Summary of Attachment 3 - Drawings 1174767.pdf

This document is a comprehensive set of technical drawings for the Building 3 and 4 PPW (Potable and Process Water) Connections project at the USDA National Centers for Animal Health facility in Ames, Iowa. The drawings, prepared by designer Brandon Keith and dated June 29, 2026, detail the piping connections, valve installations, and related modifications required to connect Buildings 3 and 4 waste systems to the existing treatment infrastructure.

The scope of work encompasses: (1) connecting existing CPVC piping from Building 3 into Building 125's piping and the dual-walled fiberglass piping system; (2) abandoning and capping existing 4-inch and 6-inch waste piping from Buildings 3 and 4; (3) installing new 6-inch and 4-inch fiberglass piping into collection tanks WWT-3-1, WWT-3-2, WWT-4-1, and WWT-4-2 with new ball valves to be coordinated with the Contracting Officer's Representative (COR); (4) connecting CPVC vent piping from collection tanks into existing 6-inch fiberglass vent piping; (5) replacing compressed air lines from 40psi to 60psi for WWT-4-2 equipment; (6) installing blank flanges and gaskets on decontaminated lines; (7) creating accessible clean-outs for Buildings 5 and 174; and (8) excavating sections of dual-walled fiberglass piping as required. The drawings include site overviews, basement work layouts, waste system piping diagrams with component identifications, detailed connection specifications, photographic references of existing conditions, trench details, and elevation views to guide contractor execution.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Location Coordinator:Contracting Officer Rep.:Contracting Officer:Engineering Project Manager:

Task

Order #:

Drawing Title:PROJECT TITLE:

FEU Project #:

Drawing Number:

Agricultural Research Service U.S. Department of Agriculture

NCAH

1920 Dayton Avenue Ames, Iowa 50010

Revision:

Client:

Sheet:

Designer:

Date:

Date:

TBD TBD TBD

Building 3 and 4 PPW Connections

Title Page

6/29/2026

Brandon Keith P01

UNITED STATES DEPARTMENT OF AGRICULTURE

AGRICULTURE RESEARCH SERVICE

NATIONAL CENTERS FOR ANIMAL HEALTH

Building 3 and 4 PPW Connections

Building 3 Building 4

Drawing Title:

Drawing Number:

Sheet:

Drawing Index

P02

P01

P02

Title Page

Drawing Index

P03 Site Overview

P04

P05

P06

P07

P08

P09

P10

P11

P12

P13

P14

P15

P16

P17

P18

P19

P20

P21

P22

P23

P24

P25

P26

P27

P28

P29

P30

P31

Original Civil Drawing

Details

Building 125 connection

Concrete Details

Building 3 and 4 Vault Pics

Vault and Piping pics

Previous Excavation Pics

Building 125 piping excavation

Elevations

Trench Details

Building 3 Title Page

Bldg 3 Basement Work

Bldg 3 Waste System Pics

WWT-3-1 Connections

WWT-3-2 Connections

Bldg 3 Waste Connections

Bldg 3 North Basement piping

Building 4 Title Page

Bldg 4 Basement Work

Bldg 4 Waste System Pics

WWT-4-1 Connections

WWT-4-2 Connections

Bldg 4 Waste Connections

Bldg 4 North Basement piping

Reference Drawings

Schedules

Original one line

Collection Tank tie ins

Sheet:

Site Overview

P03

Building 3 Building 4

Building 154

Old Waste Treatment

Facility Building 155

Waste Treatment

Facility Building 156

NORTH

Excavate Area

Building 4 basement entranceBuilding 3 basement entrance

Central Utility Plant

Area that was previously excavated.

Sheet:

Original Civil Drawing

P04

Connect existing CPVC piping from building 3 into building 125 piping. See photos #10, 11 and 12 on P11 and detail on P6

Building 3

Building 4 Building

Building

Building 125 waste line

Existing 4-inch dual-walled fiberglass piping

Abandon and cap existing 6-inch waste piping

Abandon and cap existing 6-inch waste piping

Abandon and cap existing 4-inch waste piping

Abandon and cap existing 4-inch waste piping

Note: Contractor shall disregard line weights shown (thick vs. thin). Line weight does not indicate demo or existing conditions on these drawings. Follow graphic symbols, notes, and keynotes for scope of work.

