Attachment 3 - Drawings 1174767.pdf
PDF 46 MB Posted
- Solicitation number
- 12441926Q0046
- Issued by
-
Department of Agriculture Forest Service
About this file
Summary of Attachment 3 - Drawings 1174767.pdf
This document is a comprehensive set of technical drawings for the Building 3 and 4 PPW (Potable and Process Water) Connections project at the USDA National Centers for Animal Health facility in Ames, Iowa. The drawings, prepared by designer Brandon Keith and dated June 29, 2026, detail the piping connections, valve installations, and related modifications required to connect Buildings 3 and 4 waste systems to the existing treatment infrastructure.
The scope of work encompasses: (1) connecting existing CPVC piping from Building 3 into Building 125's piping and the dual-walled fiberglass piping system; (2) abandoning and capping existing 4-inch and 6-inch waste piping from Buildings 3 and 4; (3) installing new 6-inch and 4-inch fiberglass piping into collection tanks WWT-3-1, WWT-3-2, WWT-4-1, and WWT-4-2 with new ball valves to be coordinated with the Contracting Officer's Representative (COR); (4) connecting CPVC vent piping from collection tanks into existing 6-inch fiberglass vent piping; (5) replacing compressed air lines from 40psi to 60psi for WWT-4-2 equipment; (6) installing blank flanges and gaskets on decontaminated lines; (7) creating accessible clean-outs for Buildings 5 and 174; and (8) excavating sections of dual-walled fiberglass piping as required. The drawings include site overviews, basement work layouts, waste system piping diagrams with component identifications, detailed connection specifications, photographic references of existing conditions, trench details, and elevation views to guide contractor execution.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Location Coordinator:Contracting Officer Rep.:Contracting Officer:Engineering Project Manager:
Task
Order #:
Drawing Title:PROJECT TITLE:
FEU Project #:
Drawing Number:
Agricultural Research Service U.S. Department of Agriculture
NCAH
1920 Dayton Avenue Ames, Iowa 50010
Revision:
Client:
Sheet:
Designer:
Date:
Date:
TBD TBD TBD
Building 3 and 4 PPW Connections
Title Page
6/29/2026
Brandon Keith P01
UNITED STATES DEPARTMENT OF AGRICULTURE
AGRICULTURE RESEARCH SERVICE
NATIONAL CENTERS FOR ANIMAL HEALTH
Building 3 and 4 PPW Connections
Building 3 Building 4
Drawing Title:
Drawing Number:
Sheet:
Drawing Index
P02
P01
P02
Title Page
Drawing Index
P03 Site Overview
P04
P05
P06
P07
P08
P09
P10
P11
P12
P13
P14
P15
P16
P17
P18
P19
P20
P21
P22
P23
P24
P25
P26
P27
P28
P29
P30
P31
Original Civil Drawing
Details
Building 125 connection
Concrete Details
Building 3 and 4 Vault Pics
Vault and Piping pics
Previous Excavation Pics
Building 125 piping excavation
Elevations
Trench Details
Building 3 Title Page
Bldg 3 Basement Work
Bldg 3 Waste System Pics
WWT-3-1 Connections
WWT-3-2 Connections
Bldg 3 Waste Connections
Bldg 3 North Basement piping
Building 4 Title Page
Bldg 4 Basement Work
Bldg 4 Waste System Pics
WWT-4-1 Connections
WWT-4-2 Connections
Bldg 4 Waste Connections
Bldg 4 North Basement piping
Reference Drawings
Schedules
Original one line
Collection Tank tie ins
Sheet:
Site Overview
P03
Building 3 Building 4
Building 154
Old Waste Treatment
Facility Building 155
Waste Treatment
Facility Building 156
NORTH
Excavate Area
Building 4 basement entranceBuilding 3 basement entrance
Central Utility Plant
Area that was previously excavated.
Sheet:
Original Civil Drawing
P04
Connect existing CPVC piping from building 3 into building 125 piping. See photos #10, 11 and 12 on P11 and detail on P6
Building 3
Building 4 Building
Building
Building 125 waste line
Existing 4-inch dual-walled fiberglass piping
Abandon and cap existing 6-inch waste piping
Abandon and cap existing 6-inch waste piping
Abandon and cap existing 4-inch waste piping
Abandon and cap existing 4-inch waste piping
Note: Contractor shall disregard line weights shown (thick vs. thin). Line weight does not indicate demo or existing conditions on these drawings. Follow graphic symbols, notes, and keynotes for scope of work.
