Attachment 2 - submitall cold zone.pdf
PDF 114 KB Posted
- Attached to
- Replace Dining Facility Condensing Unit Bldg. 16 P. R ANG Federal contract opportunity
- Solicitation number
- W50S9324QA011
- Issued by
- Department of the Army National Guard
About this file
This document is a combined synopsis/solicitation for a commercial item. The Puerto Rico Air National Guard has a requirement to furnish and install a new refrigeration equipment condensing unit on Building 16 at the Muniz Air National Guard Base in Carolina, Puerto Rico.
The solicitation seeks quotes from licensed, qualified, and experienced vendors to provide the refrigeration equipment, labor, and materials to replace the existing inoperative unit. The condensing unit must be Buy American Act compliant. The contract will be a firm-fixed price award under Simplified Acquisition Procedures. Quotes are due by September 13, 2023 at 11:00 AM EST. A site visit is scheduled for August 28, 2023 at 9:00 AM EST. The contract performance period is 30 days after award. Award will be made to the lowest priced, technically acceptable quote.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1. SOW TUMR 232118 Replace Dining Facility Condensing Unit Bldg. 16 UPDATE Sep 05 2024 v2.pdf | ||
| DD 369 2019.pdf | ||
| 1. SOW TUMR 232118 Replace Dining Facility Condensing Unit Bldg. 16.pdf | ||
| Solicitation - W50S9324QA011.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOP VIEW
FRONT VIEWLEFT SIDE VIEW
REFRIGERATION RACK OUTLINE DRAWING
R-1 A
MINI-PAK MODEL: MPL-2
SECTION A-A
3/4" PLYWOOD
HAT SECTION
20 GA. GALV.
CANT
2" X 6" WOOD (TYP.)
APPROX. 12" OCROOF LINE
G.C. NOTES
1-PLATFORM TO BE INSTALLED LEVEL.
2-PROVIDE SHEETMETAL HAT SECTION WITH WATER TIGHT
SOLDERED JOINTS.
3-BACK FILL OPENING WITH HOT PITCH AFTER INSTALLATION.
FRONT OF UNIT
MINI-PAK
6" 6"
4"
12"
15"
REFRIGERANT LINE SEQUENCE FACING UNIT
A B
FUSED DISCONNECT
BY COLDZONE
POWER FEEDER
CONDUIT
PLATFORM
(BY G.C)REFRIGERANT LINES (TYP.)
FINISHED ROOF
90"
38 1/2"
44"
2"
PLATFORM BY G.C.
72"
6" X 15" X 6" HIGH CURB
OPENING FOR ELECTRICAL
AND REFRIGERATION LINES
BY GENERAL CONTRACTOR.
ELECTRICAL/REFRIGERANT
R-1 B
LINE INSTALLATION
SUGGESTED ROOF PAD DETAIL
R-1 C
A
A
36-3/4
NOTES:
1. UNIT WEIGHT 584 LBS.
2. INSTALLATION CLEARANCE REQUIRES 3 FT. ON ALL SIDES.
U R L
MEA
CONTROL PANEL
38 1/2
1 1/4 1 1/436 master dwg revised 12APR22 (RG)
Project Name and Address
NOT DRAWN TO SCALE
DRAWN BY
DATE
DRAWING NUMBER
SHEET NUMBER
JOB NUMBER
DESCRIPTION
INITIAL RELEASE
DATE
GENERAL NOTES
HTPG
THE INFORMATION DISCLOSED HEREIN WAS
ORIGINATED BY AND IS THE PROPERTY OF
COLDZONE AND EXCEPT FOR RIGHTS
EXPRESSLY GRANTED TO THE CUSTOMER,
COLDZONE RESERVES ALL PATENT,
PROPERTY, DESIGN, USE, SALE,
MANUFACTURING AND REPRODUCTION
RIGHTS THERETO.
