This document outlines the requirements for conducting drydock repairs and preservation work on USCGC FIR (WLB-225B), a 225-foot seagoing buoy tender. The work includes inspecting and testing the vessel's underwater hull, cleaning and coating 100% of the underwater body surfaces, and performing various preservation tasks. The solicitation was issued by the US Coast Guard under number 70Z08523RIBCT0005. The contractor must adhere to Coast Guard specifications and standards for surface preparation, coating application, welding, fire prevention, and environmental protection. The contractor will also support inspections of the hull and systems, and drydocking of the vessel.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC FIR (WLB 213)

SPECIFICATION FOR DRYDOCK REPAIRS

FY2024

Developed By: Gregory S Gunnels

(Rev-0, 15 May 2023)

USCGC FIR (WLB-225B) DRYDOCK AVAILABILITY FY2024

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record .......................................................................................................................................... iv Consolidated List of References .................................................................................................................... v Consolidated List of Government-furnished Property ............................................................................... xii Consolidated List of Critical Inspection Items ........................................................................................... xiv Principal Characteristics ............................................................................................................................. xvi General Requirements WORK ITEM 1: Fire Prevention Requirements WORK ITEM 2: Hull Plating, U/W Body, Inspect WORK ITEM 3: Hull Plating, U/W Body, Ultrasonic Testing WORK ITEM 4: U/W Body, Preserve, 100 percent WORK ITEM 5: U/W Body, Preserve, Partial, Condition A WORK ITEM 6: U/W Body, Preserve, Partial, Condition B WORK ITEM 7: U/W Body, Preserve, Partial, Condition C WORK ITEM 8: Hull Plating Freeboard, Preserve, Partial WORK ITEM 9: Hull Plating Freeboard, Preserve, 100 Percent WORK ITEM 10: Appendages, U/W, Leak Test WORK ITEM 11: Propulsion Shaft Fairwaters And Rope Guards, Inspect WORK ITEM 12: Appendages, U/W, Internal, Preserve WORK ITEM 13: Chain Lockers, Clean and Inspect WORK ITEM 14: Tanks, MP Fuel Stowage and Overflow, Clean and Inspect WORK ITEM 15: Voids (Accessible, Weather Deck Exposed), Inspect WORK ITEM 16: Voids, Non-Accessible, Leak Test WORK ITEM 17: Voids, Non-Accessible, Internal Surfaces, Preserve WORK ITEM 18: Tanks, MP Fuel Service, Clean and Inspect WORK ITEM 19: Tanks, Hydraulic Oil Stowage and Service, Clean and Inspect WORK ITEM 20: Tanks, Potable Water, Clean and Inspect WORK ITEM 21: Tanks, Lube Oil, Clean and Inspect WORK ITEM 22: Tanks, Ballast, Clean and Inspect WORK ITEM 23: Voids, Accessible, Clean and Inspect WORK ITEM 24: Tanks, Dirty Oil and Waste, Clean and Inspect WORK ITEM 25: Propulsion Shaft Seals, Mechanical Overhaul And Inflatable Renewal WORK ITEM 26: Strain Gage Alignment, Check WORK ITEM 27: Stern Tube Interior Surfaces, Preserve, 100 Percent WORK ITEM 28: Controllable Pitch Propellers, Clean and Inspect WORK ITEM 29: Controllable Pitch Propeller, System Maintenance, Perform WORK ITEM 30: Controllable Pitch Propeller Hub, General Maintenance, Perform WORK ITEM 31: Controllable Pitch Propeller Hub, Remove and Reinstall WORK ITEM 32: Heat Exchangers, Clean, Inspect And Hydro WORK ITEM 33: Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean WORK ITEM 34: Ship Service Diesel Generator, SSDG, Exhaust Piping, Commercial Clean WORK ITEM 35: Fathometer Transducer, Renew WORK ITEM 36: Vent Ducts, Engine And Motor Room, All, Commercial Cleaning WORK ITEM 37: Vent Ducts, Galley and Pantry Room, All, Commercial Cleaning WORK ITEM 38: Vent Ducts, Laundry Exhaust, Commercial Cleaning WORK ITEM 39: Vent Ducts, All Other, Commercial Cleaning WORK ITEM 40: Sea Valves and Waster Pieces, Overhaul Or Renew WORK ITEM 41: Sea Strainers, All Sizes, Renew WORK ITEM 42: Sea Strainers, Simplex, All Sizes, Clean and Inspect iii (Rev-0)