Once building 4 has been connected into the dual walled fiberglass piping, the contractor shall cut off old wastewater piping from building 4 and cap it to prevent wastewater from buildings 5 and 174 flowing into abandoned section. Contractor shall add piping that will turn up and create a clean out for buildings 5 and 174. Clean out shall be accessible from the surface and have a removable cap rated for vehicle traffic.
See photos #7, 8 and 9, on P10
See photos #1, 2 and 3, on P08 and photos #4 and 5 on P09
Sheet:
Details
P05
For Reference only
Note: Contractor shall disregard line weights shown (thick vs. thin). Line weight does not indicate demo or existing conditions on these drawings. Follow graphic symbols, notes, and keynotes for scope of work.
Sheet:
Building 125 connection
P06
Contractor shall remove section and connect building 125 waste line into existing
CPVC pipe going into building 3 basement.
Thick line graphic shows piping previously installed. Contractor shall connect building 125 waste line into this CPVC
Sheet:
Concrete Details
P07
Sheet:
Building 3 and 4 Vault Pics
P08
Buildings 3 and 4 PPW piping Vault East of Building 156
Building 3 and 4 PPW piping going into Vault on the east side of Building 156 (Looking south)
Building 3 and 4 PPW piping Clean out and Leak Detection cable access (East of building 156) PHOTO #2
PHOTO #1 PHOTO #3
Sheet:
NORTHNorth
Vault and Piping pics
P09 https://usdagcc-my.sharepoint.com/personal/brandon_keith_usda_gov/_layouts/Doc.aspx?sourcedoc={F7387D65-72E7-4345-AA8E-67462EDF3BDC}&wd=target%28Building%203%20and%204%20PPW%20Connections.one%7C108D65C8-BFA3-46C1-AE77-F6B5DFD3E42F%2FDrawings%20and%20Info%7CCF9BFB06-D2E8-4529-BEED-81370D8EA0DE%2F%29&wdpartid={37A68264-EC08-4C56-8D8E-4AF3D5A0652B}{1}&wdsectionfileid={F35240EB-3F51-49FC-A4AC-E278A3C815B5}&end onenote:https://usdagcc-my.sharepoint.com/personal/brandon_keith_usda_gov/Documents/Keith,%20@%20USDA/Brandon's%20projects/Building%203%20and%204%20PPW%20Connections.one#Drawings%20and%20Info§ion-id={108D65C8-BFA3-46C1-AE77-F6B5DFD3E42F}&page-id={CF9BFB06-D2E8-4529-BEED-81370D8EA0DE}&end
To Buildin g 156
Fr om
B ui ld in gs a nd
Valves in Building 156 waste treatment from buildings 3 and 4
Concrete Vault on the east side of building 156
NORTH
PHOTO #4
PHOTO #5
PHOTO #6
Sheet:
Previous Excavation Pics
P10
Building 3 and 4 PPW piping Clean out (typical)
Building 3 PPW piping exposed, looking toward building 3
Building 3 PPW piping exposed, looking toward building 155
PHOTO #7 PHOTO #8 PHOTO #9
Sheet:
Building 125 piping excavation
P11
Excavation of waste piping on the southeast corner of building 3 showing the valve and piping from building 125 pit. Connection to fiberglass dual walled piping shall be made at this location.
2011 CPVC piping from Tank WWT-3-2 in basement of building 3 (SW corner of building 3)
Building 125 Piping from Pit (SW corner of building 3)
PHOTO #10 PHOTO #11 PHOTO #12
Sheet:
Elevations
P12
Contractor shall excavate the entire existing dual walled fiberglass pipe.
