This is a Contract Data Requirements List (CDRL) document (DD Form 1423-1) that specifies nine data items required under an ADR-M IDIQ contract for the Air Force Civil Engineer Center (AFCEC).

The contract concerns the ADR-M (Alternative Disaster Recovery) system for material kit production and delivery. Key data requirements include: (1) Alternative Equipment Parts List due 45 days after delivery order; (2) Material Kit Prototype due 150 days after delivery order for government inspection; (3) Weekly Status Reports due every Monday at noon with production status, completion estimates, container numbers, and shipping information; (4) Quarterly Status Reports including prototype development, production activities, financial obligations versus contract ceiling, and participation in quarterly conference calls; (5) Drawing Submittals due 30 days after contract award; (6) Part Number Submittals due 30 days of delivery order (or within 7 days of approved changes) with complete inventory listings including part descriptions, quantities, kit assignments, manufacturers, NSNs, and country of origin; (7) Safety Data Sheets on hazardous materials due 30 days after delivery order; (8) Quality Assurance/Quality Control Plan due 10 days after contract award identifying QC and QA representatives by name; and (9) DD 250 Submittal required for every delivery order. All submissions must be electronic, in Microsoft Office-compatible searchable format, and emailed to afcec.cxx.radr@us.af.mil with specific naming conventions (ContractNumber_ProjectTitle_DocumentTitle). Distribution is restricted to DISTRIBUTION STATEMENT C (authorized to U.S. Government agencies and contractors for administrative or operational use).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

Adobe Professional 8.0

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ADR-M IDIQ

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

CDRL A001

2. TITLE OF DATA ITEM

ADR-M Alternative Equipment Parts List

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A

5. CONTRACT REFERENCE

SOW Para 3.1.2; Table 2

6. REQUIRING OFFICE

AFCEC/CXXM

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

C

10. FREQUENCY

See Blk 16

12. DATE OF FIRST SUBMISSION

See Blk 16

14. DISTRIBUTION

8. APP CODE

N/A

11. AS OF DATE

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

16. REMARKS

Block 9:

Distribution can range from A-F. Most reports use DISTRIBUTION STATEMENT C:

Authorized to U.S. Government agencies and their contractors; administrative or operational use; DATE OF CONTRACT AWARD. Refer other requests for this document to AFCEC/CXX, 139 Barnes Dr, Suite 2, Tyndall AFB, FL 32403-5323.

Block 10-13:

This CDRL is due 45 after delivery order, in accordance with SOW Para 3.1.2; Table 2.

Requirement:

Contractor shall submit any alternative equipment parts for Government review and approval.

Submission:

The submission shall be an electronic submission as an attachment to an email. If report contains information subject to export-control restrictions, report may not be submitted via unsecured or unencrypted email.

All required documents shall be in a format such that the key word search capabilities found under the "find" selection of the edit menu of Microsoft Office or Microsoft Internet Explorer are functional.

The body of the email should include: Contract number, project title, document title, CDRL name/number, vendor name.

All emailed attachments shall be named in the following format:

ContractNumber_ProjectTitle_DocumentTitle

Email to:

afcec.cxx.radr@us.af.mil

AFCEC/CXX 1 1

772 ESS/PKD 1 1

15. TOTAL 2 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DRAFT

mailto:afcec.cxx.radr@us.af.mil

Reset

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ADR AM-2 IDIQ

E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A.

Item B.

Item C.

Item D.

Item E. Item F.

Item G.

Item H.

Item I.

Item J.

Item 1

Item 2.

Item 3.

Item 4.

Item 5.

Item 6.

Item 7.

Item 8.

Item 9.

Item 10.

Item 11.

Item 12.

Item 13.

Item 14.

Item 15.

Item 16.

FOR THE CONTRACTOR

Item 17.

Item 18.

DD FORM 1423-1 (BACK), FEB 2001

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ADR-M IDIQ

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

CDRL A002

2. TITLE OF DATA ITEM

ADR-M Material Kit Prototype

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-82326

5. CONTRACT REFERENCE

SOW Para 3.1.2; Table 2

6. REQUIRING OFFICE

AFCEC/CXX

7. DD 250 REQ

N/A

See Blk 16

12. DATE OF FIRST SUBMISSION

11. AS OF DATE

See Blk 16

13. DATE OF SUBSEQUENT

Distribution can range from A-F. Most reports use DISTRIBUTION STATEMENT C:

Authorized to U.S. Government agencies and their contractors; administrative or

Block 10-13 This CDRL is due 150 after delivery order, in accordance with SOW Para 3.1.2; Table 2.

