This document outlines cleaning requirements for facilities at a Corps of Engineers power plant and intake structure in North Dakota. It includes 11 attachments detailing cleaning specifications for exterior and interior locations at the power plant ranging from daily to annual frequencies. Attachment requirements cover areas such as windows, trash removal, floor cleaning and waxing, wall washing, and restroom maintenance at various plant elevations and facilities. It also outlines monthly cleaning for one location at the intake structure including offices, restrooms, and mechanical rooms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question 4.pdf | ||
| Question 3.pdf | ||
| Question 2.pdf | ||
| Site Visit Amendment 0001.pdf | ||
| Questions.pdf | ||
| W9128F23Q0042.pdf | ||
| attachment42023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Power Plant - Exterior
| ATTACHMENT 3-1: POWER PLANT - REQUIREMENTS | ||||||||||||||
| EXTERIOR/INTERIOR | ||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun |
| 1 | Exterior | Cigarette receptacles (3 entrance areas). | X | |||||||||||
| Trash cans. | X | X | ||||||||||||
| 2 | Exterior/Interior | Windows and blinds. | X |
ATTACHMENT 3-1, PAGE 1 OF 1
Power Plant - Penstocks
| ATTACHMENT 3-2: POWER PLANT - REQUIREMENTS | ||||||||||||||
| PENSTOCK FLOOR | ||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun |
| 1 | Floor | Sweep entire floor, spray wash the entire floor (including areas under surge tanks) | X | |||||||||||
| 2 | Stairways - From Fan Rooms 3 & 4 to Penstock Floor | Wash handrails (*April - September only) | *X |
Attachment 3-2, PAGE 1 OF 1
Elev. 1652
| ATTACHMENT 3-3: POWER PLANT - REQUIREMENTS | ||||||||||||||
| FLOOR 1, ELEVATION 1652 | ||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun |
| 1 | Elevator | Vacuum floor. | X | |||||||||||
| Clean. | X | |||||||||||||
| 2 | Lobby | Dust, sweep, remove trash, damp mop floor. | X | |||||||||||
| 3 | Stairways #3 (from Elev. 1652 to 1669) | Sweep, damp mop stairs, spot clean walls, wash down and clean all handrails. | X | |||||||||||
| 4 | CO2 Room | Sweep/damp mop. | X | |||||||||||
| 5 | Sanitary Drainage Area | Sweep, remove trash. Damp mop. | X |
Attachment 3-3, PAGE 1 OF 1
Elev. 1669
| ATTACHMENT 3-4: POWER PLANT - REQUIREMENTS | ||||||||||||||
| FLOOR 2, ELEVATION 1669 | ||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun |
| 1 | Equipment Storage | Sweep, remove trash. | X | |||||||||||
| Damp mop. | X | |||||||||||||
| 2 | Station Service Air Compressor Room | Sweep, remove trash, damp mop. | X | |||||||||||
| 3 | Water Treatment Room | Sweep, remove trash. | X | |||||||||||
| 4 | Fan Room #2 | Sweep, remove trash. | X | |||||||||||
| 5 | Stairways # 3 (from elev. 1669 to 1684) | Vacuum, sweep, damp mop stairs, spot clean walls, wash and clean all handrails. | X |
Attachment 3-4, PAGE 1 OF 1
Elev. 1684
| ATTACHMENT 3-5: POWER PLANT - REQUIREMENTS | ||||||||||||||
| FLOOR 3, (TURBINE FLOOR), ELEVATION 1684 | ||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun |
| 1 | Turbine Floor: UNITS #1, #2, #3, #4, & #5 | Sweep, remove trash. | X | X | ||||||||||
| Damp mop. | X | |||||||||||||
| 2 | Corridor No. 2 | Dust, vacuum, sweep, remove trash, damp mop. | X | X | ||||||||||
| 3 | Fan Room No. 3 (includes vestibule) | Sweep, damp mop. | X | X | ||||||||||