WORK ITEM 43: Sea Bay, Preserve 100% WORK ITEM 44: Potable Water Pneumatic Tanks, Clean and Inspect WORK ITEM 45: Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift . 180 WORK ITEM 46: Fixed CO2 FF Bottles, Inspect and Hydrostatic Test WORK ITEM 47: Rudders, Preserve, 100 Percent WORK ITEM 48: Rudder Stock Bearings, Check Clearances WORK ITEM 49: Rudder, Inspect And Repair WORK ITEM 50: Thruster Units (Bow And Stern), Overhaul WORK ITEM 51: Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test WORK ITEM 52: Anchor Windlass, Inspect and Service WORK ITEM 53: Anchor Chains and Ground Tackle, Inspect and Repair WORK ITEM 54: Hull Fittings (Mooring and Towing), Inspect and Test WORK ITEM 55: Welin Lambie Dual Point Davit TWPIV 5.0B, Inspect, Test, and Overhaul WORK ITEM 56: Buoy and Cargo Handling Crane Wire Rope, Renew WORK ITEM 57: Grey Water Holding Tanks, Clean and Inspect WORK ITEM 58: Sewage Holding Tanks, Clean and Inspect WORK ITEM 59: Grey Water Piping, Clean and Flush WORK ITEM 60: Sewage Piping, Clean and Flush WORK ITEM 61: Tanks, Grey Water Holding, Preserve, Partial WORK ITEM 62: Tanks (Sewage Holding), Preserve, 100 percent WORK ITEM 63: Tanks (Sewage Holding), Preserve, Partial WORK ITEM 64: Accessible Voids, Preserve, 100 Percent WORK ITEM 65: Tanks, Ballast, Preserve, 100 Percent WORK ITEM 66: Tanks, Ballast, Preserve, Partial WORK ITEM 67: Chain Locker, Preserve, 100 Percent WORK ITEM 68: Chain Lockers, Preserve, Partial WORK ITEM 69: Accessible Void(s), Preserve, Partial, WORK ITEM 70: Tanks, Potable Water Preserve, 100 Percent WORK ITEM 71: Tanks, Potable Water, Preserve, Partial, WORK ITEM 72: Decks – Exterior (Buoy or Construction Deck), Preserve 100% WORK ITEM 73: Hull Plating Freeboard (Buoy Port Areas), Preserve WORK ITEM 74: Superstructure, Preserve, Partial WORK ITEM 75: Cathodic Protection, Zinc Anodes, Renew, WORK ITEM 76: Impressed Current Cathodic Protection System, Inspect and Maintain WORK ITEM 77: Impressed Current, Cathodic Protection System, Reference Cells, Renew WORK ITEM 78: Drydock WORK ITEM 79: Temporary Services, Provide - Cutter WORK ITEM 80: Sea Trial Performance, Support, Provide WORK ITEM 81: Potable Water Pump Room Deck, Preserve WORK ITEM 82: Machinery Exhaust Stack Insulation, Renew WORK ITEM 83: Upgrade HVAC System WORK ITEM 84: Independent NACE Inspector (Level 3), Provide WORK ITEM 85: Ventilation, Galley Pre-Heater, Renew WORK ITEM 86: Deck Covering (Interior Wet/Dry), Renew

WORK ITEM 87: ESCAPE TRUNK, PRESERVE AND REPAIR

WORK ITEM 88: Firemain (Supply) Piping, Renew WORK ITEM 89: Firemain (MMR) Piping, Renew WORK ITEM 90: Boat Deck, Port and Starboard, Removable Lifeline Latches, Modify WORK ITEM 91: Tenting, Provide iv (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

v (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 225 WLB 184-001, Rev B, CRP-V850 Transducer Adapter Ring

Coast Guard Drawing 225 WLB 256-001, Rev P, Seawater Cooling System Diagram

Coast Guard Drawing 225 WLB 259-005, Rev C, Combustion Intake & Exhaust A&D Hull Block 940

Coast Guard Drawing 225 WLB 581-001, Rev E, Anchor Handling System Arrangement

Coast Guard Drawing 225 WLB 601-001, Rev M; General Arrangement Inboard & Outboard Profiles

Coast Guard Drawing 225 WLB 801-020, Rev B, Tank CAPACITY - 95% Curves

Coast Guard Drawing 225B 910-001, Rev E, Hull Block 910, Panels

Coast Guard Drawing 225B WLB 114-001, Rev C, Shell Appendages

Coast Guard Drawing 225B WLB 114-002, Rev -, Flow Accelerating Fin

Coast Guard Drawing 225B WLB 541-007, Rev D; Incinerator Fuel Oil Service Tank

Coast Guard Drawing 225B WLB 801-006, Rev G, Docking Drawing

Coast Guard Drawing 225B WLB 111-001, Rev A, Shell Expansion

Coast Guard Drawing 225B WLB 114-001, Rev C; Shell Appendages

Coast Guard Drawing 225B WLB 180-002, Rev E, Foundations, Block 910

Coast Guard Drawing 225B WLB 201-001, Rev D, Machinery Spaces Arrangement

Coast Guard Drawing 225B WLB 243-001, Rev J, Propulsion Shafting Arrangement

Coast Guard Drawing 225B WLB 243-002, Rev G, Stern Tube and Bearings A&D

Coast Guard Drawing 225B WLB 256-001, Rev P, Seawater Cooling System Diagram

Coast Guard Drawing 225B WLB 259-001, Rev D, Combustion Intake & Exhaust Diagram

Coast Guard Drawing 225B WLB 259-005, Rev C, Combustion Intake & Exhaust A&D Hull Block 940