Once building 4 has been connected into the dual walled fiberglass piping, the contractor shall cut off old wastewater piping from building 4 and cap it to prevent wastewater from buildings 5 and 174 flowing into abandoned section. Contractor shall add piping that will turn up and create a clean out for buildings 5 and 174. Clean out shall be accessible from the surface and have a removable cap rated for vehicle traffic.

See photos #7, 8 and 9, on P10

See photos #1, 2 and 3, on P08 and photos #4 and 5 on P09

Sheet:

Details

P05

For Reference only

Note: Contractor shall disregard line weights shown (thick vs. thin). Line weight does not indicate demo or existing conditions on these drawings. Follow graphic symbols, notes, and keynotes for scope of work.

Sheet:

Building 125 connection

P06

Contractor shall remove section and connect building 125 waste line into existing

CPVC pipe going into building 3 basement.

Thick line graphic shows piping previously installed. Contractor shall connect building 125 waste line into this CPVC

Sheet:

Concrete Details

P07

Sheet:

Building 3 and 4 Vault Pics

P08

Buildings 3 and 4 PPW piping Vault East of Building 156

Building 3 and 4 PPW piping going into Vault on the east side of Building 156 (Looking south)

Building 3 and 4 PPW piping Clean out and Leak Detection cable access (East of building 156) PHOTO #2

PHOTO #1 PHOTO #3

Sheet:

NORTHNorth

Vault and Piping pics

P09 https://usdagcc-my.sharepoint.com/personal/brandon_keith_usda_gov/_layouts/Doc.aspx?sourcedoc={F7387D65-72E7-4345-AA8E-67462EDF3BDC}&wd=target%28Building%203%20and%204%20PPW%20Connections.one%7C108D65C8-BFA3-46C1-AE77-F6B5DFD3E42F%2FDrawings%20and%20Info%7CCF9BFB06-D2E8-4529-BEED-81370D8EA0DE%2F%29&wdpartid={37A68264-EC08-4C56-8D8E-4AF3D5A0652B}{1}&wdsectionfileid={F35240EB-3F51-49FC-A4AC-E278A3C815B5}&end onenote:https://usdagcc-my.sharepoint.com/personal/brandon_keith_usda_gov/Documents/Keith,%20@%20USDA/Brandon's%20projects/Building%203%20and%204%20PPW%20Connections.one#Drawings%20and%20Info&section-id={108D65C8-BFA3-46C1-AE77-F6B5DFD3E42F}&page-id={CF9BFB06-D2E8-4529-BEED-81370D8EA0DE}&end

To Buildin g 156

Fr om

B ui ld in gs a nd

Valves in Building 156 waste treatment from buildings 3 and 4

Concrete Vault on the east side of building 156

NORTH

PHOTO #4

PHOTO #5

PHOTO #6

Sheet:

Previous Excavation Pics

P10

Building 3 and 4 PPW piping Clean out (typical)

Building 3 PPW piping exposed, looking toward building 3

Building 3 PPW piping exposed, looking toward building 155

PHOTO #7 PHOTO #8 PHOTO #9

Sheet:

Building 125 piping excavation

P11

Excavation of waste piping on the southeast corner of building 3 showing the valve and piping from building 125 pit. Connection to fiberglass dual walled piping shall be made at this location.

2011 CPVC piping from Tank WWT-3-2 in basement of building 3 (SW corner of building 3)

Building 125 Piping from Pit (SW corner of building 3)

PHOTO #10 PHOTO #11 PHOTO #12

Sheet:

Elevations

P12

Contractor shall excavate the entire existing dual walled fiberglass pipe.

Sheet:

Trench Details

P13

For Reference only

Sheet:

Building 3 Title Page

P14

Building 3 Waste Piping Connections

Sheet:

CONTRACTOR SHALL FURNISH AND INSTALL A BLANK

FLANGE TO THE EXISTING 6-INCH VALVE AFTER TIE-INS

Bldg 3 Basement Work

P15

Place new flow meter

Place new flow meter

Note: Contractor shall disregard line weights shown (thick vs. thin). Line weight does not indicate demo or existing conditions on these drawings. Follow graphic symbols, notes, and keynotes for scope of work.

