Attachment 3_Drawings.pdf
PDF 6 MB Posted
- Attached to
- Remodel Restroom Building 822
- Solicitation number
- FA663325Q0006
About this file
These are architectural and engineering design drawings for a restroom remodel project at Building 822 of the Minneapolis Air Reserve Station. The comprehensive set of drawings includes a project location map, demolition plans for first and second floors, new work plans, reflected ceiling plans, restroom elevations, and detailed schedules for plumbing fixtures, finishes, accessories, and electrical systems. Key elements of the project include removing existing fixtures, installing new ADA-compliant urinals and water closets, replacing flooring and wall finishes, reconfiguring electrical systems, and repainting. The drawings are dated 07 January 2025 and prepared by the 934th CEC Design Team, indicating a 95% design completion stage for a renovation of approximately 2,000 square feet across two floors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2_Specifications.pdf | ||
| Attachment 1_ Statement of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
TM
T
C M
S
C M
S
TM
T
TI
TL
E- D
R
AW
IN
G
IN
D
EX
PR
O
JE
C T
-0
SU
ST
AI
N
R R
O
FF
IC
E, B
M
IN
N
EA
PO
LI
S
AI
R R
ES
ER
VE
S
TA
TI
O N
M N
T-001 B-822
AN
SI
D
MINNEAPOLIS AIR RESERVE STATION
PROJECT 25-0011
SUSTAIN RESTROOM & OFFICE, B822
95% DESIGN
07 JANUARY 2025
4 TH
T W
LR
IA
I G
N
I F
934TH CEC DESIGN TEAM
C
EC
IN
-H
O U
SE
D
ES
IG
N
DRAWING INDEX
SHEET DESCRIPTION
T-001 TITLE - DRAWING INDEX
G-001 PROJECT LOCATION
AD-101 DEMOLITION PLAN - FIRST FLOOR
AD-102 DEMOLITION PLAN - SECOND FLOOR
A-101 NEW WORK PLAN - FIRST FLOOR
A-102 NEW WORK PLAN - SECOND FLOOR
A-103 REFLECTED CEILING PLAN - SECOND FLOOR
A-104 RESTROOM ELEVATIONS
A-601 SCHEDULES
ED-101 ELECTRICAL DEMOLITION PLAN - SECOND FLOOR
E-101 POWER PLAN - SECOND FLOOR
9 3
TH
T W
RI
A
I G
N
F
PROJECT
LOCATION
934TH MAIN GATE
VICINITY MAP- NOT TO SCALE
TH
A
VE
NORTH
ACCESS
GATE
X
X X X
X X X X X X X X
X X X X X X X X X
X X
X X X X
X X X X X X
X X X X X
X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X X X X X X X X X X X X X
X X X X X X
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
TM
T
C M
S
C M
S
PR
O
JE
C
T
LO
C
AT
IO
N
PR
O
JE
C
T
-0
SU
ST
AI
N R
R
O
FF
IC
E, B
M
IN
N
EA
PO
LI
S
AI
R
R
ES
ER
VE
S
TA
TI
O
N M
N
G-001
BLDG-822
WI
NG
I F
TLRI
A
934 TH
AN
SI
D
C
EC
IN
-H
O U
SE
D
ES
IG
N
PROJECT LOCATION
SECOND FLOOR
NORTH
GENERAL NOTES
1. BUILDING 822 IS LOCATED IN A CONTROLLED AREA. THE CONTRACTOR IS RESPONSIBLE
FOR PROVIDING MATERIALS FOR AND ESTABLISHING THE "FREE ZONE". THE CONTRACTOR
WILL BE REQUIRED TO STAY WITHIN THE BOUNDARIES OF THE ESTABLISHED "FREE ZONE"
OR BE ESCORTED BY AN AUTHORIZED GOVERNMENT REPRESENTATIVE.
