Attachment 3 Drawings.pdf
PDF 14 MB Posted
- Attached to
- Upgrade Phase III Chiller - Athens, GA Federal contract opportunity
- Solicitation number
- 1232SA25R0014
About this file
These engineering design drawings detail a Phase 3 Chiller Upgrade project for the USDA Agricultural Research Service at the Richard B. Russell Agricultural Research Center located at 950 College Station Road in Athens, Georgia. The comprehensive set of 17 architectural and engineering drawings includes mechanical, electrical, and demolition plans for replacing an existing 500-ton chiller (CH-1) with a new water-cooled centrifugal chiller. The drawings specify technical requirements for removing existing equipment, installing new chiller and pump systems, modifying electrical infrastructure, and upgrading plant controls, with specific details on piping, electrical connections, equipment schedules, and system integration.
Key technical specifications include installing a new 900-ton water-cooled centrifugal chiller (CH-1), a new chilled water pump (CHWP-1), 12-inch condenser water piping, 10-inch chilled water piping, and updating the electrical system with a new tap box and power connections. The design incorporates variable primary flow configuration, direct digital controls, and includes provisions for chiller staging, pump control, and integrated monitoring systems. The project involves precise demolition of existing infrastructure, new equipment installation, and comprehensive mechanical and electrical system upgrades to improve the facility's cooling capabilities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COR
REVISIONS
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
ADMIN OFFICER
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
T:
\2
Pr oj ec ts
\5
4- M
U
SD
A Ph as e
C hi lle r U pg ra de s
- A th en s G
A\
W or ki ng
F ol de r\T
-1
.d w g A pr
5,
- 9 :2
2a m
EPM
TEL
5624-M
R. SANDERS
C. GILMAN
E. JONES 4/25/25
Agricultural
Service Research
USDA ARS SOUTHEAST AREA
141 EXPERIMENT STATION ROAD
STONEVILLE MS 38776
PHASE 3 CHILLER UPGRADE USNPRC
RICHARD B. RUSSELL AGRICULTURAL RESEARCH CENTER (RRC)
950 COLLEGE STATION ROAD, ATHENS, GA 30605
JGM
M. SCOTT
T-101
TITLE SHEET
INDEX OF DRAWINGS
SHEET NO. DRAWING NO. TITLE
T-101 1 OF 17 TITLE SHEET
AD101 2 OF 17 DEMOLITION FLOOR PLAN
A-101 3 OF 17 FLOOR PLAN
A-102 4 OF 17 DETAILS
M-001 5 OF 17 MECHANICAL LEGEND
MD101 6 OF 17 MECHANICAL DEMOLITION PLAN
MD501 7 OF 17 MECHANICAL DEMOLITION DETAILS
MD502 8 OF 17 MECHANICAL DEMOLITION DETAILS
M-101 9 OF 17 MECHANICAL PLAN
M-501 10 OF 17 MECHANICAL DETAILS
M-502 11 OF 17 MECHANICAL DETAILS
M-601 12 OF 17 MECHANICAL EQUIPMENT SCHEDULES
M-701 13 OF 17 CHILLER PLANT CONTROLS
E-001 14 OF 17 ELECTRICAL LEGEND
ED101 15 OF 17 ELECTRICAL DEMOLITION
E-101 16 OF 17 ELECTRICAL FLOOR PLAN
E-501 17 OF 17 ELECTRICAL DETAILS AND SCHEDULES
USDA
LOCATION MAPVICINITY MAP
U.S. DEPARTMENT OF AGRICULTURE
AGRICULTURAL RESEARCH SERVICE
UPGRADE CHILLER - PHASE 3, ATHENS GA
DESIGN CONTRACT NO: 12405B21D0003
DESIGN ORDER NO: 12405B24F0343
RICHARD B. RUSSELL RESEARCH CENTER (RRC)
950 COLLEGE STATION ROAD
ATHENS, GA 30605
GENERAL NOTE:
THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO PERFORMING WORK, FABRICATION OR PURCHASE OF ANY EQUIPMENT, MATERIALS, AND ASSEMBLIES. ANY DISCREPANCIES SHALL BE BROUGHT TO THE CONTRACTING OFFICER'S ATTENTION FOR RESOLUTION BEFORE PROCEEDING WITH ANY CONSTRUCTION, FABRICATION, OR EQUIPMENT PURCHASE.
DOWNTIME DURING INSTALLATION MUST BE MINIMIZED. INSTALLATION MUST BE COORDINATED WITH THE SITE OPERATION
SCHEDULE. BELTSVILLE AGRICULTURAL RESEARCH CENTER
10300 BALTIMORE AVENUE
BELTSVILLE, MD 20705
PROJECT LOCATION
CO
LLEG
E STATIO
N RO
AD
ATLANTA
PROJECT LOCATION
AUGUSTA
MACON
DALTON
JND
X9 X10 X11 X12
XA
XB
XC
XE
EXISTING DOOR TO REMAIN
EXISTING DOOR TO REMAIN
AREA OF WORK
EXISTING DOOR TRACK TO REMAIN.
JAMB CHANNEL TO REMAIN.
8'- 6"
EXISTING DOOR
PANEL TO REMAIN. EXISTING POST BRACE. REMOVE AFTER
HEADER ANGLES AND JAMB CHANNEL
ARE INSTALLED AND MADE SECURE.
CUT POST FLUSH WITH BOTTOM OF
EXISTING STEEL PLATE AND GRIND
SMOOTH. REMOVE BASE PLATE
ANCHORS TO BELOW FINISHED FLOOR.
GROUT HOLES WITH 4000PSI
NON-SHRINK EPOXY GROUT. STRIKE
SMOOTH WITH FLOOR.
EXISTING DOOR
PANEL TO REMAIN.
SAW CUT CMU EDGES SMOOTH
STEEL PLATE TO REMAIN. SEE DETAIL 1/A-102
COR
REVISIONS
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
ADMIN OFFICER
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
T:
\2
Pr oj ec ts
\5
4- M
U
SD
A Ph as e
C hi lle r U pg ra de s
- A th en s G
A\
W or ki ng
F ol de r\A rc h\
Fi na l\A D
1.
dw g
A pr
5,
- 9
:1 9a m
EPM
TEL
5624-M
R. SANDERS
C. GILMAN
E. JONES 4/25/25
Agricultural
Service Research
USDA ARS SOUTHEAST AREA
141 EXPERIMENT STATION ROAD
STONEVILLE MS 38776
PHASE 3 CHILLER UPGRADE USNPRC
RICHARD B. RUSSELL AGRICULTURAL RESEARCH CENTER (RRC)
950 COLLEGE STATION ROAD, ATHENS, GA 30605
JGM
M. SCOTT
AD101
DEMOLITION FLOOR PLAN
SCALE:
DEMOLITION FLOOR PLAN
1/8" = 1'-0"
AD-101
NORTH
SCALE:
DEMOLITION ELEVATION
1/2" = 1'-0"
AD-101
MM
AD101
GRAPHIC SCALE
0 16'8'4' 24'
SCALE: 1/8"= 1'-0"
4'
SCALE: 1/2"=1'-0"
0 1' 2' 8'
X9 X10 X11 X12
XB
XC
XE
2'-
7"
EXISTING
SLIDING DOOR
EXISTING
SLIDING DOOR
8'- 6"
'-7
NEW 12"X3" CHANNEL
EXISTING 12"X3" CHANNEL. GRIND ALL
WELDS, EXISTING AND NEW, SOOTH,
PREP AND PAINT AS SPECIFIED
NEW 4" x 3" x 3/16" STEEL ANGLE
EACH SIDE OF OPENING
A-101
SCALE:
FLOOR PLAN
1/8" = 1'-0"
A-101
GRAPHIC SCALE
NORTH
COR
REVISIONS
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
ADMIN OFFICER
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
T:
\2
Pr oj ec ts
\5
4- M
U
SD
A Ph as e
C hi lle r U pg ra de s
- A th en s G
A\
W or ki ng
F ol de r\A rc h\
Fi na l\A -1
.d w g
A pr
5,
- 9
:1 9a m
EPM
TEL
5624-M
R. SANDERS
C. GILMAN
E. JONES 4/25/25
Agricultural
Service Research
USDA ARS SOUTHEAST AREA
141 EXPERIMENT STATION ROAD
STONEVILLE MS 38776
PHASE 3 CHILLER UPGRADE USNPRC
RICHARD B. RUSSELL AGRICULTURAL RESEARCH CENTER (RRC)
950 COLLEGE STATION ROAD, ATHENS, GA 30605
JGM
M. SCOTT
SCALE:
ELEVATION
1/2" = 1'-0"
A-101
0 16'8'4' 24'
SCALE: 1/8"= 1'-0"
MM
A-102
A-101
A-102
2'-5"
FLOOR PLANCOR
REVISIONS
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
ADMIN OFFICER
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
T:
\2
Pr oj ec ts
\5
4- M
U
SD
A Ph as e
C hi lle r U pg ra de s
- A th en s G
A\
W or ki ng
F ol de r\A rc h\
Fi na l\A -1
.d w g
A pr
5,
- 9
:1 9a m
EPM
TEL
5624-M
R. SANDERS
C. GILMAN
E. JONES 4/25/25
Agricultural
Service Research
USDA ARS SOUTHEAST AREA
141 EXPERIMENT STATION ROAD
STONEVILLE MS 38776
PHASE 3 CHILLER UPGRADE USNPRC
RICHARD B. RUSSELL AGRICULTURAL RESEARCH CENTER (RRC)
950 COLLEGE STATION ROAD, ATHENS, GA 30605
JGM
M. SCOTT
T:
\20
P ro jec ts\
-M
U
SD
A Ph as e 3
C hil ler U pg ra de s -
A the ns G
A\
W or kin g F old er
\A rch
\F ina l\A -1
.dw g A pr
, 2
5 - 9:
am
4'
SCALE: 1/2"=1'-0"
0 1' 2' 8'
HEAD
EXISTING 12"X8"X16"
CMU BLOCK
CHANNEL AT JAMB BEYOND
4"X3"X316" STEEL ANGLE
TYP.
REMOVE STEEL POST COMPLETE.
GRIND SMOOTH AT STEEL PLATE
EXISTING STEEL PLATE
3/16
CONT.
EXISTING CHANNEL
SECTION AT BASE SECTION AT BASE
1" 2"
EXISTING CONCRETE
FLOOR
58" DIA X 4" EXPANSION ANCHOR
12"X3"" CHANNEL
1" 2"
12"X3" CHANNEL
58" DIA X 4" EXPANSION ANCHOR
EXISTING CMU BLOCK
3/16
CONT.