Contractor shall connect new 6-inch fiberglass piping into Collection tank WWT-3-1

Contractor shall connect new 4-inch fiberglass piping into Collection tank WWT-3-2

Indicates work that is part of this project.

Contractor shall connect CPVC vent piping from both collection tanks into the existing 6-inch fiberglass vent piping

Contractor shall add a new 6-inch ball valve in the new 6-inch fiberglass pipe connecting to WWT-3-1. Location to be coordinated with COR before installation.

Contractor shall add a new 4-inch ball valve in the new 4-inch fiberglass pipe connecting to WWT-3-2. Location to be coordinated with COR before installation.

USDA Facilities staff shall decontaminate the existing 4-inch line. Once decontamination is completed, the contractor shall remove the 4-inch valve, cap the 4-inch line closed and install a blank flange with gasket.

USDA Facilities staff shall decontaminate the existing 6-inch line. Once decontamination is completed, the contractor shall remove the 4-inch valve, cap the 6-inch line closed and install a blank flange with gasket.

Sheet:

Bldg 3 Waste System Pics

P16

For Reference only

PHOTO #15

Building 3 vent piping

PHOTO #14:

Building 3 Wings G and H waste piping at WWT-3-2

PHOTO #13:

Building 3 - 6-inch waste pipe at WWT-3-1

Sheet:

T V

IS

-3

E

F

I

G F

B155

E

I

B155

WWT-3-1 Connections

P17

V

IS

-1

VIS-12

V

IS

-1

VIS-12

V

IS

-1

VIS-12

V

IS

-1

VIS-12

V

IS

-1

VIS-12

V

IS

-1

VIS-12

V

IS

-1

VIS-12

V

IS

-1

VCN-12

V

IS

-1

VIS-11

V

IS

-1

VIS-11

V

IS

-1

VIS-11

V

IS

-1

VIS-11

V

IS

-1

VIS-11

V

IS

-1

VIS-16

A,B,C,D,E,F,I WINGS GRAVITY WASTE SYSTEM

VI

S-

M N G

M N G

6" P

VS

-4 VC

N -2

6" PWS-15

V

IS

-1

VIS-14

V

IS

-1

VIS-58

V

IS

-1

VIS-55

V

IS

-1

VIS-53

V

IS

-5

FR

O

M

F4" P

W S-

F1

V

IS

-5

FR

O

M

E4" P

W S-

E1

V

IS

-5

FR

O

M

I4" P

W S-

I1

V

IS

-1

FR

O

M C

W

IN

G M

AI

N

4" P

W S-

C M

V

IS

-1

FR

O

M C

114" P

W S-

C

V

IS

-1

FR

O

M C

104" P

W S-

C

V

IS

-1

FR

O

M C

94" P

W S-

C

V

IS

-1

FR

O

M C

84" P

W S-

C

V

IS

-1

FR

O

M C

74" P

W S-

C

V

IS

-1

FR

O

M B

C C

O O

LE

R

4" P

W S-

BC

V

IS

-1

FR

O

M C

P O

ST

R

M

4" P

W S-

C P

V

IS

-1

FR

O

M B

74" P

W S-

B7

V

IS

-1

FR

O

M B

84" P

W S-

B8

V

IS

-1

FR

O

M B

94" P

W S-

B9

V

IS

-1

FR

O

M B

104" P

W S-

B1

V

IS

-1

FR

O

M B

D

IR

TY

C O

R R

.4" P

W S-

B1

V

IS

-1

FR

O

M B

W

IN

G H

AL

L

4" P

W S-

B2

V

IS

-7

V

IS

-1

FR

O

M B

W

IN

G 4"

P W

S- B1

V

IS

-1

VIS-15

V

IS

-1

FR

O

M A

W

IN

G

4" P

W S-

A1

LS

LS-02

V

IS

-1

VIS-151 VIS-57 6" PWS-4

CO-2LS LS

-0

S-

45 44 43 42 41 40 39

HF-1 6" PVS-5VIS-72 VIS-73

Exhaust Duct

V

IS

-1

VIS-59

S-

01 PMP-SP1

FROM

BASEMENT

DRAINS.