2. THE FACILITY WAS CONSTRUCTED IN THE 1940S AND IS KNOWN TO CONTAIN ASBESTOS
BUILDING MATERIALS, HOWEVER PREVIOUS PROJECTS ABATED THOSE MATERIALS. IF
ADDL. MATERIALS ARE SUSPECTED, CONTRACTOR IS RESPONSIBLE FOR TESTING.
3. THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF EXISTING CONDITIONS AND
FIELD MEASUREMENT. NOTIFY THE PROJECT ENGINEER IF CONDITIONS DIFFER FROM
THOSE DISPLAYED IN THESE DRAWINGS.
4. THE PROJECT AREA IS PROTECTED BY A WET PIPE FIRE SUPPRESSION SYSTEM. RISER IS
LOCATED IN THE MECHANICAL ROOM AT THE NORTHWEST CORNER OF B822. CALL
612-713-1919 FOR TECHNICAL ASSISTANCE.
5. CONTRACTOR TO PROVIDE RED LINED DRAWINGS REFLECTING AS-BUILT CONDITIONS
UPON PROJECT COMPLETION.
USE THIS ENTRANCE
NTS
WORK AREA - BUILDING 8221
PARKING/LAYDOWN AREA
FREE ZONE
PROJECT LOCATION
FIRST FLOOR
FREE
ZONE
AutoCAD SHX Text N.I.C.
AutoCAD SHX Text N.I.C.
AutoCAD SHX Text N.I.C.
AutoCAD SHX Text N.I.C.
AutoCAD SHX Text N.I.C.
AutoCAD SHX Text N.I.C.
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
TM
T
C M
S
C M
S
D
EM
O
LI
TI
O
N P
LA
N
FI
R
ST
F
LO
O R
PR
O
JE
C
T
-0
SU
ST
AI
N R
R
O
FF
IC
E, B
M
IN
N
EA
PO
LI
S
AI
R
R
ES
ER
VE
S
TA
TI
O
N M
N
AD-101
BLDG-822
WI
NG
I F
TLRI
A
934 TH
AN
SI
D
Scale: 3/8"=1'-0"
DEMOLITION PLAN - FIRST FLOOR1
SHEET KEY NOTES
REMOVE AND DISPOSE OF LAVATORY, FAUCET AND ALL EXPOSED PIPING. SUPPLY,
WASTE AND VENT PIPING TO REMAIN.
REMOVE AND DISPOSE OF WATER CLOSET AND FLUSH VALVE. CARRIER, WASTE LINE,
SUPPLY AND VENT PIPING TO REMAIN.
REMOVE AND DISPOSE OF URINAL, FLUSH VALVE AND WASTE LINE TO MAIN. SUPPLY
AND VENT PIPING TO REMAIN.
REMOVE AND DISPOSE OF ALL TOILET AND URINAL PARTITIONS. SALVAGE TOILET
ACCESSORIES MOUNTED TO PARTITIONS FOR REUSE.
GRAB BARS AND TOILET PAPER DISPENSERS MOUNTED TO CMU WALL TO REMAIN IN
PLACE.
REMOVE AND DISPOSE OF EXISTING VCT FLOORING. PREPARE FLOOR FOR NEW
FINISHES.
REMOVE AND DISPOSE OF EXISTING VINYL BASE. PREPARE WALL FOR NEW FINISHES.
EXISTING FLOOR DRAIN TO REMAIN.
REMOVE AND SAVE FOOT OPERATED WASHFOUNTAIN FOR REINSTALLATION.
EXISTING COMBO WASTE BASKET/PAPER TOWEL DISPENSER TO REMAIN.
REMOVE AND SAVE MIRRORS AND SOAP DISPENSERS FOR REINSTALLATION.
ALL EXIST. LOCKERS TO REMAIN IN PLACE.
PATCH EXISTING WALLS IN PREPARATION FOR NEW PAINT.
PREPARE DOOR AND FRAME FOR NEW PAINT.
