This document is a submittal register for a federal contract to perform corrective actions at BDO gates. It lists 14 required submittals including preliminary and initial project schedules, a quality control plan, environmental and accident prevention plans, a submittal register, schedule of values, operation and maintenance manuals and data, warranty information for the contractor and extended warranties, an access list of personnel and subcontractors, and site plans. Compliance dates are specified for each submittal ranging from submission with the proposal to 12 months after notice to proceed. The contractor is required to update the submittal register monthly with the government contracting officer representative.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2.6.2 Pedestrian Gates X X
3 Preliminary Schedule X X With Proposal 3 Initial Project Schedule X X 10 Days after NTP 10 Quality Control Plan, DFOW X X 9 Environmental Protection Plan X X 8 Accident Prevention Plan (APP) X X
Submittal Register X X
Precon & update monthly w/ Govt COR
6.2 Schedule of Values X X 10 Days after NTP
4 O&M Data/Manuals X X X
Site Plan to include temp storage/laydown/field office as applicable
X X
7.1 Contractor Warranty POC's X X During duty and non duty
7.2 Extended Warranties X X
14 Access List of Personnel/Subcontractor list X X
REMARKS
CLASSIFI‐
CATIONS
DATE SU
BM
IT
TE
D
TO
G O
VE
RN
M
EN
T
SUBMITTAL REGISTER
TYPE OF SUBMITTAL
CONTRACT NUMBERPROJECT NUMBER PROJECT TITLE
BDO Gate Corrective Actions
AC
TI
VI
TY
N U M
BE
R
ITEMS OR DESCRIPTION OF ITEM
PR
EC
O N
ST
RU
CT
IO
N
SH
O P
DR
AW
IN
G S
O
PE
RA
TI
O N A N D M
AI
N
TE
N
AN
CE
D
AT
A
IT
EM
N U M
BE
R
SP
EC
IF
IC
AT
IO
N
PA
RA
G
RA
PH
RE
Q U
IR
ED
S U
BM
IS
SI
O N D
AT
E (o r p rio r t o
DF
O W
Pr ep ar at or y)
G O
VE
RN
M
EN
T
AP
PR
O
VA
L
PR
O
DU
CT
D
AT
A
SA
M
PL
ES
DE
SI
G N D
AT
A
TE
ST
R
EP
O
RT
S
CE
RT
IF
IC
AT
ES
TR
AN
SM
IT
TA
L
Da te R ec ei ve d by G ov t
CONTRACTOR SHEDULE DATES
CONTRACTOR
ACTION
GOVERNMENT
ACTION
M
AN
U
FA
CT
U
RE
R' S
IN
ST
RU
CT
IO
N S
M
AN
U
FA
CT
U
RE
R' S
FI
EL
D
RE
PO
RT
S
DA
TE
o f A ct ito n
AP
PR
O
VA
L N
EE
DE
D
BY
M
AT
ER
IA
L N
EE
DE
D
BY
CO
DE
CL
O
SE
O U T
SU
BM
IT
TA
LS
FO
R
IN
FO
RM
AT
IO
N O N
LY
SU
BM
IT
CO
DE
TO BE COMPLETED BY PROJECT ENGINEER
File details come from the government source that posted it. Updated .