Coast Guard Drawing 225B WLB 259-006, Rev D, Combustion Intake & Exhaust A&D Hull Blocks 970 & 975

Coast Guard Drawing 225B WLB 508-001, Rev A, Thermal Insulation for Mchry, Equipment and Piping

Coast Guard Drawing 225B WLB 512-001, Rev K, HVAC Diagram

Coast Guard Drawing 225B WLB 512-007, Rev B, HVAC A&D, Fr 66-92, Innerbttm & 1st Platform

Coast Guard Drawing 225B WLB 512-1, Rev K, HVAC Diagram

Coast Guard Drawing 225B WLB 521-001, Rev E, Firemain System Diagram

Coast Guard Drawing 225B WLB 521-005, Rev D, Firemain System A/D, FR 66 FWD, Block 901, 910, 920, 930 vi (Rev-0)

Coast Guard Drawing 225B WLB 521-006, Rev C, Firemain System A/D, FR 66 AFT, Block 940, 950

Coast Guard Drawing 225B WLB 528-001, Rev G, Plumbing and Interior Deck Drains

Coast Guard Drawing 225B WLB 532-002, Rev D, Potable Water Sys Dia

Coast Guard Drawing 225B WLB 541-001, Rev J, Fuel Oil System Diagram

Coast Guard Drawing 225B WLB 551-001, Rev G, Compressed Air System Diagram

Coast Guard Drawing 225B WLB 555-005, Rev D, CO2 System A/D, Fr 48 Aft, Block 930, 940, 950, 960A

Coast Guard Drawing 225B WLB 555-006, Rev A, CO2 System, A/D, Flammable Liquid Storeroom, Blk 901, 910

Coast Guard Drawing 225B WLB 555-007, Rev B, CO2 System, A/D, Emergency Generator Rm, Block

Coast Guard Drawing 225B WLB 556-001, Rev F, Hydraulic System Diagram

Coast Guard Drawing 225B WLB 562-002, Rev D, Rudder Structural A&D

Coast Guard Drawing 225B WLB 573-11, Rev G, ATON Tie Downs

Coast Guard Drawing 225B WLB 581-001 Rev C, Anchor Handling System Arrangement

Coast Guard Drawing 225B WLB 582-001, Rev -, Mooring and Towing A & D

Coast Guard Drawing 225B WLB 593-001, Rev E, Sewage and Waste Water System

Coast Guard Drawing 225B WLB 593-009, Rev B, Sewage Holding Tank

Coast Guard Drawing 225B WLB 601-001, Rev P; General Arrangement Inboard & Outboard Profiles

Coast Guard Drawing 225B WLB 601-002, Rev L, Booklet off General Drawings

Coast Guard Drawing 225B WLB 633-001, Rev B, Cathodic Protection System Arrangement, Block Diagram, Wiring Deck Plan, and Elementary Diagrams

Coast Guard Drawing 225B WLB 633-002, Rev A; Cathodic protection passive

Coast Guard Drawing 225B WLB 635-001, Rev E, Hull, Thermal, & Acoustic Insulation Schedule

Coast Guard Drawing 225B WLB 672-001, Rev C, Storerooms, Cargo Stowage and Ship Store Arrangement and Details

Coast Guard Drawing 225B WLB 801-001, Rev A, Lines and Offsets

Coast Guard Drawing 225B WLB 801-003, Rev -, Curves of Forms and Cross Curves of Stability

Coast Guard Drawing 225B WLB 801-005, Rev A Tank CAPACITY - 95% Curves

Coast Guard Drawing 225B WLB 801-006, Rev G, Docking Drawing

Coast Guard Drawing 225B WLB 901-003, Rev A, Hull Block 901 Block Assembly

Coast Guard Drawing 225B WLB 940-001, Rev E; Hull Block 940 - Modules

Coast Guard Drawing 225B WLB 940-001, Rev E; Hull Block 940 – Panels

Coast Guard Drawing 225B-WLB 243-2, Rev G; Stern Tube and Bearing a & D

Coast Guard Drawing 225B-WLB 568-1, Rev A, Bow Thruster A & D

Coast Guard Drawing 225B-WLB 568-2, Rev A, Stern Thruster Arrangement and Detail

Coast Guard Drawing 225B-WLB 111-001, Rev A, Shell Expansion

Coast Guard Drawing 225B-WLB 233-001, Rev F, Propulsion Train Installation Drawing

Coast Guard Drawing 225B-WLB 243-001, Rev J, Propulsion Shafting Arrangement

Coast Guard Drawing 225B-WLB 243-2, Rev G, Stern Tube and Bearing A & D

Coast Guard Drawing 225B-WLB 512-1, Rev K, HVAC Diagram

Coast Guard Drawing 225B-WLB 512-12, Rev A, HVAC Standard Details and General Instructions vii (Rev-0)

