Attachment 2- Vendor Compliance Checklist.pdf
PDF 192 KB Posted
- Attached to
- Rental- 400 LPAC System Package- NLON-Groton
- Solicitation number
- N3904026Q3164
About this file
This document is a Statement of Work (SOW) compliance template requiring vendors to confirm whether their proposed equipment and services meet specified requirements and to identify any exceptions.
The SOW specifies equipment requirements including a 100 HP oil-free low-pressure air compressor (LPAC) with 115 PSIG pressure set point, remote E-Stop, 460VAC three-phase power, outdoor capability, and UL listing. Supporting equipment includes a 200-foot electrical power cable with Camlok connections rated for 400A starting and 200A operating amperage; a 500-gallon ASME-rated air receiving tank with 150 PSIG minimum working pressure and 3-inch connections; a desiccant air dryer with 400 SCFM flow rate, -40°F pressure dew point, and 150 PSIG rated pressure; 250 feet of 3-inch air hose in 50-foot sections with SPUD connections and 150 PSI minimum working pressure; and a manifold with 3-inch inlet/outlet and minimum four 1.25-inch output connections with isolation valves. Service requirements include equipment start-up and commissioning, preventative maintenance, training, and deliverables documentation. Vendors must respond using "YES" or "NO" to confirm compliance with all SOW requirements, ensure consistency with provided specification sheets and brochures, identify any exceptions, and explain reasons for non-compliance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMPLIANCE WITH SOW. EXCEPTIONS TO SOW.
(See Instructions Below) (See Instructions Below)
3.2-3.4 100HP LPAC
100% Oil free air Air pressure set point:
115PSIG
Remote E-Stop provided and connected Air cooled Compressor connection:3-IN Max. starting amps: 400A Max. operating amps: 200A Operate from one 460VAC circuit Suitable for outdoor operation Dimensions Freeze protection UL listed
3.4 Electrical Power Cable
200ft in length Camlok connections Capable of supporting amperage
3.5 Operating and Safety Controls
3.6 500 Gallon Air Receiving Tank ASME rated Pressure relief valve
Air receiver connection:3-IN
Min. working pressure rating:
150 PSIG
3.7 Desiccant Air Dryer
Flow rate: 400SCFM
Air dryer connection:3-IN
-40°F pressure dew point
120 VAC, single phase, 20A
Rated working pressure:
150PSIG
Suitable for outdoor use Dimensions UL listed
3.8 3-IN Air Hose 250-FT total length 50-FT sections SPUD Connections Min. Working pressure:150PSI
Safety restraint devices
3.9 Manifold
3-IN inlet 3-IN outlet
Min. (4) 1.25-IN Connections
Isolation valves on each output
SOW REQUIREMENT
Equipment
3.10 Equipment Start-up and Commissioning Services
6.3 Preventative Maintenance
6.4 Training
6.5 Deliverables
(i) Use YES or NO to identify if equipment and services comply with all SOW requirements.
(ii) Ensure answers are consistent with any brochures, specification sheets or other descriptive literature provided in your quote.
2. EXCEPTIONS TO SOW.
(i) Identify any exceptions to the SOW. Note: answers are required for any NO in prior column.
(ii) Explain reason for exception.
1. COMPLIANCE WITH SOW.
Services
INSTRUCTIONS
File details come from the government source that posted it. Updated .