REFRIGERATION PIPE SIZES ARE
BASED ON A MAXIMUM LINE RUN
OF 100 EQUIVALENT FEET FOR
LIQUID AND SUCTION LINES. THIS
INCLUDES AN ALLOWANCE OF 45
EQUIVALENT FEET FOR VERTICAL
RISERS. LINE RUNS LONGER THAN
100 EQUIVALENT FEET MAY VOID
THE LINE SIZES INDICATED ON
OUR SUBMITTAL DRAWING
IT IS THE INSTALLING
CONTRACTORS RESPONSIBILITY
TO FOLLOW ALL APPLICABLE
CODES AND CURRENT
REFRIGERATION INDUSTRY
STANDARDS AND PRACTICES
WHEN DETERMINING LINE SIZES,
AND INSTALLING AND STARTING
UP COLDZONE EQUIPMENT
EVAPORATOR AND PIPING
SERVICE / ISOLATION VALVES ARE
RECOMMENDED FOR PARALLEL
AND MULTIPLEX SYSTEMS. THESE
VALVES ARE TO BE SUPPLIED AND
INSTALLED BY THE INSTALLING
CONTRACTOR
ONTARIO, CA 91761
1810 VINEYARD AVE. (800)772-2653
(714)529-8503 FAX
PUERTO RICO
SAN JUAN, PUERTO RICO
22047
3/13/23
RG
R-1
NATIONAL GUARD
AIR FORCE
Puerto Rico Air Force National Guard Repl.xls
23-0249
3/13/230
REV
ENGINEERING GUIDE TO SPECIFICATION
FOR REMOTE REFRIGERATION PACKAGE
MINI-PAK REFRIGERATION SYSTEM
THE REFRIGERATION PACKAGE SHALL BE A PRE-ENGINEERED AND FACTORY ASSEMBLED UNIT, TRADE NAME "MINI-PAK", AS MANUFACTURED BY COLDZONE, A DIVISION OF HEAT TRANSFER PRODUCTS GROUP, 1810 VINEYARD AVE. ONTARIO, CA 91761.
PHONE: (800) 772-2653, FAX: (714) 529-8503.
CONTRACTOR SHALL FURNISH AND INSTALL, WHERE SHOWN ON PLANS, (1) COLDZONE U.L. APPROVED "MINI-PAK".
1. MINI-PAK REFRIGERATION SYSTEM
THE ENTIRE UNIT IS TO BE WEATHER-PROOFED AND MINIMUM OF TWO COATS OF PAINT SHALL BE APPLIED TO MAKE THE UNIT RUST-PROOF. THE UNIT SHALL BE PROVIDED WITH MULTI-CIRCUITED AIR-COOLED CONDENSER FOR COOLER, FREEZER AND ICE MACHINES. SUCTION LINE FOR LOW TEMPERATURE UNIT MUST BE INSULATED WITH ARMAFLEX.
2. REFRIGERATION UNITS
A. CRANKCASE HEATER SHALL BE PROVIDED WITH EVERY COMPRESSOR.
B. AIR-COOLED CONDENSING UNITS SHALL BE SEMI-HERMETIC, HERMETIC OR GLACIER SCROLL TYPE (COPELAND). EACH UNIT
SHALL BE EQUIPPED WITH HIGH-LOW PRESSURE CONTROL, LIQUID LINE DRIER, SIGHT GLASS, SUCTION AND DISCHARGE
VIBRATION ELIMINATOR, AND HEAD PRESSURE CONTROL.
C. ALL COMPRESSOR UNITS SHALL BE NEW AND FACTORY ASSEMBLED TO OPERATE WITH THE REFRIGERANT SPECIFIED IN
THE ENGINEERING SUMMARY SHEET.