Coast Guard Drawing 225B-WLB 512-2, Rev F, Ventilation Schedule

Coast Guard Drawing 225B-WLB 512-3, Rev B, HVAC A&D FR 05 Thru FR 12 Hull Block 901

Coast Guard Drawing 225B-WLB 512-4, Rev E, HVAC A&D FR 12-30, Hull Block 910

Coast Guard Drawing 225B-WLB 561-003, Rev B; STEERING GEAR ARRANGEMENT

Coast Guard Drawing 225B-WLB 562-001, Rev H; STEERING COMPONENTS A/D

Coast Guard Drawing 225B-WLB 562-002, Rev D; RUDDER - STRUCT A & D

Coast Guard Drawing 225B-WLB 601-001, Rev N, General Arrangements Inboard and

Coast Guard Drawing 225B-WLB 612-001, Rev K, Lifelines, Liferails, and Stanchions

Coast Guard Drawing 225B-WLB 631-02, Rev G, Painting Schedule

Coast Guard Drawing 225B-WLB 633-002, Rev A, Cathodic Protection Passive

Coast Guard Drawing 225B-WLB 801-013, Rev B, Midship Section & Typical Sections

Coast Guard Drawing 225B-WLB 801-016, Rev -, Scantlings, Watertight Bulkheads

Coast Guard Drawing 225B-WLB 801-015, Rev B, Scantling, Decks, & Platforms

Coast Guard Drawing 225B-WLB-185-011, Rev. B, Foundation to suit Chiller Pumps Incidental to MMA

Coast Guard Drawing 225B-WLB-320-019, Rev. E, MMA HVAC System Electrical Power & Control

Coast Guard Drawing 225B-WLB-514-003, Rev. B, MMA Chilled Water System Piping Ripouts to suit Chiller Upgrade

Coast Guard Drawing 225B-WLB-514-008, Rev. -, MMA Chilled Water System Diagram

Coast Guard Drawing 225B-WLB-514-009, Rev. -, MMA Chilled Water System A&D, Below Main Deck

Coast Guard Drawing 225B-WLB-514-010, Rev. -, MMA Chilled Water System A&D, Above Main Deck

Coast Guard Drawing 225B-WLB-514-011, Rev. A, MMA Chilled Water System Operating Instruction Placard

Coast Guard Drawing 225-WLB 568-202, Rev N, Bow & Stern Thruster

Coast Guard Drawing 225-WLB 244-203, Rev E, Stern Tube Split Dovetail Carrier Casting

Coast Guard Drawing 225-WLB 583-052, Rev F, Workboat Davit Installation & Related

Coast Guard Drawing 225-WLB 601-001, Rev AC, General Arrangements Inboard and Outboard Profiles

Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem

Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters

Modifications

NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details

Outboard Profiles

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual

Coast Guard Commandant Instruction (COMDTINST) M9000.6F, Naval Engineering Manual

Coast Guard Drawing 225B WLB 633-001, Rev B, Cathodic Protection System Arrangement, Block Diagram, Wiring Deck Plan, and Elementary Diagrams

Coast Guard Technical Publication (TP) 10512, Section 573-A, July 2018, Buoy Handling Crane – Model

EB600-60-40

Coast Guard Technical Publication (TP) 3498, Section A, Jul 2015, Buoy Chain Winch

Coast Guard Technical Publication (TP) 3518, Oct 2007, MDE Model 3608/1 viii (Rev-0)

Coast Guard Technical Publication (TP) 3523, SWBS 241-B, Nov 2007, Reduction Gear - Model

96DHCMGH-CP

Coast Guard Technical Publication (TP) 3523-241-A&B, 225 WLB MIB, VOL 5, SWBS 241, GEAR, REDUCTION, MMC PN 241-01-01

Coast Guard Technical Publication (TP) 3523-242-A-C, 225 WLB MIB, SWBS 242, Coupling, Torsional, MMC PN 242-01-01 & 242-01-02

Coast Guard Technical Publication (TP) 3524, 2013, Manufacturer’s Instruction Book-SWBS Group(s) 243-262

Coast Guard Technical Publication (TP) 3524, SWBS 245-B, Aug 2005, Instruction Manual for the Model 102 B Class Controllable Pitch Propeller and Shafting System

Coast Guard Technical Publication (TP) 3524, SWBS 245-B, May 2009, Propeller System, CPP - Model 110251007

Coast Guard Technical Publication (TP) 3524-244-A, 225 WLM MIB, SWBS 244-A, Bearing, Line Shaft, MMC PN 244-01-03, TP 244-A

Coast Guard Technical Publication (TP) 3524-245-A&B, 225 WLB, SWBS 245-A & 245-B, Propeller System, CPP, MMC PN 245-01-01,, 0

Coast Guard Technical Publication (TP) 3548, Manufacturer's Instruction Book-SWBS Group(s) 512