Sheet:
Trench Details
P13
For Reference only
Sheet:
Building 3 Title Page
P14
Building 3 Waste Piping Connections
Sheet:
CONTRACTOR SHALL FURNISH AND INSTALL A BLANK
FLANGE TO THE EXISTING 6-INCH VALVE AFTER TIE-INS
Bldg 3 Basement Work
P15
Place new flow meter
Place new flow meter
Note: Contractor shall disregard line weights shown (thick vs. thin). Line weight does not indicate demo or existing conditions on these drawings. Follow graphic symbols, notes, and keynotes for scope of work.
Contractor shall connect new 6-inch fiberglass piping into Collection tank WWT-3-1
Contractor shall connect new 4-inch fiberglass piping into Collection tank WWT-3-2
Indicates work that is part of this project.
Contractor shall connect CPVC vent piping from both collection tanks into the existing 6-inch fiberglass vent piping
Contractor shall add a new 6-inch ball valve in the new 6-inch fiberglass pipe connecting to WWT-3-1. Location to be coordinated with COR before installation.
Contractor shall add a new 4-inch ball valve in the new 4-inch fiberglass pipe connecting to WWT-3-2. Location to be coordinated with COR before installation.
USDA Facilities staff shall decontaminate the existing 4-inch line. Once decontamination is completed, the contractor shall remove the 4-inch valve, cap the 4-inch line closed and install a blank flange with gasket.
USDA Facilities staff shall decontaminate the existing 6-inch line. Once decontamination is completed, the contractor shall remove the 4-inch valve, cap the 6-inch line closed and install a blank flange with gasket.
Sheet:
Bldg 3 Waste System Pics
P16
For Reference only
PHOTO #15
Building 3 vent piping
PHOTO #14:
Building 3 Wings G and H waste piping at WWT-3-2
PHOTO #13:
Building 3 - 6-inch waste pipe at WWT-3-1
Sheet:
T V
IS
-3
E
F
I
G F
B155
E
I
B155
WWT-3-1 Connections
P17
V
IS
-1
VIS-12
V
IS
-1
VIS-12
V
IS
-1
VIS-12
V
IS
-1
VIS-12
V
IS
-1
VIS-12
V
IS
-1
VIS-12
V
IS
-1
VIS-12
V
IS
-1
VCN-12
V
IS
-1
VIS-11
V
IS
-1
VIS-11
V
IS
-1
VIS-11
V
IS
-1
VIS-11
V
IS
-1
VIS-11
V
IS
-1
VIS-16
A,B,C,D,E,F,I WINGS GRAVITY WASTE SYSTEM
VI
S-
M N G
M N G
6" P
VS
-4 VC
N -2
6" PWS-15
V
IS
-1
VIS-14
V
IS
-1
VIS-58
V
IS
-1
VIS-55
V
IS
-1
VIS-53
V
IS
-5
FR
O
M
F4" P
W S-
F1
V
IS
-5
FR
O
M
E4" P
W S-
E1
V
IS
-5
FR
O
M
I4" P
W S-
I1
V
IS
-1
FR
O
M C
W
IN
G M
AI
N
4" P
W S-
C M
V
IS
-1
FR
O
M C
114" P
W S-
C
V
IS
-1
FR
O
M C
104" P
W S-
C
V
IS
-1
FR
O
M C
94" P
W S-
C
V
IS
-1
FR
O
M C
84" P
W S-
C
V
IS
-1
FR
O
M C
74" P
W S-
C
V
IS
-1
FR
O
M B
C C
O O
LE
R
4" P
W S-
BC
V
IS
-1
FR
O
M C
P O
ST
R
M
4" P
W S-
C P
V
IS
-1
FR
O
M B
74" P
W S-
B7
V
IS
-1
FR
O
M B
84" P
W S-
B8
V
IS
-1
FR
O
M B
94" P
W S-
B9
V
IS
-1
FR
O
M B
104" P
W S-
B1
V
IS
-1
FR
O
M B
D
IR
TY
C O
R R
.4" P
W S-
B1
V
IS
-1
FR
O
M B
W
IN
G H
AL
L
4" P
W S-
B2
V
IS
-7
V
IS
-1
FR
O
M B
W
IN
G 4"
P W
S- B1
V
IS
-1
VIS-15
V
IS
-1
FR
O
M A
W
IN
G
4" P
W S-
A1
LS
LS-02
V
IS
-1
VIS-151 VIS-57 6" PWS-4
CO-2LS LS
-0
S-
45 44 43 42 41 40 39
HF-1 6" PVS-5VIS-72 VIS-73
Exhaust Duct
V
IS
-1
VIS-59
S-
01 PMP-SP1
FROM
BASEMENT
DRAINS.
