This document is a Statement of Work (SOW) for the repair of aircraft refueler product tanks and components for the U.S. Coast Guard (USCG). The SOW outlines the scope of work, which includes repairing and requalifying five aircraft refueler trucks at the USCG Air Station Clearwater. The repairs must be completed to the Original Equipment Manufacturer (OEM) specifications and include safety inspections, operational checks, product delivery functions, painting, rust proofing, and requalification by a Department of Transportation (DOT) registered inspector. The contractor must transport the refueler trucks to and from the Air Station Clearwater and provide documentation of the completed repairs. The SOW also provides details on the applicable regulations, required deliverables, and points of contact. The related federal contract opportunity is a Request for Quotation (RFQ) for the repair of the aircraft refueler product tanks and components, with a small business size standard of 900 employees. The closing date for offers is June 14, 2024, and the anticipated award date is on or before June 25, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - 70Z03824QE0000036 Schedule of Supplies.xlsx | XLSX spreadsheet | |
| Attachment 2 - 70Z03824QE0000036 Terms and Conditions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
REPAIR OF AIRCRAFT REFUELER PRODUCT TANK AND COMPONENTS
1.0 Background
The USCG operates 3,000 and 5,000 gallon aircraft refuler trucks (cargo tank motor vehicles) at Air Stations for refueling aircraft. Air Station employees perform maintenance and periodic inspections to include daily, weekly, monthly, semi-annual, annual, triennial inspections. A Department of Transportation (DOT) certified contracted inspector conducts a requalification of the product tank every five years. This is required because personnel operate the refueler trucks on public roads on a limited basis. In accordance with (IAW) the Aviation Ground Support Equipment (AGSE) Process Guide (PG- 150), the Aviation Logistics Center (ALC), Engineering Services Division (ESD), AGSE section and the Policy & Logistics Branch (PLB), have the responsibility to maintain the fleet of refueler trucks for continued service and to meet life expectancies.
1.1 Scope
The USCG Air Station Clearwater, currently has five (5) aircraft refueler trucks that require repair to the cargo tank and plumbing components to return the cargo tanks and plumbing components to a fully operational "like new" status. All repairs must be completed to Westmor Industries, LLC the Original Equipment Manufacturer (OEM) specifications and use OEM or equivalent parts. The repairs shall include safety inspections, operational checks, product delivery functions, full painting and rust proofing, and requalification of our cargo tank, by a DOT registered inspector. The contractor shall furnish all inspection materials, facilities, parts, equipment, tools, and services necessary to fulfill the requirements of this purchase order. The completion of the cargo tank repairs shall be performed at the contractor’s facility. The contractor may use another approved repair facility, normally used by the contractor, to perform repairs, but the contractor shall retain complete responsibility for said repair work by their selected repair facility. The contractor’s facility shall be within 150 miles of the Coast Guard Air Station Clearwater.
1.2 Specific Tasks
At a minimum the contractor shall address and repair the following cargo tank components and evolutions:
• Drain and degas cargo tank and plumbing
• All seals related to the product delivery system, to include Victaulic coupling seals
• Rubber hoses related to the product delivery system
• Fittings
• Actuators
• Other associated air system components
• Rear suspension air bags
• Tie downs and hardware
• Product distribution relate gauges
• Product pump
• Underwing nozzles
• Bottom loading valve
• Mechanical product meter
• Rumber synthetic sills
• Pressure gauge lines
• Drain lines
• Check valves
TEST AND EVALUATION, REQUALIFICATION, AND REPAIRS OF
3,000- AND 5,000-GALLON AIRCRAFT REFUELERS
• Pressure and visual inspections of the tanks
• Truck chassis
1.2.2 Transport
The contractor shall be responsible for the roundtrip towing or transporting of each refueler truck to and from Air Station Clearwater.
The contractor shall schedule pickup of each refueler truck with the designated Air Station Clearwater POC. Prior to shipping for return, the contractor shall contact the Air Station Clearwater POC and provide documentation (reporting, test reports, pictures, or any other means) so that the refueler truck can be visual inspected and confirm the funded actions have been completed by the contractor. Once the Government has determined, via in-person or solely based on the documentation provide by the contractor that the required repairs have been performed IAW the required specifications, approval to ship shall be authorized.