Coast Guard Technical Publication (TP) 3556, Manufacturer’s Instruction Book-SWBS Group(s) 568, Bow and Stern Thruster – Model 125/3 STAY/FP

Coast Guard Technical Publication (TP) 3557, Section 573-C, Apr 2010, Buoy Crane – Model EB-480- 60-40

Coast Guard Technical Publication (TP) 3559, SWBS 581B, Anchor Windlass, P/S - Model BMD-478

Coast Guard Technical Publication (TP) 3574, Mar 2009, SWBS Group 633-638

Coast Guard Technical Publication (TP) 3796, Section A, Aug 2006, Galley Hood – Model NBDL-60 (13’-4”)

Fire Prevention and Response

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2020, Overhaul AC Electrical Motors

Surface Forces Logistics Center Standard Specification 3041, (SFLC Std Spec 3041) 2020 Edition, Shipboard Electrical Cable Test

Surface Forces Logistics Center Standard Specification 3042, (SFLC Std Spec 3042) 2020 Edition, Shipboard Electrical Cable Removal, Relocation, Splice, Repair and Installation

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2020, Auxiliary Machine Systems

Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2020, Clean Shipboard Ventilation Systems

Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures ix (Rev-0)

Surface Forces Logistics Center Standard Specification 6341, (SFLC Std Spec 6341) 2020 Edition, Install Interior Deck Covering Systems

Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2020, Drydocking

Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2020, Temporary Services

Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2022, Temporary Hull Accesses

OTHER REFERENCES

The Society for Protective Coatings SSPC-SP 10/NACE No.2, Rev 7; Near-White Blast Cleaning

American Bureau of Shipping (ABS) Approved Chain, Accessory and Bar Manufacturing Facilities List, Oct 2016

American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2019, Disinfection of Water-Storage Facilities

American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System Components - Health Effects

American Society for Testing and Materials (ASTM) International F1508, 2016, Standard Specification for Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services

American Society of Mechanical Engineers (ASME) B16.34, 2017, Valves-Flanged, Threaded, and Welding End

ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets

ASTM International (ASTM) D3359, 2009, Standard Test Methods for Measuring Adhesion by Tape Test

ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means

ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component Adhesives (AN)

ASTM International (ASTM) F683, 2014, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery

ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual

Code of Federal Regulations (CFR) Title 29, Part 1910, Occupational Safety and Health Standards

Code of Federal Regulations (CFR) Title 29, Part 1915, 2022, Occupational Safety and Health Standards for Shipyard Employment

Code of Federal Regulations (CFR) Title 40, Protection of the Environment

Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust- Petrolatum

Commercial Item Description (CID) A-A-59588, 2013, Rubber Silicone

Commercial Item Descriptions (CID) A-A-59323, Rev A; Cloths, Cleaning, Low-Lint

Environmental Protection Agency (EPA) Technician Certification, Type IV (Universal Certification)

Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert

Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections

Federal Specification (Fed Spec) RR-C-271, Rev E, Mar 2016, Chains and Attachments, Carbon and Alloy Steel x (Rev-0)

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2019 Edition, Pressure Testing Of Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2017 Edition, Butterfly Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2018 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service

Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2019 Edition, Bronze Gate, Globe, Angle and Check Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2018, Pipe Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation

MIL PRF-16173, Sep 2006, Corrosion Preventive Compound, Solvent Cutback, Cold-Application

MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418)

MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning

MIL-C-24633, Oct 2014, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded

MIL-DTL-15024, General Specification for Plates, Tags, and Bands for Identification of Equipment

MIL-DTL-23549, Sep 2016, Grease, General Purpose

MIL-DTL-24244, May 2000, Insulation Material, With Special Corrosion, Chloride, and Fluoride Requirements

MIL-DTL-24643, General Specification for Low Smoke Electric Cables and Cords for Shipboard Use

MIL-DTL-32585, July 2021, Insulation, Thermal and Acoustic, Fiberglass

MIL-I-2781, Aug 2020, Insulation; Pipe, Thermal

MIL-PRF-16173, Sep 2006, Corrosion Preventive Compound, Solvent Cutback, Cold-Application

MIL-PRF-24647, Jan 2018, Paint System, Anticorrosive and Antifouling, Ship Hull

MIL-S-22473 , Rev E(8); Sealing, Locking, and Retaining Compounds: (Single Component), 01/21/04

MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant

MIL-STD-2003, Electric Plant Installation Standard Methods (Section 1: Cable)

MIL-STD-2003, Electric Plant Installation Standard Methods (Section 2: Equipment)

MIL-STD-2003, Electric Plant Installation Standard Methods (Section 3: Penetrations)

MIL-STD-2003, Electric Plant Installation Standard Methods (Section 4: Cableways)

MIL-Y-1140, Sep 1985, Yarn, Cord, Sleeving, Cloth, And Tape- Glass

Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA- PRO-160, Nov 2011, Chapter 16, Cofferdams