The Contractor shall produce a prototype of each ADR-M Material Kit Configuration for Government inspection.

contains information subject to export-control restrictions, report may not be submitted via unsecured or unencrypted email. All required documents shall be in a format such that the key word search capabilities found under the "find" selection of the edit menu of Microsoft Office or Microsoft Internet Explorer are functional.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ADR AM-2 IDIQ

E. CONTRACT/PR NO. F. CONTRACTOR

FOR GOVERNMENT PERSONNEL

Item A.

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ADR-M IDIQ

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

CDRL A003

2. TITLE OF DATA ITEM

ADR-M Weekly Status Report

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A

5. CONTRACT REFERENCE

SOW Para 3.1.3

6. REQUIRING OFFICE

AFCEC/CXX

7. DD 250 REQ

N/A

WEEKLY

12. DATE OF FIRST SUBMISSION

11. AS OF DATE

See Blk 16

13. DATE OF SUBSEQUENT

Distribution can range from A-F. Most reports use DISTRIBUTION STATEMENT C:

Authorized to U.S. Government agencies and their contractors; administrative or

This CDRL is due on a weekly basis NLT noon of the first day of the calendar week, in accordance with SOW Para 3.1.3.

The Contractor shall provide weekly status reports including the status of all production activities, anticipated production completion, container number, and shipping status of every shipment NLT every Monday at noon (central time) until delivery order completion.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ADR AM-2 IDIQ

E. CONTRACT/PR NO. F. CONTRACTOR

FOR GOVERNMENT PERSONNEL

Item A.

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ADR-M IDIQ

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

CDRL A004

2. TITLE OF DATA ITEM

ADR-M Quarterly Status Report

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A

5. CONTRACT REFERENCE

SOW Para 3.1.4

6. REQUIRING OFFICE

AFCEC/CXX

7. DD 250 REQ

N/A

Quarterly

12. DATE OF FIRST SUBMISSION

11. AS OF DATE

See Blk 16

13. DATE OF SUBSEQUENT

Distribution can range from A-F. Most reports use DISTRIBUTION STATEMENT C:

Authorized to U.S. Government agencies and their contractors; administrative or to AFCEC/CXX, 139 Barnes Dr, Suite 2,Tyndall AFB, FL 32403-5323.

This CDRL is due on a quarterly basis NLT noon of the first day of the calendar quarter (see SOW Para 3.1.4), in accordance with SOW Para 3.1.4.

The Contractor shall provide Quarterly Status Reports which include prototype development, all production activities, anticipated production completion, container number, shipping status of every shipment, and financial obligations versus contract ceiling.

As part of this CDRL, the contractor shall also participate in quarterly conference calls as directed and scheduled by AFCEC/CXX.

contains information subject to export-control restrictions, report may not be submitted via unsecured or unencrypted email. All required documents shall be in a format such that the

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ADR AM-2 IDIQ

E. CONTRACT/PR NO. F. CONTRACTOR

FOR GOVERNMENT PERSONNEL

Item A.

DD FORM 1423-1, FEB 2001 ����� �� �

Adobe Professional 8.0

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

,'-'./'&001 � ����� "# �"! � ��� ��# � � �)� � ! ��! "� ! )�! ��! �"# �"� �"+ � ! �� � � %���� " � � ��)( "� �� �� " ����� �� ��� 2�� ! ! � �"+ ��"��! + �� �����"� ! � � � $��+ )�! � � � � � "! � � "�$� � � Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ADR-M IDIQ

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

CDRL A005

2. TITLE OF DATA ITEM

ADR-M Drawing Submittals

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

DI-DRPR-81718

5. CONTRACT REFERENCE

SOW Para 3.1.5

6. REQUIRING OFFICE

AFCEC/CXX

7. DD 250 REQ

N/A

See Blk 16

12. DATE OF FIRST SUBMISSION

� � 3��� � �

8. APP CODE

N/A

11. AS OF DATE

See Blk 16

13. DATE OF SUBSEQUENT

4�"���

16. REMARKS

Block 9:

Distribution can range from A-F. Most reports use DISTRIBUTION STATEMENT C:

Authorized to U.S. Government agencies and their contractors; administrative or

This CDRL is due 30 after contract award, in accordance with SOW Para 3.1.5.