3/16
CONT.
SEALANT TYP. AT BLOCK CONNECTION
EXISTING 12"X8"X16"
CMU BLOCK
12"X3" CHANNEL
58" DIA X 4" EXPANSION
ANCHOR BELOW
58" DIA X 4" EXPANSION
ANCHOR BELOW
12"X3" CHANNEL
EXISTING 12"X3" CHANNEL.
STRAIGHTEN CHANNEL AND GRIND
EXISTING WELDS SMOOTH
JAMB SECTION AT LARGE DOOR OPENING JAMB SECTION AT CMU
3/16
CONT.
3/16
CONT.
PROVIDE GROUT REPAIRS
AT DAMAGED CMU (TYP.
BOTH SIDES OF WALLS)
A-102
DETAILS
GRAPHIC SCALE
COR
REVISIONS
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
ADMIN OFFICER
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
C :\U se rs
\T
LO
VE
L~
1.
JM
C \A pp D at a\
Lo ca l\T em p\ Ac
Pu bl is h_
0\ A-
2.
dw g
A pr
5,
- 9
:2 0a m
EPM
TEL
5624-M
R. SANDERS
C. GILMAN
E. JONES 4/25/25
Agricultural
Service Research
USDA ARS SOUTHEAST AREA
141 EXPERIMENT STATION ROAD
STONEVILLE MS 38776
PHASE 3 CHILLER UPGRADE USNPRC
RICHARD B. RUSSELL AGRICULTURAL RESEARCH CENTER (RRC)
950 COLLEGE STATION ROAD, ATHENS, GA 30605
JGM
M. SCOTT
SCALE: 3"=1'-0"
3"0 6" 1'
MM
SCALE:
DOOR SILL DETAILS
3" = 1'-0"
A-102
SCALE:
JAMB DETAILS
3" = 1'-0"
A-102
SCALE:
HEAD DETAIL AT OPENING
3" = 1'-0"
A-102
C:
\U se rs\
TL
OV
EL
~1
.JM
C\
Ap pD ata \Lo ca l\T em p\A cP ub lis h_
0\A -1
.dw g A pr
, 2
5 - 9:
am
GENERAL NOTES:
1. ALL EXISTING AND NEW STEEL MUST BE
CLEANED, PRIMED, AND PAINTED
2. PAINT CMU AROUND DOOR OPENINGS.
MUST BE PAINTED TO MATCH EXISTING
CMU WALLS
A-102
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
ADMIN OFFICER
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
T:
\2
Pr oj ec ts
\5
4- M
U
SD
A Ph as e
C hi lle r U pg ra de s
- A th en s G
A\
W or ki ng
F ol de r\M ec h\
M -0
.d w g
A pr
5,
- 7
:4 4a m
EPM
TEL
5624-M
R. SANDERS
C. GILMAN
E. JONES 4/25/25
Agricultural
Service Research
USDA ARS SOUTHEAST AREA
141 EXPERIMENT STATION ROAD
STONEVILLE MS 38776
PHASE 3 CHILLER UPGRADE USNPRC
RICHARD B. RUSSELL AGRICULTURAL RESEARCH CENTER (RRC)
950 COLLEGE STATION ROAD, ATHENS, GA 30605
JGM
M. SCOTT
M-001
MECHANICAL LEGEND
1. THIS PROJECT IS A RENOVATION OF AN EXISTING FACILITY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION OR PURCHASE OF EQUIPMENT, MATERIALS, AND ASSEMBLIES. ANY DEVIATIONS MUST BE BROUGHT TO THE CONTRACTING OFFICER'S ATTENTION FOR RESOLUTION BEFORE PROCEEDING WITH ANY
CONSTRUCTION, FABRICATION, OR EQUIPMENT PURCHASE.
2. INSTALLATION OF HVAC WORK MUST BE COORDINATED WITH OTHER TRADES BEFORE ANY INSTALLATION IS DONE. PIPING SHOWN ON PLANS IS SCHEMATIC. PROVIDE ALL TRANSITIONS, ELBOWS, REDUCERS, ETC. REQUIRED TO AVOID
CONFLICTS.
3. WRITTEN DIMENSIONS ON DRAWINGS MUST HAVE PRECEDENCE OVER SCALED DIMENSIONS. VERIFY DIMENSIONS ON SITE.
4. EQUIPMENT MUST BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S APPROVED CLEARANCE, USDA ARS 242.1, AND
INTERNATIONAL BUILDING CODE / INTERNATIONAL MECHANICAL CODE.
5. INSTALLATION OF EQUIPMENT MUST PERMIT ACCESSIBILITY FOR SERVICE AND/OR REPLACEMENT WITHOUT
NECESSITATING REMOVAL OR MODIFICATION TO OTHER PIPING, WIRING, OR EQUIPMENT.
6. CONTRACTOR MUST COORDINATE WALL, FLOOR, AND ROOF PENETRATIONS.
7. CAULK WITH SILICONE ALL GAPS BETWEEN WALL, CEILING, AND FLOOR OPENINGS AND PIPING PENETRATIONS. PATCH LARGE GAPS BEFORE CAULKING IS APPLIED. PROVIDE FIRESTOPPING FOR ALL FIRE/SMOKE RATED WALLS, FLOORS, AND
CEILINGS.
8. EXACT LOCATIONS OF CONTROL DEVICES MUST BE COORDINATED WITH THE CONTROLS CONTRACTOR.
9. SPECIFICATIONS TAKE PRECEDENCE OVER DRAWINGS. HOWEVER, ITEMS SHOWN ON DRAWING BUT NOT IN THE SPECIFICATIONS ARE REQUIRED WITHIN THE PROJECT SCOPE. IN ADDITION, SPECIFIC ITEMS SHOWN ON THE DRAWINGS TAKE PRECEDENCE OVER SPECIFICATIONS IN CASES WHERE THE SPECIFICATION HAS OPTIONS.
10. NOT ALL MECHANICAL ABBREVIATIONS SHOWN WILL BE USED FOR THIS PROJECT.
11. ALL EQUIPMENT INSTALLED IN THIS PROJECT MUST COMPLY WITH THE "BUY AMERICAN ACT". BASIS OF DESIGN
SHOWN ON SCHEDULES IS TO ESTABLISH A STANDARD OF QUALITY, NOT TO LIMIT COMPETITION. EQUIVALENT EQUIPMENT FROM ANOTHER MANUFACTURER IS ACCEPTABLE. MANUFACTURER NAME AND MODEL NUMBERS ARE BASIS OF DESIGN AND ARE SHOWN FOR INFORMATION ONLY. REFER TO SPECIFICATIONS FOR COMPLETE
REQUIREMENTS.
12. CONTROLS CONTRACTOR MUST PROVIDE ALL LOW VOLTAGE DEVICES, CONDUCTORS, AND PATHWAYS IN ACCORDANCE WITH THE REQUIREMENTS OF 26 20 00. INSTALL CONTROL WIRING IN CONDUIT. SEE DIVISION 26 SPECIFICATIONS FOR
REQUIREMENTS.
HVAC GENERAL NOTES:
1. THE DEMOLITION PLANS AND EXISTING CONDITIONS SHOWN ARE APPROXIMATE AND ARE TO BE FIELD VERIFIED. ITEMS TO
BE REMOVED ARE DENOTED BY HATCHING.
2. DEMOLITION MUST INCLUDE, BUT IS NOT LIMITED TO, THE ITEMS IDENTIFIED. THE CONTRACTOR MUST COORDINATE ALL REQUIRED RENOVATION AND NEW CONSTRUCTION WITH THE EXISTING BUILDING TO IDENTIFY THE TOTAL EXTENT OF THE
DEMOLITION WORK REQUIRED.
3. THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF ALL EXISTING BUILDING COMPONENTS, MATERIALS, EQUIPMENT, AND APPURTENANCES AS REQUIRED TO BUILD, ERECT, INSTALL, OR ACCOMMODATE ALL NEW
CONSTRUCTION.
4. IN THE EVENT THE CONTRACTOR ENCOUNTERS MATERIAL REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY OTHER HAZARDOUS MATERIAL WHICH HAS NOT BEEN RENDERED HARMLESS, THE CONTRACTOR MUST
IMMEDIATELY REPORT THE CONDITION TO THE CONTRACTING OFFICER IN WRITING.
5. THE CONTRACTOR IS RESPONSIBLE FOR THE ERECTION, MAINTENANCE, AND REMOVAL OF ALL CONSTRUCTION
ASSISTANCE DEVICES SUCH AS SCAFFOLDING AND BARRIERS.
6. THE BUILDING ENVELOPE MUST REMAIN WATERTIGHT THROUGHOUT THE CONSTRUCTION PROCESS.
7. IF IT BECOMES NECESSARY DURING DEMOLITION TO TEMPORARILY REMOVE ANY EXISTING WORK NOT SPECIFICALLY NOTED TO BE REMOVED OR RELOCATED (THEREBY IMPLYING THAT THEY ARE TO BE LEFT FOR FUTURE USE), THE CONTRACTOR MUST REINSTALL SAID WORK TO FULLY OPERABLE CONDITION IN THEIR ORIGINAL LOCATIONS
8. CONTRACTOR MUST DEMOLISH ALL EQUIPMENT, PIPING, INSULATION, SUPPORTS, CONTROLS THERMOSTATS, WIRING
AND ALL APPURTENANCES WITH THE HVAC SYSTEM TO BE DEMOLISHED.