ITEMS TO DEMOLISH
1. THE CONTRACTOR IS RESPONSIBLE FOR FIELD MEASUREMENT AND VERIFICATION
OF EXISTING CONDITIONS. NOTIFY THE PROJECT ENGINEER IF CONDITIONS DIFFER
FROM THOSE DEPICTED IN THESE DRAWINGS.
2. FOR ALL ITEMS TO REMAIN, PROTECT FROM DAMAGE DURING DEMOLITION AND
CONSTRUCTION.
3. ALL ITEMS TO BE DEMOLISHED MUST BE REMOVED AS TO FULLY ALLOW FOR
PROPER INSTALLATION OF NEW ITEMS.
4. DEMOLISH (DEMO) MEANS TO REMOVE AND DISPOSE OF ALL ITEMS IDENTIFIED BY
KEYNOTES AND AS DEPICTED WITH HATCHING OR DASHED LINES.
5. SHUTOFF VALVE FOR WATER SUPPLY TO RESTROOMS IS LOCATED ON THE SOUTH
WALL OF THE MEZZANINE ABOVE.
NORTH
GENERAL NOTES:
XX
C
EC
IN
-H
O U
SE
D
ES
IG
N
EXTENT OF FLOORING
DEMO AREA
AutoCAD SHX Text N.I.C.
AutoCAD SHX Text N.I.C.
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
TM
T
C M
S
C M
S
D
EM
O
LI
TI
O
N P
LA
N
SE
C O
N D
F
LO
O R
PR
O
JE
C
T
-0
SU
ST
AI
N R
R
O
FF
IC
E, B
M
IN
N
EA
PO
LI
S
AI
R
R
ES
ER
VE
S
TA
TI
O
N M
N
AD-102
BLDG-822
WI
NG
I F
TLRI
A
934 TH
AN
SI
D
Scale: 1/2"=1'-0"
DEMOLITION PLAN - SECOND FLOOR1
SHEET KEY NOTES
REMOVE AND DISPOSE OF CLOSET WALLS.
REMOVE AND DISPOSE OF DOOR AND FRAME.
REMOVE AND DISPOSE OF CARPET. PREPARE FLOOR FOR NEW FINISHES.
REMOVE AND DISPOSE OF EXISTING VINYL BASE. PREPARE WALL FOR NEW
FINISHES.
PATCH EXISTING GYPSUM BOARD WALLS AND PREPARE FOR NEW FINISHES.
ITEMS TO DEMOLISH
1. THE CONTRACTOR IS RESPONSIBLE FOR FIELD MEASUREMENT AND VERIFICATION
OF EXISTING CONDITIONS. NOTIFY THE PROJECT ENGINEER IF CONDITIONS DIFFER
FROM THOSE DEPICTED IN THESE DRAWINGS.
2. FOR ALL ITEMS TO REMAIN, PROTECT FROM DAMAGE DURING DEMOLITION AND
CONSTRUCTION.
3. ALL ITEMS TO BE DEMOLISHED MUST BE REMOVED TO FULLY ALLOW FOR PROPER
INSTALLATION OF NEW ITEMS.
4. WALL DEMOLITION INCLUDES GYPSUM BOARD, WALL STUDS, INSULATION, SILL
PLATE, TOP PLATE AS REQD., DOORS AND DOOR FRAMES UNLESS OTHERWISE
NOTED.
5. DEMOLISH (DEMO) MEANS TO REMOVE AND DISPOSE OF ALL ITEMS IDENTIFIED BY
KEYNOTES AND AS DEPICTED WITH HATCHING.
NORTH
GENERAL NOTES:
XX
C
EC
IN
-H
O U
SE
D
ES
IG
N
AutoCAD SHX Text N.I.C.