V

IS

-1

V

IS

-5

VIS-59

FR

O

M

D4" P

W S-

D

V

IS

-1

VIS-53

LS

TO

B

WWT

WWP-11

EM-11

VFD-11

WWP-12

EM-12

VFD-12

WWT-1

EM

VFD

EM

VFD 6"

P

W S-

V

IS

-3

V

IS

-3

LTLT-32

V

IS

-0

V

IS

-9

VIS-36

TO B156

LTLT-31

VIS-88

VIS-33

F

G

3" PWS-12

3" P

W S-

6" P

W S-

6" PWS-11 VCN-27

VCN-31

VIS-28

V

IS

-2

V

IS

-2

V

IS

-3

PG

-2

PG

-3

PG

-2

PG

-2

V

IS

-8

V

IS

-8

V

IS

-8

V

IS

-8

V

IS

-8

V

IS

-8

V

IS

-8

V

IS

-8

FROM B125

B15

V

IS

-0

-2

-2

2" PVS-1 4

" P

VS

-3

2" PVS-2

WWT-3-1

New 6-inch fiberglass piping

Existing 6-inch PPW line

New 4-inch CPVC vent line

TO 156

TO WWT-3-2

(VENT PIPING)

Building 3 Waste Piping Connections to WWT-3-1

Contractor shall install a new 6-inch ball valve. Location to be coordinated with the COR before installation.

Contractor shall connect new 6-inch fiberglass piping to collection tank

WWT-3-1.

See photo #16, P19

See photo #18, P19

Contractor shall connect existing CPVC vent piping into existing

6-inch fiberglass piping.

Indicates work that is part of this project.

Sheet:

WWT-3-2 Connections

P18

Building 3 Waste Piping Connections to WWT-3-2

TO

B

4" PWD-1

WWT-2

LDC-1

4" CO-1 4" PWS-1

WWP-21

EM-21

VFD-21

WWP-22

EM-22

VFD-22

EM

VFD

EM

VFD

4" PWS-2

" P

W S-

3" PWS-22

3" P

W S-

6" P

W S-

6" PWS-21 VCN-39

VCN-44

V

IS

-3

V

IS

-3

V

IS

-4

PG

-4

LTLT-32

V

IS

-0

V

IS

-9

VIS-36

PG

-4

PG

-3

PG

-3

V

IS

-9

V

IS

-9

V

IS

-9

V

IS

-9

V

IS

-9

V

IS

-9

V

IS

-9

V

IS

-9

3" PWS-12

3" P

W S-

VIS-28

V

IS

-3

V

IS

-8

V

IS

-8

V

IS

-8

V

IS

-8

VS-2

H & G WINGS GRAVITY

WASTE SYSTEM

4" PWS-G1

FR

O

M G

-W

IN

4" PWS-5

VIS-76

VIS-75

VIS-67 TO

B

VIS-2

V

IS

-6

FR

O

M G

-W

IN

FR

O

M H

-W

IN

G

FR

O M

H -W

IN

G on Operation ected)

VIS-64

4" PWS-H1

(IN

AC

TI

VE

V

IS

-6

4" PWS-25

FROM B125(INACTIVE)

C N

P-

VIS-74

VIS-62

V

IS

-4

WWT-3-2

M

D PG

-3

V

IS

-9

V

IS

-9

V

IS

-9

H & G WINGS GRAVITY

4" PWS-G1

FR

O

M G

-W

IN

G

4" PWS-5

VIS-76

VIS-75

VIS-67

V

IS

-6

FR

O

M G

-W

IN

G

FR

O

M H

-W

IN

G

FR

O M

H -W

IN

G VIS-64

4" PWS-H1

FROM B125

VIS-74

VIS-62

S-

VITY

TO

B

VIS-2

VIS-62

2-inch CPVC vent line

TO WWT-3-1

(VENT PIPING)

FROM

WWT-3-1

New 4-inch fiberglass piping

Contractor shall connect new 4-inch fiberglass piping to collection tank WWT-3-2

Existing 4-inch PPW piping

Existing fiberglass piping that goes into Building 156

Contractor shall install new 4-inch ball valve. Location to be coordinated with COR before installation.