V
IS
-1
V
IS
-5
VIS-59
FR
O
M
D4" P
W S-
D
V
IS
-1
VIS-53
LS
TO
B
WWT
WWP-11
EM-11
VFD-11
WWP-12
EM-12
VFD-12
WWT-1
EM
VFD
EM
VFD 6"
P
W S-
V
IS
-3
V
IS
-3
LTLT-32
V
IS
-0
V
IS
-9
VIS-36
TO B156
LTLT-31
VIS-88
VIS-33
F
G
3" PWS-12
3" P
W S-
6" P
W S-
6" PWS-11 VCN-27
VCN-31
VIS-28
V
IS
-2
V
IS
-2
V
IS
-3
PG
-2
PG
-3
PG
-2
PG
-2
V
IS
-8
V
IS
-8
V
IS
-8
V
IS
-8
V
IS
-8
V
IS
-8
V
IS
-8
V
IS
-8
FROM B125
B15
V
IS
-0
-2
-2
2" PVS-1 4
" P
VS
-3
2" PVS-2
WWT-3-1
New 6-inch fiberglass piping
Existing 6-inch PPW line
New 4-inch CPVC vent line
TO 156
TO WWT-3-2
(VENT PIPING)
Building 3 Waste Piping Connections to WWT-3-1
Contractor shall install a new 6-inch ball valve. Location to be coordinated with the COR before installation.
Contractor shall connect new 6-inch fiberglass piping to collection tank
WWT-3-1.
See photo #16, P19
See photo #18, P19
Contractor shall connect existing CPVC vent piping into existing
6-inch fiberglass piping.
Indicates work that is part of this project.
Sheet:
WWT-3-2 Connections
P18
Building 3 Waste Piping Connections to WWT-3-2
TO
B
4" PWD-1
WWT-2
LDC-1
4" CO-1 4" PWS-1
WWP-21
EM-21
VFD-21
WWP-22
EM-22
VFD-22
EM
VFD
EM
VFD
4" PWS-2
" P
W S-
3" PWS-22
3" P
W S-
6" P
W S-
6" PWS-21 VCN-39
VCN-44
V
IS
-3
V
IS
-3
V
IS
-4
PG
-4
LTLT-32
V
IS
-0
V
IS
-9
VIS-36
PG
-4
PG
-3
PG
-3
V
IS
-9
V
IS
-9
V
IS
-9
V
IS
-9
V
IS
-9
V
IS
-9
V
IS
-9
V
IS
-9
3" PWS-12
3" P
W S-
VIS-28
V
IS
-3
V
IS
-8
V
IS
-8
V
IS
-8
V
IS
-8
VS-2
H & G WINGS GRAVITY
WASTE SYSTEM
4" PWS-G1
FR
O
M G
-W
IN
4" PWS-5
VIS-76
VIS-75
VIS-67 TO
B
VIS-2
V
IS
-6
FR
O
M G
-W
IN
FR
O
M H
-W
IN
G
FR
O M
H -W
IN
G on Operation ected)
VIS-64
4" PWS-H1
(IN
AC
TI
VE
V
IS
-6
4" PWS-25
FROM B125(INACTIVE)
C N
P-
VIS-74
VIS-62
V
IS
-4
WWT-3-2
M
D PG
-3
V
IS
-9
V
IS
-9
V
IS
-9
H & G WINGS GRAVITY
4" PWS-G1
FR
O
M G
-W
IN
G
4" PWS-5
VIS-76
VIS-75
VIS-67
V
IS
-6
FR
O
M G
-W
IN
G
FR
O
M H
-W
IN
G
FR
O M
H -W
IN
G VIS-64
4" PWS-H1
FROM B125
VIS-74
VIS-62
S-
VITY
TO
B
VIS-2
VIS-62
2-inch CPVC vent line
TO WWT-3-1
(VENT PIPING)
FROM
WWT-3-1
New 4-inch fiberglass piping
Contractor shall connect new 4-inch fiberglass piping to collection tank WWT-3-2
Existing 4-inch PPW piping
Existing fiberglass piping that goes into Building 156
Contractor shall install new 4-inch ball valve. Location to be coordinated with COR before installation.