The contractor shall ensure the preservation, packing, and marking of the repaired refueler truck is IAW commercial practices for return shipment.
Inspection and acceptance of the refueler truck will be performed by Air Station Clearwater Quality Assurance (QA) personnel. If a refueler truck is determined unacceptable IAW the requirements of this SOW and OEM specifications, the contractor will be notified immediately.
1.2.3 Repairs
The Government shall provide all documents listed in section 4.1.
The contractor shall comply with all federal, state, and local laws applicable to the refueler truck product cargo tank repairs.
Replacement, repairs, or rebuilding of components shall be approved by the USCG prior to the contractor performing any replacement, repair, or rebuilding.
The contractor shall complete all repairs IAW the provided documentation or OEM specifications.
All exposed air system lines, hoses and seals shall be replaced with new Ultra Violet (UV) components.
All fittings, actuators, and other associated air system components will be new or rebuilt with new seals.
All pressure gauge lines shall be stainless steel.
All drain lines shall be braided stainless steel.
All replacement mechanical product meters will be replaced with a Veeder Root EMR4 model, to include the installation kit with roll printer and truck datalink kit, with keypad.
Any discrepancies related to the product delivery storage or distribution system, to include any corrosion, paint, and labeling is with-in the scope of work and shall be included in the inspection quote.
3,000- AND 5,000-GALLON AIRCRAFT REFUELERS
1.2.4 Above and Beyond Repairs
1.2.4.1 Any additional discrepancies found in the course the repairs identified in this SOW, shall be documented, and submitted to the Contracting Officer (KO) for review and authorization prior to any working taking place for the additional discrepancies.
1.2.4.2 The contractor shall submit a quotation addressing the documented additional discrepancies for review by the KO. The quotation shall be valid for thirty (30) days and shall include the following:
• Description of the additional discrepancy
• Fixed price labor costs required to complete the discrepancy.
• Fixed price parts and materials costs.
• Total dollar amount for the discrepancy.
• Estimated repair turnaround time.
1.2.4.3 The contractor must receive a written modification signed by the KO that authorizes the repairs prior to the commencement of any discrepancy repairs.
1.2.5 DOT Inspection
Upon completion of the repairs, the Government requires a registered DOT inspector to complete a refueler inspection and a cargo tank external visual, internal visual, pressure, and leakage inspections, and application of the completed inspection markings. The contractor shall provide the required documentation of the completed inspections to the KO prior to submitting the repair invoice.
1.2.6 Place of Performance
The primary place of performance for repairs will be the Contractor’s facilities. The contractor’s facility shall be within 150 miles of the Air Station Clearwater.
2.0 QUALIFICATION OF CARGO TANKS
2.1.1 External Visual Inspection
The Contractor shall inspect the cargo tank IAW 180.407 (d) (1-7) External Visual Inspection and Testing.
2.1.2 Internal Visual Inspection
The Contractor shall inspect the cargo tank IAW 180.407 (e) (1-4) Internal Visual Inspection.
2.1.3 Pressure Test
The Contractor shall inspect the cargo tank IAW 180.407 (g) (1-7) Pressure Test.
2.1.4 Leakage Test
The Contractor shall inspect the cargo tank IAW 180.407 (h) (1-5) Leakage Test.
2.1.5 Inspection Markings
The Contractor shall mark the Cargo Tank IAW 180.415 (a-c) Test and Inspection Markings.
2.1.6 Test or Inspection Reporting
3,000- AND 5,000-GALLON AIRCRAFT REFUELERS
The Contractor shall provide refueler inspection compliance paperwork IAW Federal, State, and Local Regulations. The Contractor shall provide cargo tank inspection compliance paperwork IAW 180.417 (a-
d) Test or Inspection Reporting.
2.1.7 Repair of the Cargo Tank
The Contractor shall repair the cargo tank IAW 180.413 (a-f) Repair of Specification Cargo Tanks and IAW the OEM specifications.
3.0 OPERATION AND FUNCTIONAL TESTING
3.1 The Contractor shall conduct an extensive operational test of the refueler motor vehicle and product distribution system, post repairs, and of approved repairs, to identify and correct any remaining or new deficiencies.
