This document is a material submittal schedule for a federal contract to replace two generators at a military base. The schedule outlines eleven required submittals including hazardous material questionnaires and safety data sheets due five days prior to start date, recycling and landfill reports due at end of contract, manufacturer and contractor warranties due at end of contract, and operation and maintenance manuals due at project closeout. It also specifies that submittals for generator equipment, an automatic transfer switch, and miscellaneous materials like conduit and wire are due ten days after notice to proceed. The contract is identified as MAHG221080 under solicitation number FA301023R0034 between the Department of the Air Force Air Education and Training Command and an undisclosed contractor.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre Bid Site Visit Attendance Sheet.pdf | ||
| Attachment 1 MAHG221080 Replace 2 AF Generator SOW 20230530.pdf | ||
| Attachment 5 MAHG221080 Wage Det MS2023050 20230602.pdf | ||
| Solicitation - FA301023R0034.pdf | ||
| Attachment 7 MAHG221080 Past Performance Questionnaire.pdf | ||
| Attachment 4 MAHG 221080 Submittal Procedures.pdf | ||
| Attachment 2 MAHG221080 Replace 2 AF Generator Drawings 20230518.pdf | ||
| Attachment 6 MAHG221080 Past Performance Reference List.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittal Schedule
| Project Number: MAHG221080 | Project: Replace 2 AF Generator @ B2804 | Solicitation / Contract Number: | |||||||||||||||
| Line Number | (To Be Completed by Project Engineer) | (To Be Completed by Contract Administrator) | |||||||||||||||
| Number of Copies Required (If Not Electronically Submitted) | Remarks | ||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Warranty-Manufacturer and/or Workmanship | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date |
fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
Submittal Numbers fergusog: Enter the Submittal Number
| Date Contractor | ||
| Notified | Contractor Resubmittal |
fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date
(MM/DD/YY)
Approved fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
| 1 | HazMat Questionnaire | 1 | 5 Days Prior to Start Date | ||||||
| 2 | HazMat MSDS | 1 | 5 Days Prior to Start Date | ||||||
| 3 | Hazmat Reporting Entry Form | 1 | 5 Days Prior to Start Date | ||||||
| 4 | Hazmat Reporting Entry Form | 1 | End of Contract | ||||||
| 5 | Recycling and Landfill Report | 1 | End of Contract | ||||||
| 6 | Warranty (Manufacturer's) | 1 | End of Contract | ||||||
| 7 | 1-Year Warranty (Contractor) | 1 | End of Contract | ||||||
| 8 | Miscellanous Material conduit/wire | 1 | 10 Days after NTP | ||||||
| 9 | Level 2 Enclosure | 1 | 10 Days after NTP | ||||||
| 10 | Generator | 1 | 2 | 1 | 1 | 10 days after NTP | |||
| 11 | ATS | 1 | 2 | 1 | 1 | 10 days after NTP | |||
| 12 | O&M Manuals | 2 | 2 | 2 | 2 | 2 | Project Closeout | 2 hard copy binders and 2 electronic copies | |
| 13 | |||||||||
| 14 | |||||||||
| 15 | |||||||||
| 16 | |||||||||
| 17 | |||||||||
| 18 | |||||||||
| 19 | |||||||||
| 20 | |||||||||
| 21 | |||||||||
| 22 | |||||||||
| 23 | |||||||||
| 24 | |||||||||
| 25 |