HVAC GENERAL DEMOLITION NOTES:
ABBREVIATIONS:
AFF ABOVE FINISHED FLOOR
ARCH ARCHITECTURAL
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATING,
AND AIR CONDITIONING ENGINEERS
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
APD AIR PRESSURE DROP
BLDG BUILDING
BTU, BTUH BRITISH THERMAL UNITS, BTUs PER HOUR
CHW CHILLED WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CONN CONNECT, CONNECTING, CONNECTION
CONT CONTINUED
COR CONTRACTING OFFICER'S (OWNER'S)
REPRESENTATIVE
CW CONDENSER WATER
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
DDC DIRECT DIGITAL CONTROLS
DEG F (°F) DEGREES FAHRENHEIT
DIA, Ø DIAMETER
DIV DIVISION
DN DOWN
DP DIFFERENTIAL PRESSURE
DWG DRAWING
DX DIRECT EXPANSION
(E) EXISTING (USED WITH EQUIPMENT MARKS)
EA EXHAUST AIR
EAG EXHAUST AIR GRILLE
EFF EFFICIENCY
ELEC ELECTRICAL
EMCS ENERGY MONITORING AND CONTROLS SYSTEM
EWT ENTERING WATER TEMPERATURE
EXT EXTERIOR
EXH EXHAUST
FFE FINISHED FLOOR ELEVATION
FLA FULL LOAD AMPS
FPD FLUID PRESSURE DROP
FSD FIRE SMOKE DAMPER
FT FOOT, FEET
FT H20 FEET OF WATER
GA GAUGE
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
HP HORSEPOWER
HR HOUR
HTG HEATING
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
HZ HERTZ
IMC INTERNATIONAL MECHANICAL CODE
IN, IN. INCH, INCHES
IN WG INCHES WATER GAUGE
LB POUNDS
LRA LOCKED ROTOR AMPS
LWT LEAVING WATER TEMPERATURE
MBH 1000 BRITISH THERMAL UNITS
MCA MINIMUM CIRCUIT AMPACITY
MECH MECHANICAL
MIN MINIMUM
MOCP MAXIMUM OVER CURRENT PROTECTION
PH PHASE
PRV PRESSURE RELIEF VALVE
PSI POUNDS PER SQUARE INCH
QTY QUANTITY
RLA RUNNING LOAD AMPS
RPM REVOLUTIONS PER MINUTE
TEMP TEMPERATURE
TYP TYPICAL
UL UNDERWRITER'S LABORATORY
UMCS UTILITY MONITORING AND CONTROL SYSTEM
V VOLTAGE, VOLTS
VFD VARIABLE FREQUENCY DRIVE
NORTH ARROW
PLAN
NORTH
HATCHING INDICATES ITEMS TO
BE DISMANTLED AND REMOVED.
DEMOLITION LEGEND:
EXISTING EQUIPMENT
CH-1 (E) (E) AFTER AN EQUIPMENT
MARK INDICATES EXISTING
TRUE NORTH
X9 X10 X11 X12X8
XB
XC
XE
X7X6
M V
MV
MV
M V
VF
D
VF
D
VF
D
VF
D
CHWP-2 (E)
CWP-2 (E)
CWP-1 (E)
CH-2 (E)
CH-1 (E)
CHWP-1 (E)
CT-2 (E)
CT-2 (E)
EXISTING 10" CHILLED WATER
SUPPLY AND RETURN
EXISTING 12" CONDENSER
WATER SUPPLY AND RETURN
COR
REVISIONS
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
ADMIN OFFICER
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
C :\U se rs
\T
LO
VE
L~
1.
JM
C \A pp D at a\
Lo ca l\T em p\ Ac
Pu bl is h_
6\ M
D
1.
dw g A pr
5,
- 7 :4
4a m
EPM
TEL
5624-M
R. SANDERS
C. GILMAN
E. JONES 4/25/25
Agricultural
Service Research
USDA ARS SOUTHEAST AREA
141 EXPERIMENT STATION ROAD
STONEVILLE MS 38776
PHASE 3 CHILLER UPGRADE USNPRC
RICHARD B. RUSSELL AGRICULTURAL RESEARCH CENTER (RRC)
950 COLLEGE STATION ROAD, ATHENS, GA 30605
JGM
M. SCOTT
MD101
MECHANICAL DEMOLITION PLAN
KEYED NOTES
1. DISMANTLE AND REMOVE EXISTING 500 TON CHILLER, CH-1,
AND ALL APPURTENANCES.
2. DISMANTLE AND REMOVE EXISTING CHILLED WATER PUMP,
CHWP-1, AND ALL APPURTENANCES.
3. DISMANTLE AND REMOVE EXISTING CONDENSER WATER
SUPPLY AND RETURN PIPING, HANGERS AND ALL
APPURTENANCES.
4. DISMANTLE AND REMOVE EXISTING CHILLED WATER SUPPLY
AND RETURN PIPING, INSULATION, HANGERS AND ALL
APPURTENANCES..
5. EXISTING EQUIPMENT/PIPING TO REMAIN.
08' 8'
1'-0"
4'
SCALE: 1/8" =
GRAPHIC SCALE
NORTH
MECHANICAL DEMOLITION PLAN1
SCALE: 1/8" = 1'-0"MD101
JND
MD501
MD501
MD502
MD502
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
ADMIN OFFICER
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
C :\U se rs
\T
LO
VE
L~
1.
JM
C \A pp D at a\
Lo ca l\T em p\ Ac
Pu bl is h_
6\ M
D
1.
dw g A pr
5,
- 7 :4
4a m
EPM
TEL
5624-M
R. SANDERS
C. GILMAN
E. JONES 4/25/25
Agricultural
Service Research
USDA ARS SOUTHEAST AREA
141 EXPERIMENT STATION ROAD
STONEVILLE MS 38776
PHASE 3 CHILLER UPGRADE USNPRC
RICHARD B. RUSSELL AGRICULTURAL RESEARCH CENTER (RRC)
950 COLLEGE STATION ROAD, ATHENS, GA 30605
JGM
M. SCOTT
MD501
MECHANICAL DEMOLITION DETAILS
MECHANICAL DEMOLITION DETAIL1
SCALE: NONEMD501
EXISTING 12" CONDENSER
WATER PIPING TO REMIAN
CLOSE CONDENSER WATER
SUPPLY VALVE
DISMANTLE AND REMOVE EXISTING
CONDENSER WATER PIPING FROM
EXISTING VICTAULIC CLAMP TO CH-1
MECHANICAL DEMOLITION DETAIL2
SCALE: NONEMD501
TIE IN TO POINT FOR 12" CONDENSER
WATER PIPING TO CH-1
CLOSE CONDENSER WATER
RETURN VALVE
EXISTING 12" CONDENSER
WATER TO REMAIN
DISMANTLE AND REMOVE EXISTING
CONDENSER WATER PIPING FROM
CH-1 TO VALVE AS SHOWN
TIE IN TO POINT FOR 12" CONDENSER
WATER PIPING FROM CH-1
CWP-2 (E)
CWP-1 (E)
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
ADMIN OFFICER
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
T:
\2
Pr oj ec ts
\5
4- M
U
SD
A Ph as e
C hi lle r U pg ra de s
- A th en s G
A\
W or ki ng
F ol de r\M ec h\
M D
2.
dw g
A pr
5,
- 7
:4 4a m
EPM
TEL
5624-M
R. SANDERS
C. GILMAN
E. JONES 4/25/25
Agricultural
Service Research
USDA ARS SOUTHEAST AREA
141 EXPERIMENT STATION ROAD
STONEVILLE MS 38776
PHASE 3 CHILLER UPGRADE USNPRC
RICHARD B. RUSSELL AGRICULTURAL RESEARCH CENTER (RRC)
950 COLLEGE STATION ROAD, ATHENS, GA 30605
JGM
M. SCOTT
MD502
MECHANICAL DEMOLITION DETAILS
MECHANICAL DEMOLITION DETAIL1
SCALE: NONEMD502
DISMANTLE AND REMOVE EXISTING
CHILLED WATER PUMP, CHWP-1
DISMANTLE AND REMOVE EXISTING
8" CHILLED WATER PIPING
DISMANTLE AND REMOVE
EXISTING CHILLER, CH-1
CHILLED WATER TIE IN POINT. CLOSE
CHILLED WATER VALVE. VALVE IS
NOT VISIBLE IN THIS PICTURE.
MECHANICAL DEMOLITION DETAIL2
SCALE: NONEMD502
DISMANTLE AND REMOVE EXISTING
CHILLED WATER PUMP, CHWP-1
CHILLED WATER TIE IN POINT.
CLOSE CHILLED WATER VALVE.
DISMANTLE AND REMOVE EXISTING
8" CHILLED WATER PIPING
XB
XC
XE
X7X6
M V
MV
MV
M V
VF
D
VF
D
VF
D
VF
D
CHWP-2 (E)
CWP-2 (E)
CWP-1 (E)
CH-2 (E)
CH-1
CHWP-1
CT-2 (E)
CT-1 (E)
EXISTING 10" CHILLED WATER
SUPPLY AND RETURN
EXISTING 12" CONDENSER
WATER SUPPLY AND RETURN
COR
REVISIONS
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
ADMIN OFFICER
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
T:
\2
Pr oj ec ts
\5
4- M
U
SD
A Ph as e
C hi lle r U pg ra de s
- A th en s G
A\
W or ki ng
F ol de r\M ec h\
M -1
.d w g
A pr
5,
- 7
:4 4a m
EPM
TEL
5624-M
R. SANDERS
C. GILMAN
E. JONES 4/25/25
Agricultural
Service Research
USDA ARS SOUTHEAST AREA
141 EXPERIMENT STATION ROAD
STONEVILLE MS 38776
PHASE 3 CHILLER UPGRADE USNPRC
RICHARD B. RUSSELL AGRICULTURAL RESEARCH CENTER (RRC)
950 COLLEGE STATION ROAD, ATHENS, GA 30605
JGM
M. SCOTT
M-101
MECHANICAL PLAN
KEYED NOTES
1. PROVIDE WATER COOLED CENTRIFUGAL CHILLER AND
HOUSEKEEPING PAD. INSTALL CHILLER ON MANUFACTURER
PROVIDED VIBRATION ISOLATORS.
2. PROVIDE CHILLED WATER PUMP AND CONCRETE INERTIA
BASE WITH VIBRATION ISOLATORS.
3. PROVIDE 12" CONDENSER WATER SUPPLY FROM TIE IN POINT
TO CHILLER AS SHOWN.
4. PROVIDE 12" CONDENSER WATER RETURN FROM CHILLER TO
TIE IN POINT AS SHOWN.
5. PROVIDE 10" CHILLED WATER RETURN FROM CHWP-1 TO CH-1
AS SHOWN. PROVIDE INSULATION PER SPECIFICATIONS.
6. PROVIDE 10" CHILLED WATER SUPPLY FROM CH-1 TO TIE IN
POINT AS SHOWN. PROVIDE INSULATION PER
SPECIFICATIONS.
7. PROVIDE REFRIGERANT RELIEF DISCHARGE PIPING AS
SHOWN. TERMINATE AS HIGH ON WALL AS POSSIBLE.
TERMINATE PIPE INSIDE A WALL-CAP WITH BIRD SCREEN.
PRIME AND PAINT WALL CAP TO MATCH BUILDING EXTERIOR.
REFER TO DETAILS.
8. AREA BETWEEN CHILLERS TO REMAIN OPEN FOR TUBE
REPLACEMENT AND CLEANING.