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
TM
T
C M
S
C M
S
N
EW
W O
R K
PL
AN
FI
R
ST
F
LO
O R
PR
O
JE
C
T
-0
SU
ST
AI
N R
R
O
FF
IC
E, B
M
IN
N
EA
PO
LI
S
AI
R
R
ES
ER
VE
S
TA
TI
O
N M
N
A-101
BLDG-822
WI
NG
I F
TLRI
A
934 TH
AN
SI
D
SHEET KEY NOTES
INSTALL NEW LAVATORY, FAUCET & STOPS PER PLUMBING SCHEDULE. REUSE
EXISTING SUPPLY, WASTE AND VENT.
INSTALL NEW WATER CLOSET & FLUSH VALVE PER PLUMBING SCHEDULE. REUSE
EXISTING CARRIER, SUPPLY, WASTE AND VENT LINES.
INSTALL NEW ADA URINAL, FLUSH VALVE, AND WASTE LINE BACK TO MAIN PER
PLUMBING FIXTURE SCHEDULE.
INSTALL NEW LAMINATE, FLOOR MOUNTED TOILET PARTITION PER ACCESSORIES
SCHEDULE.
REINSTALL SALVAGED TOILET PAPER DISPENSER.
REINSTALL SALVAGED MIRROR AND SOAP DISPENSERS.
PRIME AND PROVIDE A MINIMUM 2 COATS OF PAINT ON ALL WALLS PER FINISH
SCHEDULE.
INSTALL NEW VCT FLOORING PER FINISH SCHEDULE. INSTALL SO THAT NO TILE
WILL BE LESS THAN HALF A TILE AT THE ROOM PERIMETER. IN ROOM 115, ENSURE
NEW VCT JOINTS ALIGN WITH EXISTING JOINTS.
INSTALL NEW RUBBER WALL BASE PER FINISH SCHEDULE.
PAINT DOOR AND FRAME PER FINISH SCHEDULE.
REINSTALL FOOT OPERATED WASHFOUNTAIN.
A1 A-103
Scale: 3/8"=1'-0"
NEW WORK PLAN - FIRST FLOOR1 NORTH
XX
1. THE CONTRACTOR IS RESPONSIBLE FOR FIELD MEASUREMENT AND
VERIFICATION OF EXISTING CONDITIONS. NOTIFY THE PROJECT ENGINEER IF
CONDITIONS DIFFER FROM THOSE DEPICTED IN THESE DRAWINGS.
2. FIXTURE ELEVATIONS SHOWN ON DRAWING A-601.
3. GYPSUM TO RECEIVE PAINT SHALL BE COATED WITH MIN. 1 COAT OF SHERWIN
WILLIAMS MULTI-PURPOSE LATEX PRIMER.
4. PROVIDE SCHLUTER, RENO-U ANODIZED ALUMINUM TRANSITION STRIP WHERE
NEW FLOOR FINISHES ABUT EXISTING FINISHES. CENTER TRANSITION STRIP
UNDER CLOSED DOORS.
GENERAL NOTES:
A3 A-103
A2 A-103
C
EC
IN
-H
O U
SE
D
ES
IG
N
EXTENT OF NEW FLOORING
IN ROOM 115
AutoCAD SHX Text N.I.C.
AutoCAD SHX Text N.I.C.
1. THE CONTRACTOR IS RESPONSIBLE FOR FIELD MEASUREMENT AND VERIFICATION
OF EXISTING CONDITIONS. NOTIFY THE PROJECT ENGINEER IF CONDITIONS DIFFER
FROM THOSE DEPICTED IN THESE DRAWINGS.
2. GYPSUM TO RECEIVE PAINT SHALL BE COATED WITH MIN. 1 COAT OF SHERWIN
WILLIAMS MULTI-PURPOSE LATEX PRIMER.
3. PROVIDE SCHLUTER, RENO-U ANODIZED ALUMINUM TRANSITION STRIP WHERE
NEW FLOOR FINISHES ABUT EXISTING FINISHES. CENTER TRANSITION STRIP
UNDER CLOSED DOORS.