| 4 | Fan Room No. 4 (includes vestibule) | Sweep, damp mop. | X | X | ||||||||||
| 5 | Pump Room | Sweep, remove trash, damp mop. | X | |||||||||||
| 6 | Machine Shop | Vacuum, sweep, remove trash, damp mop. | X |
ATTACHMENT 3-5, PAGE 1 OF 1
Elev. 1684
| ATTACHMENT 3-6: POWER PLANT - REQUIREMENTS | |||||||||||||||||||
| FLOOR 3, (OFFICE FLOOR), ELEVATION 1684 | |||||||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun | Annual - 2024 - Feb | Annual - 2025 - Feb | Annual - 2026 - Feb | Annual - 2027 - Feb | Annual - 2028 - Feb |
| 1 | Men's Restroom | Sweep, remove trash, damp mop, clean all plumbing & mirrors. | X | ||||||||||||||||
| Wash down walls. | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax, buff. | X | X | X | ||||||||||||||||
| 2 | Locker/Lunch Room | Dust, sweep, remove trash, damp mop, wipe off tables, wipe chairs | X | ||||||||||||||||
| Wash walls and lockers from floor to ceiling | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax, buff. | X | X | X | ||||||||||||||||
| 3 | Kitchen | Vacuum, sweep, remove trash, damp mop, clean all plumbing (including counters), microwave (wipe inside and out), clean top of stove, empty and rinse coffee pot, wipe off refrigerator doors | X | ||||||||||||||||
| Clean oven and refrigerator, wipe clean cupboard doors. | X | ||||||||||||||||||
| Wash walls from floor to ceiling | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax and buff. (includes moving out refrigerator and stove) | X | X | X | ||||||||||||||||
| 4 | Electronics Office | Remove trash, vacuum floor | X | ||||||||||||||||
| Vacuum chairs. | X | ||||||||||||||||||
| 5 | Mech. Office | Remove trash. | X | ||||||||||||||||
| Dust, vacuum, sweep, damp mop. | X | ||||||||||||||||||
| Vacuum chairs. | X | ||||||||||||||||||
| ATTACHMENT 3-6, PAGE 1 OF 2 | |||||||||||||||||||
| 6 | Corridor No. 1 | Dust, vacuum, sweep, remove trash, clean fountain. | X | ||||||||||||||||
| Damp mop. | X | ||||||||||||||||||
| Wash walls from floor to ceiling | X | ||||||||||||||||||
| Maintenance Wax | |||||||||||||||||||
| Strip, wax, buff. | X | X | X | ||||||||||||||||
| 7 | Stair No. 2 (Elev. 1684 - 1703) | Dust op of tile, vacuum, sweep, damp mop stairs, spot clean walls. Handrails- wash down and clean. | X | ||||||||||||||||
| Maintenance Wax | |||||||||||||||||||
| Strip, wax, buff. | X | X | X | ||||||||||||||||
| 8 | Spreader Room | Dust, vacuum, sweep, remove trash, damp mop. | X | ||||||||||||||||
| 9 | Office 1 & Office 2 | Remove trash | X | ||||||||||||||||
| Sweep, damp mop | X | ||||||||||||||||||
| 10 | Janitorial Room | Vacuum, sweep, remove trash, damp mop, clean plumbing. | X | ||||||||||||||||
| 11 | Computer Room | Dust, vacuum, sweep, remove trash, damp mop. | X | ||||||||||||||||
| ATTACHMENT 3-6, PAGE 2 OF 2 |
Elev. 1703
| ATTACHMENT 3-7: POWER PLANT - REQUIREMENTS | |||||||||||||||||||
| FLOOR 4, (GENERATOR FLOOR), ELEVATION 1703 | |||||||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun | Annual - 2024 - Feb | Annual - 2025 - Feb | Annual - 2026 - Feb | Annual - 2027 - Feb | Annual - 2028 - Feb |
| 1 | Assembly Bay | Dust , sweep, remove trash | X | ||||||||||||||||
| Damp mop, buff. | X | ||||||||||||||||||
| Clean windows, spot clean wall tiles and baseboards | X | ||||||||||||||||||
| Maintenance Wax | x | x | |||||||||||||||||
| Strip and Wax | x | x | x | ||||||||||||||||