NAVSEA Drawing 803-1385866, Rev E, Penetration, Bulkhead and Deck

NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation for Compartments Installation Details

NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

ODOM Echotrac DF3200 MKII, Rev 2, Technical Manual

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2019, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2014, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric

Society of Automotive Engineers (SAE) AMS-G-6032, August 2012, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric xi (Rev-0)

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2016, Solvent Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 16 (SSPC-SP 16), 2010, Brush-Off Blast Cleaning of Coated and Uncoated Galvanized Steel, Stainless Steels, and Non-Ferrous Metals

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power-Tool Cleaning to Bare Metal

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), Power Tool Cleaning)

The Society for Protective Coatings (SSPC), Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by Water jetting Prior to Recoating

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 6/NACE No. 3, 2007, Commercial Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 7/NACE No.4, 2007, Brush-Off Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-4/NACE WJ-4, 2012, Waterjet Cleaning of Metals – Light Cleaning

The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Metal Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No. SSPC-SP 12/NACE No.5, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting Prior to Recoating xii (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

25 N 225' WLB Major

Overhaul Kit NSN: 5330-01-520-5284 1 ea. 35,249.00

25 N **225' WLB Seat (Split)

NSN: 5330-01-645-3665 1 ea. 12,500.00

25 Y *Seal Compression Tool

Onboard Tool 1 ea. 200.00

29 N Stat-O-Seal Washers NSN: 5310-01-212-5987 PN:

0-4-3-5

12 ea. 55.61

29 N O-Ring, Hub Flange Bolt Cover

NSN: 5331-00-983-9878 PN:

0-2-2-5

12 ea. 50.00

30 Y **Blade Bolts NSN: 5306-01-410-6893 4 ea. 1,854.12 30 N Blade Bolt O-rings NSN: 5330-01-408-7251 (0-3-

2-11) 48 ea. 2.25

30 N Blade Seal NSN: 5331-01-623-0621 (2-

472 KA174-75)

4 ea. 55.00

30 Y *Lifting Device, Propeller Blade

NSN: 2020-01-F02-6825 1 ea. 100.00

35 N *** Fathometer Transducer, shallow water, 50-200 kHz

(Airmar Technology

SS505)

NSN: 5845-01-518-7231 PN:

SS505

2 ea. 343.63

35 Y ***Fathometer Transducer, Deep

Water, 24kHZ

NSN: 5845-01-496-9770 PN:

TH28/20-41-516CG

1 ea. $7,709.21

50 N Seal Kit, Thruster NSN: 2010-01-555-9048 2 ea. 4376.00 50 N Anode, Zinc NSN: 5365-01-495-5350 18 ea. 113.75 50 N **Seal Spacer

(B125SM44178)

NSN: 2010-01-495-6823 2 ea. 700.00

50 N **Shaft Sleeve NSN: 2010-01-495-2638 2 ea. 5702.40 55 N 4 Year Davit In-Place

Overhaul Kit

NSN: 3950-01-F18-5354 PN:

892-02053 1 ea. 124,229.92

55 N Hook, Release, Boat Davit

NSN: 4030-01-467-1005 PN:

APR-356-CBH

2 ea. 4,340.00

56 N Main Fall Wire Rope NSN: 4010-01-486-0047 PN:

JWCG13001919PL

1 ea. 3,000.00

56 N Aux Fall Wire Rope NSN: 4010-01-594-2228 PN:

JWCG75200637PL

1 ea. 1.200.00

77 N Reference electrode, silver & silver chloride

Siemens Water Technologies

NSN: 5977-01-346-0750 2 ea. 1,300.02 xiii (Rev-0)

W3T105012 (Electrocatalytic

32622) 78 Y *Transducer Cover

Plate N/A 4 ea. 50.00

85 N INDEECO Heater* PN:

0106-

512-01- D24

TFZU

85 N 830U *Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center xiv (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item

Title

3 Hull Plating, U/W Body, Ultrasonic Testing

4 U/W Body, Preserve, 100 percent

10 Appendages, U/W, Leak Test

13 Chain Lockers, Clean and Inspect

14 Tanks, MP Fuel Stowage and Overflow, Clean and Inspect

15 Voids (Accessible, Weather Deck Exposed), Inspect

16 Voids, Non-Accessible, Leak Test

18 Tanks, MP Fuel Service, Clean and Inspect

22 Tanks, Ballast, Clean and Inspect

25 Propulsion Shaft Seals, Mechanical Overhaul And Inflatable Renewal

28 Controllable Pitch Propellers, Clean and Inspect

29 Controllable Pitch Propeller, System Maintenance, Perform

30 Controllable Pitch Propeller Hub, General Maintenance, Perform

42 Sea Strainers, Simplex, All Sizes, Clean and Inspect

48 Rudder Stock Bearings, Check Clearances

49 Rudder, Inspect And Repair

52 Anchor Windlass, Inspect and Service

53 Anchor Chains and Ground Tackle, Inspect and Repair

55 Welin Lambie Dual Point Davit TWPIV 5.0B, Inspect, Test, and Overhaul

57 Buoy Crane, Appleton EB600-60-40, Inspect and Service

65 Accessible Voids, Preserve, 100 Percent xv (Rev-0)

70 Accessible Void(s), Preserve, Partial, 77 Impressed Current Cathodic Protection System, Inspect and Maintain

79 Drydock

82 Potable Water Pump Room Deck, Preserve

83 Machinery Exhaust Stack Insulation, Renew

84 Upgrade HVAC System xvi (Rev-0)

PRINCIPAL CHARACTERISTICS

225' WLB (B-CLASS)

