facility.
Table 3: Priority Repair Recommendations
Structure Element Location Quantity Defect Repair Priority Comments
Dock Safety Ladder Above Water 1 EA No safety ladder present Install safety ladder 1-High Safety - Provide safe emergency egress from water
Finger Dock Framing Above Water 20 LF Cut wales at guide piles Replace 3x12 wales after replacing pile guides.
1-High Structural - Restore orignal capacity
Finger Dock Pile Guides Above Water 2 EA Incorrectly sized pile guides Replace pile guides with appropriately sized guides with UHMW.
1-High Structural – Reduce deterioration rate
Finger Dock Floatation Modules
Below Water 1 LS Insufficient floatation resulting in uneven freeboard
Install additional floatation on left side to provide consistent 14 in. freeboard of the floating dock.
1-High Structural – Provide consistent freeboard of dock
Gangway Gangway Skids
Above Water 24 LF Missing UHMW skid material Install UMHW material at gangway landing
1-High Structural – Reduce deterioration rate
Gangway Pin and Hanger
Above Water 2 EA No redundant gangway support system Install redundant safety system 1-High Safety – Provide a redundant anchorage point for the gangway
Main Dock Floatation Modules
Below Water 1 LS Insufficient floatation resulting in uneven freeboard
Install additional floatation on inshore side to provide consistent 14 in.
freeboard of the floating dock.
1-High Structural – Provide consistent freeboard of dock
Main Dock Pile Guides Above Water 3 EA Loose UMHW at Piles 3 and 4, missing UMHW section at Pile 5
Secure loose UMHW and replace missing UMHW
1-High Structural – Reduce deterioration rate
Finger Dock Mooring Hardware
Above Water 12 EA (8) 8 in. loose cleats and (3) 8 in.
missing cleats
Remove and stockpile cleats. Install (6) 8 in. cleats (12 total) on offshore and inshore faces on new curb
2-Med Convenience – Provide secure mooring
Finger Dock Curb Above Water 150 LF No curb Install 6x6 composite curb. 2-Med Convenience/Safety - Provide safe mooring and berthing
Main Dock Mooring Hardware
Above Water 12 EA (4) 12 in., (5) 10 in. loose cleats and (3) 10 in. missing cleats
Remove and stockpile cleats. Install (4) 12 in. cleats on offshore face and (4) 10
in. cleats (8 total) on left and right faces on new curb
2-Med Convenience – Provide secure mooring
Main Dock Curb Above Water 165 LF Deteriorated timber curb Remove 6x6 timber curb and replace with 6x6 composite curb.
2-Med Structural – Reduce deterioration rate
Main/Finger Docks
Pile Corrosion Protection
Below Water 6 Piles No corrosion protection system Provide sacrificial anode cathodic protection system
2-Med Estimated min. mudline depth 14.3 ft
Main/Finger Docks
Decking Above Water 2400 SF Slick deck with isolated deterioration Install non-slip composite decking surface.
2-Med Structural/Safety– Reduce deterioration rate and mitigate slip hazard
Trestle Pile Corrosion Protection
Above/Below Water
6 Piles Minor corrosion of piles Clean and paint Bent 2 trestle piles with zinc-rich paint. Provide sacrificial anode cathodic protection system for piles at Bents 3 and 4
2-Med Structural – Reduce corrosion rate
Main/Finger Docks
Dock Transition Plate
Above Water 2 EA Loose connection hardware Replace loose connection hardware. 3-Low Safety - Mitigate trip/fall hazard
Main/Finger Docks
Fender System
Waterline 170 LF Tire-only fender system with 2 missing tires
Remove tires and install rubber D fender system along left, right, and offshore faces of main dock and finger dock.
3-Low Convenience/Safety - Provide safe mooring and berthing
Gangway Handrails Above Water 520 LF Rails do not meet IBC/ADA Standards Install intermediate rails to provide a maximum clear spacing of 4 in.
4-Option Safety – Mitigate fall hazard
Trestle Handrails Above Water 250 LF Rails do not meet IBC/ADA Standards Install intermediate rails to provide a maximum clear spacing of 4 in.
4-Option Safety – Mitigate fall hazard
A-1
Appendix A Damage Rating Criteria
A-2
Source: ASCE MOP 130 Waterfront Facilities Inspection and Assessment.
A-3
Source: ASCE MOP 130 Waterfront Facilities Inspection and Assessment
A-4
A-5
A-6
A-7
Source: POLATRAK CP Gun Operation Manual
B-1
Appendix B Facility Sketches
Dock: Margaret Bay Island: Revillagigedo Ranger District: Ketchikan-Misty Inspection Date: October 6, 2020
UNITED STATES DEPARTMENT OF AGRICULTURE
REMOTE DOCK AND MARINE FACILITY INSPECTIONS
Southeast Alaska/Tongass National Forest Contract No. 12010920F0013
11.5"x1.5" DECK
PLANKS (TYP)
16.2" Ø x 0.5" W.T. STL
PIPE PILE
DWG 1 General Layout - Dock
PILE 1
X.X" X.X'
10.0" 16.7'
14.0" 27.2'
Water depth is presented relative to MLLW based on Tide Station 9450460 Ketchikan, AK
ACCESS TRESTLE
30" x 3 4" STOCK
TREADS @ 16" O.C.