9. NEW CHILLED WATER PUMP TO BE CONNECTED TO EXISTING
VFD. ADJUST AMPERAGE AND HORSEPOWER SETTINGS IN
VFD FOR NEW PUMP.
08' 8'
1'-0"
4'
SCALE: 1/8" =
GRAPHIC SCALE
NORTH
MECHANICAL PLAN1
SCALE: 1/8" = 1'-0"M-101
GENERAL NOTES
1. PROVIDE ALL REQUIRED PIPE HANGERS, FASTENERS AND
GASKETS. REFER TO SPECIFICATIONS.
2. PROVIDE ALL REQUIRED ANCHOR BOLTS, STRUCTURAL STEEL
MEMBERS, AND CONCRETE FOR INERTIA BASE AND
HOUSEKEEPING PAD.
JND
M-501
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
ADMIN OFFICER
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
T:
\2
Pr oj ec ts
\5
4- M
U
SD
A Ph as e
C hi lle r U pg ra de s
- A th en s G
A\
W or ki ng
F ol de r\M ec h\
M -5
.d w g
A pr
5,
- 7
:4 4a m
EPM
TEL
5624-M
R. SANDERS
C. GILMAN
E. JONES 4/25/25
Agricultural
Service Research
USDA ARS SOUTHEAST AREA
141 EXPERIMENT STATION ROAD
STONEVILLE MS 38776
PHASE 3 CHILLER UPGRADE USNPRC
RICHARD B. RUSSELL AGRICULTURAL RESEARCH CENTER (RRC)
950 COLLEGE STATION ROAD, ATHENS, GA 30605
JGM
M. SCOTT
M-501
MECHANICAL DETAILS
SEE DRAWINGS FOR CONTINUATION
14 GA GALVANIZED STEEL PLATE
SECURED TO WALL EXTENDING MIN
6-INCHES OUT FROM PIPE PENETRATION
RUPTURE DISC ASSEMBLY
PURGE DISCHARGE VENT LINE
FLEXIBLE STEEL CONNECTION
CHILLER
MIN 9"
DRIP LEG (LENGTH AS REQUIRED
FOR EASY ACCESS)
1/4" FL x 1/4" NPT DRAIN VALVE
NOTE
RELIEF PIPE SIZES AND QUANTITY
OF CONNECTIONS VARY BY CHILLER
MANUFACTURER. SIZE AND INSTALL
PIPING AS RECOMMENDED BY THE
CHILLER MANUFACTURER'S
LITERATURE.
SEAL AROUND PIPE
PENETRATION AIR-TIGHT
CHILLER REFRIGERANT
RELIEF VENT
COMPLETELY FILL IN ANNULAR
SPACE AROUND PIPE WITH
NON-SHRINK GROUT FOR AN
AIR-TIGHT INSTALLATION
INTERIOR OF WALL EXTERIOR OF WALL
GALVANIZED STEEL WALL
CAP WITH BIRD SCREEN,
PRIMED AND PAINTED TO
MATCH BUILDING EXTERIOR
4.5" LIQUID-FILLED
PRESSURE GAUGE WITH
304 STAINLESS STEEL
CASE (RANGE 0-60 PSI)
9" RED LIQUID-IN-GLASS
THERMOMETER WITH CAST
ALUMINUM CASE AND
ADJUSTABLE ANGLE STEM
SNUBBER
FULL-PORT BALL VALVE WITH
EXTENDED VALVE STEM AND
STAND-OFF FOR
INSTALLATION OF INSULATION
WELD-ON THREADOLET (TYP)
CHILLED OR CONDENSER
WATER PIPE
PRESSURE GAUGE P/T PORT
PRESSURE AND
TEMPERATURE
PLUG WITH CAP
(DESIGN BASIS:
PETE'S PLUG II)
AUTOMATIC AIR VENT
FULL-PORT BALL VALVE
WITH EXTENDED VALVE
STEM AND STAND-OFF
FOR INSTALLATION OF
INSULATION
REDUCERS AS
REQUIRED (TYP)
WELL LENGTH SHALL REACH
APPROXIMATELY HALFWAY INTO PIPE
AUTOMATIC AIR VENT THERMOMETER
NOTES
1. ALL CHILLED WATER PIPE IS INSULATED AND JACKETED. INSULATION IS NOT SHOWN FOR CLARITY. PROVIDE EXTENDED NECK VALVE STEMS AND
EXTENDED FITTINGS FOR INSULATED PIPES.
2. ALL GAUGES SHALL BE MOUNTED IN THE VERTICAL POSITION. PROVIDE ELBOWS FOR PRESSURE GAUGES LOCATED IN VERTICAL PIPES AND
ROTATE THERMOMETER STEMS AS REQUIRED SO THAT ALL GAUGES AND THERMOMETERS ARE INSTALLED VERTICALLY REGARDLESS OF THE
ORIENTATION OF THE CHILLED WATER PIPE.
3. PROVIDE ULTRAVIOLET PROTECTIVE PLASTIC WINDOW AND WEATHERPROOF CASE FOR ACCESSORIES IN EXTERIOR LOCATIONS.
DUAL TEMPERATURE SCALE
CHW: (0-100 DEG F / -18-38 DEG C)
CW: (30-130 DEG F / 0-55 DEG C)
COUPLING NUT AND
304 SS STEM
THERMOWELL - LAGGING
EXTENSION TYPE FOR
INSULATED PIPES
PAINT TOP OF NEW PAD TO MATCH
EXISTING GRAY CONCRETE EPOXY
COATING AND SHEEN
#5 BARS, 16" O.C.
EACH WAY
PREP AND REPAINT TOP OF
EXISTING PAD CHW OR CW OUT
6-INCH TALL CONCRETE
HOUSEKEEPING PAD EXTENSION
WITH CHAMFERED EDGE - PAINT
FACE OF EDGE SAFETY YELLOW
5" LONG #5 BARS, 12" O.C. WITH 2.5"
EMBED - SECURE BARS IN EXISTING
CONCRETE PAD WITH EPOXY
CHW OR CW IN
MANUAL BUTTERFLY VALVE
PRESSURE GAUGE (TYP)
TEMPERATURE SENSOR (TYP)
5" LONG #5 BARS, 12" O.C. EACH WAY
WITH 2.5" EMBED - SECURE BARS IN
CONCRETE FLOOR WITH EPOXY
CLEAN AND ROUGHEN THE SURFACE AND
PROVIDE CONCRETE BONDING AGENT PRIOR
TO POURING THE CONCRETE PAD
CONCRETE NOTES
1. INSTALL #5 EPOXY COATED METAL DOWEL BARS, PLACED AT THE MID SLAB DEPTH AND SPACED ON 12" CENTERS. EPOXY-COATED JOINT DOWEL BARS SHALL
CONFORM TO ASTM A 615, GRADE 60, PLAIN-STEEL BARS, ASTM A 775 EPOXY COATED.
2. ALL CONCRETE SHALL HAVE A MINIMUM OF 3,000 PSI COMPRESSIVE STRENGTH AT 28 DAYS.
3. ALL CONCRETE SHALL HAVE A SLUMP OF 4" PLUS OR MINUS 1", AND HAVE 2%-4% AIR ENTRAINMENT, AND A MAXIMUM WATER/CEMENT RATIO OF 0.58.
4. CONCRETE MIX SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF ACI 301 CHAPTER 3, METHOD 1 OR METHOD 2. SUBMIT BACK-UP DATA AS REQUIRED BY
CHAPTER 5 SECTION 5.3. OF THE LATEST EDITION OF ACI 318.
5. ALL REINFORCING STEEL SHALL BE NEW DOMESTIC DEFORMED BILLET STEEL CONFORMING TO ASTM A-615 GRADE 60.
6. ALL CONCRETE WORK SHALL BE IN ACCORDANCE WITH "THE BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE" ACI 318 LATEST EDITION, AND
"SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS," ACI 301.
7. ALL REINFORCING DETAILS SHALL CONFORM TO "MANUAL OR STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES" ACI 315 LATEST EDITION.
8. CONTRACTOR SHALL PROVIDE SPACERS, CHAIRS, BOLSTERS, ETC., NECESSARY TO SUPPORT REINFORCING STEEL. SUPPORT ITEMS WHICH BEAR ON EXPOSED
CONCRETE SURFACES SHALL HAVE ENDS WHICH ARE PLASTIC TIPPED OR STAINLESS STEEL.
WATER BOX DRAIN VALVE PIPE SUPPORT (TYP)
NOTES
1. INSULATION IS NOT SHOWN ON THE DETAIL FOR CLARITY, PROVIDE INSULATION AND JACKET ON ALL
CHILLED WATER PIPING AND EQUIPMENT.
2. ALL INSTRUMENT PIPE SHALL BE INSULATED 1/4" DIA HARD DRAWN COPPER PIPE
NEOPRENE PAD DRAIN BALL VALVE WITH THREADED
HOSE END CONNECTION AND CAP
FINISHED FLOOR
SPHERICAL FLEXIBLE
CONNECTOR (TYP)
TMANUAL VENT
EVAPORATOR
OR CONDENSER
TUBE BARREL
T
PRESSURE/TEMPERATURE
TAP (TYP)
DIFFERENTIAL PRESSURE
TRANSMITTER (TYP)
CHW OR CW FLOW SWITCH
MANUAL BUTTERFLY
VALVE
THERMOMETER (TYP)
CHILLER HOUSEKEEPING PAD EXTENSION DETAIL1
SCALE: NONEM-501
TYPICAL CHILLER WATER BOX CONNECTIONS2
SCALE: NONEM-501
TYPICAL PIPE ACCESSORY INSTALLATIONS3
SCALE: NONEM-501
CHILLER REFRIGERANT RELIEF CONNECTION4
SCALE: NONEM-501
REFRIGERANT RELIEF VENT TERMINATION5
SCALE: NONEM-501
JND
PROVIDE PIPE HANGERS PER SPECIFICATIONS
EXISTING CMU WALL
SAW CUT OR CORE OPENING
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
ADMIN OFFICER
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
T:
\2
Pr oj ec ts
\5
4- M
U
SD
A Ph as e
C hi lle r U pg ra de s
- A th en s G
A\
W or ki ng
F ol de r\M ec h\
M -5
.d w g
A pr
5,
- 7
:4 4a m
EPM
TEL
5624-M
R. SANDERS
C. GILMAN
E. JONES 4/25/25
Agricultural
Service Research
USDA ARS SOUTHEAST AREA
141 EXPERIMENT STATION ROAD
STONEVILLE MS 38776
PHASE 3 CHILLER UPGRADE USNPRC
RICHARD B. RUSSELL AGRICULTURAL RESEARCH CENTER (RRC)
950 COLLEGE STATION ROAD, ATHENS, GA 30605
JGM
M. SCOTT
M-502
CONCRETE INERTIA BASE1
SCALE: NONEM-501
END-SUCTION PUMP DETAIL2
SCALE: NONEM-501
PIPE HANGER DETAIL3
SCALE: NONEM-501
ADJUSTABLE PUMP
ATTACHMENTS FILL BASE WITH CONCRETE ONCE
FINAL LOCATION HAS BEEN
ESTABLISHED AND THE FRAME HAS
BEEN SECURED TO THE FLOOR
REINFORCING STEEL
SPRING ISOLATOR (TYP)
BUTTERFLY ISOLATION VALVE - LOCATE
ACTUATOR FOR EASE OF SERVICE (TYP 2)
HANGER ROD
SUPPORT NUT
GLOBE STYLE SILENT CHECK VALVE
NEW RUBBER EXPANSION FITTING (TYP 2)
