Attachment 3 Davis Bacon Wage Determination.pdf
PDF 4 MB Posted
- Attached to
- Construction - B147 connector Roof Federal contract opportunity
- Solicitation number
- N6660425Q0135
About this file
This is a Davis-Bacon Act wage determination document (RI20240001) for construction projects in Rhode Island, effective November 8, 2024. The document covers building construction, heavy construction (including marine), and highway construction projects throughout Rhode Island.
The wage determination establishes minimum wage rates and fringe benefits for various construction trades, including specific rates for hazardous material handlers ($49.91/hour plus $36.63 fringe), electricians ($52.11/hour plus 47.25% fringe), plumbers ($52.49/hour plus $33.60 fringe), and truck drivers (ranging from $30.71 to $31.66/hour plus 36.9125%+A+B fringe). The document includes Executive Order 14026 requirements mandating a minimum wage of $17.20 per hour for contracts entered after January 30, 2022, and Executive Order 13658 requiring $12.90 per hour for contracts awarded between January 1, 2015, and January 29, 2022. Additional provisions cover paid holidays, vacation benefits based on years of service, hazard pay premiums, and specific requirements for different types of construction work like tunnel work or work at heights.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_3_WD RI20240001_12_13_2024.pdf | ||
| N6660425Q0135 Amendment 0001.pdf | ||
| Attachment_4_Contractor Fall protection sample memo.docx | DOCX document | |
| N6660425Q0135.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .