This is a Bill of Materials (BoQ) for the Reconstruction and Barrier-Free Access Project at the U.S. Embassy in Bratislava, Slovakia, dated November 19, 2025. The document is prepared by playarchitects s.r.o. and serves as a comprehensive pricing template for contractor bids covering all supply and installation works required for the embassy renovation project.
The BoQ is organized into six major work categories: Demolition Works, Architectural and Structural Works, Plumbing, Heating, Ventilation and Air Conditioning, and Electrical Installations. Demolition Works include removal of partition walls (11.87-20.96 m² of fired clay brick masonry), ceramic tiling (25.47 m²), window and door frames, sanitary fixtures, and heating pipework, with debris transport and disposal fees totaling approximately 12.46 metric tons locally plus 124.56 metric tons for additional distance. Architectural and Structural Works encompass cellular concrete masonry (6.80-5.29 m²), internal wall preparation and plaster finishes, drywall partitions on steel frames (18 m²), tiled floors and cladding (15.50 m²), suspended modular ceilings (4.78 m²), steel structure fabrication (236.50 kg), and fixtures including grab rails, soap dispensers, and baby changing tables. Plumbing covers internal drainage (DN40, DN50, DN110 waste pipes totaling 12 meters), water supply pipework (14 meters of PEX/Al/PEX), and fixture installations including concealed WC frames, washbasins, and a wall-mounted drinking fountain. Heating systems include pipe insulation (17-15 meters for DN15 and DN35), press-fit carbon steel distribution pipes (23-15 meters), radiators, and thermostatic valve sets. Ventilation and Air Conditioning work requires Spiro and flexible ductwork (4-1.5 meters for DN150 and DN100), non-return dampers, and a ceiling-mounted axial fan. Electrical Installations include rigid electrical conduit (100 meters total), modular circuit breakers, copper cables (3x1.5 to 5x2.5mm²), junction boxes, switches, socket outlets, ceiling luminaires with LED lighting, and fire safety system relocations. The contractor is contractually required to price all supply and installation works to fulfill the complete project scope as defined in the project documentation, and must notify the employer immediately of any identified discrepancies, omissions, or deficiencies.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reconstruction and Barrier-Free Access Project US
EMBASSY BRATISLAVA
Bill of Materials playarchitects s.r.o.
Roľnícka 187, 831 07 Bratislava www.playarchitects.sk
Cost Summary
Project : Reconstruction and Barrier-Free Access Project US EMBASSY BRATISLAVA
Employer : U.S. EMBASSY, Hviezdoslavovo sq.5, 81102 Bratislava, SVK date : 19.11.2025 Designer : playarchitects s.r.o.
Contractor:
item description
1 Demolition Works kpl
2 Architectural and Structural Works kpl
3 Plumbing kpl
4 Heating kpl
5 Ventilation and Air Conditioning kpl
6 Electrical Installations kpl
Total Price excluding VAT
VAT 23%
Total Price including VAT
The scope of the Reconstruction and Barrier-Free Access Project is covered by this Bill of Quantities (BoQ).
The Contractor is strictly required to price all supply and installation works to fulfil the complete scope as defined in the Project Documentation. Should the Contractor identify any discrepancies, omissions, or deficiencies in the BoQ, they must notify the Employer immediately and ensure that their Final Tender Price fully accounts for all necessary supplies and works defined in the Project Documentation.
Matúš Gondek playarchitects s.r.o.
Demolition Works
Employer : U.S. EMBASSY, Hviezdoslavovo sq.5, 81102 Bratislava, SVK date : 19.11.2025 Designer : playarchitects s.r.o.
