Attachment_3_-_Example_Bid_Format.pdf
PDF 536 KB Posted
- Attached to
- CEDAR RAPIDS MONITORING WELL DRILLING
- Solicitation number
- 140G0223Q0109
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
item Description / Item Unit Unit price # of units total price Unit
Unit price
# of units total price
1 Mobilization / demobil ization job 1 job 1 2 Util ity Clearance (1-Call / J.U.L.I.E) job 1 job 1 3 support vehicle 4 travel , per-diem
4-in Monitoring Well Installation (4 at ~9 ft, 3 at ~19ft)
9 Boring / dri l ling foot 93 foot 93
Assuming 9 and 19 ft depths *note depths are +- 2 feet
10 Well installation
Continuous soil core (each of 3 deep wells to ~19 ft) method determined by contractor
Materials / Supplies
4-in x 2 ft SH40 #10 slot flush thread PVC well screen each 1 each
16 4" x 5 ft SH 40 flush thread PVC riser each each
17 4" x 10 ft SH 40 flush thread PVC riser each 7 each 18 4" PVC flush thread bottom plug each each 19 4" expandable top plug / cap each each 20 Bentonite chips Bag Bag
Lockable Protective cover (minimum 6" diameter 5 ft long) each each
Concrete (1 ft radius pad around protective casing)
Total
Hollow Stem Auger Direct Push
Example Bid format. Contractor may provide estimates for either Hollow Stem Auger, Direct Push, or both.
Direct Push is the preferred method but Hollow Stem Auger is also acceptable.