Contractor shall remove existing 4-inch valve, grout pipe and provide and install blank flange with gasket after connection to WWT-3-2 are completed

See photo #17, P19

Indicates work that is part of this project.

See photo #17, P19

Sheet:

Bldg 3 Waste Connections

P19

Contractor shall connect the existing 6-inch fiberglass piping into WWT-3-1.

Contractor shall connect the existing 4-inch fiberglass piping into WWT-3-2.

Contractor shall connect the 4-inch CPVC vent piping to the existing 6-inch fiberglass vent piping.

6-inch fiberglass vent line

4-inch

CPVC

vent line

2-in ch C

P V

C v en t l in e

2-inch CPVC vent line from

W W

T-3-2

WWT-3-2

Collection Tank

4-inch waste piping from

Building

2-inch

CPVC

Vent piping

Existing 4-inch fiberglass piping

WWT-3-1

Collection Tank

Existing 6-inch fiberglass piping

Effluent to building

PHOTO #16

PHOTO #17

PHOTO #18

Sheet:

Bldg 3 North Basement piping

P20

Building 3 North Basement section of waste system (6-inch) Building 3 North Basement section of waste system (6-inch) Once new 6-inch pipe is installed and in service, USDA facilities staff will decontaminate the old 6-inch piping. Contractor shall then remove the existing 6-inch clean out and add new blank flange with gasket.

PHOTO #19 PHOTO #20

Sheet:

Building 4 Title Page

P21

Building 4 Waste Piping Connections

Sheet:

Bldg 4 Basement Work

P22

CONTRACTOR SHALL FURNISH AND INSTALL

FITTINGS AND VALVE DURING TIE-IN

Place new flow meter

Place new flow meter

Indicates work that is part of this project.

Note: Contractor shall disregard line weights shown (thick vs. thin). Line weight does not indicate demo or existing conditions on these drawings. Follow graphic symbols, notes, and keynotes for scope of work.

Contractor shall replace the 40psi compressed air that is currently connected to equipment for WWT-4-2 and replace it with 60psi compressed air.

Contractor shall connect the compressed air lines from WWT-4-2 to the 60psi compressed air located here.

Contractor shall connect 6-inch fiberglass piping into Collection tank WWT-4-1

Contractor shall add a new 6-inch ball valve in the new 6-inch fiberglass pipe connecting to WWT-4-1. Location to be coordinated with COR before installation.

Contractor shall add a new 4-inch ball valve in the new 4-inch fiberglass pipe connecting to WWT-4-2. Location to be coordinated with COR before installation.

Contractor shall connect 6-inch fiberglass piping into Collection tank WWT-4-1

USDA Facilities staff shall decontaminate the existing 4-inch line. Once decontamination is completed, the contractor shall remove the 4-inch valve, cap the 4-inch line closed and install a blank flange with gasket.

USDA Facilities staff shall decontaminate the existing 6-inch line. Once decontamination is completed, the contractor shall remove the 6-inch valve, cap the 6-inch line closed and install a blank flange with gasket.

Sheet:

Bldg 4 Waste System Pics

P23

For Reference only

Building 4 Wings G and H waste piping at WWT-4-2

Building 4 - Vent piping

Building 4 - 6-inch waste piping at WWT-4-1

PHOTO #21

PHOTO #22

PHOTO #23

Sheet:

WWWWT-1

VFD VFD

LT

LT-42

V

IS

-1

V

IS

-9

VI

S-

PG

-1

V

IS

-9

V

IS

-9

VIS-94

VIS-6

LTLT-41

V

IS

-8

VIS-3

S-

S-

PG

-4

PG

-5

V

IS

-8

V

IS

-8

VIS-85 VIS-84

" P

VS

-1

For Future Lift Station Operation (Currently Disconnected)

