Attachment 3 - DwgMarkup-16PersonBarracksFawnHall(1986.3.3).pdf
PDF 1 MB Posted
- Attached to
- Phase 2 - 0412 GAOA 4FL Forest Housing Deferred Maintenance Federal contract opportunity
- Solicitation number
- 1240LT24R0064
- Issued by
- Department of Agriculture Forest Service
About this file
This document appears to be an attachment (Attachment 3) to a federal contract opportunity. The attachment contains detailed drawings and markups related to the renovation and upgrade of a 16-person barracks facility called Fawn Hall, which is part of the Phase 2 - 0412 GAOA 4FL Forest Housing Deferred Maintenance project for the United States Forest Service.
The key details from the drawings include the installation of new HVAC systems, plumbing upgrades, replacement of windows and roofing, insulation improvements, and removal of existing heating and water heater equipment. The contract opportunity is a 100% Small Business Set-Aside solicitation with a site visit scheduled for August 27, 2024 at 12:00 PM Mountain Time. The project is located on the Payette National Forest in Valley County, Idaho.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 4 - DwgMarkup-DaycareConst(1990).pdf | ||
| Attachment 7 - Wage Determination ID202240036.pdf | ||
| Attachment 5 - DwgMarkup-McCallFamilyHousing(1986).pdf | ||
| 1240LT240064 SF1442 Phase 2 4FL Forest Housing Deferred Maintenance.pdf | ||
| Attachment 6 - DwgMarkup-PVBunkhsesPartial(2001.5).pdf | ||
| Attachment 2 - Statement of Work (SOW).pdf | ||
| Attachment 1 - Schedule of Items (SOI).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BrianG Rectangle
BrianG Rectangle
BrianG Rectangle
BrianG Rectangle
BrianG Callout
105 CFM
BrianG Rectangle
BrianG PolyLine
BrianG PolyLine
BrianG Callout
FLOOR GRILLE TYPICAL
BrianG Callout
105 CFM
BrianG Rectangle
BrianG PolyLine
BrianG PolyLine
BrianG Callout
105 CFM
BrianG Rectangle
BrianG PolyLine
BrianG PolyLine
BrianG Callout
105 CFM
BrianG Rectangle
BrianG PolyLine
BrianG PolyLine
BrianG Callout
130 CFM
BrianG Rectangle
BrianG PolyLine
BrianG PolyLine
BrianG Callout
125 CFM
BrianG Rectangle
BrianG PolyLine
BrianG PolyLine
BrianG Callout
125 CFM
BrianG Rectangle
BrianG PolyLine
BrianG PolyLine
BrianG Callout
125 CFM
BrianG Rectangle
BrianG PolyLine
BrianG PolyLine
BrianG Text Box T
BrianG Ellipse
BrianG Text Box T
BrianG Ellipse
BrianG PolyLine
BrianG PolyLine
BrianG PolyLine
BrianG PolyLine
BrianG PolyLine
BrianG PolyLine
BrianG PolyLine
BrianG PolyLine
BrianG Arrow
BrianG PolyLine
BrianG PolyLine
BrianG Callout INSTALL 14"x12" LOUVER HIGH ON WALL & DUCT TO HP IDU RETURN
BrianG Arrow
BrianG Callout FRAME 14"x12" LOUVER HIGH ON WALL & DUCT TO HP IDU RETURN
BrianG Rectangle
BrianG PolyLine
BrianG PolyLine
BrianG Rectangle
BrianG PolyLine
BrianG PolyLine
BrianG Rectangle
BrianG PolyLine
BrianG PolyLine
BrianG Rectangle
BrianG PolyLine
BrianG PolyLine
BrianG Rectangle
BrianG PolyLine
BrianG PolyLine
BrianG Rectangle
BrianG PolyLine
BrianG PolyLine
BrianG Rectangle
BrianG PolyLine
BrianG PolyLine
BrianG Callout
215 CFM
BrianG Callout
215 CFM
BrianG Callout
215 CFM
BrianG Callout
215 CFM
BrianG Callout
215 CFM
BrianG Callout
215 CFM
BrianG Callout
215 CFM
BrianG Callout
5 TON DUCTED HEAT PUMP IDU VERTICAL AHU W/ 13 KW SUPPLEMENTAL ELECTRIC HEAT
BrianG Callout
5 TON DUCTED HEAT PUMP ODU W/ 42,950 BTU/HR HEAT
BrianG Callout
3 TON DUCTED HEAT PUMP ODU W/
25,420 BTU/HR HEAT
BrianG PolyLine
BrianG PolyLine
BrianG PolyLine
BrianG PolyLine
BrianG PolyLine
BrianG Callout
10" Ø TYP-5
BrianG Callout 12" Ø
BrianG Callout 14" Ø
BrianG Callout 14" Ø
BrianG Callout 10" Ø
BrianG Callout 8" Ø
BrianG Callout 8" Ø
BrianG Callout 8" Ø
BrianG Callout 8" Ø
BrianG Callout 12" Ø
BrianG Callout 12" Ø
BrianG Callout 8" Ø
BrianG Callout 10" Ø
BrianG Callout 10" Ø
BrianG Callout 12" Ø
BrianG PolyLine
BrianG PolyLine
BrianG Rectangle
BrianG PolyLine
BrianG PolyLine
BrianG Callout
10" Ø TYP-2
BrianG Callout 12" Ø
BrianG Callout INSTALL 14"x12" TRANSFER LOUVER HIGH ON WALL
BrianG Rectangle
BrianG Callout
ROUTE ALL SUPPLY DUCTWORK IN CRAWLSPACE BELOW FLOOR (TYP)
BrianG Rectangle
BrianG PolyLine
BrianG PolyLine
BrianG PolyLine