PHYSICAL

Length overall 225' 0" Length between perpendiculars 206' 0" Maximum beam 46' Designed draft 13' 0" Full load displacement 1905.6 Long Tons SW Light ship displacement 1500.7 Long Tons SW Minimum operating displacement 1869.2 Long Tons SW Mast height (above 12' waterline) 67' 5" Anchor Two 4000 lb standard Navy stockless anchors, 10 shots each, port and starboard, 1-1/4 die lock chain

HULL

Bilge keels (port & starboard) Frames 42-79 Frame spacing FR 0 to 12 21" FR 12 to 30 22" FR 30 to 102 24"

MACHINERY

Main propulsion Diesel Reduction Diesel engines Two Caterpillar 3608, TA, 3100 BHP each @ 900 RPM Number of propellers 1 Number of blades 4 Diameter 10' Pitch Controllable

RPM 254

Ship's service diesel generators Two Caterpillar 3508 TA, 450 KW Emergency diesel generator One Caterpillar 3406 DITA, 280 KW Shore tie Two 450 VAC, 400 Amp, 3-wire Shaft bearing, forward Cooper Bearing 01-BCP-1400-EX-TL Shaft bearing, aft Water Lubricated Cutless Bearing

TANK CAPACITIES

Diesel oil 76,498 gal.

Fresh water capacity 8056 gal.

Hydraulic oil capacity 2785 gal.

Lube oil storage 764 gal.

Grey water tank 2700 gal.

Sewage holding tank 1700 gal.

1 (Rev-0)

00000_0522_FLT

REC_00000_FLT_Commercial Project @ Contractor’ Facility (0121)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response

Fire Prevention and Response

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

OTHER REFERENCES

Code of Federal Regulations (CFR) Title 29, Part 1915, 2022, Occupational Safety and Health Standards for Shipyard Employment

NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

2 (Rev-0)

3. REQUIREMENTS

3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.1.1 The Contractor must conform to all requirements specified in SFLC Std Spec 5550 and in the Fire Protection and Response work item, as applicable, during the performance of this availability.

3.1.1.1 Fire Safety Plan submission. The Contractor must submit a copy of the CFR 1915, Subpart P, Fire Safety Plan with the Contractor’s bid when work will be conducted in a Contractor–owned facility. Include any MOA(s) with local firefighting facilities.

3.1.1.2 Fire Plan submission. The Contractor must submit a copy of the developed availability specific fire plan, as requested in the Fire Protection and Response work item, seven (7) days before the Arrival Conference.

NOTE

NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents.

Contractors can apply to NAVSEA headquarters directly for copies.

3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and equipment.

3.2 Fire watch requirements. The Contractor must refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:

Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.

Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.

3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).

3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.

3 (Rev-0)

3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.

Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:

ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.

ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.

3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.

For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).

3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;

for each additional 1000 square feet, perform an additional area measurement. A “measurements” for coating thickness is defined as follows:

SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.

SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must be moved to a new location within a 1.5 inch diameter circle defining the spot.

3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3.4.1 HY-130 material substitution. The Contractor must be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B- Class” cutters, Weldox 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Weldox 900, all welding procedures and welder qualifications for welding Weldox 900 must be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY- 130.

3.4.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-Class” cutters, perform all welding and allied processes, and non-destructive evaluation (NDE) in accordance with NAVSEA TP 1688. The Contractor must be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.

3.4.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B- Class” cutters, the Contractor must provide written Performance Qualification Records (PQR’s) for each process to be used. The PQR’s must be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor must ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.

NOTE

NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding Weldox 900 are considered the same as those for welding HY-130.

4 (Rev-0)

3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 Contractor operated (non USCG) facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.

3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out;

ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.

3.6 Local Policy. The Contractor must refer to site (e.g. Base) Regulations and Instructions for details regarding local policies (e.g. crane services, parking, or facility usage).

5 (Rev-0)

3.7 SFLC Standard Specification approved changes. The Contractor must be aware that the following are approved changes to published SFLC 2020 Edition Standard Specifications and supersede published content:

3.7.1 SFLC Standard Specification 8636. Add missing paragraphs between 3.2 and 3.5 of Std Spec 8636 as follows:

“3.3 Access cut boundaries. The Contractor shall ensure that access cuts comply with the requirements and restrictions detailed in the following and in SFLC Std Spec 0740, and referenced codes.