Contractor shall provide a drawing package as described in SOW Para 3.1.5.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ADR AM-2 IDIQ

E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 ���� � ��

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. ���/�*���"�! � +��

Item B. ���/�*���"�! � +��

Item C.

� 5 ,61 ��� � � ��! � � �! ��� +7 � �!� ��� 5���8 � �"���8 �! �� / � ! �� � �! ��� + � � # �! �( ��� � �� 9� � %���� "�"�(993� "���� �! �� " �"���$�"! (9 �! � ��

Item D. �"! � "�$� � � �+�! �$:�! �$ � ��"� �� ;�� �# !��! # �! � )��� ����� ! ��

Item E. ���/�*���"�! � + ,! � � � �����# �" ��! � ��"! ��! �)� # 1 � Item F.

�)� # 1 � Item G. ��"�! � � � � � ��� � � � 3

Item H.

�! � 3

Item I. ��"�! � � � � 3

Item J.

�! � 3

Item 1� �� 4�� �����$�"! �� �� ! .�-& �� � � �� "�$� � �"���

Item 2. �"! � ! �! �� �� �! ����� � � " # �! � �� ;����! �� " #���$�"! ��!�# �" � ! �$ .��

Item 3. �"! � ��� ! �! �� � � # �! � �! �$ �� �� ! �� #���"�!��" �� # �! � �! �$ ,� �! �� "�� �"! +1 ��

Item 4. �"! � 1 "�$� � ( $���!� + ���������!��" "�$� � ( � $���! � +

<1 ( � � "�/! �$�

Item 5. �"! � ��� �"� � ! � ! ��5�"� �" � � "! �� ! ! ��! ��"� �!�� �;�� �$�"! �� ! �� # �! � �! �$ ,����( ! �! �$�"! � � ?� 5 �� �� ��� "�$� � 1 ��

Item 6. �"! � ! �� �"�� �� � ���� � ���� "��� �� �� �"�� �"� �#�;���+ � � ! �� # �! � �! �$��

Item 7. ��� ��+ �;�� �$�"! �� �"���� ! �� ":�� � ��! �"� � �� ! �� # �! � �! �$ � + ! ��

Item 8. ��� ��+ �;�� �$�"! �� ��� � %�� � � � # ��! ���� � � ��� �! �� " � � ! �� ��"��

Item 9. 4� ! �� �"�� �� # �! �( ���� ��+ �;�� �$�"! �� ��"! ��!� ! � $� 5 ! �� ��� � � ��! �

=>A'�>.1 ��

Item 10. ��� ��+ "�$� � � � ! �$�� # �! � �! �$� � � ! � �� # ���%� �# ��

Item 11. ��� ��+ ��/� � # �! � � � # �! � �! �$( )��" ������������

Item 12. ��� ��+ )��" �� �! ��� $�! ! �� �� �;�� �# ��

Item 13. ��� ��+ )��" ��� ��;��"! ��� $�! ! ��� � � �;�� �# ( )��"

Item 14. �"! � �# # ������ �"# "�$� � � � # ��! :��"�� ������ ! � � � # ���%� �# ! � ��� � �# # ������ �*����" �� � # �� �� �� � � ���� �" � ! �$ &B��

Item 15. �"! � ! � ! �� "�$� � � � # ��! :��"�� � � ���� ! � � � #���%� �#��

Item 16. ��� �� �# # �! �� "��:� �� ��+�"� �"�� $�! �� " �� �!�$� & ! � � ��� &=� �*�$���� � �7 ����� �"� � � # � � �$�"! � � �! �# �" � ! �$ .8 3�� ���� �! �� " � � ��� $�! ! �� # �! �� �" � ! �$� &> �"# &A8 �*���"�! �� " � � �� � # �� �� �� � � ���� �" � ! �$ &.�8

FOR THE CONTRACTOR

Item 17. ��� ��+ ��� � � ��! � � �� � � � �� � � $ �"� � � ! �� �� ��� )�"�

4� $ &.>A��

� � "! �� ! � C� �� �� $�"� � � � ! �� � �$� + � � "! �� ! �# ���� !

,� � # �� ! �� "( # �%��� �$�"! ( ! ��! �"�( �"# �# $�"��! �! �� "1 � �!