A
FREEBOARD (INCHES)
DEPTH (FEET)
CLEAT
GANGWAY
GANGWAY
CROSS BRACE
MUDLINE
HANDRAIL
PILE CAP (TYP)
11.5"x2.75" DECK
PLANKS (TYP)
W 8x31 PILE CAP (TYP)
65' GANGWAY
6'
20' (TYP)
14.0" 29.5'
13.0" 19.8'
15.0" 21.3'
9.5" 17.0'
5.0" 14.9'
11.5"x3" DECK PLANKS (TYP)
36'-6"
48'-6"
10'
26'-9"
27'-9"
6'
21'-6"
18'
60'-6"
9.5" 14.3'
STEEL GANGWAY
L
R
2 134
PILE 2
PILE 3
PILE 4
PILE 6
PILE 5
16.2" Ø x 0.5" W.T. STL
PIPE PILE
12.9" Ø x 0.5" W.T.
STL PIPE PILE
12.9" Ø x 0.5"
W.T. STL
PIPE PILE
16"x16"x1
2" STL
PLATE (TYP)
62' ACCESS TRESTLE
WATERLINE (VARIES)
DECK PLANKS
2 134
62' ACCESS TRESTLE
5'-3"
6"x12" TIMBER STRINGERS
RUBBER TIRE (TYP)
PILE TOP BRACING
B
STEEL GRATE
TIMBER CROSS BRACE
3'-6"
PIN AND
HANGER
PIN AND
HANGER
PIN AND
HANGER
PILE CAP
6"x6" TIMBER
CURB (TYP)
TRANSITION
PLATE
TRANSITION
PLATE
TRANSITION PLATE
24' 21'
11'
10" CLEAT
12" CLEAT
10" CLEAT
8" CLEAT (TYP)
DOCK GENERAL PLAN
0 5' 10'
SCALE: 3/32"=1'-0" OFFSHORE INSHORE
TRESTLE ELEVATION
0 8' 16'
SCALE: 1/16"=1'-0" OFFSHORE INSHORE
TRESTLE GENERAL PLAN
0 8' 16'
SCALE: 1/16"=1'-0" OFFSHORE INSHORE
1.00"0.50"
7.50"
2.00"
3.00"
6.50"
1.00"
1.00"
2.50"
2.50"
ACCESS TRESTLEGANGWAY
DECK PLANK
1/2" THICK
ANCHOR PLATE
3/4" THICK HANGER
7/8" Ø x 6" LONG PIN
7/8" Ø x 6" LONG PIN
HANGER
1/2" THICK
ANCHOR PLATE
2.75"
0.75"
3.50"
2.50"
ACCESS TRESTLEGANGWAY
6.00"
Dock: Margaret Bay Island: Revillagigedo Ranger District: Ketchikan-Misty Inspection Date: October 6, 2020
UNITED STATES DEPARTMENT OF AGRICULTURE
REMOTE DOCK AND MARINE FACILITY INSPECTIONS
Southeast Alaska/Tongass National Forest Contract No. 12010920F0013
11.5"x2.75" DECK BOARDS (TYP)
DWG 2 Sections and Details
W 8x31 PILE CAP (TYP)
12.9" Ø x 0.5" W.T.
STL PIPE PILE
2.5"x9.25" TIMBER
CROSS BRACE
MUDLINE (VARIES)
8'-6" (TYP)
16.2" Ø x 0.5" W.T. STL
PIPE PILE (BEYOND)
48'-6"
2'-8"
11.5"x3" DECK PLANKS
3"x18" TIMBER @ 28" O.C.
9"x6" TIMBER (TYP)
16.2" Ø x 0.5" W.T. STL
PIPE PILE (BEYOND)
11.5"x1.5" DECK PLANKS
60'-6"
18' 27'-9"
6"x12" TIMBER (TYP)
4.25"x12" TIMBER (TYP)
12" Ø TIMBER @ 3' O.C.
8"x12" TIMBER
4' (TYP)
12"x12" TIMBER
VARIESVARIES
6"x12" TIMBER STRINGERS
3'-6"
6"x12" TIMBER STRINGER
(AT PILE CAP ONLY)
2"x6" TIMBER RAIL 4"x4" TIMBER HANDRAIL POST @ 3' O.C.
4'-6"
16"x16"x1
2" STL PLATE (TYP)
6'
PIN AND HANGER ELEVATION
11.5"x2.75" DECK BOARDS (TYP)
W 8x31 PILE CAP (TYP)
12.9" Ø x 0.5" W.T.