VIS-57

V

IS

-1

V

IS

-1

VIS-12

V

IS

-1

V

IS

-1

VIS-12

FR

O

M B

-W

IN

G H

AL

L

V

IS

-1

V

IS

-1

VIS-13

FR

O

M B

V

IS

-1

V

IS

-1

VIS-13

FR

O

M B

V

IS

-1

V

IS

-1

VIS-13

FR

O

M B

V

IS

-1

V

IS

-1

VIS-13

FR

O

M B

V

IS

-1

V

IS

-1

FR

O

M C

B

AT

H

V

IS

-1

V

IS

-1

VIS-14

FR

O

M C

V

IS

-1

V

IS

-1

VIS-14

V

IS

-1

V

IS

-1

VIS-14

FR

O

M C

V

IS

-1

V

IS

-1

VIS-14

FR

O

M C

V

IS

-1

V

IS

-1

VIS-14

FR

O

M C

V

IS

-1

V

IS

-1

VIS-15

FR

O

M C

-H

AL

L

V

IS

-1

FR

O

M

I

V

IS

-1

FR

O

M

E

V

IS

-1

FR

O

M

F

A,B,C,D,E,F,I WINGS GRAVITY WASTE SYSTEM

V

IS

-1

V

IS

-1

VIS-16

FR

O

M A

-W

IN

G

VIS-16

V

IS

-1

VIS-119

FR

O

M G

-W

IN

G

FR

O M

G -W

IN

G

6" P

VS

-4

6" PWS-15

FR

O

M A

-W

IN

G

V

IS

-1

V

IS

-1

VIS-12

FR

O

M A

-W

IN

G ? 4" P

WS-A2

FR

O

M C

FR

O

M B

V C

N -1

V

IS

-1

V

IS

-1

V

IS

-1

VIS-12

FR

O

M A

-W

IN

G

LS

LS-44

2" PVS-2

VIS-13

VIS-162

FR

O

M

E

V

IS

-1

FR

O

M

F

6" PWS-4

V

IS

-1

V

IS

-9

VIS-15

FR

O

M

D

LS

LS-4 V

IS

-1

V

IS

-1

FR

O

M

D

LS

LS-4

V

IS

-1

6" PWS-4

V

IS

-1

V

IS

-9

VIS-15

FR

O

M

D V

IS

-1

29 13

HF-1 6" PVS-5VI

S-

Exhaust DuctVI S-

VI

S-

VIS-16

TO

B

WW

WWP-11

EM-11

VFD-11

WWP-12

EM-12

VFD-12

WWT-1

EM

VFD

EM

VFD

V

IS

-1

V

IS

-1

LT

LT-42

V

IS

-1

V

IS

-9

VI

S-

E

LTLT-41

V

IS

-8

VIS-3

FD

WWT-1

3" PWS-12

3" P

W S-

6" P

W S-

6" PWS-11 VCN-6

VC

N

-1

VIS-7

V

IS

-1

V

IS

-2

V

IS

-1

PG

-8

PG

-9

PG

-4

PG

-5

V

IS

-8

V

IS

-8

V

IS

-8

V

IS

-8

VIS-85

V

IS

-8

VIS-84

V

IS

-8

TO B155

2" PVS-2

WWT-4-1

VIS-6

" P

VS

-1

S

VIS-75

TO6" PWS-4

PMP-SP1

FROM

BASEMENT

DRAINS.

6" PWS-4

WWT-4-1 Connections

P24

2-inch CPVC vent line

2-inch C P

V C vent line from W

W T

-4-2

New 6-inch fiberglass piping

4-inch CPVC vent line

4-inch to 2-inch CPVC pipe reducer

Contractor shall connect new 6-inch fiberglass pipe from existing 6-inch waste pipe to collection tank WWT-4-1

Contractor shall connect the 4-inch CPVC vent pipe into the existing 6-inch fiberglass vent piping

TO 156

VI

S-

72VC

N

-2

VI

S-

Building 4 Waste Piping Connections to WWT-4-1 Indicates work that is part of this project.

Contractor shall install a new 6-inch ball valve. Location to be coordinated with the COR before installation.