4� $ &.>A��

��! �$�! �# � �� � / 3� �! � ! � � � �"� ��# �# �"#� @ ��� � � � ! �� ��

� � "! �� ! � �� �;�� �# ! � �� �� $ �# # �! �� "�� )� 5 ! �

��! �$�! �# � �� � / 3� �! � ! � � � �"� ��# �# �"#� @ ��� � � � � ! �� ��

��! �$�! �# � �� � / 3� �! � ! � � � �"� ��# �# �"#� @ ��� � � � � � ! ��

4� $ &.>A �! "� � � �! ��

Item 18. 4� ��� � # �! � �! �$( �"! � �" �$� �"! �;��� !� ! ��! �� ! �� " � �

@� %� "$�"! C� ���! ! � ��� ! �� # �! ��

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ADR-M IDIQ

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

CDRL A006

2. TITLE OF DATA ITEM

ADR-M Part Number Submittals

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A

5. CONTRACT REFERENCE

SOW Para 3.1.6

6. REQUIRING OFFICE

AFCEC/CXX

7. DD 250 REQ

N/A

See Blk 16

12. DATE OF FIRST SUBMISSION

11. AS OF DATE

See Blk 16

13. DATE OF SUBSEQUENT

Distribution can range from A-F. Most reports use DISTRIBUTION STATEMENT C:

Authorized to U.S. Government agencies and their contractors; administrative or

This CDRL is due 30 days of the awarded delivery order (or within 7 days of any approved change), in accordance with SOW Para 3.1.6.

The Contractor shall create a document detailing the part numbers being provided with the ADR-M Material Kit Confuguration. The document shall include a complete inventory listing with part description, quantity, which kit the item is included in, manufacturer, manufacturer's part numbers, National Stock Numbers (NSN) if available, and country of origin

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ADR AM-2 IDIQ

E. CONTRACT/PR NO. F. CONTRACTOR

FOR GOVERNMENT PERSONNEL

Item A.

DD FORM 1423-1, FEB 2001 ����� �� �

Adobe Professional 8.0

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

,'-'./'&001 � ����� "# �"! � ��� ��# � � �)� � ! ��! "� ! )�! ��! �"# �"� �"+ � ! �� � � %���� " � � ��)( "� �� �� " ����� �� ��� 2�� ! ! � �"+ ��"��! + �� �����"� ! � � � $��+ )�! � � � � � "! � � "�$� � � Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ADR-M IDIQ

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

CDRL A007

2. TITLE OF DATA ITEM

ADR-M Safety Data Sheets (SDS)

3. SUBTITLE

Hazardous Material

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-82112

5. CONTRACT REFERENCE

SOW Para 3.1.7

6. REQUIRING OFFICE

AFCEC/CXX

7. DD 250 REQ

N/A

See Blk 16

12. DATE OF FIRST SUBMISSION

� � 3��� � �

8. APP CODE

N/A

11. AS OF DATE

See Blk 16

13. DATE OF SUBSEQUENT

4�"���

16. REMARKS

Block 9:

Distribution can range from A-F. Most reports use DISTRIBUTION STATEMENT C:

Authorized to U.S. Government agencies and their contractors; administrative or

This CDRL is due 30 days after delivery order, in accordance with SOW Para 3.1.7.

Contractor shall submit complete Safety Data Sheets on hazardous materials (if applicable).

Explorer are functional.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ADR AM-2 IDIQ

E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 ���� � ��

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. ���/�*���"�! � +��

Item B. ���/�*���"�! � +��

Item C.

� 5 ,61 ��� � � ��! � � �! ��� +7 � �!� ��� 5���8 � �"���8 �! �� / � ! �� � �! ��� + � � # �! �( ��� � �� 9� � %���� "�"�(993� "���� �! �� " �"���$�"! (9 �! � ��

Item D. �"! � "�$� � � �+�! �$:�! �$ � ��"� �� ;�� �# !��! # �! � )��� ����� ! ��

Item E. ���/�*���"�! � + ,! � � � �����# �" ��! � ��"! ��! �)� # 1 � Item F.

�)� # 1 � Item G. ��"�! � � � � � ��� � � � 3

Item H.

�! � 3

Item I. ��"�! � � � � 3

Item J.

