Attachment 2 - TRD (18 Aug 21).pdf

PDF 36 KB Posted

Attached to
SPAN Systems
Solicitation number
FA282321Q0031
Issued by

About this file

This technical requirements document outlines specifications for GPS/INS systems required by the Air Force Research Laboratory at Wright-Patterson Air Force Base. The Air Force requires two Novatel SPAN HG1900 systems, two HG1700 systems, and one HG9900 IMU, all with L1/L2 capability and 20Hz output. A PwrPak7 single antenna enclosure is also required, compatible with GPS, GLONASS, Galileo, supporting RTK, PPP, and other PNT functions with a 20Hz data output rate and base station corrections. Accompanying cables and other listed parts must also be provided. Delivery of all items is required within 120 days after receipt of order. Responses to the related solicitation should include a completed quote, reps and certs, and any questions submitted in writing to the identified contracting officer by the response deadline.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 96TH TEST WING (AFMC)

EGLIN AIR FORCE BASE, FLORIDA

MEMORANDUM FOR AFTC/PZIOA 18 August 2021

FROM: AFRL/RWWN

SUBJECT: Technical Requirements Document for GPS/INS Systems

1. The AFRL/RWWN has a requirement to purchase Novatel SPAN GPS/INS systems conforming to the specifications of the Novatel OEM 7 SPAN system and must meet all of the following requirements:

a. Two HG1900 Honeywell IMUs

b. Two HG1700 Honeywell IMUs

c. One HG9900 IMU

d. The OEM7 SPAN for the HG1900 and HG1700 IMUs must have L1/L2 capability with

20Hz

e. PwrPak7 single antenna enclosure containing OEM7 meeting the following requirements:

i. GPS, Glonass, Galileo capable

ii. L1/L2/ capable

iii. RTK, PPP, Single Point, DGPS PNT

iv. Align relative positioning

v. 20Hz data output rate

vi. Base Station Corrections plus measurements

vii. Sprinkler, Interference Mitigation and spoofing detection

f. And all associated cables

2. List of Materials

Part Number Quantity

OEM-IMU-HG9900-C1A 1

OEM-IMU-HG9900-UIC 1

OEM729-GDN-RNN-TBN-P2 4

OEM-IMU-HG1700-H58 2

OEM-IMU-HG1700-SDLC 2

OEM-IMU-HG1900-CA50 2

OEM-IMU-HG1900-SDLC 2

PW7700-FFN-RYN-TBF-S4-AH 1

01020004 1

01020005 1

3. Delivery 120 Days ARO.

File details come from the government source that posted it. Updated .