BrianG Callout 6" Ø
BrianG Callout
50 CFM
BrianG Rectangle
BrianG PolyLine
BrianG PolyLine
BrianG Callout
140 CFM
BrianG PolyLine
BrianG Callout 8" Ø
BrianG Callout 10" Ø
BrianG Callout
3 TON DUCTED HEAT PUMP IDU VERTICAL AHU W/ 8 KW SUPPLEMENTAL ELECTRIC HEAT
BrianG Callout
2 KW ELECTRIC BASEBOARD HEATER
BrianG Rectangle
BrianG Callout
1 KW ELECTRIC BASEBOARD HEATER
BrianG Rectangle
BrianG Rectangle
BrianG PolyLine
BrianG Rectangle
BrianG PolyLine samuelpthompson Rectangle samuelpthompson Polygonal Line samuelpthompson Line samuelpthompson Callout Remove 80 gallon propane tank water heater and direct vent, remove propane lines back to tee, reroute water lines to feed on-demand water heaters in bathrooms, patch exterior wall including adding insulation in wall cavity.
samuelpthompson
Remove existing metal roofing & felt paper, install ice/water shield & standing seam metal roof w/ trim.
samuelpthompson Line samuelpthompson Line samuelpthompson Line samuelpthompson Rectangle samuelpthompson Callout Utilize this detail and additional detail on page 5 for construction of porch on west side of daycare with the following landing dimensions: 4'-0" width x 5'-0" depth.
samuelpthompson Callout Replace all existing aluminum windows throughout building w/ new fiberglass windows. Replace trim as necessary, matching the existing.
samuelpthompson Line samuelpthompson Callout 5'-0" samuelpthompson Rectangle samuelpthompson Polygonal Line samuelpthompson Rectangle samuelpthompson Polygonal Line samuelpthompson Rectangle samuelpthompson Polygonal Line samuelpthompson
Embed 2"x2" plate w/ j-hook as shown on either side of the landing and stairs.
Install additional blown-in cellulose insulation to achieve R-60 value samuelpthompson Line samuelpthompson Callout Spray foam insulation (4-inches) on rim joists samuelpthompson Line samuelpthompson Line samuelpthompson
Spray foam insulation (4-inches) on rim joists
Install spray foam insulation on rim joists (4-inches) samuelpthompson Callout Install spray foam insulation on rim joists (4-inches) samuelpthompson Callout Install spray foam insulation on rim joists (4-inches) samuelpthompson Callout Utilize this detail and additional detail on page 3 for construction of porch on west side of daycare.
samuelpthompson Rectangle samuelpthompson Callout Install additional blown-in cellulose insulation to achieve R-60 samuelpthompson
Install additional blown-in cellulose insulation to achieve R-60 samuelpthompson
Replace existing aluminum windows w/ new fiberglass windows
Remove existing insulation & install 8-inches of poly iso rigid foam board on attic access samuelpthompson Callout Remove existing insulation and install 8-inches of poly iso rigid foam board on attic access
Line
Remove existing on-demand water heaters & install (2) new 180k BTU/h on-demand water heaters in series w/ community venting through gable wall as specified by the manufacturer. Replumb waterlines and propane lines w/ associated shutoff valves.
samuelpthompson Callout Remove existing on-demand water heater, replace w/ new 150k BTU/h on-demand water heater w/ community venting through gable wall as specified by the manufacturer. Replumb waterlines and propane lines w/ associated shutoff valves.
samuelpthompson Line samuelpthompson Line samuelpthompson Line samuelpthompson Callout Patch drywall and repaint to match existing.
samuelpthompson Callout Patch drywall and repaint to match existing.
Line samuelpthompson Callout Replumb waterline to accept on-demand water heater samuelpthompson
Replumb waterlines to accept on-demand water heaters in series.
Remove all ceiling panel heaters throughout building, cover j-boxes, disconnect and remove circuit breakers, provide filler plates, and update panel schedule.
samuelpthompson Line samuelpthompson Line samuelpthompson Line samuelpthompson Line samuelpthompson Rectangle samuelpthompson
Remove all ceiling heat panels within building.
samuelpthompson
Remove circuit breakers. Spaces to be repurposed for circuits required for 5-ton and 3-ton heat pump systems as dictated by the manufacturer. Provide filler plates and relabel panel schedule.