�! � 3

Item 1� �� 4�� �����$�"! �� �� ! .�-& �� � � �� "�$� � �"���

Item 2. �"! � ! �! �� �� �! ����� � � " # �! � �� ;����! �� " #���$�"! ��!�# �" � ! �$ .��

Item 3. �"! � ��� ! �! �� � � # �! � �! �$ �� �� ! �� #���"�!��" �� # �! � �! �$ ,� �! �� "�� �"! +1 ��

Item 4. �"! � 1 "�$� � ( $���!� + ���������!��" "�$� � ( � $���! � +

<1 ( � � "�/! �$�

Item 5. �"! � ��� �"� � ! � ! ��5�"� �" � � "! �� ! ! ��! ��"� �!�� �;�� �$�"! �� ! �� # �! � �! �$ ,����( ! �! �$�"! � � ?� 5 �� �� ��� "�$� � 1 ��

Item 6. �"! � ! �� �"�� �� � ���� � ���� "��� �� �� �"�� �"� �#�;���+ � � ! �� # �! � �! �$��

Item 7. ��� ��+ �;�� �$�"! �� �"���� ! �� ":�� � ��! �"� � �� ! �� # �! � �! �$ � + ! ��

Item 8. ��� ��+ �;�� �$�"! �� ��� � %�� � � � # ��! ���� � � ��� �! �� " � � ! �� ��"��

Item 9. 4� ! �� �"�� �� # �! �( ���� ��+ �;�� �$�"! �� ��"! ��!� ! � $� 5 ! �� ��� � � ��! �

=>A'�>.1 ��

Item 10. ��� ��+ "�$� � � � ! �$�� # �! � �! �$� � � ! � �� # ���%� �# ��

Item 11. ��� ��+ ��/� � # �! � � � # �! � �! �$( )��" ������������

Item 12. ��� ��+ )��" �� �! ��� $�! ! �� �� �;�� �# ��

Item 13. ��� ��+ )��" ��� ��;��"! ��� $�! ! ��� � � �;�� �# ( )��"

Item 14. �"! � �# # ������ �"# "�$� � � � # ��! :��"�� ������ ! � � � # ���%� �# ! � ��� � �# # ������ �*����" �� � # �� �� �� � � ���� �" � ! �$ &B��

Item 15. �"! � ! � ! �� "�$� � � � # ��! :��"�� � � ���� ! � � � #���%� �#��

Item 16. ��� �� �# # �! �� "��:� �� ��+�"� �"�� $�! �� " �� �!�$� & ! � � ��� &=� �*�$���� � �7 ����� �"� � � # � � �$�"! � � �! �# �" � ! �$ .8 3�� ���� �! �� " � � ��� $�! ! �� # �! �� �" � ! �$� &> �"# &A8 �*���"�! �� " � � �� � # �� �� �� � � ���� �" � ! �$ &.�8

FOR THE CONTRACTOR

Item 17. ��� ��+ ��� � � ��! � � �� � � � �� � � $ �"� � � ! �� �� ��� )�"�

4� $ &.>A��

� � "! �� ! � C� �� �� $�"� � � � ! �� � �$� + � � "! �� ! �# ���� !

,� � # �� ! �� "( # �%��� �$�"! ( ! ��! �"�( �"# �# $�"��! �! �� "1 � �!

4� $ &.>A��

��! �$�! �# � �� � / 3� �! � ! � � � �"� ��# �# �"#� @ ��� � � � ! �� ��

� � "! �� ! � �� �;�� �# ! � �� �� $ �# # �! �� "�� )� 5 ! �

��! �$�! �# � �� � / 3� �! � ! � � � �"� ��# �# �"#� @ ��� � � � � ! �� ��

��! �$�! �# � �� � / 3� �! � ! � � � �"� ��# �# �"#� @ ��� � � � � � ! ��

4� $ &.>A �! "� � � �! ��

Item 18. 4� ��� � # �! � �! �$( �"! � �" �$� �"! �;��� !� ! ��! �� ! �� " � �

@� %� "$�"! C� ���! ! � ��� ! �� # �! ��

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ADR-M IDIQ

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

CDRL A008

2. TITLE OF DATA ITEM

ADR-M Quality Assurance/Quality Control (QA/QC)

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

DI-QCIC-81198

5. CONTRACT REFERENCE

SOW Para 3.1.8

6. REQUIRING OFFICE

AFCEC/CXX

7. DD 250 REQ

N/A

See Blk 16

12. DATE OF FIRST SUBMISSION

11. AS OF DATE

See Blk 16

13. DATE OF SUBSEQUENT

Distribution can range from A-F. Most reports use DISTRIBUTION STATEMENT C:

Authorized to U.S. Government agencies and their contractors; administrative or

This CDRL is due 10 days of contract award, in accordance with SOW Para 3.1.8.