SPLIT-COUPLED END
SUCTION PUMP PACKAGE
PUMP INERTIA PAD SECURED
TO HOUSEKEEPING PAD -
PAINT ALL CONCRETE TO
MATCH FLOOR FINISH
CLEVIS HANGER
HOUSEKEEPING PAD
FLOOR
NOTES
1. CHILLED WATER PUMPS: INSULATE AND JACKET PIPING, APPURTENANCES, AND PUMP HEAD.
NEW SUCTION DIFFUSER
WITH STRAINER
NEW 3/4-INCH BALL VALVE WITH HOSE END
CONNECTION AND CAP CONNECTED TO
SUCTION DIFFUSER BLOWDOWN PORT
PRESSURE GAUGE WITH 1/4-INCH ISOLATION
VALVES AND HARD-DRAWN TUBING
LOCKING NUT
PIPE
HEAVY DUTY
CLEVIS HANGER
JND
MECHANICAL DETAILS
NOTE: PAINT ALL STEEL
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
ADMIN OFFICER
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
T:
\2
Pr oj ec ts
\5
4- M
U
SD
A Ph as e
C hi lle r U pg ra de s
- A th en s G
A\
W or ki ng
F ol de r\M ec h\
M -6
.d w g
A pr
5,
- 7
:4 4a m
EPM
TEL
5624-M
R. SANDERS
C. GILMAN
E. JONES 4/25/25
Agricultural
Service Research
USDA ARS SOUTHEAST AREA
141 EXPERIMENT STATION ROAD
STONEVILLE MS 38776
PHASE 3 CHILLER UPGRADE USNPRC
RICHARD B. RUSSELL AGRICULTURAL RESEARCH CENTER (RRC)
950 COLLEGE STATION ROAD, ATHENS, GA 30605
JGM
M. SCOTT
M-601
MECHANICAL EQUIPMENT SCHEDULES
WATER COOLED CENTRIFUGAL CHILLER SCHEDULE
MARK
BASIS OF DESIGN GENERAL DATA EVAPORATOR DATA CONDENSER DATA ELECTRICAL DATA
OPERATING
WEIGHT
(LB)MANUFACTURER MODEL NO.
CAPACITY
(TONS)
COMPRESSOR DATA REFRIGERATION FULL LOAD
COOLING
EFFICIENCY
(kW/TON)
FLUID
FLUID FLOW DATA
(GPM)
PRESSURE
DROP @
DESIGN
FLOW
(FT H2O)
FLUID TEMPERATURE
DATA (°F)
FLUID
FLUID FLOW DATA
(GPM)
PRESSURE
DROP @
DESIGN
FLOW
(FT H2O)
FLUID TEMPERATURE
DATA (°F) VOLTAGE
(VOLTS/PH)
MCA
(A)
MOCP
(A)
NAME-
PLATE
RLA
(A)
PRI-
MARY
RLA
(A)
LRA
(A)
TYPE QTY REFRIGERANT
TYPE CIRCUITS DESIGN MINIMUM MAXIMUM ENTERING LEAVING DESIGN MINIMUM MAXIMUM ENTERING LEAVING
CH-1 TRANE CVHF870 900 CENTRIFUGAL 1 R-514A 1 0.581 WATER 2,150 873 4,802 15.5 50 40 WATER 2,540 1,418 5,197 3.63 85 95 460 / 3 863 1,200 742 692 4,743 39,641
NOTES
1. CHILLER MANUFACTURER MUST SHIP CHILLER ASSEMBLED IN A SINGLE PIECE FROM FACTORY WITH NITROGEN HOLDING CHARGE TO AVOID COMPONENT
CONTAMINATION DURING SHIPMENT. SHIPMENT IN PIECES IS NOT ALLOWED UNDER ANY CIRCUMSTANCE. FULL DISASSEMBLY/REASSEMBLY KIT MUST BE PROVIDED ALONG WITH LOCAL FACTORY SERVICE SUPERVISION LABOR FOR WARRANTY MAINTENANCE PURPOSES.
2. MANUFACTURER TO PROVIDE FULL REFRIGERANT CHARGE SHIPPED LOOSE FOR FIELD INSTALLATION BY CHILLER INSTALLER PRIOR TO OPERATION.
3. PROVIDE DIRECT DRIVE MULTI STATE COMPRESSOR.
4. PROVIDE SHELL AND TUBE EVAPORATOR AND CONDENSER WITH ASME PRESSURE VESSEL RATING.
5. PROVIDE GROOVED PIPE CONNECTIONS.
6. PROVIDE REFRIGERANT COOLED VARIABLE FREQUENCY DRIVE.
7. PROVIDE 3/4" FACTORY INSTALLED INSULATION ON ALL COLD SURFACES EXCEPT ECONOMIZER. PROVIDE ECONOMIZER WITH 3/8" INSULATION.
8. PROVIDE FACTORY INSTALLED DISCONNECT SWITCH WITH CIRCUIT BREAKER.
9. PROVIDE FACTORY INSTALLED BACNET INTERFACE CARD COMPATIBLE WITH EXISTING CONTROL SYSTEM.
10. PROVIDE WEB CONNECTION KIT WITH MODEM AND LABOR FOR SETUP TO MATCH CH-2 FOR CONNECTION WITH FACTORY SERVICE MONITORING.
11. PROVIDE FACTORY INSTALLED CHILLED WATER AND CONDENSER WATER FLOW SENSORS.
12. PROVIDE FACTORY INSTALLED PHASE PROTECTION, REVERSAL AND IMBALANCE PROTECTION.
13. PROVIDE LOOSE SHIPPED NEOPRENE ISOLATOR PADS TO MATCH EXISTING CHILLER PADS FOR FIELD INSTALLATION.
14. PROVIDE FACTORY START-UP. FIVE YEARS COMPLETE PARTS, REFRIGERANT, LABOR AND SERVICE WARRANTY.
15. CHILLER MUST BE CERTIFIED BASED ON AHRI AND ASHRAE 90.1 STANDARDS.
16. CHILLER MUST BE SHIPPED COMPLETELY WRAPPED IN HEAVY DUTY BAG TO PROTECT FROM ROAD DAMAGE, ROAD SALT, AND CONSTRUCTION DIRT.
17. AFTER CHILLER IS INSTALLED AND PRIOR TO REFRIGERANT CHARGING, PERFORM EDDY CURRENT TESTING AS RECOMMENDED BY CHILLER MANUFACTURER. PROVIDE
BASELINE TESTING INFORMATION TO CHILLER MANUFACTURER AND TO GOVERNMENT FOR WARRANTY PURPOSES.
NOTES
1. PROVIDE 150 LB FLANGED INLET AND OUTLET CONNECTIONS.
2. PROVIDE STAINLESS STEEL IMPELLER.
3. PROVIDE INLET AND OUTLET ISOLATION VALVES.
4. PROVIDE INLET AND OUTLET FLEX CONNECTIONS.
5. PROVIDE FACTORY FURNISHED VIBRATION ISOLATORS.
6. PROVIDE CONCRETE AND STEEL INERTIA PAD. REFER TO DETAIL.
7. PUMP TO BE VARIABLE SPEED. PUMP MOTOR TO BE WIRED TO EXISTING VFD INSTALLED IN PHASE 2.
PUMP SCHEDULE
MARK
BASIS OF DESIGN PUMP DATA ELECTRICAL DATA
WEIGHT
(LB) NOTES
MANUFACTURER MODEL NO. TYPE
FLOW
(GPM)
TOTAL
HEAD
(FT H20)
RPM
INLET
SIZE
(IN.)
OUTLET
SIZE
(IN.)
IMPELLER
SIZE
(IN.)
MOTOR
POWER
(HP)
VOLTAGE
(VOLTS/PH)
CHWP-1 TACO FI18013E END SUCTION 2,150 75 1750 4 3 10.05 60 460 / 3 - ALL
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
ADMIN OFFICER
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
T:
\2
Pr oj ec ts
\5
4- M
U
SD
A Ph as e
C hi lle r U pg ra de s
- A th en s G
A\
W or ki ng
F ol de r\M ec h\
M -7
.d w g
A pr
5,
- 7
:4 4a m
EPM
TEL
5624-M
R. SANDERS
C. GILMAN
E. JONES 4/25/25
Agricultural
Service Research
USDA ARS SOUTHEAST AREA
141 EXPERIMENT STATION ROAD
STONEVILLE MS 38776
PHASE 3 CHILLER UPGRADE USNPRC
RICHARD B. RUSSELL AGRICULTURAL RESEARCH CENTER (RRC)
950 COLLEGE STATION ROAD, ATHENS, GA 30605
JGM
M. SCOTT
M-701
CHILLER PLANT CONTROLS
12"
COOLING OVERFLOW
12"
COOLING TOWER
EQUALIZER PIPING
MV
8"
VFD
CT-2 (E)
12" TS
8"
VFD
12"
MV
COOLING TOWER DRAIN
COOLING OVERFLOW
COOLING BYPASS
DPT
VFD
12"
8" 12"
12" MV
12"
12" 12" DPT VFD
12"
8"
12" MV CWP-1 (E)
12" 12"
COOLING BYPASS
12"
10" TS
CONDENSER
CHILLER
CONTROLLER
10" TS CH-2 (E)
900 TONS
EVAPORATOR
12" 12"
DPT
TS
TS
10" TS DPT
PS CONDENSER
CHILLER
CONTROLLER
10" DPT TS
PS
EVAPORATOR
3/4"
CHEMICAL SHOT FEEDER
10"
10" EMERGENCY CHILLED
WATER RETURN CONNECTION
10"
VFD DPT
10"
10"
10" EMERGENCY CHILLED
WATER SUPPLY CONNECTION
10"
LVL
CT-1 (E)
TS LVL
CH-1
900 TONS
12"
12" 12"
DPT
TS
TS
10"
CHILLER PLANT CONTROLS - SCHEMATIC1
SCALE: NONEM-701
CHILLER STOP CYCLE:
WHEN THE DDC SYSTEM INDEXES THE CHILLER TO STOP THE FOLLOWING SHALL OCCUR:
A. THE CHILLER CONTROL PANEL SHALL INDEX CHILLER TO STOP.
B. THE CHILLER CONTROL PANEL SHALL DISABLE THE CONDENSER WATER PUMP AFTER A TIME DELAY AND
SEND A SIGNAL TO THE DDC SYSTEM TO DISABLE THE CHILLED WATER PUMP.
