Attachment 3 AF 3052.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
M500 Water Main Replacement, Maxwell AFB
Solicitation number
PNQS2603400001
Issued by

About this file

This is a Submittal Register template used to track and manage contractor submissions throughout the course of a construction project at Maxwell Air Force Base. The register is designed for the M500 Water Main Replacement project (PNQS260340) and establishes a standardized process for monitoring eight key submittal items with corresponding deadlines, approval statuses, and contractor notifications.

Contractors are required to submit hazardous materials documentation (HazMat Questionnaire, Material Safety Data Sheets, and Hazmat Reporting Entry Forms) within five days prior to project start and at project conclusion. Additional required submittals include a Recycling and Landfill Report, As-Built drawings, warranty documentation, and a Project Schedule due within ten days of Notice to Proceed. All submittals require three copies and must be reviewed by the Civil Engineering and Contract Administrator teams, with documented approval or disapproval dates and contractor resubmittal requirements tracked in designated columns. The register provides space for remarks and certification of compliance, allowing project managers and contract administrators to maintain comprehensive documentation of contractor compliance with Air Force submittal requirements throughout the contract period.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF 66 Sheet 1-16

SUBMITTAL REGISTER PROJECT NUMBER PROJECT TITLE

TO BE COMPLETED BY PROJECT MANAGERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
ITEM NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALNO. OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATEDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
CERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSDATADOCUMENT \ REPORT

APPROVED DIS-APPROVED

1HazMat Questionnaire335 Days Prior to Start Date
2HazMat MSDS35 Days Prior to Start DateMust be filled out if contractor answers YES to the Hazmat Questionnaire
3Hazmat Reporting Entry Form335 Days Prior to Start DateSubmit Final Quantities
4Hazmat Reporting Entry Form (end of project)33End of Contract
5Recycling and Landfill Report33End of Contract
6As Builts33End of Contract
7Warranty33End of Contract
8Project Schedule3NTP +10 days
9
10
11
12
13
14
15
16
17
18
19
20
18
19

Sheet1

File details come from the government source that posted it. Updated .