NORTH
GENERAL NOTES:
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
TM
T
C M
S
C M
S
N
EW
W O
R K
PL
AN
SE
C O
N D
F
LO
O R
PR
O
JE
C
T
-0
SU
ST
AI
N R
R
O
FF
IC
E, B
M
IN
N
EA
PO
LI
S
AI
R
R
ES
ER
VE
S
TA
TI
O
N M
N
A-102
BLDG-822
WI
NG
I F
TLRI
A
934 TH
AN
SI
D
Scale: 1/2"=1'-0"
NEW WORK PLAN - SECOND FLOOR1
SHEET KEY NOTES
INSTALL NEW CARPET TILE PER FINISH SCHEDULE. BEGIN WITH A FULL TILE
CENTERED IN THE ROOM UNLESS DOING SO WILL RESULT IN LESS THAN A 3 INCH
WIDE TILE AT THE ROOM PERIMETER. ADJUST STARTING TILE AS NECESSARY TO
PREVENT THIS CONDITION.
INSTALL NEW RUBBER WALL BASE PER FINISH SCHEDULE.
PRIME AND PROVIDE A MINIMUM OF 2 COATS OF PAINT PER FINISH SCHEDULE.
XX
C
EC
IN
-H
O U
SE
D
ES
IG
N
AutoCAD SHX Text N.I.C.
1. THE CONTRACTOR IS RESPONSIBLE FOR FIELD MEASUREMENT AND VERIFICATION
OF EXISTING CONDITIONS. NOTIFY THE PROJECT ENGINEER IF CONDITIONS DIFFER
FROM THOSE DEPICTED IN THESE DRAWINGS.
2. GYPSUM BOARD TO RECEIVE PAINT SHALL BE COATED WITH MIN. 1 COAT OF
SHERWIN WILLIAMS MULTI-PURPOSE LATEX PRIMER.
NORTH
GENERAL NOTES:
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
TM
T
C M
S
C M
S
R
EF
LE
C
TE
D
C
EI
LI
N
G P
LA
N
SE
C O
N D
F
LO
O R
PR
O
JE
C
T
-0
SU
ST
AI
N R
R
O
FF
IC
E, B
M
IN
N
EA
PO
LI
S
AI
R
R
ES
ER
VE
S
TA
TI
O
N M
N
A-103
BLDG-822
WI
NG
I F
TLRI
A
934 TH
AN
SI
D
Scale: 1/2"=1'-0"
REFLECTED CEILING PLAN - SECOND FLOOR1
SHEET KEY NOTES
REMOVE LIGHT FIXTURES AND REINSTALL AFTER PAINTING.
EXTEND EXIST. SOFFIT TO SOUTH WALL OF ROOM TO CONCEAL EXIST. FIRE
PROTECTION PIPING. PROTECT EXIST. SPRINKLER HEADS. PAINT SOFFIT TO MATCH
WALL PER FINISH SCHEDULE.
PATCH GYPSUM BOARD AS REQD. AND PAINT CEILING PER FINISH SCHEDULE.
XX
C
EC
IN
-H
O U
SE
D
ES
IG
N
AutoCAD SHX Text N.I.C.
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
TM
T
C M
S
C M
S
R
ES
TR
O
O M
E
LE
VA
TI
O N
S
PR
O
JE
C T
-0
SU
ST
AI
N
R R
O
FF
IC
E, B
M
IN
N
EA
PO
LI
S
AI
R R
ES
ER
VE
S
TA
TI
O N
M N
A-104
BLDG-822
WI
NG
I F
TLRI
A
934 TH
AN
SI
D
Scale: 3/4"=1'-0"
MEN'S RESTROOM - NORTH ELEVATION2
Scale: 3/4" = 1'-0"
MEN'S RESTROOM - WEST ELEVATION1
Scale: 3/4"=1'-0"
MEN'S RESTROOM - EAST ELEVATION3
SHEET KEY NOTES
INSTALL 4'-0" X 4'-0" FRP PANEL BEHIND FOOT OPERATED WASHFOUNTAIN. MOUNT
WITH ADHESIVE.