C. THE DDC SYSTEM SHALL CLOSE THE CHILLER ISOLATION VALVE ON THE CONDENSER WATER SUPPLY
AND ON THE CHILLED WATER RETURN ASSOCIATED WITH THE CHILLER.
CHILLER STAGING:
THE SYSTEM IS VARIABLE PRIMARY: THE CHILLERS CONTROL IS PRIMARY/STANDBY WHERE EACH CHILLER IS SIZED AT 100% OF THE REQUIRED LOAD. SOFTWARE PRIMARY/STANDBY FUNCTION SHALL ALLOW EITHER OF THE CHILLERS TO ACT AS THE PRIMARY CHILLER BY OPENING/CLOSING THE ASSOCIATED ISOLATION VALVES FOR EACH CHILLER. THE STANDBY CHILLER SHALL REMAIN OFF UNTIL RECEIVING A COMMAND TO TO ACTIVATE FROM THE DDC. THE CHILLED WATER PUMP SHALL ADJUST TO MAINTAIN THE CHILLED WATER DIFFERENTIAL PRESSURE
(FLOW RATE, AS RECOMMENDED BY THE MANUFACTURER) FOR THE CHILLERS.
DESIGNATING PRIMARY, STANDBY AND 'OUT OF SERVICE' CHILLERS:
THE CHILLER PLANT GRAPHICAL SCREEN SHALL ALLOW THE OPERATOR TO DESIGNATE WHICH CHILLER IS PRIMARY, STANDBY, AND 'OUT OF SERVICE'. THE DDC SYSTEM SHALL CHANGE THE PRIMARY/ STANDBY STATUS OF THE CHILLERS ON A WEEKLY BASIS. THE DDC SYSTEM SHALL THEN AUTOMATICALLY START/STOP CHILLERS AS
REQUIRED TO MAINTAIN EQUAL CHILLER RUN TIME.
CHILLED WATER PUMP CONTROL:
ALL CHILLED WATER PUMPS ARE SIZED FOR 100% SYSTEM CAPACITY AS VARIABLE SPEED PRIMARY CONFIGURATION. THE DDC SYSTEM SHALL START THE CHILLED WATER PUMP ASSOCIATED WITH THE ACTUVE CHILLER VIA THE VFD WHENEVER THE CHILLER CONTROL PANEL IS ENABLED AND CHILLER CONTROL PANEL IS
CALLING FOR COOLING. THE STANDBY PUMP SHALL REMAIN OFF.
THE DDC SYSTEM SHALL MODULATE OUTPUT TO THE PUMP VFD AS REQUIRED TO MAINTAIN DIFFERENTIAL
PRESSURE (DP) SETPOINT AT THE LOCATION OF THE DP TRANSMITTER.
THE DDC SYSTEM SHALL ALTERNATE THE PRIMARY/STANDBY PUMPS ON A WEEKLY BASIS WITH THEIR
ASSOCIATED CHILLER.
MINIMUM CHILLED WATER FLOW CONTROL:
DDC SYSTEM SHALL MODULATE THE CHILLED WATER PUMP SPEED CONTROL AS REQUIRED TO MAINTAIN MINIMUM FLOW THROUGH CHILLER. THE MINIMUM FLOW SHALL VERIFIED WITH THE EQUIPMENT MANUFACTURER.
ADEQUATE FLOW THROUGH EACH CHILLER SHALL BE DETERMINED BY THE CHILLER FLOW SENSOR.
CHILLER SAFETIES:
CONTRACTOR SHALL COORDINATE ALL SAFETY AND INTERLOCK REQUIREMENTS WITH CHILLER MANUFACTURER.
THE CONTROLS CONTRACTOR SHALL PROVIDE THE INSTALLATION AND WIRING OF CHILLED WATER FLOW SWITCHES AND OTHER COMPONENTS PROVIDED WITH CHILLER AS REQUIRED FOR PROPER OPERATION.
COOLING TOWER CONTROL:
WHEN THE WATER LEVEL IS AT THE “OPERATING LEVEL”, THE MAKE-UP WATER CONTROL VALVE SHALL BE CLOSED. AS THE WATER LEVEL DROPS TO “LOW LEVEL”, THE LEVEL SENSOR SHALL SEND A SIGNAL TO THE DDC
SYSTEM TO OPEN THE MAKE-UP WATER CONTROL VALVE.
TOWER START-UP:
UPON INITIAL SYSTEM START-UP THE TOWER BY-PASS VALVE AND INDIVIDUAL TOWER ISOLATION VALVES SHALL BE UTILIZED AND SEQUENCED TO WARM UP CONDENSER WATER SYSTEM FOR PROPER CHILLER OPERATION.
WHEN THE CONDENSER WATER SUPPLY TEMPERATURE IS ABOVE 55°F (ADJ.) (REFER TO CONDENSER WATER
TEMPERATURE RESET) THE DDC SYSTEM SHALL CALL FOR COOLING TOWER OPERATION.
COOLING TOWER FAN OPERATION:
ONCE CONDENSER WATER FLOW IS PROVEN, THE DDC SYSTEM SHALL START THE COOLING TOWER FAN VIA THE VFD. THE DDC SYSTEM SHALL STOP THE COOLING TOWER FAN WHEN THE VFD IS OPERATING AT MINIMUM SPEED AND CONDENSER WATER SUPPLY TEMPERATURE IS 5°F BELOW SETPOINT FOR 10 MINUTES (ADJ) OR IF
CONDENSER WATER FLOW IS NOT PROVEN.
THE PURPOSE OF THE COOLING TOWER FAN SPEED CONTROL IS TO MAINTAIN THE OPTIMAL CONDENSER WATER SUPPLY TEMPERATURE SETPOINT. THE DDC SYSTEM SHALL CONTROL THE COOLING TOWER FAN VFD USING A
4-20MA OUTPUT.
CONDENSER WATER PUMP:
THE CONDENSER WATER PUMP SHALL RUN ANYTIME THE COOLING TOWER IS CALLED TO RUN AND SHALL HAVE A USER DEFINABLE DELAY (ADJ.) ON STOP. THE CONDENSER WATER PUMP SHALL BE VARIABLE AND VARY FLOW AS
DEMAND CHANGES.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
A. CONDENSER WATER PUMP FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.
B. CONDENSER WATER PUMP RUNNING IN HAND: COMMANDED OFF, BUT THE STATUS IS ON.
C. CONDENSER WATER PUMP RUNTIME EXCEEDED: STATUS RUNTIME EXCEEDS A USER DEFINABLE LIMIT
CHILLER PLANT CONTROLS - SEQUENCE OF OPERATIONS2
SCALE: NONEM-701
JND
CWP-2 (E)
CHWP-2 (E)
CHWP-1
VFD DPT
10"
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
ADMIN OFFICER
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
T:
\2
Pr oj ec ts
\5
4- M
U
SD
A Ph as e
C hi lle r U pg ra de s
- A th en s G
A\
W or ki ng
F ol de r\E le c\
D R
AW
IN
G S\
E-
1.
dw g A pr
5,
- 7 :3
6a m
EPM
TEL
5624-M
R. SANDERS
C. GILMAN
E. JONES 4/25/25
Agricultural
Service Research
USDA ARS SOUTHEAST AREA
141 EXPERIMENT STATION ROAD
STONEVILLE MS 38776
PHASE 3 CHILLER UPGRADE USNPRC
RICHARD B. RUSSELL AGRICULTURAL RESEARCH CENTER (RRC)
950 COLLEGE STATION ROAD, ATHENS, GA 30605
JGM
M. SCOTTNo. 032883
GEORGIA
PROFESSIONAL **
E-001
ELECTRICAL LEGEND
SYMBOL / KEY
REVISION TAG DESIGNATION
DESCRIPTION
TOP DESIGNATION IS SECTION DESIGNATION
KEY NOTE DESIGNATION
BOTTOM DESIGNATION IS SECTION SHEET LOCATION (STANDARD SYMBOL SCALED DOWN FOR LEGEND)
NOTE: ANY CIRCUIT WITHOUT FURTHER DESIGNATION INDICATES A 2 WIRE #12AWG CIRCUIT WITH A #12AWG
GND. A GREATER NUMBER OF WIRES IS INDICATED AS FOLLOWS:
4 WIRE, 2 CIRCUITS & GROUND (LONGER SLASH INDICATES NEUTRAL)
6 WIRE, 3 CIRCUITS & GROUND, ETC.(WIRING LARGER THAN #10AWG SHALL BE AS NOTED)
INDICATES #10 GROUND CONDUCTOR UOI (DOUBLE TICK/SLASH INDICATES ISOLATED GROUND)
PANELBOARD AND CIRCUIT DESIGNATION
RACEWAY CONCEALED IN WALL OR CEILING OR EXPOSED ON STRUCTURE AS REQUIRED
HOMERUN TO PANELBOARD - LETTERS INDICATE PANEL, NUMBERS INDICATE CIRCUIT
(NOT ALL SYMBOLS MAY APPLY, TYP.)
TAG STYLE ANNOTATION: CIRCUIT DESIGNATION, POINT TOWARD ASSOCIATED BRANCH/DIST PANEL.
TAG STYLE ANNOTATION: ELEC EQUIP DESIGNATION (PANELBOARDS, XFMRS, DIST BOARDS, ETC.)
TAG STYLE ANNOTATION: ELECTRICALLY POWERED EQUIPMENT (PROVIDED BY OTHERS)
TAG STYLE ANNOTATION: ELECTRICALLY POWERED MECHANICAL/PLUMBING EQUIPMENT (RE: MECHANICAL)
TOP DESIGNATION IS PLAN / ENLARGED PLAN / DETAIL NUMBER
BOTTOM DESIGNATION IS SHEET LOCATION (STANDARD SYMBOL SCALED DOWN FOR LEGEND)
LA1:13
LA1:13
EP101
A
EP101
GENERAL SYMBOLS LEGEND
ABBR.