3.2 The Contractor shall confirm the refueler is operational and configured IAW OEM specifications and standards using the OEM manual and the CG MSR MPC 153801.3.
3.3 Any new discrepancies revealed by the Contractor during the testing process, shall also be identified, relayed to the CG and corrected prior to requesting to ship the refueler.
3.3 The Contractor shall provide formal documentation of their inspection, testing procedures, and further repair actions for the refurbished refueler, to ensure quality assurance. The minimum standards of all stated reference material herein shall be met and acknowledged by the Contractor.
4.0 APPLICABLE DOCUMENTS
4.1 COMPLIANCE DOCUMENTS
The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:
• Federal, state, and local laws applicable to motor vehicle and refueler inspections and repairs.
• Westmor Industries, LLC.; 5000 Gallon Refueler for United States Coast Guard, Operations &
Parts Manual
• USCG Mandatory Special Requirements (MSR), Maintenance Requirements Card (MPC)
153301.0; Dated: 27August2021
The following may be found at: http://www.ecfr.gov/
• 49 CFR, Part 180, Subpart E, Qualification and Maintenance of Cargo Tanks
• 180.407 (d) (1-7) External Visual Inspection and Testing
• 180.407 (e) (1-4) Internal Visual Inspection
• 180.407 (g) (1-7) Pressure Test
• 180.407 (h) (1-5) Leakage Test
• 180.409 (a-d3) Minimum Qualifications for Inspectors and Testers
• 180.411 Acceptable Results of Tests and Inspections
• 180.413 (a-f) Repair or Mounting of Specification Cargo Tanks
• 180.415 (a-c) Test and Inspection Markings
• 180.417 (a-d) Reporting and Record Retention Requirements http://www.ecfr.gov/cgi-bin/ECFR?page=browse
3,000- AND 5,000-GALLON AIRCRAFT REFUELERS
5.0 USCG POCs:
5.1 ALC ESD POCs
Contract Specialist – Mr. Madison Coker (252) 335-6204 Email: madison.l.coker@uscg.mil
Item Manager – Mr. Daniel Knotts (252) 335-6477 Email: daniel.f.knotts@uscg.mil
Equipment Specialist – Christopher Barr (252) 384-7292 Email: Christopher.R.Barr@uscg.mil
5.2 Air Station Clearwater POS
Unit Maintenance Officer (C130) – CWO Luke Eanes
(727) 535-1437 ext. 1423 Email: luke.b.eanes@uscg.mil
Unit Maintenance Officer (C27) – CWO Craig Morris
(727) 535-1437 ext. 1200 Email: craig.p.morris@uscg.mil
Unit Maintenance Officer (H60) – CWO Cletus Milan
(727) 535-1437 ext. 1319 Email: cletus.a.milan@uscg.mil
Unit Support Officer – CWO Brandon Kelly
(727) 535-1437 Email: brandon.r.kelly@uscg.mil
Unit Facility Engineering Officer – CWO William Stevenson
(727) 535-1437 ext. 1572 Email: william.k.stevenson@uscg.mil
6.0 DELIVERABLES
The items below are requirements of this SOW.
ITEM DELIVERABLE REQUIREMENT SUBMIT TO
1 Shipping Scheduling SOW Sect 1.2.2 CONTRACTOR CWO Luke Eanes and
Madison Coker
2 Additional Discrepancies SOW 1.2.4 CONTRACTOR Madison Coker
Qualification of Cargo Tanks and inspection results SOW Sect 2.0
CONTRACTOR CWO Luke Eanes and Madison Coker
4 Testing & Documentation Results SOW Sect 3.0 CONTRACTOR CWO Luke Eanes and
Madison Coker mailto:madison.l.coker@uscg.mil mailto:daniel.f.knotts@uscg.mil mailto:Christopher.R.Barr@uscg.mil mailto:luke.b.eanes@uscg.mil mailto:craig.p.morris@uscg.mil mailto:cletus.a.milan@uscg.mil mailto:brandon.r.kelly@uscg.mil mailto:william.k.stevenson@uscg.mil