Contractor:
item description UoM total quantity item price total price
Demoliton Works
Demolition of partition walls made of fired clay bricks, solid or hollow, up to 150 mm thickness m2 11,87 80mm Partition Wall (1+0,89+1,1)*3,97 11,87
Demolition of partition walls made of fired clay bricks, solid or hollow, up to 250 mm thickness, -0,32600t m2 20,96 170mm Partition Wall (1,15+2,05+1,15+0,93)*3,97 20,96
Demolition of concrete screeds, non-structural concrete over foundation, -2,20000t m2 0,18 Demolition of non stuctural floor layers for steel structure footing 0,3*0,3 0,09
Channel for relocated electrical installations 0,9*0,1 0,09
Core drilling, 4cm diameter, through ceiling slab, length up to 0.4m pcs 2,00
Drilling for heating system distribution through slab 2,00
Chasing groove into load-bearing solid fired clay brick masonry, up to 10cm deep and 20cm wide m 1,00 Groove for DN110 sewerage piping in load-bearing wall up to 10cm deep - 1*0,2*0,1 1,00
6 Scrubbing plaster down to load-bearing brickwork m2 0,25 Scrubbing off plaster at steel structure anchoring 0,5*0,5 0,25
Excavation and removal/transport of debris mixture of bricks, concrete, and ceramic tiles m3 0,97 Bottom fill at ventilation shaft (0,92*0,96)*1,1 0,97
8 Removal of ceramic wall tiles down to base layer m2 25,47 Ceramic wall tiling (4,7+3+6,3)*2-2,53 25,47
Removal of floor tiles, including underlying adhesive, down to continuous screed layer m2 5,10 Ceramic floor tiling 4,15+0,95 5,10
Demolition/Removal of single wooden window frames up to 1 m2 surface area, -0,04100t m2 2,53 Shaft windows (0,8+0,8+0,7)*1,1 2,53
Removal of metal door frames up to 2 m2 surface area, -0,07600t pcs 2,00
Removal of wooden door frames up to 2 m2 surface area, -0,07600t pcs 1,00
Dismantling/Removal and disposal of window or door leaf/sash up to 2 m2 pcs 9,00
Dismantling/Remova
Dismantling/Removal of sanitary fixtures, including disposal pcs 3,00 Toilet (W.C.), washbasin, sink/slop sink
Removal of steel heating pipework connections to radiators, including installation of valves at connection points, steel pipe up to 40mm m 22,60 (4,5+0,6+0,9+3,8+1,5)*2 22,60
Shut-down of the heating system, including necessary draining and refilling. set 1,00
Removal of steel water pipework up to DN40 diameter, including capping of blind pipe ends m 4,00
5 Dismantling and relocation/transfer of items pcs 3,00 Drinking fountain 1,00 Vending machine 1,00 Fire extinguisher 1,00
6 Dismantling/Removal of steel grille/mesh in shaft pcs 1,00
Dismantling of electrical devices, including disconnection in junction box in the area set 1,00 Light fixtures 3pcs Fan/Ventilator 1pc Switches 4pcs
Waste Disposal 1 Transport of debris to disposal site up to 1 km t 12,46
Transport of debris to disposal site for each additional 1 km t 124,56
Disposal fee for construction waste for recycling of mixture of concrete, bricks, tiles, and ceramics (17 01
07) t 10,94
Disposal fee for construction waste for recycling of wood (17 02 01) t 0,31
Disposal fee for construction waste for recycling of glass (17 02 02) t 0,05
On Site transport Main Construction Works
On Site material transport for demolition without restrictions, performed by gradual dismantling up to 21 m height t 12,46
Total Price excluding VAT
VAT 23%
Total Price including VAT
The scope of the Reconstruction and Barrier-Free Access Project is covered by this Bill of Quantities (BoQ).
The Contractor is strictly required to price all supply and installation works to fulfil the complete scope as defined in the Project Documentation. Should the Contractor identify any discrepancies, omissions, or deficiencies in the BoQ, they must notify the Employer immediately and ensure that their Final Tender Price fully accounts for all necessary supplies and works defined in the Project Documentation.
Architectural and Structural Works
Employer : U.S. EMBASSY, Hviezdoslavovo sq.5, 81102 Bratislava, SVK date : 19.11.2025 Designer : playarchitects s.r.o.