AMPERE(S)
DESCRIPTION
A / AMP
ALTERNATING CURRENT : AIR COMPRESSOR
AIR CURTAIN : ABOVE COUNTER/ BACKSPLASH
AMPERE FRAME
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AIR HANDLING UNIT
AMPERE INTERRUPT CAPACITY
ALUMINUM
AMP TRIP
AUTOMATIC TRANSFER SWITCH
AUTOMATIC
AIR COOLED CONDENSING UNITACCU
AC
AC
AF
AFF
AFG
AHU
AIC
AL
AT
ATS
AUTO
AUX
AWG
BRKR
BLDG
C
CAT
CB
CCT
CCTV
CFCI
CKT
CLG
CMH
COMM
CP
CPT
CRI
CT
CU
AUXILIARY
BREAKER
BUILDING
CONDUIT
CATEGORY
CIRCUIT BREAKER
CORRELATED COLOR TEMPERATURE
CLOSED CIRCUIT TELEVISION
CONTRACTOR FURNISHED/ INSTALLED
CIRCUIT
CEILING
COMMUNICATIONS MANHOLE
AMERICAN WIRE GUAGE
COMMUNICATIONS
CONTROL POWER TRANSFORMER
COLOR RENDERING INDEX
CURRENT TRANSFORMER : COOLING TOWER
COPPER : CONDENSING UNIT
CONDENSATE PUMP
HEIGHT
HORSE POWER : HEAT PUMP
INTERMEDIATE METAL CONDUIT
KILO
THOUSAND AMPERE INTERRUPT CAPACITY
THOUSANDS OF CIRCULAR MILS
KILOVOLT
KILOVOLT-AMPERES
KILOWATT
KILOWATT - HOUR
LENGTH
LOCAL AREA NETWORK
HAND-OFF AUTOMATICHOA
HP
IMC
K
KAIC
KCMIL
KV
KVA
KW
KWHR
L
LAN
LTG
MAX
MCA
MCB
MCC
MGB
MH
MIN
MLO
NEC
NEMA
NFPA
NC
NESC
NL
NO
NTS
LIGHTING
MINIMUM CIRCUIT AMPACITY
MAIN CIRCUIT BREAKER
MOTOR CONTROL CENTER
MAIN GROUND BAR
MANHOLE / MOUNTING HEIGHT
MINIMUM
MAIN LUGS ONLY
NATIONAL ELEC CODE
NATIONAL ELEC MANUFACTURER'S ASSOCIATION
NATIONAL FIRE PROTECTION ASSOCIATION
MAXIMUM
NORMALLY CLOSED
NIGHT LIGHT
NORMALLY OPEN
NOT TO SCALE
NATIONAL ELEC SAFETY CODE
ABBR. DESCRIPTION
D
DC
DISC
DIST
DPST
DPDT
EC
EF
ELEC
EMER
EMH
EMT
EQUIP
DEPTH
DIRECT CURRENT
DISCONNECT
DISTRIBUTION
DOUBLE POLE SINGLE THROW
DOUBLE POLE DOUBLE THROW
EMPTY CONDUIT
EXHAUST FAN
ELECTRICAL
ELECTRICAL MANHOLE
ELECTRICAL METALLIC TUBING
EQUIPMENT
EMERGENCY
PF
PH
PNL
PTAC
PVC
REC / RECPT
RMC
RTU
RVNR
SA
SCCR
SF
SPD
POWER FACTOR
PHASE
PANEL : PANELBOARD
PACKAGED THRU-WALL AIR CONDITIONER
POLYVINYL CHLORIDE
RECEPTACLE
RIGID METAL CONDUIT
ROOF TOP UNIT
REDUCED VOLTAGE NON-REVERSING
SHORT CIRCUIT CURRENT RATING
SUPPLY FAN
SURGE PROTECTIVE DEVICE
SURGE ARRESTORS
ETR
EUH
EXP
EWH / EWC
EXISTING
EXPLOSION PROOF
ELECTRIC WATER HEATER / COOLER
ELECTRIC UNIT HEATER SPEC
SPST
SWBD
SWGR
SPECIFICATIONS
SWITCHBOARD
SINGLE POLE SINGLE THROW
F
FACP
FCU
FLEX
G / GND
GFGI
GFI / GFCI
GRS
GUH
GWH
FUSE
FIRE ALARM CONTROL PANEL
FAN COIL UNIT
FLEXIBLE
GROUND
GOVERNMENT FURNISHED / INSTALLED
GROUND FAULT (CIRCUIT) INTERRUPTER
GALVANIZED RIGID STEEL
GAS UNIT HEATER
GAS WATER HEATER
TMGB
TOL
TYP
UH
UOI
UL
W
WP
Z
TELECOMMUNICATION MAIN GROUNDING BUSBAR
THERMAL OVERLOAD
TYPICAL
UNIT HEATER
UNLESS OTHERWISE INDICATED
UNDERWRITERS LABORATORY
WATTS : WIDTH
WEATHERPROOF
IMPEDANCE
P POLE(S)
SPDT SINGLE POLE DOUBLE THROW
SWITCHGEAR
H / HT
NAT NATIONAL
XFMR TRANSFORMER
ETC. ETCETERA
MTD MOUNTED
N NEUTRAL
QTY QUANTITY
ABBREVIATIONS
ABBREVIATIONS ABOVE ARE FOR ELECTRICAL
SHEETS ONLY. NOT ALL MAY BE USED.
MGC MAIN GROUNDING CONDUCTOR
EX / EXIST
EXISTING TO REMAIN
SYMBOL / KEY
FEEDER KEY
DESCRIPTION
GROUND
CURRENT XFMR
M METER
SURGE PROTECTIVE DEVICESPD
J JUNCTION BOX
CONTINUATION, UPSTREAM LABEL#
J JUNCTION BOX FLOOR MOUNTED
TAP BOXTB
PANELBOARD (PLAN VIEW)
MOTOR
ONE-LINE DIAGRAM, SCHEDULE, AND
DISTRIBUTION LEGEND
LOCAL DISCONNECT
LOCAL DISCONNECT W/ OCP
VARIABLE FREQUENCY DRIVEVFD
LOCAL MOTOR STARTER ( * = TYPE)*
LOCAL COMBINATION MOTOR STARTER
( * = TYPE) (2S: TWO SPEED) (RV: REDUCED VOLTAGE) (FVR/FVNR:FULL
VOLTAGE REVERSING/NON-REVERSING)
PNL PANELBOARD (ONE-LINE)
TRANSFER SWITCH ( * = TYPE)
(ATS : AUTOMATIC) (MTS: MANUAL)
1. THE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE DRAWINGS ARE NOT
INTENDED TO INDICATE OR DESCRIBE ALL WORK REQUIRED FOR THE FULL
PERFORMANCE AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT.
2. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL PARTS OF THE
WORK SO THAT NO WORK SHALL BE LEFT IN AN UNFINISHED OR INCOMPLETE
CONDITION. INSTALLATION OF ELECTRICAL WORK SHALL BE COORDINATED WITH OTHER
TRADES BEFORE ANY INSTALLATION IS DONE. CONDUIT AND DEVICES SHOWN ON PLANS
ARE SCHEMATIC.
3. ALL WORK SHALL CONFORM TO APPLICABLE INDUSTRY AND MANUFACTURER'S
PUBLISHED STANDARDS FOR QUALITY OF MATERIALS AND WORKMANSHIP, AS WELL AS,
ALL REQUIREMENTS IN THESE DRAWINGS AND SPECIFICATIONS. ANY CONFLICTING
REQUIREMENTS OF THE SOURCES LISTED ABOVE SHALL BE BROUGHT TO THE
CONTACTING OFFICER'S ATTENTION PRIOR TO PROCEEDING WITH THE WORK.
4. THE CONTRACTOR SHALL PROTECT ANY EXISTING, IN-PLACE, AND NEW WORK.
5. ONCE ON SITE, THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SHALL VERIFY
ALL NEW AND EXISTING CONDITIONS SHOWN ON THESE DRAWINGS. THE CONTRACTOR
SHALL NOTIFY THE C.O. IN WRITING OF ANY DIFFERING CONDITIONS BEFORE
COMMENCEMENT OF WORK.
6. THE CONTRACTOR SHALL PLAN WORK TO PROVIDE ADEQUATE PROTECTION FOR
PERSONS AND PROPERTY AT ALL TIMES, AND EXECUTE THE WORK IN SUCH A MANNER
TO AVOID ANY HAZARD TO PERSONS AND PROPERTY AS NECESSARY.
7. MINIMUM RACEWAY SIZE SHALL BE 3/4-IN. INCREASE RACEWAY SIZE AS REQUIRED TO
LIMIT RACEWAY FILL RATIO TO LESS THAN 40% FULL.
8. ALL CONDUCTORS SHALL BE COPPER.
9. ALL FEEDERS AND BRANCH CIRCUITS SHALL INCLUDE A GREEN INSULATED GROUND
CONDUCTOR, SIZE PER NATIONAL ELECTRICAL CODE, OR AS SHOWN, CONNECTED TO
EACH DEVICE AND OUTLET BOX ON THE CIRCUIT AND TO THE PANELBOARD GROUND
BUS. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT.
MULTIPLE BRANCH CIRCUITS IN ONE RACEWAY REQUIRE ONLY ONE GROUND
CONDUCTOR.
10. ALL SAFETY DISCONNECTS SHALL BE HEAVY DUTY 240V NEMA 3R NON-FUSED TYPE.
11. REFER TO ONE-LINE DIAGRAMS, SCHEDULES, AND TABLES FOR CONDUCTOR AND
CONDUIT SIZES NOT SHOWN ON PLANS.
12. PROVIDE LABELS ON ALL RECEPTACLES, WALL MOUNTED LIGHT SWITCHES/OCCUPANCY
SENSORS AND JUNCTION BOXES INDICATING THE SOURCE PANEL AND CIRCUIT(S). TEXT
SHALL BE BLACK 1/4-IN IN HEIGHT PRINTED ON A CLEAR LABEL. HANDWRITTEN LABELS
ARE NOT PERMITTED.
13. COORDINATE WALL, FLOOR AND ROOF PENETRATIONS WITH THE CONTRACTING
OFFICER.