STL PIPE PILE
MUDLINE (VARIES)
6"x12" TIMBER STRINGERS
3'-6"
6"x12" TIMBER STRINGER
(AT PILE CAP ONLY)
2"x6" TIMBER RAIL
4"x4" TIMBER HANDRAIL POST @ 3' O.C.
4'-6"
16"x16"x1
2" STL PLATE (TYP)
6'
12'
MAIN DOCK CROSS SECTION A-A
0 4' 8'
SCALE: 1/8"=1'-0"
FINGER DOCK CROSS SECTION B-B
0 4' 8'
SCALE: 1/8"=1'-0" LEFT RIGHT
TRESTLE BENT 4 CROSS SECTION
LEFT RIGHTSCALE: 3/16"=1'-0"
0' 1' 2' 4' 6'
TRESTLE BENTS 1-3 CROSS SECTION
LEFT RIGHTSCALE: 3/16"=1'-0"
0' 1' 2' 4' 6'
0 3" 6"
SCALE: 3"=1'-0" OFFSHORE INSHORE
OFFSHORE INSHORE
PIN AND HANGER PLAN
0 3" 6"
SCALE: 3"=1'-0" OFFSHORE INSHORE
Dock: Margaret Bay Island: Revillagigedo Ranger District: Ketchikan-Misty Inspection Date: October 6, 2020
UNITED STATES DEPARTMENT OF AGRICULTURE
REMOTE DOCK AND MARINE FACILITY INSPECTIONS
Southeast Alaska/Tongass National Forest Contract No. 12010920F0013
DWG 3 Deficiency Plan
PILE 1
ACCESS TRESTLE
GANGWAY
MUDLINE
65' GANGWAY
20' (TYP)
STEEL GANGWAY
L
R
2 134
PILE 2
PILE 3
PILE 4
PILE 6
PILE 5
12.9" Ø x 0.5" W.T.
STL PIPE PILE
62' ACCESS TRESTLE
WATERLINE (VARIES)
2 134
62' ACCESS TRESTLE
PIN AND HANGER WITHOUT
REDUNDANT SAFETY SYSTEM
PIN AND
HANGER
PILE CAP
MISSING UHMW
BROKEN TRANSITION
PLATE CONNECTIONS
TRANSITION PLATE
TYPICAL DEFICIENCIES
1. Access trestle has minor rot and algae growth on bottom of stringers and deck planks.
2. All steel piles exhibit minor corrosion below the waterline.
3. Timber decking on both docks is deteriorated with vegetation and algae growth.
CUT WALE AND ABRADED DECK
CUT WALE AND DECK
BURN
HOLES
MISSING UHMW
MISSING UHMW
MISSING UHMW
MISSING TIRES
BROKEN CURB
BURN
HOLE
GREATER THAN 4" CLEAR SPACING
BETWEEN INTERMEDIATE RAILS
PIN AND HANGER WITHOUT
REDUNDANT SAFETY SYSTEM
PILE GUIDE IS TOO LARGE
AND HAS NO UHMW
PILE GUIDE IS TOO LARGE
AND HAS NO UHMW
LOW FREEBOARD DUE TO
INSUFFICIENT FLOATATION
MINOR DETERIORATION
OF CURB (TYP)
UNSUPPORTED DECK PLANKS
MISSING CLEAT
(TYP)
LOOSE CLEAT
(TYP)
DOCK DEFICIENCY PLAN
0 5' 10'
SCALE: 3/32"=1'-0" OFFSHORE INSHORE
TRESTLE DEFICIENCY ELEVATION
0 8' 16'
SCALE: 1/16"=1'-0" OFFSHORE INSHORE
TRESTLE DEFICIENCY PLAN
0 8' 16'
SCALE: 1/16"=1'-0" OFFSHORE INSHORE
C-1
Appendix C Photos
C-2
Photo 1: General view of the facility.
Photo 2: General view of access trestle and gangway.
C-3
Photo 3: Typical access trestle bent configuration.
Photo 4: General view of trestle framing. Note minor algae growth.
C-4
Photo 5: General view of the end of access trestle and gangway.
Photo 6: General view of the pin and hanger assembly.
C-5
Photo 7: View of gangway landing. Note there is no UMHW material installed.
Photo 8: General view of the main dock.
C-6
Photo 9: Typical main dock pile guide. Note the missing UMHW material.
Photo 10: Partially broken curb.
C-7
Photo 11: Burn holes in deck.
Photo 12: Missing tires on main dock.
C-8
Photo 13: Transition plate between main dock and finger dock. Note the detached and loose connections.
Photo 14: General view of the finger dock. Note cut wale for pile and vegetation growth in deck.
C-9
Photo 15: Low freeboard on the finger dock.
Photo 16: Typical pile condition underwater with no significant damage.
| 2021-09-30T10:49:46-0500 | |