Contractor shall remove existing 4-inch valve, grout pipe and provide and install blank flange with gasket after connection to WWT-3-2 are completed
See photo #17, P19
Indicates work that is part of this project.
See photo #17, P19
Sheet:
Bldg 3 Waste Connections
P19
Contractor shall connect the existing 6-inch fiberglass piping into WWT-3-1.
Contractor shall connect the existing 4-inch fiberglass piping into WWT-3-2.
Contractor shall connect the 4-inch CPVC vent piping to the existing 6-inch fiberglass vent piping.
6-inch fiberglass vent line
4-inch
CPVC
vent line
2-in ch C
P V
C v en t l in e
2-inch CPVC vent line from
W W
T-3-2
WWT-3-2
Collection Tank
4-inch waste piping from
Building
2-inch
CPVC
Vent piping
Existing 4-inch fiberglass piping
WWT-3-1
Collection Tank
Existing 6-inch fiberglass piping
Effluent to building
PHOTO #16
PHOTO #17
PHOTO #18
Sheet:
Bldg 3 North Basement piping
P20
Building 3 North Basement section of waste system (6-inch) Building 3 North Basement section of waste system (6-inch) Once new 6-inch pipe is installed and in service, USDA facilities staff will decontaminate the old 6-inch piping. Contractor shall then remove the existing 6-inch clean out and add new blank flange with gasket.
PHOTO #19 PHOTO #20
Sheet:
Building 4 Title Page
P21
Building 4 Waste Piping Connections
Sheet:
Bldg 4 Basement Work
P22
CONTRACTOR SHALL FURNISH AND INSTALL
FITTINGS AND VALVE DURING TIE-IN
Place new flow meter
Place new flow meter
Indicates work that is part of this project.
Note: Contractor shall disregard line weights shown (thick vs. thin). Line weight does not indicate demo or existing conditions on these drawings. Follow graphic symbols, notes, and keynotes for scope of work.
Contractor shall replace the 40psi compressed air that is currently connected to equipment for WWT-4-2 and replace it with 60psi compressed air.
Contractor shall connect the compressed air lines from WWT-4-2 to the 60psi compressed air located here.
Contractor shall connect 6-inch fiberglass piping into Collection tank WWT-4-1
Contractor shall add a new 6-inch ball valve in the new 6-inch fiberglass pipe connecting to WWT-4-1. Location to be coordinated with COR before installation.
Contractor shall add a new 4-inch ball valve in the new 4-inch fiberglass pipe connecting to WWT-4-2. Location to be coordinated with COR before installation.
Contractor shall connect 6-inch fiberglass piping into Collection tank WWT-4-1
USDA Facilities staff shall decontaminate the existing 4-inch line. Once decontamination is completed, the contractor shall remove the 4-inch valve, cap the 4-inch line closed and install a blank flange with gasket.
USDA Facilities staff shall decontaminate the existing 6-inch line. Once decontamination is completed, the contractor shall remove the 6-inch valve, cap the 6-inch line closed and install a blank flange with gasket.
