Attachment 3_AF 66.pdf
PDF 66 KB Posted
- Attached to
- Repair Car Wash Drain Line Bldg. 754- JBER, AK
- Solicitation number
- FA500020Q0061
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - FA500020Q0061.pdf | ||
| Attachment 2_Drawings.pdf | ||
| Attachment 1_Revised Statement of Work and Specs.pdf | ||
| Attachment 4_Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIALS SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
HJZH 20-5251
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT PREFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
D R
A W
IN
G
S
P L
A N
M S
D S
M A
N F
'R R
E C
O M
M E
N D
A T
IO
N
S
R E
Q U
E S
T L
E T
T E
R
C A
T A
L O
G D
A T
A
R E
P O
R T
S
O T
H E
R D
A T
A
T E
S T
R E
S U
L T
S
REQUIRED
SUBMISSION
DATE
DATE
RECEIVED IN
CONTRACTIN
G
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENSE DATE
FOLLOW-UP
DATE CONTRACTOR
NOTIFIED
CONTRACTOR RE-
SUBMITTAL
FINAL APPROVAL REMARKS
1 Section 01010, para. 2.1
Notice of Start of Work
10 days prior to start of any work
2 Section 01010, para. 5.7
As-Built Drawings
30 days after completion of
Work
3 Section 01010, para. 8.1
Utility Outages
14 Days prior to start of start of work
4 Section 01010, para. 9.1
Form 3
After completion of
Form
5 Section 01010, para. 26.7
Quality Control Plan 1 20 Days after
NTP
6 Section 01120, para. 5.1.2.1
Material Safety Data Sheet
30 days before brought on
Base
7 Section 01120, para. 7.
Radioactive Usage Request 1 60 days prior to start of work
8 Section 01120, para. 8
Fuel Spill Clean Up Plan 1 prior to work start
9 Section 01121, para.1.2.4
Record of Proper Disposal
After completion of
Disposal
10 Section 01121, part 3
Documentation 1 1 1 NTP +10 Days
Section 02200, Para. 1.3
Compaction Test Result
3 Days after completion of test
Section 02605, Para. 1.4
Base Course
3 Days after completion of test
Section 02722, Para. 1.8
Gravity Sanitary Sewer 1 NTP +10 Days
Section 03000, Para. 3.
Concrete Testing and Sampling
3 Days after completion of test
Repair Car Wash Drain Line Bldg. 754
SCHEDULE OF MATERIALS SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
HJZH 20-5251
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L
I
N
E
N
U
M
B
E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT PREFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
D R
A W
IN
G
S
P L
A N
M S
D S
M A
N F
'R R
E C
O M
M E
N D
A T
IO
N
S
R E
Q U
E S
T L
E T
T E
R
C A
T A
L O
G D
A T
A
R E
P O
R T
S
O T
H E
R D
A T
A
T E
S T
R E
S U
L T
S
REQUIRED
SUBMISSION
DATE
DATE
RECEIVED IN
CONTRACTIN
G
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENSE DATE
FOLLOW-UP
DATE CONTRACTOR
NOTIFIED
CONTRACTOR RE-
SUBMITTAL
FINAL APPROVAL REMARKS
Repair Car Wash Drain Line Bldg. 754