Contractor:
item description UoM total quantity item price total price
Vertical and Complete Structures
Non-loadbearing masonry, cellular concrete (Ytong) on adhesive, 75mm thickness m2 6,80 Partition wall infill masonry and opening 0,7*2,05+(0,2+1,1+0,1)*3,75+1,9*0,06 6,80
Non-loadbearing masonry, cellular concrete (Ytong) on adhesive, 150mm thickness m2 5,29 Partition wall door 2,05*3,75-1*2,40 5,29
3 Load-bearing ceramic lintel 70x249x1250 pcs 2,00 Load-bearing ceramic lintel over door 2pcs
Surface Treatments, Floors, Fixtures
1 Preparation of internal wall substrate with basic primer m2 20,65 (3,15+2,05+0,7+0,7)*3,75-2*1*2,05 20,65
Coating of steel structure with adhesive concrete-contact primer m2 0,60 0,16*3,75 0,60
Bonding of walls with fiberglass mesh using full-surface adhesion m2 22,72
Internal wall plaster, gypsum, manually mixed and applied, up to 25 mm thickness m2 10,89 (2,05+0,7+0,7)*3,75-1*2,05 10,89
5 Gypsum coat, full-surface skimming of walls m2 17,11 Corridor walls (4,3+2,2)*3,2-2*0,9*2,05 17,11
Other Works
Light work scaffolding, ancillary, with scaffolding floor height from 1.20 to 1.90 m m2 6,00
2 Cleaning of buildings with floor height up to 4m m2 16,00
Covering materials for separation of construction site from interior, foils, tapes set 1,00
On Site transport Main Construction Works On Site transport JKSO 801,803,812, vertical structures from bricks, blocks, metal t 1,63
Waterproofing and Damp Proofing
Supply and Installation (S&I) of substrate penetration/primer m2 12,07 5,1+(2,01+2,5)*2-1*2,05 12,07
S&I of insulation coating with two-component waterproofing compound m2 6,12
Hydroizolácia poidlaha a sokel do výšky 10cm - 5,1*1,2 6,12 3 S&I of joint sealing tapes for corners m 9,00
Tiled Floors and Cladding 1 Cutting of floor and wall tiles m 8,10
Straight cuts in one row 2,8+2,5+2,8 8,10 2 Openings cuts/holes for fixtures pcs 10,00
Washbasin, toilet, towel holder, brush holder, grab rails, counter 10,00
Installation of special rounded ceramic fittings into flexible adhesive, including grouting pcs 36,00 2*8+10+6 U-shaped fittings 32,00 4 corner fittings 4,00
Rounded corner r60/125/8 mm, Agrob Buchtal, Coved Skirting System, greybeige, Article 900-18190 pcs 32,00
Rounded corner r60/60/60 mm, Agrob Buchtal, Coved Skirting System, greybeige; Article 900-17112 pcs 4,00
Installation of ceramic wall and floor tiles using flexible adhesive via the BUTTERING-FLOATING system (double-sided adhesive application) m2 15,50 (6,53-2,12+5,14+4,54)*1,1 15,50
Agrob Buchtal Wall Tile, Chroma, grey-beige;
125x125x6mm, ATTENTION: Special colour pcs 15,50
S&I of ceramic grouting - floor tiles using grout - MAPEI Ultracolor Plus 112 Medium Grey m2 15,50
9 Chemical cleaning of ceramic wall and floor tiles m2 16,40 10 Material handling/tansport for tiled floors % 0,00
Drywall/Installed Systems
S&I of Drywall Partition on steel frame, double-sided sheeting, without thermal insulation, CW+UW 75, 12.5 mm impregnated Knauf Diamant boards m2 18,00 CW profiles with spacing up to 30cm (2.1+2.5+0.2)*3.75 18,00
S&I of Plywood board, 24mm thickness, timber infill/reinforcement in grab rail fixing locations pcs 4,00 0,5*0,5 - 4pcs 4,00
S&I of Suspended Modular Ceiling, system - KNAUF ADAGIO HD+ 19 MM, 600x600mm TILES m2 4,78
Including suspension into reinforced concrete ceiling, including suspended grid, Knauf type 00831599 - 4044617317225 - Board edge, 4,78
S&I of Mirror, glued to the level of tiling, ground edges, 1000x2125x6mm m2 2,13
Material handling/transport for drywall constructions in structures up to 6 m height % 0,00
Joinery Works
S&I Interior door, clear opening size 900x1970mm, jamb/architrave frame, motorised door opener, handle-handle ironmongery, lacquered finish, white colour RAL 9010 pcs 1,00 Joinery production, including installation Closer details, ironmongery, see Project Documentation
S&I Built-in wardrobe, as per Project Documentation, 1870x2750x375mm pcs 1,00 Joinery production, including installation
3 Corridor skirting, refitting of existing skirting m 2,50
Material handling/transport for joinery constructions in structures up to 6 m height % 0,00
Steel Structures
S&I Steel structure for supporting concrete slab edge.