3. PRE-PIPING
A. ALL COPPER TUBING TO BE REFRIGERANT GRADE A.C.R. OR TYPE "L".
B. ALL TUBING SHALL BE SECURELY SUPPORTED AND ANCHORED WITH CLAMPS.
C. ALL REFRIGERANT LINES SHALL BE EXTENDED TO ONE SIDE OF THE PACKAGE IN A NEAT AND ORDERLY MANNER.
D. SILVER SOLDER AND/OR SIL-FOS SHALL BE USED FOR ALL REFRIGERANT PIPING. SOFT SOLDER IS NOT ACCEPTABLE.
E. ALL PIPING TO BE PRESSURE TESTED WITH NITROGEN AT 300 PSI. AFTER THE CONDENSING UNIT AND COIL HAVE BEEN
CONNECTED, THE BALANCE OF THE SYSTEM SHALL BE LEAK TESTED WITH ALL VALVES OPEN.
4. CONTROL PANEL
A. THE PACKAGE SHALL HAVE FACTORY MOUNTED AND PRE-WIRED CONTROL PANEL COMPLETE WITH INTERLOCKED MAIN
FUSED DISCONNECT, COMPRESSOR CIRCUIT BREAKERS, CONTACTORS AND TIME CLOCKS WIRED FOR SINGLE POINT
POWER CONNECTION.
B. ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL MAIN POWER LINES TO PANEL, AND USE WIRE HARNESS WIRING FOR CONTROL AND DEFROST HEATER BETWEEN THE DEFROST CLOCK AND THE REFRIGERATION FIXTURES, ALL IN
ACCORDANCE WITH THE WIRING DIAGRAM AND LOCAL CODES.
GENERAL NOTES
1. GENERAL CONTRACTOR
A. CONTRACTORS SHALL VERIFY ALL DIMENSIONS AND COORDINATE WITH OTHER TRADES.
B. GENERAL CONTRACTOR SHALL PREPARE AND WEATHERPROOFING THE PLATFORM AND CURBED OPENINGS.
2. REFRIGERATION CONTRACTOR
A. THE COMPLETE SYSTEM SHALL BE EVACUATED WITH VACUUM PUMP.
B. ALL COPPER TUBING TO BE REFRIGERANT GRADE A.C.R. OR TYPE "L".
C. CHARGE, TEST, AND ADJUST EACH UNIT TO BE IN AN OPERATIONAL SYSTEM.
D. SILVER SOLDER AND/OR SIL-FOS SHALL BE USED FOR ALL REFRIGERANT PIPING. SOFT SOLDER IS NOT E. ALL PIPING TO BE PRESSURE TESTED WITH NITROGEN AT 300 PSI. AFTER THE CONDENSING UNIT AND COIL HAVE BEEN
CONNECTED, THE BALANCE OF THE SYSTEM SHALL BE LEAK TESTED WITH ALL VALVES OPEN.
F. REFRIGERATION CONTRACTOR TO PROVIDE AND INSTALL DRAIN LINE HEATER IN FREEZER TO BE CONNECTED BY
ELECTRICAL CONTRACTOR
3. ELECTRICAL CONTRACTOR
A. ELECTRICAL CONTRACTOR TO PROVIDE POWER FROM REFRIGERATION PACKAGE AND CONNECT CONTROL AND
DEFROST SYSTEM AS CALLED FOR IN THE WIRING DIAGRAM.
B. ALL ELECTRICAL WIRING AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE WIRING DIAGRAM AND LOCAL CODES.
4. PLUMBING CONTRACTOR
A. PLUMBING CONTRACTOR TO PROVIDE HARD A.C.R. OR TYPE "L" COPPER DRAIN LINES FOR WALK-IN REFRIGERATOR AND
FREEZER, PITCHED 1/4" PER FOOT OF RUN. IN FREEZER, UNHEATED DRAIN LINE MUST BE OUTSIDE OF FREEZER WALL TO PREVENT FREEZING. TRAP DRAIN LINE OUTSIDE OF REFRIGERATED SPACE TO AVOID ENTRANCE OF WARM AND MOIST
AIR.
