Attachment 2 - Tool Room Layout and Measurements.pdf

PDF 169 KB Posted

Attached to
Tool Room Refresh Federal contract opportunity
Solicitation number
FA461321Q1019
Issued by
Department of the Air Force Global Strike Command

View the file

Other files for this federal contract opportunity

Other files attached to Tool Room Refresh, newest first.
File Type Posted
Attachment 5 - Sample Shelving System.pdf PDF
Attachment 1 - Statement of Objectives (SOO).pdf PDF
Attachment 3 - Tool Room Site Pictures.pdf PDF
Attachment 4- Applicable Clauses and Provisions.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

17’ 7.25”

6’6.5”

5’1”

17’3”

6’6.5” 8’6”

Bldg 4331 Tool Room Dimesions/Measurements of hindering items (not to scale) N

S

W E

Attachment 2 - Tool Room Layout and Measurements

1. electrical boxes 9.5" W from wall 3'6" from the floor

2. Floating air compressor, 6'11" from ground

3. Red line is grounding bar that stands 3' from the ground and 3.25" from wall.

4. Fire alarm 1' 4" from door alcove

5. Air duct, 1'7" wide, 1'10" L, 6'.5" off ground. 6" 7 1/4" from east wall. Slants upwards after 1' 10“

6. Cable reel 6' 2" from ground, is 1'7" L, 1'W, 1'1.5" H. Pnuematic reel 8' 3

11/16" to wall bracket 8'6" to reel.

File details come from the government source that posted it. Updated .