Primer coat and top alkyd coat, white colour RAL 9010 kg 236,50 Beam HEB 140 S355, 120x120x12mm 147,80 Column UPE 160 S355, 160x70x5.5/9.5mm 68,10 Steel plate, flat S355, 200x200x10mm - 3pcs 9,50 Steel plate, flat S355, 70x160x15mm - 1pc 8,00 Steel plate, flat S355, 140x140x10mm - 2pcs 3,10
2 Refitting of mesh/grille in skylight/light shaft pcs 1,00
Fixtures and Fittings 1 Installation of stainless steel grab rail on wall pcs 2,00 2 Installation of wall-mounted soap dispenser pcs 1,00 3 Installation of stainless steel towel dispenser pcs 1,00
4 Installation of brush holder and toilet paper dispenser pcs 1,00 5 Installation of wall-mounted baby changing table pcs 1,00
Custom stainless steel straight grab rail 90cm, as per specification in Project Documentation pcs 1,00
Custom stainless steel straight grab rail 110cm, as per specification in Project Documentation pcs 1,00
MERIDA liquid soap dispenser 400 ml, matte stainless steel, DSM206 pcs 1,00
Sanela Stainless Steel Accessories - Stainless steel paper towel dispenser with waste bin, anti-vandal SLZN 21 pcs 1,00
Stainless Steel Brush Paper Holder, built in, 145x595x120mm, custom made pcs 1,00
Bolero horizontal baby changing table, Code:
01_DA695 pcs 1,00
12 Installation of Fire extinguisher with wall bracket pcs 1,00 13 Material handling for fixtures and fittings % 0,00
Painting
Painting with washable painter's mixtures, applied in two coats on fine-grained substrate up to 3.80 m height, including substrate priming m2 25,50 (2,3+3,5+1)*3,75 25,50
Other works - covering of interior fixtures and floors with foil/sheeting in rooms m2 17,00
Total Price excluding VAT
VAT 23%
Total Price including VAT
The scope of the Reconstruction and Barrier-Free Access Project is covered by this Bill of Quantities (BoQ).
The Contractor is strictly required to price all supply and installation works to fulfil the complete scope as defined in the Project Documentation. Should the Contractor identify any discrepancies, omissions, or deficiencies in the BoQ, they must notify the Employer immediately and ensure that their Final Tender Price fully accounts for all necessary supplies and works defined in the Project Documentation.
Plumbing
Employer : U.S. EMBASSY, Hviezdoslavovo sq.5, 81102 Bratislava, SVK date : 19.11.2025 Designer : playarchitects s.r.o.