EXIST. GRAB BARS
WATER CLOSET PER PLUMBING FIXTURE SCHEDULE
URINAL PER PLUMBING FIXTURE SCHEDULE
TOILET PARTITION PER ACCESSORIES SCHEDULE
EXIST. TOILET PAPER DISPENSER
LAVATORY PER PLUMBING FIXTURE SCHEDULE
EXIST. MIRROR
EXIST. HAND SOAP DISPENSER
PAINT PER FINISH SCHEDULE
WALL BASE PER FINISH SCHEDULE
EXIST.COMBO WASTE BASKET/PAPER TOWEL DISPENSER
EXIST. FOOT OPERATED WASHFOUNTAIN
XX
7 11
C
EC
IN
-H
O U
SE
D
ES
IG
N
ADA
URINAL
STANDARD
URINAL
2'
1' -5
3' -8
3'6"
3' -6
2' -1
0" 3' -4
3'-6"1'
3'
1' -7
3'
1'
7"-9"
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
TM
T
C M
S
C M
S
SC
H
ED
U
LE
S
PR
O
JE
C T
-0
SU
ST
AI
N
R R
O
FF
IC
E, B
M
IN
N
EA
PO
LI
S
AI
R R
ES
ER
VE
S
TA
TI
O N
M N
A-601
BLDG-822
WI
NG
I F
TLRI
A
934 TH
AN
SI
D
1. LISTED PRODUCTS ARE BASIS OF DESIGN AND ARE INTENDED TO REFERENCE THE
MINIMUM QUALITY AND PERFORMANCE REQUIREMENTS. ANY PRODUCTS THAT
MEET THE SALIENT CHARACTERISTICS OF THESE PRODUCTS MAY BE USED.
2. GYPSUM BOARD TO RECEIVE PAINT SHALL BE COATED WITH M IN. 1 COAT OF
SHERWIN WILLIAMS MULTI-PURPOSE LATEX PRIMER.
3. ALL AREAS TO RECEIVE PAINT WILL BE COATED WITH MIN. 2 FINISH COATS.
4. FOR COLORS NOTES AS "MATCH EXIST.", PROVIDE SAMPLES TO GOVT. FOR FINAL
COLOR SELECTION.
GENERAL NOTES:PLUMBING FIXTURE SCHEDULE
MARK FIXTURE TYPE MANUFACTURER MODEL NO. ACCESSORIES NOTES
P-1 WATER CLOSET WH, FV
AMERICAN STANDARD AFWALL
MILLENNIUM 3351101.020 WHITE
AMERICAN STANDARD 5901100.020
SLOAN REGAL 110-3.5-XL 1
P-2 LAVATORY WH
AMERICAN STANDARD
LUCERNE 0355012.020 WHITE DELTA 523LF-HGMHDF 1, 2
P-3 URINAL WH, FV
AMERICAN STANDARD WASHBROOK
6590001.020 WHITE SLOAN REGAL 186-0.5-XL 1, 3
NOTES: 1 - OR EQUAL
2 - PROVIDE NEW SPUD, SUPPLY LINES, ANGLE STOPS, TRAP & CONNECTION TO WASTE LINE. SAFETY STOPS ARE NOT PERMITTED.