| 2 | Generator Bay 1 | Dust, sweep, remove trash. | X | X | |||||||||||||||
| Damp mop, buff. | X | ||||||||||||||||||
| Clean windows, spot clean walls tiles and baseboards. | X | ||||||||||||||||||
| Maintenance Wax | |||||||||||||||||||
| Strip and Wax | X | X | |||||||||||||||||
| 3 | Stair No. 8 (Elev. 1703 to 1684) | Sweep, damp mop stairs, spot clean walls. Handrails- wash down and clean. | X | X | |||||||||||||||
| Damp mop. | X | ||||||||||||||||||
| 4 | Generator Bays 2, 3, 4, & 5 | Dust, sweep, remove trash, damp mop, buff. | X | ||||||||||||||||
| Clean wall tiles and baseboards. Spot clean walls. | X | ||||||||||||||||||
| Maintenance Wax | |||||||||||||||||||
| Strip and Wax | X | X | |||||||||||||||||
| 5 | Other Stairs (Generator Room) | Dust, vacuum, sweep, damp mop. Handrails - wash down and clean. | X | ||||||||||||||||
| ATTACHMENT 3-7, PAGE 1 OF 1 |
Elev. 1703
| ATTACHMENT 3-8: POWER PLANT - REQUIREMENTS | |||||||||||||||||||
| FLOOR 4, (CONTROL ROOM, ETC.) , ELEVATION 1703 | |||||||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun | Annual - 2024 - Feb | Annual - 2025 - Feb | Annual - 2026 - Feb | Annual - 2027 - Feb | Annual - 2028 - Feb |
| 1 | Vestibule No. 2 | Dust, vacuum, sweep, remove trash. | X | ||||||||||||||||
| Damp mop. | X | ||||||||||||||||||
| Buff. | X | ||||||||||||||||||
| Spot clean walls & doors. Clean bugs out of light fixture. | X | ||||||||||||||||||
| Maintenance Wax | x | x | |||||||||||||||||
| Strip, wax & buff. | X | X | X | ||||||||||||||||
| 2 | Restroom & First Aid Room | Vacuum, sweep, remove trash, clean plumbing, damp mop, clean mirrors, dust | X | ||||||||||||||||
| Maintenance Wax | x | x | |||||||||||||||||
| Strip and Wax | X | X | X | ||||||||||||||||
| 3 | Meter Room | Dust, vacuum, sweep, remove trash, damp mop. | X | ||||||||||||||||
| 4 | Vestibule No. 1 | Dust, vacuum, sweep. | X | X | |||||||||||||||
| Damp mop, clean windows. | X | X | |||||||||||||||||
| Buff. | X | ||||||||||||||||||
| Maintenance Wax | x | x | |||||||||||||||||
| Strip, wax and buff. | X | X | X | ||||||||||||||||
| 5 | Lunch Room | Dust, vacuum, sweep, remove trash, clean plumbing, microwave, wipe top of stove, wipe down refrigerator doors. | X | ||||||||||||||||
| Damp mop, wipe off top of refrigerator. | X | ||||||||||||||||||
| Clean refrigerator & oven. | X | ||||||||||||||||||
| Clean walls and cupboard doors. | X | ||||||||||||||||||
| Maintenance Wax | x | x | |||||||||||||||||
| Strip, wax, buff. | X | X | X | ||||||||||||||||
| 6 | Rest Room (Control Room) | Sweep, remove trash, clean plumbing, damp mop. Spot clean walls. | X | ||||||||||||||||
| Maintenance Wax | x | x | |||||||||||||||||
| Strip, wax, buff. | X | X | X | ||||||||||||||||
| ATTACHMENT 3-8, PAGE 1 OF 3 | |||||||||||||||||||
| 7 | Service Passage | Dust, vacuum, sweep, remove trash, clean drinking fountain. | X | ||||||||||||||||
| Damp mop. | X | ||||||||||||||||||
| Buff, clean light fixtures | X | ||||||||||||||||||
| Wash down walls from floor to ceiling | X | ||||||||||||||||||
| Maintenance Wax | x | x | |||||||||||||||||
| Strip, wax and buff. | X | X | X | ||||||||||||||||
| 8 | Control Room | Dust, vacuum, sweep, remove trash, wipe chairs | X | ||||||||||||||||
| Clean glass above control desk, vacuum chairs | X | ||||||||||||||||||
| Damp mop laminite | X | ||||||||||||||||||