See photo #25, P26

See photo #26, P26

See photo #25, P26

Sheet:

4" PWS-G1

FR

O

M G

-W

IN

G

4" PWS-5

VIS-75

VIS-67

VIS-74

VIS-62

VIS-65

FR

O

M G

-W

IN

G

FR

O

M H

-W

IN

G

FR

O M

H -W

IN

G

VIS-64

4" PWS-H1

CNP-1

VIS-156

VIS-157 VIS-158

VIS-76

PMP-SP1

H & G WINGS GRAVITY

BASEMENT

DRAINS.

TO

B

VIS-2

WWT-4-2 Connections

P25

SITE TO B156

4" PWD-1

WWT-2

4" CO-1

4" PWS-1

WWP-21

EM-21

VFD-21

WWP-22

EM-22

VFD-22

EM

VFD

EM

VFD

4" PWS-2

3" PWS-22

3" P

W S-

6" PWS-23

6" PWS-21 VCN-16

VC

N

-2

VIS-17

V

IS

-1

V

IS

-1

V

IS

-2

PG

-1

LT

LT-42

V

IS

-1

V

IS

-9

VI

S-

PG

-1

PG

-1

PG

-1

V

IS

-9

V

IS

-9

V

IS

-9

V

IS

-9

V

IS

-9

V

IS

-9

VIS-94

V

IS

-9

3" PWS-12

3" P

W S-

CN-6

VC

N

-1

VIS-7

V

IS

-1

VIS-85

V

IS

-8

VIS-84

V

IS

-8

4" PWS-G1

FR

O

M G

-W

IN

G

4" PWS-5

VIS-75

VIS-67

VIS-74

VIS-65

FR

O

M G

-W

IN

G

FR

O

M H

-W

IN

G

FR

O M

H -W

IN

G

VIS-64

4" PWS-H1

(INACTIVE)

CNP-1

VIS-156

VIS-157 VIS-158

VIS-76

PM

2" PVS-2

H & G WINGS GRAV

WASTE SYSTEM

LDS-1 LDS

FROM

BASEMENT

DRAINS.

WWT-4-2

2-inch CPVC vent line

New 4-inch fiberglass piping

Contractor shall remove existing 4-inch valve, grout pipe and provide and install blank flange with gasket after connection to WWT-4-2 are completed

FROM

WWT-4-1

Existing fiberglass piping that goes into Building 156

Building 4 Waste Piping Connections to WWT-4-2 Indicates work that is part of this project.

Contractor shall connect new 4-inch fiberglass pipe from existing 4-inch waste pipe to collection tank WWT-4-2

Contractor shall install a new 4-inch ball valve. Location to be coordinated with the COR before installation.

See photo #24, P26

Sheet:

Bldg 4 Waste Connections

P26

Waste Tank WWT-4-2

Waste Tank

WWT-4-1

Vent piping from both tanks

Existing 6-inch vent piping

4-inch fiberglass piping to building 155

V ent piping

Existing 6-inch waste piping

4-inch valve VIS-2

2011 Fiberglass piping to building 156

Contractor shall connect new 4-inch fiberglass pipe from existing 4-inch fiberglass piping into WWT-4-2

Contractor shall connect CPVC vent piping from both collection tanks into the existing 6-inch fiberglass vent

PHOTO #24

PHOTO #25

PHOTO #26

Contractor shall connect new 6-inch fiberglass pipe from existing 6-inch fiberglass piping into WWT-4-1

Sheet:

Bldg 4 North Basement piping

P27

Building 4 North Basement section of waste system (6-inch) Building 4 South Basement section of waste system (6-inch)

Once new 6-inch pipe is installed and in service, USDA facilities staff will decontaminate the old 6-inch piping. Contractor shall then remove the existing 6-inch valve to here and add new blank flange with gasket.

PHOTO #27 PHOTO #28

Sheet:

Reference Drawings

P28

Drawings from original project

Sheet:

Schedules

P29

For Reference only

Sheet:

Original one line

P30

For Reference only

Sheet:

Collection Tank tie ins

P31

Indicates work that is part of this project.

Note: Contractor shall disregard line weights shown (thick vs. thin). Line weight does not indicate demo or existing conditions on these drawings. Follow graphic symbols, notes, and keynotes for scope of work.

File details come from the government source that posted it. Updated .