B. PLUMBING CONTRACTOR TO PROVIDE INDIVIDUAL DRAIN LINE FOR EACH EVAPORATOR UNLESS OTHERWISE CALLED FOR.
C. ALL PLUMBING INSTALLATION SHALL BE IN ACCORDANCE WITH LOCAL CODES.
RLA V PH REMARKS AMP V AMP V PH
A 60B Walk-In Freezer -10 -20 404A ZF11K4E 3.5 10.9 208 3 11.1 DD 1 Existing 1.5 208 14.3 208 1 S 1 1/8 3/8 10.9 FI FI MFR MFR MFR
B 60A Walk-In Cooler 35 25 404A ZS11KAE 1.5 9.3 208 3 10.7 T 1 Existing 1.6 115 S 7/8 3/8 9.3 FI FI MFR MFR MFR
0.8 3.4 208 3 6.8
NOTES:
REFRIGERATION SYSTEM CONDENSER TO HAVE AST COATING TO RETARD SALT AIR DETERIORATION
ALL LOW TEMPERATURE SYSTEMS ARE SUPPLIED WITH SUCTION ACCUMULATORS FACTORY INSTALLED
ALL COMPRESSORS AND CONDENSER CIRCUITS ARE SIZED TO OPERATE AT 95° F AMBIENT
EACH COMPRESSOR SYSTEM IS SUPPLIED WITH A CRANKCASE HEATER AND HEADPRESSURE CONTROL FACTORY INSTALLED
REFRIGERATION SYSTEM INCLUDES A MAIN-FUSED DISCONNECT SWITCH FACTORY INSTALLED
REFRIGERATION PIPE SIZES ARE BASED ON A MAXIMUM LINE RUN OF 100 EQUIVALENT FEET FOR LIQUID AND SUCTION LINES
ENGINEERING SUMMARY
POWER SUPPLY: 208-230V/3PH/60HZ
CONNECTED LOAD = 28.0 AMPS
FUSE SIZE: 40 AMPS
MINIMUM AMPACITY = 30.7 AMPS
COMPRESSORS ** LINE SIZES ACCESSORIESFIXTURES
TO
TA
L U
N
IT
A M
P [R
LA
TS
TA
T
S' N
O
ID
TX
V/
EX
VLI
Q
U
ID
D
IS
C H
C R
AN
KC
AS
E
H
EA
TE
R
H
EA
D P
R
ES
S.
C
TR
L.
FURNISHED BY (SEE
CODE)
C O
LD
SA
VE
R
D R
AI
N
SY
ST
EM
IT
EM DESCRIPTION
TEMP.ºF
R
EF
R
IG
. R
MODEL NO.
SU
C
T.
MFR- FURNISH WITH FIXTURE
FL- CZ TO FURNISH AND SHIP LOOSE
FI- CZ TO FURNISH AND INSTALL ON UNIT
RC- FURNISH AND INSTALL BY REF. CONTRACTOR
(2)CONDENSER FAN MOTORS
H .P
ELECTRICAL
CHARACTERISTIC AT
60 HZ
D
EF
R O
ST
Q U
AN
TI
TY
MODEL NO.
MFR.
R
IS
ERFAN 1PH HEATER
VERIFY LINE SIZES WITH JOB SITE
CONDITIONS
R O
U
TE
SU
C
TI
O
N
FI
XT
M
BH
. A T
ºF
MINI-PAK
RACK
DD-DEMAND DEFROST E-ELECTRIC G-GRAVITY(W/TIMER)
T-AIR DEFROST E^ -DEFROST CLOCK BY FIXTURE MFR
S-SINGLE M-MAIN B-BRANCH **
IDENT
SYSTEM ITEM
NO: 60
EVAPORATOR COILS
D
ER
O
ST
O
PT
IO
N
N O
LEGEND
File details come from the government source that posted it. Updated .