| 9 | Electric Shop & Office | Remove trash | X | ||||||||||||||||
| Dust, vacuum, sweep | X | ||||||||||||||||||
| Office - vacuum chairs | X | ||||||||||||||||||
| 10 | Exit to Transformer Deck | Sweep/vacuum, damp mop, clean glass | X | ||||||||||||||||
| Maintenance Wax | |||||||||||||||||||
| Strip, wax, and buff. | X | X | X | ||||||||||||||||
| 11 | Public Lobby | Dust, vacuum, sweep, remove trash, damp mop, clean windows, mirrors/glass, fountain. | X | X | |||||||||||||||
| Spot clean walls, vacuum chairs, buff. | X | ||||||||||||||||||
| Maintenance Wax | x | x | |||||||||||||||||
| Strip, wax, buff. | X | X | X | ||||||||||||||||
| 12 | Men's & Women's Restroom | Dust, vacuum, sweep, remove trash, damp mop, clean windows, mirrors, glass. | X | ||||||||||||||||
| Buff. | X | ||||||||||||||||||
| Maintenance Wax | x | x | |||||||||||||||||
| Strip, wax and buff. | X | X | X | ||||||||||||||||
| ATTACHMENT 3-8, PAGE 2 OF 3 | |||||||||||||||||||
| 13 | Observation Room | Dust, vacuum, sweep, remove trash, damp mop, mirrors, display glass, clean fountain. Wash down and clean all handrails. | X | X | |||||||||||||||
| Buff, Clean glass looking into control room (* Mon OR Tue) | *X | *X | |||||||||||||||||
| Maintenance Wax | x | x | |||||||||||||||||
| Strip, wax and buff. | X | X | X | ||||||||||||||||
| 14 | Stair No. 2 (Elev. 1703-1717.25) | Dust (handrails and top of tile), vacuum, sweep, damp mop stairs, spot clean walls. | X | ||||||||||||||||
| Maintenance Wax | x | x | |||||||||||||||||
| Strip, wax, and buff. | X | X | X | ||||||||||||||||
| 15 | Janitorial Closet | Damp mop, clean plumbing. | X | ||||||||||||||||
| 16 | Safety Storage Room | Dust, vacuum, sweep, damp mop. | X | ||||||||||||||||
| 17 | Vault | Dust, vacuum, sweep, damp mop. | X | ||||||||||||||||
| 18 | Relay Room | Dust, vacuum. | X | ||||||||||||||||
| ATTACHMENT 3-8, PAGE 3 OF 3 |
Elev. 1717.25
| ATTACHMENT 3-9: POWER PLANT - REQUIREMENTS | |||||||||||||||||||
| FLOOR 5, ELEVATION 1717.25 | |||||||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun | Annual - 2024 - Feb | Annual - 2025 - Feb | Annual - 2026 - Feb | Annual - 2027 - Feb | Annual - 2028 - Feb |
| 1 | Corridor | Dust, vacuum, sweep, remove trash, clean fountains. | X | ||||||||||||||||
| Damp Mop | X | ||||||||||||||||||
| Buff. | X | ||||||||||||||||||
| Clean wall tiles. | X | ||||||||||||||||||
| Maintenance Wax | X | X | |||||||||||||||||
| Strip, wax, buff. | X | X | X | ||||||||||||||||
| 2 | Kitchen | Dust, vacuum, sweep, remove trash, clean plumbing and counter, microwave, empty and rinse coffee pot. | X | ||||||||||||||||
| Damp mop. | X | ||||||||||||||||||
| Refrigerator - clean inside and out, wipe down cupboards. | X | ||||||||||||||||||
| 3 | Supplies | Dust, sweep, remove trash. | X | ||||||||||||||||
| Damp mop. | X | ||||||||||||||||||
| ATTACHMENT 3-9, PAGE 1 OF 2 | |||||||||||||||||||
| 4 | Restrooms (Men's & Women's) | Dust, sweep, remove trash, clean plumbing. | X | ||||||||||||||||
| Damp mop. | X | ||||||||||||||||||
| Maintenance Wax | |||||||||||||||||||
| Strip, wax & buff. | X | X | X | ||||||||||||||||
| 5 | Office Areas & Copier Room | Dust, vacuum, remove trash. | X | ||||||||||||||||
| Vacuum chairs. | X | ||||||||||||||||||
| 6 | Stair No. 2 (Elev. 1717.25 to 1730.25) | Dust, vacuum, sweep. | X | ||||||||||||||||