Contractor:
item description UoM total quantity item price total price
Internal Drainage 1 HT Waste pipe from PP, connection DN 40 mb 8,00 2 HT Waste pipe from PP, connection DN 50 mb 2,00 3 HT Waste pipe from PP, connection DN 110 mb 2,00 4 Installation of sewerage ventilation/aeration valve ks 1,00
Installation of PE pipes, 15-20 mm wall thickness, internal diameter up to 38 mm mb 12,00
PE insulating pipe, outer/inner diameter 20x13 mm, pre-cut, for insulation of water pipework mb 12,00
7 Sewerage aeration valve DN50 ks 1,00 8 Sealing of opening after DN110 sink removal ks 1,00
Miscellaneous - tightness/leak test of internal sewerage in structures up to DN 125 using water mb 12,00
Material handling/transportation for internal drainage in structures up to 6 m height % 0,00
Internal Water Supply
PEX/Al/PEX pipe, rods, pressure joints, 16 mm diameter mb 14,00 Cold Water (CW) and Hot Water (HW) 4+4+5+1 14,00
Installation of brass T-piece 2", threaded with union nut, onto existing rising main ks 2,00
Brass T-piece, threaded with union nut, onto existing rising main ks 2,00
4 Installation of 1" straight threaded ball valve for water ks 2,00 5 1" ball valve for water, nickel-plated brass ks 2,00
Installation of G1/2" wall-mounted elbow, internal thread ks 4,00
7 AL-PEX wall-mounted elbow 16-1/2", internal thread ks 4,00
Flushing and disinfection of water supply pipework up to DN 80 mb 14,00
Material handling/transportation for internal water supply in structures up to 6 m height % 0,00
Fixtures and Fittings
Installation of concealed WC frame system, fixing to drywall profiles and load-bearing wall ks 1,00
Duravit DuraSystem - Basic concealed frame for wall-hung WC, 115 cm WD1020000000 ks 1,00
Installation of concealed washbasin frame system, fixing to drywall profiles and load-bearing wall ks 1,00
Geberit Duofix - Concealed frame for washbasin, 1.12 m height 111.430.00.2 ks 1,00
5 Installation of WC pan onto concealed frame system ks 1,00 6 Installation of flush actuator plate ks 1,00
7 Installation of washbasin onto concealed frame system ks 1,00 8 Installation of washbasin single-lever mixer tap ks 1,00
Installation of wall-mounted drinking fountain with connection to water and drainage ks 1,00
Duravit Starck 3 - Wall-hung WC, accessibility model (barrier-free), with HygieneGlaze, Alpine white 2203092000 ks 1,00
11 Duravit Starck 3 - seat and lid, white 0062410000 ks 1,00
Duravit DuraSystem - Flush actuator plate, white glass WD5002012000 ks 1,00
Duravit DuraStyle - Washbasin 65x57 cm, with 1 tap hole, with WonderGliss, Alpine white 23296500001 ks 1,00
Hansgrohe Talis E - Single-lever washbasin mixer 150, chrome 71755000 ks 1,00
15 Installation of washbasin siphon/waste trap ks 1,00
Alcadrain Siphons - Design washbasin trap, 32 mm diameter, space-saving, metal A403 ks 1,00
17 Installation of angle valve with filter ks 2,00 18 Kludi Zenta - Angle valve, chrome 1584505-00 ks 2,00
Material handling/transport for fixtures and fittings in structures up to 6 m height % 0,00
(Hourly Billing Rates / Daywork Rates
More complex, comprehensive, difficult, routine construction and installation works (Tr. 2) exceeding 8 hours of duration hod 30,00 Non-standard works, connection of DN110 drainage to cast iron rising main
Total Price excluding VAT
VAT 23%
Total Price including VAT
The scope of the Reconstruction and Barrier-Free Access Project is covered by this Bill of Quantities (BoQ).
The Contractor is strictly required to price all supply and installation works to fulfil the complete scope as defined in the Project Documentation. Should the Contractor identify any discrepancies, omissions, or deficiencies in the BoQ, they must notify the Employer immediately and ensure that their Final Tender Price fully accounts for all necessary supplies and works defined in the Project Documentation.
Heating
Employer : U.S. EMBASSY, Hviezdoslavovo sq.5, 81102 Bratislava, SVK date : 19.11.2025 Designer : playarchitects s.r.o.