Sheet:
Bldg 4 Waste System Pics
P23
For Reference only
Building 4 Wings G and H waste piping at WWT-4-2
Building 4 - Vent piping
Building 4 - 6-inch waste piping at WWT-4-1
PHOTO #21
PHOTO #22
PHOTO #23
Sheet:
WWWWT-1
VFD VFD
LT
LT-42
V
IS
-1
V
IS
-9
VI
S-
PG
-1
V
IS
-9
V
IS
-9
VIS-94
VIS-6
LTLT-41
V
IS
-8
VIS-3
S-
S-
PG
-4
PG
-5
V
IS
-8
V
IS
-8
VIS-85 VIS-84
" P
VS
-1
For Future Lift Station Operation (Currently Disconnected)
VIS-57
V
IS
-1
V
IS
-1
VIS-12
V
IS
-1
V
IS
-1
VIS-12
FR
O
M B
-W
IN
G H
AL
L
V
IS
-1
V
IS
-1
VIS-13
FR
O
M B
V
IS
-1
V
IS
-1
VIS-13
FR
O
M B
V
IS
-1
V
IS
-1
VIS-13
FR
O
M B
V
IS
-1
V
IS
-1
VIS-13
FR
O
M B
V
IS
-1
V
IS
-1
FR
O
M C
B
AT
H
V
IS
-1
V
IS
-1
VIS-14
FR
O
M C
V
IS
-1
V
IS
-1
VIS-14
V
IS
-1
V
IS
-1
VIS-14
FR
O
M C
V
IS
-1
V
IS
-1
VIS-14
FR
O
M C
V
IS
-1
V
IS
-1
VIS-14
FR
O
M C
V
IS
-1
V
IS
-1
VIS-15
FR
O
M C
-H
AL
L
V
IS
-1
FR
O
M
I
V
IS
-1
FR
O
M
E
V
IS
-1
FR
O
M
F
A,B,C,D,E,F,I WINGS GRAVITY WASTE SYSTEM
V
IS
-1
V
IS
-1
VIS-16
FR
O
M A
-W
IN
G
VIS-16
V
IS
-1
VIS-119
FR
O
M G
-W
IN
G
FR
O M
G -W
IN
G
6" P
VS
-4
6" PWS-15
FR
O
M A
-W
IN
G
V
IS
-1
V
IS
-1
VIS-12
FR
O
M A
-W
IN
G ? 4" P
WS-A2
FR
O
M C
FR
O
M B
V C
N -1
V
IS
-1
V
IS
-1
V
IS
-1
VIS-12
FR
O
M A
-W
IN
G
LS
LS-44
2" PVS-2
VIS-13
VIS-162
FR
O
M
E
V
IS
-1
FR
O
M
F
6" PWS-4
V
IS
-1
V
IS
-9
VIS-15
FR
O
M
D
LS
LS-4 V
IS
-1
V
IS
-1
FR
O
M
D
LS
LS-4
V
IS
-1
6" PWS-4
V
IS
-1
V
IS
-9
VIS-15
FR
O
M
D V
IS
-1
29 13
HF-1 6" PVS-5VI
S-
Exhaust DuctVI S-
VI
S-
VIS-16
TO
B
WW
WWP-11
EM-11
VFD-11
WWP-12
EM-12
VFD-12
WWT-1
EM
VFD
EM
VFD
V
IS
-1
V
IS
-1
LT
LT-42
V
IS
-1
V
IS
-9
VI
S-
E
LTLT-41
V
IS
-8
VIS-3
FD
WWT-1
3" PWS-12
3" P
W S-
6" P
W S-
6" PWS-11 VCN-6
VC
N
-1
VIS-7
V
IS
-1
V
IS
-2
V
IS
-1
PG
-8
PG
-9
PG
-4
PG
-5
V
IS
-8
V
IS
-8
V
IS
-8
V
IS
-8
VIS-85
V
IS
-8
VIS-84
V
IS
-8
TO B155
2" PVS-2
WWT-4-1
VIS-6
" P
VS
-1
S
VIS-75
TO6" PWS-4
PMP-SP1
FROM
BASEMENT
DRAINS.
6" PWS-4
WWT-4-1 Connections
P24
2-inch CPVC vent line
2-inch C P
V C vent line from W
W T
-4-2
New 6-inch fiberglass piping
4-inch CPVC vent line
4-inch to 2-inch CPVC pipe reducer
Contractor shall connect new 6-inch fiberglass pipe from existing 6-inch waste pipe to collection tank WWT-4-1
Contractor shall connect the 4-inch CPVC vent pipe into the existing 6-inch fiberglass vent piping
TO 156
VI
S-
72VC
N
-2
VI
S-
Building 4 Waste Piping Connections to WWT-4-1 Indicates work that is part of this project.
Contractor shall install a new 6-inch ball valve. Location to be coordinated with the COR before installation.