14. SUPPLEMENTAL STEEL MEMBERS REQUIRED TO SUPPORT ELECTRICAL EQUIPMENT
FROM MAIN STRUCTURE SHALL BE PROVIDED BY THE ELECTRICAL CONTRACTOR
UNLESS SPECIFICALLY NOTED OTHERWISE.
15. EXACT LOCATIONS OF PANELBOARDS, DISCONNECTS, TIMERS, AND SWITCHES SHALL BE
COORDINATED WITH FINAL LOCATIONS OF WALL-MOUNTED ARCHITECTURAL AND
MECHANICAL EQUIPMENT. MOUNT DISCONNECTS AND SWITCHES MINIMUM 48" AFF.
MOUNT TIMERS MINIMUM 40" AFF.
16. SPECIFICATIONS TAKE PRECEDENCE OVER DRAWINGS. HOWEVER, ITEMS SHOWN ON
DRAWING BUT NOT IN THE SPECIFICATIONS ARE REQUIRED WITHIN THE PROJECT
SCOPE. IN ADDITION, SPECIFIC ITEMS SHOWN ON THE DRAWINGS TAKE PRECEDENCE
OVER SPECIFICATIONS IN CASES WHERE THE SPECIFICATION HAS OPTIONS.
17. ALL EQUIPMENT INSTALLED IN THIS PROJECT SHALL COMPLY WITH THE "BUY
AMERICAN ACT". BASIS OF DESIGN SHOWN ON SCHEDULES IS TO ESTABLISH A
STANDARD OF QUALITY, NOT TO LIMIT COMPETITION. EQUIVALENT EQUIPMENT FROM
ANOTHER MANUFACTURER IS ACCEPTABLE.
18. PROVIDE WEATHERPROOF COVERS FOR ALL SWITCHES.
19. THE CONTRACTOR SHALL COORDINATE WITH THE ARCHITECTURAL, MECHANICAL, CIVIL
DRAWINGS AND SPECIFICATIONS FOR EXACT LOCATION OF EQUIPMENT. ALL WORK
SHALL BE COORDINATED WITH THE WORK OF OTHER TRADES TO AVOID INTERFERENCE.
REFER TO MECHANICAL DRAWINGS FOR PIPES, DUCTS, AND MECHANICAL EQUIPMENT.
GENERAL PROJECT NOTES:
CIRCUITRY RUN IN STRAIGHT LINE SEGMENTS SIGNIFIES EXPOSED SURFACE-MOUNTED RACEWAY
(SEE SPECIFICATIONS).
WS
XB
XC
XE
X7X6
VF
D
VF
D
VF
D
VF
D
CH-1
CHWP-1
ETR MAIN SERVICE
SWITCHGEAR 'MSB'
HMPU:19,21,23
HMPU
CH-2
CHWP-2
HMPU:25,27,29
ETR
ETR
ETR CWP-1
HMPU:31,33,35
ETR CWP-2
HMPU:37,39,41
MSB
TEMPORARY
DISCONNECT
CH-1
ETR
BUSWAY
ETR LIGHTS
ETR LIGHTS
ETR
TB
COR
REVISIONS
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
ADMIN OFFICER
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
T:
\2
Pr oj ec ts
\5
4- M
U
SD
A Ph as e
C hi lle r U pg ra de s
- A th en s G
A\
W or ki ng
F ol de r\E le c\
D R
AW
IN
G S\
ED
1.
dw g A pr
5,
- 7 :3
6a m
EPM
TEL
5624-M
R. SANDERS
C. GILMAN
E. JONES 4/25/25
Agricultural
Service Research
USDA ARS SOUTHEAST AREA
141 EXPERIMENT STATION ROAD
STONEVILLE MS 38776
PHASE 3 CHILLER UPGRADE USNPRC
RICHARD B. RUSSELL AGRICULTURAL RESEARCH CENTER (RRC)
950 COLLEGE STATION ROAD, ATHENS, GA 30605
JGM
M. SCOTTNo. 032883
GEORGIA
PROFESSIONAL **
ED101
ELECTRICAL DEMOLITIONSCALE:
ELECTRICAL DEMOLITION
1/8" = 1'-0"
ED-101
KEYED NOTES
1. DEMOLISH EXISTING BRANCH CIRCUIT BACK
TO PANEL.
2. DEMOLISH EXISTING CIRCUIT BACK TO
TEMPORARY DISCONNECT CH-1.
3. TEMPORARY DISCONNECT CH-1 IS ETR.
DEMOLISH "CH-1" LABEL. REPLACE LABEL
WITH LABEL THAT SAYS "TEMPORARY
DISCONNECT".
4. DEMOLISH EXISTING CONDUIT AND WIRING
BACK TO VFD.
08' 8'
1'-0"
4'
SCALE: 1/8" =
GRAPHIC SCALE
NORTH
GENERAL NOTES
1. REFER TO E-001 FOR GENERAL NOTES AND
SYMBOLS LIST.
2. ALL EXISTING RECEPTACLES AND EQUIPMENT
NOT ASSOCIATED WITH DEMOLITION SCOPE OF
WORK SHALL REMAIN ACTIVE. REWORK
EXISTING CIRCUITRY AS REQUIRED IN ORDER
TO RE-FEED AND/OR MAINTAIN CIRCUIT
CONTINUITY.
XB
XC
XE
X7X6
VF
D
VF
D
VF
D
VF
D CH-1
CH-2
CHWP-1
CHWP-2
MAIN SERVICE
SWITCHGEAR 'MSB'
HMPU:56,58,60
HMPU:25,27,29
ETR
NEW
ETR
NEW
ETR CWP-1
HMPU:31,33,35
ETR CWP-2
HMPU:37,39,41
HMPU
MSB
ETR
TEMPORARY
DISCONNECT
ETR
BUSWAY
ETR LIGHTS
ETR LIGHTS
ETR
TBTB
COR
REVISIONS
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
ADMIN OFFICER
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
T:
\2
Pr oj ec ts
\5
4- M
U
SD
A Ph as e
C hi lle r U pg ra de s
- A th en s G
A\
W or ki ng
F ol de r\E le c\
D R
AW
IN
G S\
E-
1.
dw g A pr
5,
- 7 :3
6a m
EPM
TEL
5624-M
R. SANDERS
C. GILMAN
E. JONES 4/25/25
Agricultural
Service Research
USDA ARS SOUTHEAST AREA
141 EXPERIMENT STATION ROAD
STONEVILLE MS 38776
PHASE 3 CHILLER UPGRADE USNPRC
RICHARD B. RUSSELL AGRICULTURAL RESEARCH CENTER (RRC)
950 COLLEGE STATION ROAD, ATHENS, GA 30605
JGM
M. SCOTTNo. 032883
GEORGIA
PROFESSIONAL **
E-101
ELECTRICAL FLOOR PLANSCALE:
ELECTRICAL FLOOR PLAN
1/8" = 1'-0"
E-101
KEYED NOTES
1. PROVIDE POWER CONNECTION TO CH-1
USING THE NON FUSED DISCONNECT THAT
THE CHILLER COMES EQUIPPED WITH.
2. PROVIDE POWER VIA NEW 1350 A BUS WAY
TO THE TAP BOX. MINIMUM OF 1' CLEARANCE
AROUND BUS WAY. CROSS OVER EXISTING
BUS WAY, AND RAISE EXISTING LIGHTING AS
NEEDED. SEE DETAIL 2/E-501 FOR EXISTING
ELEMENTS.
3. PROVIDE NEW TAP BOX. PROVIDE POWER VIA
CONDUIT AND WIRE FROM TAP TO CH-1.
PROVIDE A 480 V 3PH/4W SYSTEM VIA 2 RUNS
OF 600 KCMIL COPPER WIRE AND 3/0 AWG
COPPER GROUND WIRE IN 3 1/2" CONDUIT.
4. PROVIDE POWER CONNECTION TO CHWP-1
VIA EXISTING VFD. PROVIDE NEW 150 A 480 V
3 PHASE BREAKER ON HMPU:56,58,60. REFER
TO PANEL SCHEDULE ON E-501. USE 3 AWG
COPPER WIRE AND 8 AWG COPPER GROUND
WIRE IN 1" CONDUIT.
5. REFER TO DETAIL 1/E-501 FOR ETR BREAKER.
08' 8'
1'-0"
4'
SCALE: 1/8" =
GRAPHIC SCALE
NORTH
GENERAL NOTES
1. REFER TO E-001 FOR GENERAL NOTES AND
SYMBOLS LIST.
2. REFER TO EQUIPMENT FEEDER SCHEDULE ON
DRAWING E-501.
3. PROVIDE CONDUIT SYSTEM FOR MECHANICAL
CONTROLS AS REQ'D COORDINATE WITH
MECHANICAL INSTALLER PRIOR TO ROUGH IN.
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
ADMIN OFFICER
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
T:
\2
Pr oj ec ts
\5
4- M
U
SD
A Ph as e
C hi lle r U pg ra de s
- A th en s G
A\
W or ki ng
F ol de r\E le c\
D R
AW
IN
G S\
E-
1.
dw g A pr
5,
- 7 :3
6a m
EPM
TEL
5624-M
R. SANDERS
C. GILMAN
E. JONES 4/25/25
Agricultural
Service Research
USDA ARS SOUTHEAST AREA
141 EXPERIMENT STATION ROAD
STONEVILLE MS 38776
PHASE 3 CHILLER UPGRADE USNPRC
RICHARD B. RUSSELL AGRICULTURAL RESEARCH CENTER (RRC)
950 COLLEGE STATION ROAD, ATHENS, GA 30605
JGM
M. SCOTTNo. 032883
GEORGIA
PROFESSIONAL **
E-501
ELECTRICAL DETAILS AND SCHEDULES
TVSS
1A
NWH2
1600 A
MAN OP
TU (A)
LSIG
1B
NWH2
800 A
MAN OP
TU (A)
LSI
1C
NWH2
800 A
MAN OP
TU (A)
LSI
1D
NWH2
800 A
MAN OP
TU (A)
LSI
2A
NWH2
1600 A
MAN OP
TU (A)
LSIG
2B
NWH2
1600 A
MAN OP
TU (A)
LSIG
2C
NWH2
800 A
MAN OP
TU (A)
LSI
2D
NWH2
800 A
MAN OP
TU (A)
LSI
3D
NWH2
1600 A
MAN OP
PREP SP
LSIG
3BC
NWH2
3200 A
MAN OP
TU (A)
LSIG
ETR
BREAKER
FOR CH-1
SCALE:
SECTION OF MSB
N.T.S.
E-501
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .