Attachment 3.h-NZ Planting Detailed Unit Info.pdf

PDF 225 KB Posted

Attached to
R2 Spring Tree Planting Federal contract opportunity
Solicitation number
1240LQ24Q0038
Issued by
Department of Agriculture Forest Service R2-Rocky Mountain Region

About this file

This document appears to be an attachment detailing the planting unit information for the North Zone project area under a larger federal contract opportunity. The attachment provides specifications for 18 individual planting units, including the unit name, size, number of trees needed, average spacing, seed lot, boundary markings, non-planting areas, and delivery locations. The related federal contract opportunity is Solicitation Number 1240LQ24Q0038 for the FY24 Region 2 Multi-Award spring tree planting contract, which will cover approximately 3,160 acres and 914,610 seedlings across several National Forests. The solicitation is being issued by the USDA Forest Service Rocky Mountain Region.

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3.h

Item 1 – North Zone Project Area Sub-item or Planting

Unit 1-1 1-2 1-3 1-4

FACTS ID

CRANETSALE-

CRANETSALE-

CRANETSALE-

CRANETSALE-

Unit Name Crane Unit 6 Crane Unit 5 Crane Unit 4 Crane Unit 1

FACTS Acres 12 179 24 98

Net Planting Acres 1 19 4 6

Portion Net Planting

Acres With Plantable

Spots 0.80 0.70 0.70 0.70

Desired TPA 436 436 436 436

Estimated Number of

Trees Needed 500 8,300 1,800 21,800

Average Spacing 6.8 10’x 10’ 10’x 10’ 10’x 10’ 10’x 10’

Seed Lot 6.11 PIEN-223-103-16 PIEN-223-103-16 PIEN-223-103-16 PIEN-223-103-16

Boundary Marking

Blue Flagging and

Orange Boundary paint.

Blue Flagging and

Orange Boundary paint.

Blue Flagging and

Orange Boundary paint.

Blue Flagging and

Orange Boundary paint.

Non-planting Areas 6.9

Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.

Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.

Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.

Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.

Tree Shelter Type 6.13

None

Average Aspect S SW S W

Average Slope 15% 10% 10% 20%

Average Elevation 10,900’ 10,900’ 10,900’ 10,900’

Direct Vehicle Access1 Yes Yes Yes Yes

Walk-in Distance in

Feet to Center Unit

6.1.2 300 feet 1,100 feet 500 feet 1,100 feet

Delivery Point(s)

At pull offs along

NFSR 109.

At pull offs along

NFSR 109.

At pull offs along

NFSR 109.1D.

At pull offs along

NFSR 109.

Alternative Delivery

Point NA NA NA NA 1Vehicle Access 6.1.1. All roads may be impassible when wet or snow covered.

5Units 1-17 and 1-18 are intended to be the final planting units for Item 1 for using the remaining spruce seedlings available. Acres and number of trees to be used will vary from the number presented given variations in use in other

Item 1 plant units.

Sub-item or Planting

Unit 1-5 1-6 1-7 1-8

FACTS ID BIGCREEKTS009 BIGCREEKTS010 BIGCREEKTS011 BIGCREEKTS002

Unit Name Big Creek 9 Big Creek 10 Big Creek 11 Big Creek 2

FACTS Acres 29 18 30 21

Net Planting Acres 5 1 7 4

Portion Net Planting

Acres With Plantable

Spots 0.70 0.70 0.70 0.70

Desired TPA 436 436 436 436

Estimated Number of

Trees Needed 2,200 500 3,100 1,800

Boundary Marking -

See Project Map 4

Blue Flagging and

Orange Boundary paint.

Blue Flagging and

Orange Boundary paint.

Blue Flagging and

Orange Boundary paint.

Blue Flagging and

Orange Boundary paint.

Non-planting Areas 6.9

Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.

Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.

Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.

Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced

Average Aspect W NW NW SW

Average Slope 20% 15% 20% 20%

Average Elevation 10,200’ 10,200’ 10,200’ 10,100’

Feet to Center Unit

6.1.2 300 feet 400 feet 1,100 feet 1,400 feet

Delivery Point(s)

At pull offs along

NFSR 260.

At pull offs along

NFSR 260.1A.

At pull offs along

NFSR 279.

At pull offs along

NFSR 279.

Alternative Delivery

Point NA NA NA NA 1Vehicle Access 6.1.1. All roads may be impassible when wet or snow covered.