3.3.1 Location of boundaries. Boundaries of access cuts and closure plates shall, in general, be located between principal ship framing, bulkheads, and other structural members and shall be at least three inches from any of these members or from the toes of other welds. A reduction in this three inch minimum may be approved by the KO on a case by case basis provided sufficient clearance is maintained for welding and inspection requirements. The boundaries of access cuts and closure plates should land on existing butts or seams, wherever practicable. The boundaries of prior access cuts should be utilized wherever possible. Boundaries may extend across one or more frames as required for the size of the opening.

3.3.2 Access hole dimensions and arrangements. Holes or access cuts shall be the minimum size necessary and shall be in accordance with the following:

Rectangular access cuts and closure plates welded into primary hull structure shall be at least 12 inches wide in the lesser dimension.

For circular access cuts, the minimum diameter shall be 4T, where T = thickness of the involved structural member, but not less than three inches.

Circular closure plates for access cuts less than two feet in diameter shall be dished 1/16 to 1/8 inch to allow for shrinkage when welded.

Corners of rectangular access cuts and closure plates shall have a minimum radius of 6 inches except when a boundary lands on an existing hull longitudinal seam or transverse butt weld.

Corners at an existing seam or butt shall intersect at a 90 degree angle.

Cuts that are to cross existing butts or seams shall do so at an angle of 90 degrees plus or minus 15 degrees.

In primary hull structure, existing welds forming the boundary of a cut shall be cut back 3 inches beyond the toe of the access cut, except that the cut back shall not intersect or cross an existing weld, frame, or structural member. In which case, the cut back may be reduced to a minimum of two inches in length.

Existing welds crossed by the cut shall not be cut back.

3.3.3 Primary hull structure. Primary Hull Structure includes the shell, main strength decks, principal longitudinal bulkheads, vertical keel, deep web girders and stiffeners designed to withstand the ship bending stress.

3.3.4 Mechanically fastened joints. Welding closer than six inches to a mechanically fastened joint should be avoided. When access cuts cross or come within six inches of a mechanically fastened joint, the fasteners shall be checked for tightness and if necessary, 6 (Rev-0) loose fasteners shall be seal welded or removed, and replaced for a distance of 6 inches beyond the edge of the cut. When a cut crosses a mechanically fastened seam the cut plates shall be repaired using single V welds backed with glass tape (MIL-C-20079) to prevent fusion between the mechanically fastened plates.

3.4 Ship integrity maintenance. The Contractor shall maintain safety and ship integrity by installing temporary guarding and coaming, in addition to weathertight and watertight closures. Remove these temporary fabrications after closing the hull access, and grind surfaces flush in way of removals. For shell plating cuts made at or below the waterline where temporary closures are impractical, the Contractor shall secure each vulnerable compartment and subdivision to minimize potential damage to the extent permitted by the scope and urgency of the work.

3.4.1 Guarding. Install temporary guards in accordance with 29 CFR 1915.73.

3.4.2 Coaming. Ensure that in areas where flammable liquids may be stored, a 4 inch high metal coaming shall be installed on the surface of the deck with tack welds and fully sealed with caulking compound. The coaming shall encircle the access cut in the deck.

3.4.3 Weathertight and contamination closures. Fabricate temporary closures, using fire retardant material, before cutting access openings and install closures whenever access is not in use. Closures shall be:

Constructed to protect the access from inclement weather and entry of contaminants (shall include a coaming or dam on the deck to redirect rain runoff away from the opening).

Fitted with fasteners that permit rapid installation and removal.

Able to support a minimum of 150 pounds per square foot for horizontal deck closures.

Where the access opening is in way of a removed hatch, scuttle or door, the closure shall be configured to allow normal passage of ship’s personnel and equipment.

3.4.4 Watertight closures. Ensure that access openings created four feet or less above the maximum anticipated waterline shall include temporary watertight closures when the vessel is waterborne.

NOTE

NAVSEA S0600-AA-PRO-160/CH16 provides requirements for design, fabrication, and installation of temporary watertight closures.”

3.7.2 SFLC Standard Specification 0000. Replace paragraph 3.3.4 Vessel access, as follows:

"3.3.4 Vessel access. During work at the Contractor’s facility, provide access and/or egress to and from the vessel in accordance with 29 CFR 1915.74, Subpart E. Provide a minimum of two gangways that have the following:

Adequate walking surface width and strength and be safely secured.

A railing, with a mid-rail, on each side of the gangway, and a turn table if necessary.

Substantial steps properly secured and equipped with at least one handrail, 7 (Rev-0) when the upper end of the gangway rests on or is flush with the top of the bulwark of the dock.

Nets or other suitable protection on both sides, when there is a danger of personnel falling between the ship and the dock. Nets and other suitable protection must extend beyond the projected area of the access and egress points so as to catch a personnel that may be falling outward: i.e., the nets must be wider than the gangway.

Proper trimming at all times.

Adequate…