3 - REPLACE DRAIN LINE FROM URINAL TRAP TO MAIN DRAIN WITH CIP
FINISH SCHEDULE
MARK MATERIAL MANUFACTURER PATTERN/COLOR SIZE NOTES
FLOOR MATERIAL
VCT-1 VINYL COMPOSITION TILE ARMSTRONG
STANDARD EXCELON IMPERIAL
TEXTURE, MATCH EXIST. 12" X 12" 1
CPT-1 CARPET TILE TARKETT AFTERMATH II - POTPOURRI 24" X 24" 1, 2
WALL MATERIAL
PT-1 PAINT (WALL) SHERWIN WILLIAMS MATCH EXIST., EGGSHELL - 1
PT-2 PAINT (DOOR & DOOR FRAME) SHERWIN WILLIAMS MATCH EXIST., SEMI-GLOSS - 1
PT-3 PAINT (CEILING) SHERWIN WILLIAMS SW 7005 PURE WHITE, FLAT - 1
PT-4 PRIMER SHERWIN WILLIAMS MULTI-PURPOSE LATEX PRIMER - 1
WALL BASE
RB-1 RUBBER WALL BASE TARKETT
TRADITIONAL VINYL 1/8", 32 PEBBLE,
COVE 4" HIGH 1
RB-2 RUBBER WALL BASE TARKETT
TRADITIONAL VINYL 1/8", 129 SILK,
COVE 4" HIGH 1
NOTES: 1 - OR EQUAL
2 - ASHLAR INSTALLATION
ACCESSORIES SCHEDULE
MARK FIXTURE VENDOR MODEL # COLOR/FINISH NOTES
TP-1 TOILET PARTITION BOBRICK DURALINE SERIES 1082
COMPACT GRADE LAMINATE -
PROVIDE STANDARD COLORS FOR
SELECTION 1
NOTES: 1 - OR EQUAL
ROOM FINISH SCHEDULE
ROOM # FLOOR FINISH WALL BASE WALL PAINT DOOR PAINT CEILING FINISH
115 N/A RB-2 PT-4, PT-1 PT-4, PT-2 N/A
118 VCT-1 RB-2 PT-4, PT-1 PT-4, PT-2 N/A
202 CPT-1 RB-1 PT-4, PT-1 PT-4, PT-2 PT-4, PT-3
Scale: 1/2"=1'-0"
STANDARD MOUNTING HEIGHTS1
C
EC
IN
-H
O U
SE
D
ES
IG
N
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
TM
T
C M
S
C M
S
EL
EC
TR
IC
AL
D
EM
O
LI
TI
O N
P
LA
N
SE
C
O N
D F
LO
O
R
PR
O
JE
C T
-0
SU
ST
AI
N
R R
O
FF
IC
E, B
M
IN
N
EA
PO
LI
S
AI
R R
ES
ER
VE
S
TA
TI
O N
M N
ED-101
BLDG-822
WI
NG
I F
TLRI
A
934 TH
AN
SI
D
Scale: 1/2"=1'-0"
ELECTRICAL DEMOLITION PLAN - SECOND FLOOR1
SHEET KEY NOTES
REMOVE ELECTRICAL FROM CLOSET WALLS, INCLUDING ALL ELECTRICAL, LIGHT
SWITCHING, AND ABANDONED OR EMPTY BOXES/DROPS.
PULL WIRING TO REMOVE NORTHWEST LIGHT FIXTURE (REF A-103) FROM
HALLWAY CIRCUIT.
EXISTING DUPLEX SWITCH TO REMAIN & RECONFIGURE. SEE E-101 FOR
REVISIONS TO CONNECTION.
EXIST. ELECTRICAL RECEPTACLES TO REMAIN.
ELECTRICAL
1. REMOVAL INCLUDES COVER PLATES, RECEPTACLES, SWITCHES, BOXES, CONDUIT,
CONDUCTORS, AND ASSOCIATED HARDWARE.
2. EXISTING BREAKERS, CONDUIT, AND CONDUCTORS MAY BE REUSED AND/OR
EXTENDED WHERE POSSIBLE. IF NOT REUSED, DEMOLISH CONDUCTOR AND
CONDUIT BACK TO POWER PANEL, REMOVE BREAKER, AND UPDATE LEGEND.
3. ALL ELECTRICAL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE
NATIONAL ELECTRIC CODE.