The Contractor shall submit a Quality Assurance/Quality Control (QA/QC) Plan as stated in SOW Para 3.1.8 identifying a Quality Control (QC) representative (by name) at each project location as well as a Quality Assurance (QA) representative (by name) who shall be the POC for any and all Quality concerns.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ADR AM-2 IDIQ

E. CONTRACT/PR NO. F. CONTRACTOR

FOR GOVERNMENT PERSONNEL

Item A.

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ADR-M IDIQ

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

CDRL A009

2. TITLE OF DATA ITEM

ADR-M DD 250 Submittal

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A

5. CONTRACT REFERENCE

SOW Para 4.1

6. REQUIRING OFFICE

AFCEC/CXX

7. DD 250 REQ

N/A

ASREQ

12. DATE OF FIRST SUBMISSION

11. AS OF DATE

See Blk 16

13. DATE OF SUBSEQUENT

Distribution can range from A-F. Most reports use DISTRIBUTION STATEMENT C:

Authorized to U.S. Government agencies and their contractors; administrative or

This CDRL is required for every delivery order, in accordance with SOW Para 4.1.

The Contractor shall provide a DD form 250 signed by a destination point of contact in accordance with SOW Para 4.3.

The submission shall be an electronic submission as an attachment to the WAWF invoice.

If the DD form 250 contains information subject to export-control restrictions, report may not be submitted via unsecured or unencrypted email.

Explorer are functional.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ADR AM-2 IDIQ

E. CONTRACT/PR NO. F. CONTRACTOR

FOR GOVERNMENT PERSONNEL

Item A.

CDRL A001 - ADR-M Alternative Equipment Parts List
CDRL A002 - ADR-M Component Kit Prototype
CDRL A003 - ADR-M Weekly Status Reports
CDRL A004 - ADR-M Quarterly Status Reports
CDRL A005 - ADR-M Drawings Submittals
CDRL A006 - ADR-M Part Number Submittals
CDRL A007 - ADR-M Safety Data Sheets (SDS)
CDRL A008 - ADR-M Quality Assurance-Quality Control (QA-QC) Testing
CDRL A009 - ADR-M DD 250

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

ADR-M IDIQ

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

1. DATA ITEM NO.

CDRL A001

2. TITLE OF DATA ITEM

ADR-M Alternative Equipment Parts List

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A

5. CONTRACT REFERENCE

SOW Para 3.1.2; Table 2

6. REQUIRING OFFICE

AFCEC/CXXM

7. DD 250 REQ

12. DATE OF FIRST SUBMISSION

11. AS OF DATE

13. DATE OF SUBSEQUENT

Distribution can range from A-F. Most reports use DISTRIBUTION STATEMENT C:

Authorized to U.S. Government agencies and their contractors; administrative or

This CDRL is due 45 after delivery order, in accordance with SOW Para 3.1.2; Table 2.

Contractor shall submit any alternative equipment parts for Government review and approval.

ADR AM-2 IDIQ

E. CONTRACT/PR NO. F. CONTRACTOR

FOR GOVERNMENT PERSONNEL

Item A.

ADR-M IDIQ

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

CDRL A002

2. TITLE OF DATA ITEM

ADR-M Material Kit Prototype

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-82326

5. CONTRACT REFERENCE

SOW Para 3.1.2; Table 2

6. REQUIRING OFFICE

AFCEC/CXX

7. DD 250 REQ

12. DATE OF FIRST SUBMISSION

11. AS OF DATE

13. DATE OF SUBSEQUENT

Distribution can range from A-F. Most reports use DISTRIBUTION STATEMENT C:

Authorized to U.S. Government agencies and their contractors; administrative or

Block 10-13 This CDRL is due 150 after delivery order, in accordance with SOW Para 3.1.2; Table 2.

The Contractor shall produce a prototype of each ADR-M Material Kit Configuration for Government inspection.

contains information subject to export-control restrictions, report may not be submitted via unsecured or unencrypted email. All required documents shall be in a format such that the

ADR AM-2 IDIQ

E. CONTRACT/PR NO. F. CONTRACTOR

FOR GOVERNMENT PERSONNEL

Item A.

File details come from the government source that posted it. Updated .