See photo #25, P26
See photo #26, P26
See photo #25, P26
Sheet:
4" PWS-G1
FR
O
M G
-W
IN
G
4" PWS-5
VIS-75
VIS-67
VIS-74
VIS-62
VIS-65
FR
O
M G
-W
IN
G
FR
O
M H
-W
IN
G
FR
O M
H -W
IN
G
VIS-64
4" PWS-H1
CNP-1
VIS-156
VIS-157 VIS-158
VIS-76
PMP-SP1
H & G WINGS GRAVITY
BASEMENT
DRAINS.
TO
B
VIS-2
WWT-4-2 Connections
P25
SITE TO B156
4" PWD-1
WWT-2
4" CO-1
4" PWS-1
WWP-21
EM-21
VFD-21
WWP-22
EM-22
VFD-22
EM
VFD
EM
VFD
4" PWS-2
3" PWS-22
3" P
W S-
6" PWS-23
6" PWS-21 VCN-16
VC
N
-2
VIS-17
V
IS
-1
V
IS
-1
V
IS
-2
PG
-1
LT
LT-42
V
IS
-1
V
IS
-9
VI
S-
PG
-1
PG
-1
PG
-1
V
IS
-9
V
IS
-9
V
IS
-9
V
IS
-9
V
IS
-9
V
IS
-9
VIS-94
V
IS
-9
3" PWS-12
3" P
W S-
CN-6
VC
N
-1
VIS-7
V
IS
-1
VIS-85
V
IS
-8
VIS-84
V
IS
-8
4" PWS-G1
FR
O
M G
-W
IN
G
4" PWS-5
VIS-75
VIS-67
VIS-74
VIS-65
FR
O
M G
-W
IN
G
FR
O
M H
-W
IN
G
FR
O M
H -W
IN
G
VIS-64
4" PWS-H1
(INACTIVE)
CNP-1
VIS-156
VIS-157 VIS-158
VIS-76
PM
2" PVS-2
H & G WINGS GRAV
WASTE SYSTEM
LDS-1 LDS
FROM
BASEMENT
DRAINS.
WWT-4-2
2-inch CPVC vent line
New 4-inch fiberglass piping
Contractor shall remove existing 4-inch valve, grout pipe and provide and install blank flange with gasket after connection to WWT-4-2 are completed
FROM
WWT-4-1
Existing fiberglass piping that goes into Building 156
Building 4 Waste Piping Connections to WWT-4-2 Indicates work that is part of this project.
Contractor shall connect new 4-inch fiberglass pipe from existing 4-inch waste pipe to collection tank WWT-4-2
Contractor shall install a new 4-inch ball valve. Location to be coordinated with the COR before installation.
See photo #24, P26
Sheet:
Bldg 4 Waste Connections
P26
Waste Tank WWT-4-2
Waste Tank
WWT-4-1
Vent piping from both tanks
Existing 6-inch vent piping
4-inch fiberglass piping to building 155
V ent piping
Existing 6-inch waste piping
4-inch valve VIS-2
2011 Fiberglass piping to building 156
Contractor shall connect new 4-inch fiberglass pipe from existing 4-inch fiberglass piping into WWT-4-2
Contractor shall connect CPVC vent piping from both collection tanks into the existing 6-inch fiberglass vent
PHOTO #24
PHOTO #25
PHOTO #26
Contractor shall connect new 6-inch fiberglass pipe from existing 6-inch fiberglass piping into WWT-4-1
Sheet:
Bldg 4 North Basement piping
P27
Building 4 North Basement section of waste system (6-inch) Building 4 South Basement section of waste system (6-inch)
Once new 6-inch pipe is installed and in service, USDA facilities staff will decontaminate the old 6-inch piping. Contractor shall then remove the existing 6-inch valve to here and add new blank flange with gasket.
PHOTO #27 PHOTO #28
Sheet:
Reference Drawings
P28
Drawings from original project
Sheet:
Schedules
P29
For Reference only
Sheet:
Original one line
P30
For Reference only
Sheet:
Collection Tank tie ins
P31
Indicates work that is part of this project.
Note: Contractor shall disregard line weights shown (thick vs. thin). Line weight does not indicate demo or existing conditions on these drawings. Follow graphic symbols, notes, and keynotes for scope of work.
File details come from the government source that posted it. Updated .