Contractor:
item description UoM total quantity
Thermal Insulation 1 Installation of pipe insulation, DN 15 m 17,00
(0,5+3,5+0,5+1+3)*2 17,00 2 Installation of pipe insulation, DN 35 m 15,00
1,5*2+4,5*2+1,5*2 15,00
TUBEX STANDARD 20-15 sleeve insulation - 15 mm internal diameter, 20 mm thickness - (PE) m 17,00
TUBEX STANDARD 20-35 sleeve insulation - 35 mm internal diameter, 20 mm thickness - (PE) m 15,00
5 Material handling/transportation for TI % 0,00
Central Heating - Distribution Pipework 1 S&I of Press-fit carbon steel pipe 15x1.2 m 23,00 pipe including elbows, sleeves/couplings (0.5+3.5+0.5+1+3+3)*2 23,00
2 S&I of Press-fit carbon steel pipe 35x1.5 m 15,00 "pipe including elbows, sleeves/couplings 1.5*2+4.5*2+1.5*2" 15,00
3 Installation of 1" ball valve pcs 2,00 4 1" ball valve pcs 2,00
Installation of transition from DN40 steel pipe to press-fit carbon steel 35x1.5 pcs 4,00
Press-fit carbon steel 35x6/4" DG transition with internal thread pcs 4,00
7 Installation of wall-mounted bathroom radiator
Tallheo radiator 41 x 180 cm, sand colour, manufacturer Blumfeld, double panel pcs 1,00
9 Installation of thermostatic valve set for radiator set 1,00
Design chrome SET - 1/2"x1/2" three-way thermostatic corner valve, (thermostatic valve, lockshield valve, head) pcs 1,00
11 Reconnection of radiator in corridor set 1,00
Set of thermostatic valves with regulating head for side connection pcs 1,00
Material handling/transport for heating elements (radiators) in structures up to 6 m height % 0,00
Total Price excluding VAT
VAT 23%
Total Price including VAT
The scope of the Reconstruction and Barrier-Free Access Project is covered by this Bill of Quantities (BoQ).
The Contractor is strictly required to price all supply and installation works to fulfil the complete scope as defined in the Project Documentation. Should the Contractor identify any discrepancies, omissions, or deficiencies in the BoQ, they must notify the Employer immediately and ensure that their Final Tender Price fully accounts for all necessary supplies and works defined in the Project Documentation.
Ventilation and Air Conditioning
Employer : U.S. EMBASSY, Hviezdoslavovo sq.5, 81102 Bratislava, SVK date : 19.11.2025 Designer : playarchitects s.r.o.
Contractor:
item description UoM total quantity
Ventilation and Air Conditioning
Installation of VZT Spiro and Flexible ductwork DN150 on clamps and threaded rods mb 4,00
Installation of VZT Spiro and Flexible ductwork DN100 on clamps and threaded rods mb 1,50
3 Spiro ductwork DN150 mb 2,00 4 Flexible ductwork DN100 mb 1,50 5 Non-return damper DN150 ks 1,00 6 Non-return damper DN100 ks 1,00
S&I of ceiling-mounted axial fan, connection to Flexible ductwork DN100. Fan with front panel, timer and humidity sensor, Ø 100 mm, energy-efficient and quiet, Dalap 100 BFZW ECO ks 1,00
Total Price excluding VAT
VAT 23%
Total Price including VAT
The scope of the Reconstruction and Barrier-Free Access Project is covered by this Bill of Quantities (BoQ).
The Contractor is strictly required to price all supply and installation works to fulfil the complete scope as defined in the Project Documentation. Should the Contractor identify any discrepancies, omissions, or deficiencies in the BoQ, they must notify the Employer immediately and ensure that their Final Tender Price fully accounts for all necessary supplies and works defined in the Project Documentation.
Electrical Installations
Employer : U.S. EMBASSY, Hviezdoslavovo sq.5, 81102 Bratislava, SVK date : 19.11.2025 Designer : playarchitects s.r.o.