GENERAL NOTES
XX
ELECTRICAL RECEPTACLE
SINGLE SWITCH
DUPLEX SWITCH
LEGEND
NORTH
DATA
DATA
C
EC
IN
-H
O U
SE
D
ES
IG
N
AutoCAD SHX Text N.I.C.
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A SHEET ID
TM
T
C M
S
C M
S
PO
W
ER
P
LA
N
SE
C O
N D
F
LO
O R
PR
O
JE
C
T
-0
SU
ST
AI
N R
R
O
FF
IC
E, B
M
IN
N
EA
PO
LI
S
AI
R
R
ES
ER
VE
S
TA
TI
O
N M
N
E-101
BLDG-822
WI
NG
I F
TLRI
A
934 TH
AN
SI
D
Scale: 1/2"=1'-0"
POWER PLAN - SECOND FLOOR1
SHEET KEY NOTES
INSTALL SURFACE MOUNT DUPLEX POWER AS SHOWN ON PLAN. EXTEND
EXISTING WIRING AND/OR INSTALL NEW CIRCUITS FROM ELECTRICAL PANEL.
INSTALL DUPLEX POWER 20A RECEPTACLES.
RECONFIGURE EXIST. DUPLEX SWITCH TO CONTROL ROOM 202 LIGHTING
(REF A-103):
TOGGLE 1 - NORTHWEST & SOUTHWEST FIXTURES, (2) THUS
TOGGLE 2 - CENTER & EAST FIXTURES, (4) THUS
INSTALL NEW JUNCTION BOX TO CONNECT EXISTING NORTHWEST AND
SOUTHWEST FIXTURES.
1. ELECTRICAL ITEMS SHOWN ARE FOR BIDDING PURPOSES ONLY. CONDUCTOR
SIZES, BREAKERS SIZES, AND OTHER ITEMS ARE ESTIMATES. DESIGN
PROFESSIONAL SHALL CONFIRM ALL ITEMS.
2. ELECTRICAL INSTALLATION INCLUDES COVER PLATES, RECEPTACLES, SWITCHES,
BOXES, CONDUIT, AND CONDUCTORS.
3. EXISTING BREAKERS, CONDUIT, AND WIRE MAY BE REUSED/EXTENDED WHERE
SUFFICIENT LENGTH PERMITS.
4. INSTALL RECEPTACLES, SWITCHES, AND FACE PLATES TO MATCH EXIST.
5. LABEL ELECTRICAL RECEPTACLES. SEE SPECIFICATIONS.
6. EDIT POWER PANEL DIRECTORY TO REFLECT NEW OR CHANGED CIRCUITS.
7. ALL ELECTRICAL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE
NATIONAL ELECTRIC CODE.
GENERAL NOTES
LEGEND
DUPLEX RECEPTACLE - MOUNTED 18" AFF
DUPLEX SWITCH
JUNCTION BOX
NORTH
XX
J
J
DATA
DATA
C
EC
IN
-H
O U
SE
D
ES
IG
N
AutoCAD SHX Text N.I.C.
| B822_22X34-T-001 |
| Sheets and Views |
| T-001 |
| B822_22X34-G-001 |
| Sheets and Views |
| G-001 |
| B822_22X34-AD-101 |
| Sheets and Views |
| AD-101 |
| B822_22X34-AD-102 |
| Sheets and Views |
| AD-102 |
| B822_22X34-A-101 |
| Sheets and Views |
| A-101 |
| B822_22X34-A-102 |
| Sheets and Views |
| A-102 |
| B822_22X34-A-103 |
| Sheets and Views |
| A-103 |
| B822_22X34-A-104 |
| Sheets and Views |
| A-104 |
| B822_22X34-A-601 |
| Sheets and Views |
| A-601 |
| B822_22X34-ED-101 |
| Sheets and Views |
| ED-101 |
| B822_22X34-E-101 |
| Sheets and Views |
| E-101 |
| B822_22X34-AD-102.pdf |
| Sheets and Views |
| AD-102 |
File details come from the government source that posted it. Updated .