This document contains a solicitation and cost estimate for a CP radio upgrade project at Maxwell Air Force Base. The solicitation seeks competitive fixed-price proposals to upgrade radios in Building 929. A mandatory site visit is scheduled for March 12, 2024, with attendee information due by March 11. All questions must be submitted by March 14 and proposals are due by March 19. The cost estimate provides a line item breakdown of materials, labor, overhead, profit, bonds, and total estimated costs for the radio upgrade work. Divisions include general requirements, site work, concrete, masonry, metals, finishes, electrical work, and communications. The estimate calculates costs for items like core drilling, mounting hardware, scaffolding, electrical receptacles, and ground testing. The total proposed contract price is listed as $0.00, indicating this is a template. The soliciting agency is the Air Force Air Education and Training Command.

View the file

Other files for this federal contract opportunity

Other files attached to CP Radio Upgrade Solicitation, newest first.
File Type Posted
Attachment 4 - Solicitation - FA330024R0019.pdf PDF
Attachment 2 - CP Radio Upgrade Drawings.pdf PDF
Attachment 1 - CP Radio Upgrade B929 - SOW.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total

CONSTRUCTION COST ESTIMATE BREAKDOWN

ADDRESS400 Cannon Street
Maxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CP Radio Upgrade$0.00
PROJECT NUMBER/WORK ORDERWORK LOCATION
1.3631844E7Bldg. 929 Maxwell AFB
UNITMATERIAL/EQUIP. COSTSLABOR RATESOTHER
LINEITEMOFQUANTITYQuantityAVERAGEDIRECTLINE
NO.MEASUREUNITTOTALRATETOTALCOSTSTOTAL
DIVISION 1 (General Requirements)
Site Formanea$0.00
Electricianea$0.00
DIVISION 2 (Site Work)
Clean-Upea$0.00
DIVISION 3 (Concrete)
DIVISION 4 (Masonry)
Core Drill 4" holeea$0.00
DIVISION 5 (Metal)
Unistrut, Mounting Hardwareea$0.00
DIVISION 6 (Flooring)$0.00
DIVISION 7 (Thermal & Moisture Protection)
Cover for core drill holeea$0.00
DIVISION 8 (Doors & Windows)
DIVISION 9 (Finishes)
Paintgal$0.00
DIVISION 10 (Specialities)
DIVISION 11 (Equipment)
Scaffolding/Liftwk
DIVISION 12 (Furnishings)
DIVISION 13 (Special Construction)$0.00
DIVISION 14 (Conveying Systems)$0.00
DIVISION 15 (Mechanical)$0.00
DIVISION 16 (Electrical/Fire System/Communications)$0.00
Install 110VAC twist lock receptacleea
Preform Ground Test on Busbar w\printed resultsea
$0.00$0.00$0.00
TOTAL$0.00$0.00$0.00$0.00
$0.00$0.00$0.00
Material Costs$0.00$0.00
Tax on Materials$0.00$0.00
TOTAL MATERIAL COST$0.00$0.00
$0.00$0.00$0.00
Labor Cost$0.00$0.00
Insurance & Tax on Labor$0.00$0.00
TOTAL LABOR COST$0.00$0.00
$0.00$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00
Total Material, Labor, Tax & Insurance$0.00$0.00
TOTAL DIRECT COSTS$0.00$0.00$0.00
$0.00$0.00$0.00
Overhead$0.00$0.00$0.00
Subtotal$0.00$0.00$0.00$0.00
Profit$0.00$0.00$0.00
Sub Total$0.00$0.00
TOTAL$0.00$0.00$0.00
Bonds$0.00$0.00
TOTAL$0.00$0.00$0.00