Contractor:
item description UoM total quantity item price total price
Electrical Installations
Rigid electrical conduit, UV stable, halogen-free, made of PC ABS, D 16 mm, surface mounted m 50,00 Connection between circuit breaker panel and toilet area
Rigid spigot-end conduit with medium mechanical resistance, made of PC ABS, UV stable, halogen-free, self-extinguishing, D 16 mm m 50,00 Including clamps and wall fixtures
Termination of conductors in distribution board, including wiring mm2 psc 3,00
4 3P Modular circuit breakers up to 63 A on DIN rail psc 3,00 5 Modular circuit breaker 3P/16A/B, 2 modules psc 1,00 6 Modular circuit breaker 1P/10A/B, 1 module psc 1,00
Residual current device (RCD) PF6 - 40A/4P/30mA, Type A - 112933, 4 modules psc 1,00
8 Copper cable, fixed installation 5x2.5 m 25,00 9 Fixed cable N2XH-J 5x2.5, halogen-free, black m 25,00
10 Copper cable, fixed installation 3x2.5 m 20,00 11 Fixed cable N2XH-J 3x2.5, halogen-free, black m 20,00 12 Halogen-free copper cable, fixed installation 3x1.5 m 30,00 13 Fixed cable N2XH-J 3x1.5, halogen-free, black m 30,00
KO 68 flush-mounted junction box, fixing into prepared setting, making of openings, without terminals and wiring psc 2,00
15 Junction box KU68; 8595057688414 psc 2,00
KP 68 flush-mounted junction box, fixing into prepared setting, making of openings, without terminals and wiring psc 12,00
17 Junction box KP 68; 8595568936240 psc 12,00
Single-pole switch - switching arrangement 1, including wiring psc 3,00
Series switch - switching arrangement 5, including wiring psc 1,00
Elhard Rondo RD5101S switch, complete device with frame psc 8,00
Elhard Rondo RD5105S switch No. 5, complete device with frame psc 1,00
22 Household socket outlet 220 V / 16A, including wiring psc 8,00
Elhard Rondo RD6100S single socket outlet, complete device with frame psc 8,00
24 Square double frame Elhard Rondo RD3102S psc 1,00 25 Square triple frame Elhard Rondo RD3103S psc 1,00 26 Wiring/Connection of device psc 2,00
Fan, drinking fountain, door opener
Relocation of cable together with plastic protective conduit and chasing into wall - cables running through ventilation shaft m 10,00
Luminaires/Lighting Fixtures
1 Installation of interior luminaire on ceiling up to 2 kg psc 2,00
Deltalight Multinova 55 Down Up TW Prism ceiling luminaire, 3000K, 230V psc 2,00
Assembly and installation of interior luminaire on wall up to 4 kg psc 1,00
Luminaire from aluminium profile XC21, silver colour, 50x50mm, prismatic diffuser and aluminium end caps, ALU cooling strip inside profile set 1,00
LED strip 14.4W, 24V, 160pcs/m, 2835SMD, WW (Warm White), IP20, 10mm width m 5,00
6 Power supply unit 100W, 24V, IP67 psc 1,00
Fire Safety
Dismantling and refitting of fire alarm - strobe light with sound unit psc 2,00
Alarm deactivation, disassembly of stainless steel protective conduit, relocation of device, cable shortening, re-installation of protective conduit
Relocation of Fire Detection System (EPS) sensor under the chamber ceiling to under the new modular ceiling of the toilet psc 1,00
System shutdown, sensor dismantling, new cable from nearest FDS node, sensor refitting and system restart
Hourly Billing Rates
Construction and installation works requiring highest level of expertise - inspections and revisions hour 10,00 Accounting for reconstruction typology, determination of as-built status of installations
Ancillary Budget Costs 1 Builder's work assistance set 1,00 2 Minor installation material set 1,00
Total Price excluding VAT
VAT 23%
Total Price including VAT
The scope of the Reconstruction and Barrier-Free Access Project is covered by this Bill of Quantities (BoQ).
The Contractor is strictly required to price all supply and installation works to fulfil the complete scope as defined in the Project Documentation. Should the Contractor identify any discrepancies, omissions, or deficiencies in the BoQ, they must notify the Employer immediately and ensure that their Final Tender Price fully accounts for all necessary supplies and works defined in the Project Documentation.
File details come from the government source that posted it. Updated .