| Damp mop, spot clean wall tiles. Wash down and clean all handrails. | X | ||||||||||||||||||
| Maintenance Wax | |||||||||||||||||||
| Strip, wax, buff. | X | X | X | ||||||||||||||||
| 7 | Stair No. 1 (Elev. 1703 to 1717.25) | Dust, vacuum, sweep, damp mop.Wash down and clean all handrails. | X | X | |||||||||||||||
| Clean wall tiles . | X | ||||||||||||||||||
| Maintenance Wax | |||||||||||||||||||
| Strip, wax and buff. | X | X | X | ||||||||||||||||
| 8 | Fan Room No. 1 | Sweep, damp mop. | X | ||||||||||||||||
| ATTACHMENT 3-9, PAGE 2 OF 2 |
Elev. 1730.25
| ATTACHMENT 3-10: POWER PLANT - REQUIREMENTS | |||||||||||||||||||
| FLOOR 6, ELEVATION 1730.25 | |||||||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun | Annual - 2024 - Feb | Annual - 2025 - Feb | Annual - 2026 - Feb | Annual - 2027 - Feb | Annual - 2028 - Feb |
| 1 | Observ. Room | Dust, vacuum, sweep, damp mop, clean glass. | X | X | |||||||||||||||
| Clean wall tile. | X | ||||||||||||||||||
| Maintenance Wax | X | ||||||||||||||||||
| Strip, wax and buff. | X | X | |||||||||||||||||
| 2 | Conference Room | Dust, vacuum, sweep, remove trash, clean fountain, damp mop, clean glass. | X | ||||||||||||||||
| Clean wall tile, vacuum chairs | X | ||||||||||||||||||
| Maintenance Wax | |||||||||||||||||||
| Strip, wax and buff. | X | X | X | ||||||||||||||||
| 3 | Restrooms (Men's & Women's) | Dust, vacuum, sweep, remove trash, clean plumbing, damp mop. | X | X | |||||||||||||||
| Maintenance Wax | |||||||||||||||||||
| Strip, wax & buff. | X | X | X | ||||||||||||||||
| 4 | Print Room | Remove trash | X | ||||||||||||||||
| Dust, vacuum | X | ||||||||||||||||||
| Vacuum chairs. | X | ||||||||||||||||||
| 5 | Corridor | Dust, sweep. | X | ||||||||||||||||
| Damp mop. | X | ||||||||||||||||||
| Maintenance Wax | |||||||||||||||||||
| Strip, wax and buff. | X | X | X | ||||||||||||||||
| 6 | Stair No. 1 (Elev. 1717.25 to 1730.25) | Dust, vacuum, sweep, damp mop. Clean and wash all handrails. | X | ||||||||||||||||
| Spot clean walls . | X | ||||||||||||||||||
| Maintenance Wax | |||||||||||||||||||
| Strip, wax and buff. | X | X | X | ||||||||||||||||
| 7 | Janitorial Closet | Damp mop, scrub, clean plumbing. | X | ||||||||||||||||
| 8 | Storage Rooms | Dust, vacuum, sweep, remove trash, damp mop. | X | ||||||||||||||||
| ATTACHMENT 3-10, PAGE 1 OF 1 |
Intake Structure
| ATTACHMENT 3-11: INTAKE STRUCTURE - REQUIREMENTS | |||||||||||||||||||
| INTAKE STRUCTURE | |||||||||||||||||||
| Item No. | Location | Cleaning required at this location | Daily | Daily - Apr - Sep | Weekly (Mon.) | Weekly (Tues.) | Weekly (Wed.) Apr - Sep | Weekly (Thurs.) Apr - Sep | Monthly (first week) | Monthly (first week) Oct - Mar | Semi-Annually - Apr & Sep | Semi-Annual - Dec & Jun | Annual - Mar | Annual - Jun | Annual - 2024 - Feb | Annual - 2025 - Feb | Annual - 2026 - Feb | Annual - 2027 - Feb | Annual - 2028 - Feb |
| 1 | Restroom | Dust, vacuum, sweep, remove trash, clean plumbing, walls, stalls, mirror, damp mop. | X | ||||||||||||||||
| 2 | Office | Remove trash, dust vacuum, vacuum or wipe chairs, sweep, damp mop | X | ||||||||||||||||
| 3 | Water Treament Room, Diesel Generator Room, Air Compressor Room | Sweep and damp mop | X | ||||||||||||||||
| 4 | Main Level & Balcony | Sweep and damp mop | X | ||||||||||||||||
| ATTACHMENT 3-11, PAGE 1 OF 1 |