5Units 1-17 and 1-18 are intended to be the final planting units for Item 1 for using the remaining spruce seedlings available. Acres and number of trees to be used will vary from the number presented given variations in use in other

Sub-item or Planting

Unit 1-9 1-10 1-11 1-12

FACTS ID BIGCREEKTS001 BIGCREEKTS003 BIGCREEKTS005 BIGCREEKTS04

Unit Name Big Creek 1 Big Creek 3 Big Creek 5 Big Creek 4

FACTS Acres 41 48 9 8

Net Planting Acres 3 6 2 2

Portion Net Planting

Acres With Plantable

Spots 0.70 0.70 0.70 0.70

Desired TPA 436 436 436 436

Estimated Number of

Trees Needed 1,500 2,600 1,000 1,000

Blue Flagging and

Orange Boundary paint.

Blue Flagging and

Orange Boundary paint.

Blue Flagging and

Orange Boundary paint.

Blue Flagging and

Orange Boundary paint.

Non-planting Areas 6.9

Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.

Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.

Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.

Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced

Average Aspect NW W N N

Average Slope 15% 20% 15% 10%

Average Elevation 10,200’ 10,100’ 10,200’ 10,200’

Feet to Center Unit

6.1.2 1,400 feet 1,100 feet 300 feet 300 feet

Delivery Point(s)

At pull offs along

NFSR 260.

At pull offs along

NFSR 279.1A.

At pull offs along

NFSR 279.

At pull offs along

NFSR 279.

Alternative Delivery

Point NA NA NA NA 1Vehicle Access 6.1.1. All roads may be impassible when wet or snow covered.

5Units 1-17 and 1-19 are intended to be the final planting units for Item 1 for using the remaining spruce seedlings available. Acres and number of trees to be used will vary from the number presented given variations in use in other

Sub-item or Planting

Unit 1-13 1-14 1-15 1-16

FACTS ID BIGCREEKTS06 HAYPARKTS

Unit Name Big Creek 6 Hay Park 6 Hay Park 1 Hay Park 4

FACTS Acres 54 79 8 31

Net Planting Acres 10 8 2 3

Portion Net Planting

Acres With Plantable

Spots 0.70 0.70 0.70 0.70

Desired TPA 436 436 436 436

Estimated Number of

Trees Needed 4,400 3,500 900 1,300

Blue Flagging and

Orange Boundary paint.

Blue Flagging and

Orange Boundary paint.

Blue Flagging and

Orange Boundary paint.

Blue Flagging and

Orange Boundary paint.

Non-planting Areas 6.9

Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.

Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.

Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.

Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced

Average Aspect W W W SW

Average Slope 20% 20% 25% 15%

Average Elevation 10,100’ 10,200’ 10,200’ 10,300’

Feet to Center Unit

6.1.2 600 feet 1,000 feet 500 feet 800 feet

Delivery Point(s)

At pull offs along

NFSR 279.1A.

At pull offs along

NFSR 129.1G.

At pull offs along

NFSR 129.

At pull offs along

NFSR 129.1C.

Alternative Delivery

Point NA NA NA NA 1Vehicle Access 6.1.1. All roads may be impassible when wet or snow covered.

5Units 1-9 and 1-10 are intended to be the final planting units for Item 1 for using the remaining spruce seedlings available. Acres and number of trees to be used will vary from the number presented given variations in use in other

Sub-item or Planting

Unit 1-17 1-18

FACTS ID

Unit Name Hay Park 9 Hay Park 3

FACTS Acres 10 27

Net Planting Acres 3 3

Portion Net Planting

Acres With Plantable

Spots 0.70 .70

Desired TPA 436 436

Estimated Number of

Trees Needed 1,300 1,300

Average Spacing 6.8 10’x 10’ 10’x 10’

Seed Lot 6.11 PIEN-223-103-16 PIEN-223-103-16

Blue Flagging and

Orange Boundary paint.

Blue Flagging and

Orange Boundary paint.

Non-planting Areas 6.9

Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.

Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced

None None

Average Aspect N W

Average Slope 15% 20%

Average Elevation 10,400’ 10,400’

Direct Vehicle Access1 Yes Yes

Feet to Center Unit

6.1.2 300 feet 300 feet

Delivery Point(s)

At pull offs along

NFSR 129.

At pull offs along

NFSR 129

Alternative Delivery

Point NA NA 1Vehicle Access 6.1.1. All roads may be impassible when wet or snow covered.

5Units 1-17 and 1-18 are intended to be the final planting units for Item 1 for using the remaining spruce seedlings available. Acres and number of trees to be used will vary from the number presented given variations in use in other

2There will be 41,769 Engelmann spruce seedlings delivered to Grand Valley for Item 1.

File details come from the government source that posted it. Updated .